Loading...
HomeMy WebLinkAboutWPO201200003 Other 2021-03-22latt,oal U. Ool �J Date Received: J S' 41 Fee Paid: 'a Rxeieed by: —r� Intake: Forward to YlaaagemektAaelpct BOND INSPECTION REQUEST APPROVED PLAN #: WPO #2012-00003 PROJECT NAME (including Phase #): Charlottesville -Albemarle Airport Extend Runway 21 Phase 4 (As listed on the approved plan) This form is used to request a reduction or release of a bond. A fee is required for each inspection, Please check the appropriate box below for the requested inspection(s). Inspections for the purposes of bond reduction or release will require a separate fee for each bond. ® VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance sections 17-207 & 17-208 $250 ❑ Reduction v Release ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14435 & 14-438 $269 Reduction ❑ Release ❑ Water & Sewer bond per Subdivision Ordinance section 14-435 $269 e Reduction ❑ Release ❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $301 ❑ Reduction (site work only) ❑ Release TOTAL FEES$250 Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst— Phone 434-296-5832; Fax 434-9724126. All roads and stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts, certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and County's published procedures. A minimum 20% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded site work, a request for reduction should only be made once all landscaping is complete. If all required documentation is not received within 30 days of receipt of this request, this application shall be deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will be required. Applications may be withdrawn for a full refund within 30 days of receipt. If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner. Please provide contact information. EMAIL: tridky@sargentus OR REGULAR MAIL ADDRESS: Sargent Corporation Ashland, VA 23005 i ner/Developer Travis Ridky - Project Manager Print Name March 11, 2021 Date Revised 71152014, 720@015, 11/52015, 91I412p17, i 72R"262o ILI"