Loading...
HomeMy WebLinkAboutSUB202000222 Correspondence 2021-03-15ROUDABUSH, GALE & ASSOC. , Inc. A PROFESSIONAL CORPORATION Serving Virginia Since 1956 March 15, 2021 Ms. Mariah Gleason, Planner Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE. SUB202000222 Glenbrook at Foothills Phase IIB — Final Plat Ms. Gleason, The plat has been revised to address your comments received on January 22, 2021 in accordance with the following: 1. [14-400, 16.7, 4.16, 2.2.3] Recreation requirement for R-6 cluster developments. As proposed, this development needs to satisfy the minimum recreation requirements outlined in Sec. 4.16. An option for meeting these requirements is to locate intended recreation areas - including the tot lot and trails - on the subdivision plat map and then describe specific planned improvements (e.g. equipment, ground cover, additional requirements, etc.) within the required maintenance documents. RESPONSE — REVISED OPEN SPACE PARCEL B. 2. [ZMA201600005] Trailways. a. Provide a sheet, with the plat or as an exhibit, that shows the intended trail system. Information on this sheet/material should include existing and proposed trail locations, notation as to whether trails are public or private, current and proposed trail material(s), and proposed property boundaries. The location of the greenway trail to surrounding residential and non-residential properties is of particular interest as the County considers future improvements and maintenance to the greenway trail. Please keep in mind that proposed trailways should be in general accord with the approved Application Plan and proffers. RESPONSE — ADDITIONAL TRAIL EXHIBIT CREATED. b. Add a trail connection from the proposed east -west connector road (Arboleda Dr) to the greenway trail, to align with the Application Plan and proffers. The proffers identify this connection as a major element of the Application Plan. Staff understands that the road plan for this development (SUB202000216 — under review) shows a 1Oft pedestrian trial/access easement behind Lots 191-198. This alignment would satisfy the proffer. However, consider adjusting the rear property line of these lots to provide 1Oft of common space for the trail in lieu of an easement. This separation of space could avoid unwanted conflicts between property owners and trail users in the future as 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com 434.977.0205 SUB202000222 Glen brook at Foothills Phase I16— Final Plat 3/11/2021 well as a need to address fencing and landscaping limitations in the aforementioned lots that would otherwise be needed if the trail were provided in an easement. RESPONSE — PARCEL LAYOUT UPDATED; FURTHER INFORMATION PROVIDED ON TRAIL EXHIBIT. c. Include the existing trail connection from the southeastern portion of the greenway trail to the sidewalk along Eastern Ave. RESPONSE — SEE TRAIL EXHIBIT. 3. [14-401, 14-203.1] Double frontage. Albemarle County Code prohibits double frontage lots. While the Code allows for special exceptions and variations to this regulation, upon reviewing the criteria to grant such requests, staff does not believe the necessary findings can be made to support the current lot configuration of proposed Lots 183-185. Therefore, these lots will most likely need to be revised to provide 20ft of common area between the rear of the lots and Eastern Ave. RESPONSE — PARCEL LAYOUT UPDATED. 4. [Comment] Boundary line adjustment. On Sheet V3, provide an inset map(s) to more clearly show the boundary line adjustments proposed to TMP 56K-A2 and TMP 56K1-F. RESPONSE — ADDED SHEET, NEW SHEET V4. 5. [ZMA201600005] Open space. Note 6 of the approved Application Plan for this development requires a minimum of 25% open space. Provide a phase -by -phase breakdown, with deed book references, of open space provided in the rezoning area. RESPONSE — UPDATED PLAT, SEE SHEET V1 "OPEN SPACE". 6. [14-303(I)] Bearing and distance ties. a. There are two instances of bearing "C58" on Sheet V4 - one by Lot 177 and one by Lot 180. Revise the subdivision map and boundary line table such that each line is uniquely identified. RESPONSE — UPDATED. b. On Sheet V4, provide bearing and distance information for boundary lines enclosing Open Space A, specifically along Eastern Ave. RESPONSE — UPDATED. 7. [14-302(A)(11)] Instrument creating property. Provide information, such as the assigned TMP and instrument creating the property, for Lot 155 in Glenbrook Phase IIA when known. RESPONSE — STILL UNDER REVIEW 8. [14-303(D)] Acreage. This plat will need to align with the property acreages for new and residue parcels created by the subdivision plat for Glenbrook Phase IIA. Note, the plat for Glenbrook Phase IIA is still in review by the County at this time, but is anticipated to precede this plat in approval. RESPONSE — NOTED. 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 2 of 6 SUB202000222 Glen brook at Foothills Phase I16— Final Plat 3/11/2021 9. [14-302(B)(5)] Steep slopes. On the plat maps, show the location of the preserved steep slope area on TMP 56K-A2. RESPONSE — UPDATED PLAT. 10. [USPS] Group mailbox. Please be aware that, per USPS, new residential developments require centralized mail delivery. Please see the attached letter from the USPS for more information. RESPONSE — SHOWN ON SITE PLAN, NOTHING TO ADD TO SUB PLAT. 11. [14-317] Maintenance instruments. Prior to approval, instruments evidencing maintenance of certain improvements, including but not limited to, public drainage easements, open space, recreation requirements, and trails will be needed. When submitted, this information will be forwarded to the County Attorney's Office for review/approval. (Note: Trailways should be established and maintained such that they are in general accord with the Application Plan and Proffer 3 of the rezoning. Please work with Parks & Recreation, Zoning, and Planning to ensure the standard of tradways within the Greenway area to be dedicated is satisfactory. Also, perpetual care of the "SWM Forest and Open Space Easement" within the intended Geenway dedication area may need to be addressed.) RESPONSE — SUBMITTED UNDER DIFFERENT COVER 12. [14-302(B)(1)] Resubmission. Reminder that revised plats must include the original date of drawing and the revision date(s) of each subsequent version of the plat. RESPONSE — UPDATED. Albemarle County Engineering Services (Engineer) 1. The road plans will need to be approved and bonded before final plat approval. RESPONSE — NOTED. 2. A Deed of Dedication will need to be signed and recorded for the public drainage easements. This will filled out by the County and forwarded to the applicant when the plat is nearing approval. RESPONSE — NOTED. 3. Several easements are not shown on the road plans that will also need to be shown on this plat. This includes on Lot 165 for pipe 12E, on Lot 195 for pipe 8C, and on Lot 174 for pipe 4C. Please verify no other easements are missing. RESPONSE — UPDATED EASEMENTS. Albemarle County Service Authority (ACSA) Utility plan approval will be required prior to final plat approval. RESPONSE — NOTED. 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 3 of 6 SUB202000222 Glenbrook at Foothills Phase 1113 —Final Plat 3/11/2021 2. Dedication of ACSA utilities in Glenbrook at Foothills Phase 1 will be required. RESPONSE — NOTED. 3. Show the proposed access easement to ACSA utilities. RESPONSE — ACSA EASEMENTS ARE ADJACENT TO PUBLIC R/W. 4. Show private sewer lateral easement for Lot 203. RESPONSE — EASEMENTS UPDATED. 5. Callout sewer easements as "variable width" where they are not truly 20' wide (ie. Running parallel to ROW) RESPONSE — UPDATED LABELS. Virginia Department of Transportation 1. Approved road plans meeting SSAR, and in compliance with the VDOT Road Design Manual are required prior to final plat approval. RESPONSE — DIFFERENT COVER 2. Please include a note stating that VDOT will only maintain within drainage easements to the extent necessary to protect the roadway from flooding or damage. RESPONSE — UPDATED PLAT, SEE NOTE 24. 3. Please include a note stating the homeowners and/or homeowners association shall be responsible for keeping the variable sight distance easements clear from obstruction at all times for public safety. RESPONSE — UPDATED PLAT, SEE NOTE 25. Albemarle County Zoning Division Proffer 3- The County requests that the entire greenway as proffered and shown on the application plan be dedicated to the County. Detailed comments are provided by Planning and Parks & Rec. RESPONSE — GREENWAY PARCEL DEDICATED TO COUNTY. 2. Proffer 6- The plat indicates the correct number of affordable units (8) for this phase. Will the proffer be addressed with for -sale, for -rent, or cash payments? To -date affordable housing proffers have not been satisfied in any prior phases of Glenbrook. RESPONSE — SUBMITTED UNDER DIFFERENT COVER Albemarle County Parks & Recreation 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 4 of 6 SUB202000222 Glen brook at Foothills Phase I16— Final Plat 3/11/2021 Staff acknowledges Note 22 on the Cover Sheet, which states that the greenway parcel is hereby dedicated to the County of Albemarle County" in accordance with the Proffer Statement and Application Plan for ZMA-2016-00005. The Albemarle County Attorney's Office provides deed templates for such greenway dedications, which are available upon request and also online at https://www.albemarle.org/home/showdocument?id=1058. RESPONSE — SUBMITTED UNDER DIFFERENT COVER. 2. Staff acknowledges the legal boundaries of the 2.663 acre "Greenway Dedication" area. RESPONSE — NOTED. 3. An area noted on the preliminary plat (SUB202000167) as "additional greenway easement over open space area for trailway connection" located adjacent to the proposed greenway dedication area and behind Lots 200 and 201 is now shown as private Open Space C on the final plat, with no greenway easement. RESPONSE — FINAL SUB PLAT REFLECTS THE LATEST SITE PLAN a. In order to help ACPR staff determine if the proposed greenway dedication parcel contains adequate area for the public use and maintenance of the Crozet Connector greenway trail, please revise the plat to show the location of the existing Crozet Connector greenway trail. b. Alternately, please provide via email a separate exhibit (showing location of existing trail within proposed greenway dedication area) directly to ACPR for review and comment, prior to revision and formal resubmittal of SUB202000222. This would enable ACPR staff to gain clarity on this detail and provide review comments on this issue directly back to you in a timely manner. RESPONSE (A & B) — SEPARATE EXHBIT SUBMITTED. 4. Please note that the Proffer Statement for ZMA-2016-00005 requires that "The Greenway trail system shall include a connection to this phase of the Foothills Crossings Neighborhood and a connection to Crozet Park," and the Application Plan for ZMA-2016-00005 shows a "Proposed connection from greenway trail to Crozet Park." RESPONSE — PARCEL LAYOUT UPDATED. a. Please clarify if any addition(s), modification(s), or improvement(s) will be made to the existing trail connecting Glenbrook Phase IIB (TMP #56-57132) to the lower portion of the existing dog park (located on TMP 456-55); if so, please provide details of where, how, and when this required connection from the Crozet Connector greenway trail into Crozet Park (TMP 456A2-1-72A) will be constructed and established. If there is any need for clarification or opportunity for collaboration on this detail, ACPR staff will be happy to meet on -site to review existing conditions and discuss the required connection "to Crozet Park" - including any potential improvements that can be made to improve the accessibility and quality of this high -profile, major access point to/from Crozet Park along the communitywide Crozet Connector greenway trail. RESPONSE — DIFFERENT COVER 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 5 of 6 SUB202000222 Glenbrook at Foothills Phase 1113 —Final Plat 3/11/2021 b. Neither the "Greenway Dedication" area (in particular) nor the final subdivision plat (in general) appear to include the "proposed trailway connection to greenway trail' between the Crozet Connector greenway trail and the proposed new street (identified as "Arboleda Drive" on the final plat), as shown and annotated on the approved Application Plan for ZMA-2016-00005. Please address this required connection. RESPONSE — PARCEL LAYOUT UPDATED. Thank you for taking the time to review this plat. Please let me know if you have any questions or require additional information. Thank you, William White 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 6 of 6