HomeMy WebLinkAboutFDP202100001 Application 2021-03-16a
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phonef434129fi-5832 Fax (434)979-4126
This form is intended to aid the Department in documenting and characterizing the nature of development proposed in the
floodplain. Development includes buildings or other structures, mining, dredging, filling, grading, paving, excavation or
drilling operations or storage of equipment or materials. The form responses will be used to determine whether a
floodplain impact plan or special use permit is required.
Please check one: X New Submittal with no anticipated floodplain impact (no floodplain impact plan)
❑ New Submittal with an anticipated floodplain impact. Please include a floodplain impact
plan. FEE required with submittal: $323 (Code 18-35.1g)
❑ FEMA Letter of Map Change (LOMA, LOMR) Please include a complete copy of all
material to be submitted to FEMA. Include any computer models (HEC-RASf:les) on a disc.
FEE required with submittal: $161 (topographic info only), or $323 (floodplain
modeling)
❑ New Submittal with a Zoning Special Use Permit. Please include a floodplain impact plan.
FEE required with submittal: $323
❑ Resubmittal (Floodplain Development Permit Number ) Please include your
response form from the original submittal. FEE as above required with each resubmittal.
A Floodplain Impact Plan, Special Use Permit, or FEMA Map Change will need to follow Zoning Floodplain Overlay
District requirements (County Code 18-30.3), found at
Section 4 of the Design Standards Manual provides a list of required items to be included in a Floodplain Impact Plan.
This can be found at htip•//www albemarle org/doartment asp?department—=cdd&relpaage=4447.
It Go. LLC
724 Jefferson Mill Lane
Address
Scottsville VA 24590
City State Zip Code
Tax Map & Parcel Number Lot 123-26
Project Name (if applicable) Jefferson Mill hydroelectric Proiect
Building Permit or Project Number (if applicable)
11nrz015
Ahmkd Vv-A SQZc,21
Please describe the nature of the development activity proposed within the floodplain (e.g. new structure, grading for a
playing field, driveway stream crossing, installation of a fence, etc.):
The project proposes to rehabilitate the existing powerhouse with a new turbine and generator. An intake structure that
will divert 20 cfs to 45 cfs (cubic feet per second) of river flow into a 3-ft diameter penstock. After passing through the
turbine, the water will return to the river, just downstream of the dam. The elevation of the dam crest will not change, nor
will the dam's impoundment area. There will be no net increase in fill in the floodplain.
(Please attach any plans or photos to this application)
1. If a structure is proposed, is the structure accessory to a recreational or agricultural use? Yes No N/A
2. Does the proposed activity involve a stream crossing for a pedestrian trail or driveway
serving a single family dwelling? Yes N/A
3. Does any proposed fencing cross a stream channel? Yes o N/A
4. If any fill is proposed, please approximate the proposed amount of fill in the floodplain No net increase
Owner / Agent Signature Date 3/2/2021
Natel Energy signing as agent for Let It Go, LLC
(FOR OFFICE USE ONLY)
Checked By
(for resubmituds) Fee Amount $ Date Paid
Receipt #
Check #
Date
11/12015