Memorandum
To: Scott Collins (scoff =,collins-engineering.com)
From: Kevin McCollum - Planner
Division: Planning Services
Date: March 17, 2021
Revision of Tori Kanellopoulos' Comment Letter sent on 8/25/2020
Subject: SDP202000053 — Lochlyn Hills Phase IV — Final Site Plan
The Planner for the Planning Services Division of the Albemarle County Department of Community
Development will recommend approval of the plan referred to above when the following items have been
satisfactorily addressed. (The following comments are those that have been identified at this time. Additional
comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by
the applicable reference to the Albemarle County Code.]
Planning (Kevin McCollum)
[18-4.19 Setbacks] Update the setback note on Sheet 1 to indicate that the minimum side setback is 5'.
Comment has been addressed.
2. [18-4.19 Setbacks] Note that all setbacks have been reviewed assuming the sidewalk is in the public
ROW. Clarify if the ROW is being adjusted so that the sidewalk is fully in the ROW. See Sheet 4 —
"ROW Dedication area proposed with Lochlvn Hill Phase IV Road Plan." Clearly label and show
the proposed ROW. On sheet 3 there are discrepancies between the 50' ROW measurement and the
proposed 5' sidewalk that is being added to the RW.
3. [18-4.7 and 18-15.5 and 18-2.2 Open space and cluster developments] Include a plan sheet that shows
the entire open space area included in this development, not just the townhouses. The development is
using the cluster and bonus provisions for density bonus; therefore, the entire development needs 25
percent open space. All open space needs to be shown on the site plan, include square footages of each
open space (A, B, etc.). Comment has been addressed.
4. [18-4.7 and 18-15.5 and 18-2.2 Open space and cluster developments] Revise notes throughout site
plan that indicate `no open space is provided'. Comment has been addressed.
5. [18-15.4.3 Affordable housing density bonus] Since the preliminary plat/initial site plan approval, there
has been a reduction in total acreage for the site. Previous acreage was 4.554 acres, which allows for 18
units by -right, and which would require 2 affordable units for the additional 4 bonus units (1/2 affordable).
However, the new acreage is 4.4595, which results in 17 units by -right, and which would require 3
affordable units for the additional 5 bonus units. Either add an additional unit or include the full acreage
as was approved with the preliminary and initial approvals. Comment stands. The proposed BLA that
is adding acreage to this phase must be reviewed, approved, and recorded prior to final site plan
approval. See comment #9 for further information.
6. [18-4.11.4 Structures and easements] There appears to be an easement within the building on Lot 20.
Comment has been addressed.
[18-32.5.2 and 18-32.6.2 Contents of a site plan]
A. The name of the owners for TMP's 61A-3, 61A-3A, and 61A-313 do not appear to be listed — just
the addresses. Comment has been addressed.
B. Include the owners, present use, and zoning districts of abutting parcels. Comment has been
addressed.
C. Include an existing sheet/demo plan that shows existing conditions (not with proposed lots for the
site plan). Comment has been addressed.
D. Include the ingress/egress with distance to centerline of nearest existing intersection. Comment
addressed.
8. [18-32.7.2.3 Sidewalks.] Planning staff has contacted Transportation Planning staff to determine if
sidewalks should be provided on the other side of Pen Park Lane, or if only having sidewalks on one side
is acceptable. Transportation Staff has been followed up with and their review is pending (3/16/2021)
9. [18-32.7.4 and 18-32.7.5 Easements and required improvements.]
A. Label all easements.
B. The easements shown on the plan do not appear to exactly match the final plat. The sight distance
easements do not appear to be shown. The full dimensions of the private sanitary lateral easement
do not appear to be shown. The full dimensions of the drainage easements do not appear to be
shown.
Comment stands. Easements need to be shown on an easement plat and easement
dimensions/locations must match those shown on the final site plan. Additionally, the BLA
mentioned above in comment 95 should be incorporated into the easement plat once that application
is submitted. As noted below in comment #12, easement plat application and BLA must be approved
prior to final site plan approval.
10. [18-32.7.9.4 Contents of a landscape plan]
A. Ensure all easements are shown on the landscape plan. Some easements/dimensions are missing,
as compared with the final plat. Comment stands. See comment #9 above — ensure that all new
easements are shown on the landscape plan and that new easement locations match the plat.
B. Provide a signed conservation checklist, as some existing landscaping is being counted toward the
street tree requirement. Comment addressed.
11. [18-32.7.9.5 Street trees]
1. Ensure the applicable areas of the road and site plans match. Some sheets indicate three (3) exiting
street trees will be preserved, while others indicate four (4). Comment has been addressed.
2. Ensure existing trees still meet 32.7.9.5 street tree requirements. Comment has been addressed.
3. Update table to include all street trees, including the species/caliper of existing trees being counted
toward street trees. Comment has been addressed. On sheet 6, no landscaping access and
maintenance easements shown on Lots 13-20. Please identify the easement location and
dimensions to ensure that proposed landscaping is within easements.
12. [Additional applications] The following applications and approvals are required prior to final site plan
approval:
A. 18-32.7.4.2 and 18-32.7.5.3: Easement Plats: All new and adjusted easements must be shown on
an easement plat or on a final plat, which must be approved prior to final site plan approval, and
must match the final site plan. See Engineering comments on required SWM easements.
B. 14-403, 14-235, 14-311 and 18-4.6.1 Road Plan approval will be required prior to final site plan
approval. Improvements must be built or bonded prior to final approval.
C. 18-32.7.4.1: Approval of a VSMP Plan is required prior to final site plan approval. See Engineering
comments. Coordinate directly with David James (diames2 e albemarle.org).
Applicant has indicated that an easement plat, road plan, and VSMP will be submitted for
approval. Easement plat has not vet been submitted. Once the easement plat is reviewed,
approved, and recorded, please update the final site plan so that all new easements are labeled
as "existing" and state whether they are public or private, provide dimensions, and include the
recorded instrument number for the plat that created the easements.
Road Plans, SUB202000133 are under review.
A WPO/VSMP application has not vet been submitted. See EnQineerin¢ Division comments for
further information about WPO requirements.
13. [32.7.9.51 Please add a label to the landscaping plans pointing toward all proposed street trees that
states "street trees shown for reference purposes only. Street tree locations/species
reviewed/approved with road plan application SUB202000133.
Please contact Kevin McCollum at the Department of Community Development at kmccollutn&albemarle.org or
296-5832 ext. 3141 for further information.
Albemarle County Building Inspections — Michael Dellinger, mdellinger@aibemarle.org — Review not yet complete,
comments or approvals will be forwarded to the applicant upon receipt (3/16/2021).
Albemarle County Engineering Services — David James, diames2@albemarle.org — Requested changes (3/12/2021).
1. Please submit a VSMP plan; approval will be needed prior to FSP approval. (Rev.1) Comment remains.
2. The Road Plan will need to be approved prior to FSP approval. (Rev.1) Comment remains.
3. The subdiv. plat will need to be approved prior to FSP approval. (Rev.1) Comment remains.
4. Please sign & date seals. (Rev.1) Currently addressed.
5. A waiver request is needed for dead-end alley. [ACDSM, pg. 18] (Rev.1) Not addressed/received.
a. Alley must intersect streets at two locations. (ACDSM, pg.18)
6. Sheet 3/4 —
a. Provide 25' radius for cul-de-sac. [ACDSM, pg.20] (Rev.1) Addressed.
b. Remove curbing shown at driveway entrances. (Rev.1) Addressed.
c. Provide entrance aprons for alleyway lots. (Rev.1) Addressed.
d. Label curb & entrance apron type along alleyways. (Rev.1) Addressed.
e. Callout street sign for Ellison Alley. (Rev.1) Addressed.
f. Show roof drains and where they outlet. (Rev.1) Addressed
g. Show drainage easements over pipes in alleyways. (Rev.1) Addressed.
h. Show sight distance easement for lot 20. (Rev.1) Addressed.
i. Label drainage structure type, pipe diameter, length, slope & material or provide drainage summary table.
[18-32.6.2] (Rev.l) Addressed.
7. (Rev. 1) Sheet 5 — Correct the details to show 6" stone base (21-A) under the curb.
Albemarle County E911 Services — Elise Kiewra, ekiewra&albemarle.org — Requested changes (2/16/2021)
1. Per site plan dated 2/1/21 Evanson Alley and Ellie Alley are acceptable. Page 7 of this site plan incorrectly
shows Evans Alley and Ellison Alley please update this page before I can approve.
Albemarle County Fire Rescue —Shawn Maddox — smaddox@albemarle.org —No objection (2/27/2021)
Albemarle County Service Authority — Richard Nelson, melsonanserviceauthority.org — Review not yet complete,
comments or approvals will be forwarded to the applicant upon receipt (3/16/2021).
Virginia Department of Transportation— Adam Moore — Adam.Moorekvdot.vir ig nia.gov — No objection (2/19/2021).
1. The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced Lochlyn Hill — Phase IV — Plans, as submitted by Collins
Engineering, dated February 01, 2021 and find the plans generally acceptable. A VDOT Land Use Permit will be
required prior to any work within the right of way. The owner/developer must contact the Charlottesville
Residency land Use Section at (434) 422-9399 for information pertaining to this process. If you have further
questions please contact Max Greene at (434) 422-9894.
Rivanna Water and Sewer Authority— Dyon Vega, dvega@rivanna.org—Requested changes (2/25/2021)
General Comments:
1. RWSA will require a sewer capacity flow acceptance.
Sheet 4:
1. Please include note to stake and protect RWSA Valve box connected to the 18" WL North of lot 12 during
construction. Valve box is shallow.
2. The survey for the ACSA waterline does not match with our GIS. The waterline that crosses the RWSA 18" WL
northeast of lot 12 should connect with the 10" ACSA WL that runs parallel to the 18" RWSA WL. Screenshot of
our GIS is attached.