HomeMy WebLinkAboutWPO202000058 Calculations 2021-03-05 (2)SHIMP ENGINEERING, P.C.
Design Focused Engineering
December23,2020 APPROVED
by the Albemarle County
John Anderson, PE Community Development Department
County of Albemarle Date 03/05/2021
File W P02 0 2 0 0 0 0 5 8
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
RE: WPO 2020-OOXXX Albemarle Business Campus SWM Calculation Packet
A Revision of WPO 2018-00084 Royal Fern Phase 2 VSMP
Dear John,
Enclosed is the stormwater calculation packet for Albemarle Business Campus (ABC). This is
development will occupy a site that has an area of 8.55 acres. The disturbed area is 9.10 acres. The
proposed stormwater design meets the runoff requirements set forth in 9VAC25-870-95 as the Part IIC
regulations are applicable to the project per 9VAC25-870-47. This VSMP plan is intended to revise the
approved plans for Royal Fern Phase 2, also prepared by Shimp Engineering.
In effect, the strategies for ABC and Royal Fern Phase 2 are the same. All onsite runoff is routed
to the existing pond built as part of the site plan for Sterling University Housing (SDP 2001000129). The
narrative from Royal Fem Phase 2 is copied below, but to achieve approval, all that remains to be shown is
that the impervious area / Curve Number for the ABC plan remains lower than what the pond was
designed for, and that the runoff to the offsite storm pipes remains lower than the original design capacity
for those pipes. Both of these conditions are still met with the ABC development.
COPIED FROM WPO2018-84: After research of the approved site plan for Sterling University
Housing (SDP 200100129), it was determined that the downstream sewer system empties into the wet
pond on the Cavalier Crossing Apartments property (TMP 76-54AI ). This pond was designed to manage
and treat runoff from a fully -built Sparrow Hill Phase 2 [Now ABC] site, listed in the approved calculation
packet for SDP 2001000129 as the "western residue of the Heischman property". The pond was designed
under VA Part IIC regulations and constructed before 2014 while these regulations were the current VSMP
ordinance. Per 9VAC25-870-47 (B), "Land -disturbing activities that obtain an initial state permit or
commence land disturbance prior to July 1, 2014, shall be conducted in accordance with the Part H C
(9 VAC25-8 70-93 et seq) technical criteria of this chapter. Such projects shall remain subject to the Part H
C technical criteria for two additional state permit cycles." Only one permit cycle has completed since the
pond was approved, so Part IIC regulations are applicable to the Royal Fern Phase 2 project.
Since Phase 2 [Now ABC] falls under Part IIC regulations, and since the pond to which all site
runoff shall drain was designed for a fully developed site, the Royal Fern Phase 2 project [Now ABC] must
fall within the original design assumptions for the pond to achieve SWM compliance. Royal Fern Phase 2
[Now ABC] has less onsite impervious area than the assumed drainage area used for the pond design, so
nutrient treatment and downstream natural channel requirements are satisfied. Royal Fern Phase 2 /Now
ABC] outlets runoff into the SDP 2001000129 storm sewer at rates that do not exceed the capacity of the
system, so manmade channel requirements are satisfied.
SWM Comparison: SDP 2001000129 Pond/Sewer Design Limits Vs. ABCAchieved Conditions
Design Assumption
Achieved Condition
Land Cover
63% Impervious (total pond
47°/u Impervious (total pond
contributing Drainage Area)
contributing Drainage Area
Original Inlet El
10 yr runoff:
10 yr runoff:
(ABC Str. A2)
51.11 cfs
50.30 cfs
Original Inlet Cl
10 yr runoff:
10 yr runoff:
(ABC Str. B2)
45.58 cfs
40.17 cfs
If you have any questions please do not hesitate to contact me at: keane@shimp-en ing eerieg com or by
phone at 434-299-9843.
Contents:
Post-Dev Runoff Calculations:
Post-Dev Drainage Spreadsheet
Post-Dev Structure Drainage Map
Post-Dev Pond Drainage Map - Aerial
Post-Dev Pond Drainage Map — Topo
Post-Dev Onsite Land Cover Map
VDOT LD-229 Culvert Capacity
ALBEMARLE BUSINESS CAMPUS
Inlet Drainage Area Summary
C for Disturbed Soil during Construction 0.6
Impervious C 0.9
Pervious C 0.3
Str. Type
Number
Total Area
Impervious (ft)
Turf (ft)
C
Area (ac)
DI-3C
A2
337,600
202,560
135,040
0.66
7.75
DI-313
B5
385,070
192,535
192,535
0.60
8.84
(Offsite DA)
DI-3C
B2
113,200
79,240
33,960
0.72
2.60
III �'__--
,
i111 li 1 {' ice' _�-_-��__� � �•� ___ _________
-- = ='�' �' '' �•
- - ;
I
IiI I I
��
II11' nI 1
�� ilil A r �• � '/ i/ 1�_I, 1,1 � �I
aso-�
' r W
-
-� I 11
_ _____
-i _so- -- �•p`
— 0"
o- 1
�� ���•� -� ` �� - --aa°
I 1 ill li �� ,A� 1 /� �� - _ ��'�� -- � - - - -_ - a "-� - - / ,♦ /, , _ -� a ,�- !
i
1 /
`1
Il lill l` i i � II �� __ ' o � -_ � ,%/n•� � J --_ i//'I � r �
1� Ili 'i'i i L_
it 1 1 i 1 . __ __ ______ __ _ _ •.,__ _,,� i _ -,-� - .
-
_ III 11 �1A�--_ �•,_ _ ____ ___�. i� '� 1 I 1� it__ _ �� a5
�• x �- 1 - - - 4—
Vlb,
SP-
1 -
1 �I 1 •�� �� .i "aa°�
----- -- -
—
-k
=-__ T61
r/ SITE DRI AINA
0
VIA/OFFSITE 5T T-T 6-
�{ - 1'=80'Sca \
ROYALFERN
POST-DEV INLET DRAINAGE MAP
80 160 240
IMAGERY PROVIDED BY BING MAPS, ACCESSED APRIL 24, 2019. 02019
ROADS, BUILDINGS, & DRIVEWAY LOCATIONS PROVIDED BY ALBEMARLE
COUNTY GIS, ACCESSED APRIL 24, 2019.
JSINESS CAMPUS
AERIAL PHOTOGRAPHY -
POND DRAINAGE MAP
LEGEND
Building:
Road:
Driveway:
New Imp:
Pond DA:
Pond:
Stream: --
11 1 11 .11 •11
N
m
N
M
P
O
AC
�c
0
LD-229 Storm Drain Design Computations
Albemarle Business Campus
To
Catch.
Runoff
Increment
Accum.
Total
Total 10-yr
Total 10-yr
Up
Down
Pipe
Invert
Pipe
Pipe
Velocity
Flow time
;JS-2
Pi
tructure
Area
Coef
AC
AC
TOC
Intensity
Flow
Invert
Invert
Length
Slope
Diameter
Capacity
Increment
(ac)
(min)
(in/hr)
(cfs)
Elev.
Elev.
(ft)
%
(in)
(cfs)
(ftfs)
(min)
3
4
5
6
7
8 9
10
11
12
13
14
15
16
17
A8
A7
0.00
8.63 0.00
#DIV/01
18
8.0
0.00
A7
A6
0.00
8.63 0.00
#DIV/01
18
8.0
0.00
A6
A5
0.00
8.63 2.20
#DIV/01
18
8.0
0.00
A5
A4
0.00
8.63 0.00
#DIV/01
18
8.0
0.00
A4
A3
0.00
8.63 0.00
#DIV/01
18
8.0
0.00
A3
A2
0.00
8.63 0.00
#DIV/01
24
8.0
0.00
C6
C5
0.00
8.63 0.00
#DIV/01
15
8.0
0.00
C5A
C5
0.00
8.63 0.00
#DIV/01
15
8.0
0.00
C5
C4
0.00
8.63 0.00
#DIV/0!
18
8.0
0.00
C4
C3
0.00
8.63 0.00
#DIV/01
18
8.0
0.00
C3
C2
25.79
#DIV/0!
18
8.0
0.00
C2A
C2
0.00
8.63 0.00
#DIV/0!
15
8.0
0.00
C2
C7
0.00
8.63 25.79
#DIV/0!
18
8.0
0.00
C1
A2
0.00
8.63 25.79
#DIV/0!
24
8.0
0.00
A2
Al
7.75
0.66
5.12
5.12
15.00
4.79 50.30
471.25
470.25
59.92
1.670%
36
93.4
10.2
0.10
B3D
133C
0.00
8.63 0.00
#DIV/01
15
93.4
8.0
0.00
B3C
B3B
0.00
8.63 25.79
#DIV/0!
15
97.5
8.0
0.00
B3Z
13313
0.00
8.63 0.00
#DIV/01
15
93.4
8.0
0.00
13313
133A
0.00
8.63 0.00
#DIV/01
15
8.0
8.0
0.00
B3Y
133A
0.00
8.63 25.79
#DIV/0!
18
93.4
8.0
0.00
133A
B3
0.00
8.63 0.00
#DIV/01
18
13.9
8.0
0.00
B4'
B3
8.84
0.60
5.30
5.30
10.00
5.62 29.83
463.00
462.70
31.95
0.94%
15
6.8
4.5
0.12
B3
B2
2.60
0.72
1.87
7.18
10.12
5.60 40.19
462.50
462.00
8.04
6.22%
15
17.5
10.0
0.01
B2
131
0.00
0.00
0.00
7.18
10.13
5.60 40.17
463.00
462.70
31.95
0.94%
15
6.8
4.5
0.12
'From Existing Culvert. Includes offsite drainage area
ABC Sediment Basin Riser Buoyancy Calculation
Riser Dimensions:
D= 48 "
H= 10 ' above pond bottom
Riser Volume = 125.7 cubic feet
Buoyant Force = p*V
= 62.4 lb/cf * 125.7 cf
Buoyant Force = 7841 Ibs
1.25x BF = 9802 Ibs (factor of safety)
Concrete Base Dimensions:
��M
D= 25 "
Base Volume = 67 cf
Base Weight = p*V
= 150lb/cf * 54.0
Base Weight= 10035 Ibs
Weight> 1.25*Bouvant Force
Chapter 8 - Culverts
Appendix 8C-1 Inlet Control, Circular Concrete
180 10,000 CHART 10
168 8.000 EXAMPLE (1) (2) (3)
156 6.000 014e i•snx (3.5 reed 6.
D•leo n• 6'
149 5,000 5,
4,000 y* 4 nW 6• S.
3Y
3,000 0.0 5' 4.
120
m e.l �.•
IOB 2.000 (3) e.4 TJ
'D 1. 4.1
96
1.000
Boo
B4
600
500
72
400
N
W
x
300
z
N
=
BO
p
200
O
54
/
DOM
STREAM W
�
/
so
CONDITION:
36" RCP
u
42
60
CULVERT
W.
C
N
So
His ENTRANCE
SQUARE
c
O
40
D SCALE TYPE
EDGE
'
36
30
Mo.e'
01 sa•4r• 3• with
HEADWALL.
Q23=8
CFS
a
33
FROM
BASIN
c
20
Ie) Dreeu and Run
30
euavu
(31 Br osv enl
Y7
r.epenR4
0
f4
9
8
is eu feeN IYI er 13) Or41ee1
21
5
eer leeerene b •<el• DI, rMn
Is
15
4 •., flrele Al W.Iind Ilne Far eee4
D end 0 w•lu, a nnn• e•
3 illunrena.
2
1.0
3.
3.
3.
2.6
3
x
1.5
I.S
N
OC
W
r1l
x
e-
o
1.0
e
W
�
c
1.0
.9
.9
9
a
.e
.7
.T
.7
L.5 L- .5 L .5
L-If HEADWATER DEPTH FOR
HEADWATER SCALES 283 CONCRETE PIPE CULVERTS
BUREAU OF NBLIE ROADS JAM. 1943 REVISED MAY 1964 WITH INLET CONTROL
CULVERT INLET IS FOR PRIVATE SYSTEM.
TOTAL DEPTH OF WATER=2.6 x 3.0' = 7.8'
Source: HDS-5 INVERT AT HEADWALL = 406.0
MAX ELEVATION OF WATER IN 25 YR STORM = 413.8
"RIDGE" ELEVATION ADJACENT TO HEADWALL = 420.0
BASIN OUTFALL CONDITION DOES NOT CAUSE
FLOODING IN OUTFALL DEPRESSION AREA AT
CULVERT HEADWALL.
1 of 1 VDOT Drainage Manual