Loading...
HomeMy WebLinkAboutSDP202100022 Easements 2021-03-22SHIMP ENGINEERING, P.C. Design Focused Engineering March 22, 2021 John Anderson County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: Response Letter #1 for SDP2020-66 Albemarle Business Campus — Initial Site Plan Dear John, Thank you for your review of the initial site plan for Albemarle Business Campus. This letter contains responses to County comments dated December 18, 2020. Our responses are as follows: 1. C1, Stormwater Management Notes: Please ref, WPO201800084, Royal Fern Phase 2 rather than a regional stormwater facility (in addition to referencing more recent ZMA201900003). Engineering will evaluate WPO plan for Albemarle Business Campus WPO plan against information and stormwater data approved with WPO201800084. WPO plan approval for ABC is not automatic with ZMA201900003 approval or satisfied by reference to regional stormwater facilities for blocks 2-5. WPO plan approval is required for ABC FSP approval. This development is subject to same or similar SWM program review requirements and criteria as applied to WPO201800084. Also, see Engineering email to Shimp Engineering, 11/12/2020 2:56 PM, and November 12, 2020 12:04 PM. Please submit WPO plan for ABC at earliest convenience. 2. It appears that design relies on fewer parking spaces than required by ordinance. There is potential for ISP disapproval with significant revision required prior even to approval of ISP (with conditions). RESPONSE: Comment received. We are working through a parking reduction request with Zoning. With final site plan: 3. C5: Revise existing improvements shown on TMP 76-46C 1. See image below (C5 v. satellite imagery) (attached image and satellite imagery removed in comment response). RESPONSE: Thank you for bringing this to our attention. These multifamily buildings have been included in the existing conditions. 4. CS C6 a. Label managed steep slopes. RESPONSE: Managed steep slopes are now labeled on the existing conditions page. 5. C6 a. Existing grade appears to indicate a SWM facility in vicinity of feature labeled rip -rap. With WPO, address any SWM quality -quantity implications of removing any existing SWM facility with proposed development. RESPONSE: Noted, this was addressed in approved WPO plan, notes copied to SDP. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com 6. C7 a. Recommend provide sidewalk access to westernmost 24-apt 3-story building via internal sidewalk rather than walk within public RW along Country Green Road since this is facility to be used by residents for every trip between vehicle and apartment. This route so near a public road provides inherent risk, risk analogous to requiring owners of single- family dwellings to transit walk within public RW to travel between parked car in driveway and dwelling entrance. RESPONSE: Noted, if necessary in the future, we will address this comment with the potential multifamily final site plan. b. If apartment building access is via sidewalk along Country Green Road and ordinance requires illumination from parking to dwelling entrance, provide adequate lighting. Engineering defers to Planning, while reiterating safety concerns for residents if forced to rely on a walk within public RW of Country Green Road. RESPONSE: Noted, if necessary in the future, Pedestrian access will be provided with an internal sidewalk, to be addressed with the multifamily final site plan. c. Label site entrance radii and relevant entrance geometry. RESPONSE: Site entrance radii and relevant entrance geometry are now labeled on the site plan sheet. 7. CT C8 a. Label (typ.) parking space length. RESPONSE: Parking space length (18') is now included. b. Label parking lot island radii. RESPONSE: Parking lot island radii are now labeled on the site plan sheet. c. Provide, label and revise or reconfigure parking to provide adequate HC parking, with ramps. RESPONSE: Handicap parking spaces are shown with this submission. d. Label CG-12. RESPONSE: CG-12's are shown and labeled on the site plan sheet. e. Label CG-6. RESPONSE: CG-6's are shown and labeled on the site plan sheet. f. Provide /show /label dumpster pads for each use. No use appears likely able to function without permanent outdoor solid waste disposal, with possible exception of self -storage, yet self -storage patrons may wish to avail themselves of trash facility, which may or may not be required. Hotel, office, and retail space typically (likely) require dumpster pads. Engineering defers to Planning. RESPONSE: For the self -storage block, we have provided a concrete pad for (2) 65- gallon trash totes. Dumpster pads will be provided for the other blocks as needed with their subsequent final site plans. g. Please ensure that all parking spaces immediately adjacent to sidewalks are either: i. 18' L fronting 6' sidewalks, or ii. 18' L with bumper blocks fronting 5' sidewalks (ref. ACDSM, pg. 17). 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com 8. C8 RESPONSE: Comment received. Please see the labeled parking space lengths and sidewalks with this submission. a. Label block 2-5 development entrance radii /relevant entrance geometry at Old Lynchburg Road. RESPONSE: Entrance radii has been provided. b. Label angle for angled parking. RESPONSE: The 60' angle label has been added. c. Provide angled parking dimensions for comparison with ordinance requirements /ACDSM. RESPONSE: Angled parking dimensions are included for review. d. Label site features (walks, crosswalks, traffic control signs). RESPONSE: Comment received. Please see the updated site plan sheet. e. Provide internal and external stop /yield signs to define stop /thru traffic patterns. RESPONSE: Comment received. Appropriate traffic control signs have been provided with this submission. As the other blocks are subsequently developed, additional traffic control signs will be proposed. f. Since site access from 5th Street spans property line with parcel to east, provide legal instrument that allows site access. Existing legal instrument (201800013730) presents obsolete image. Provide instrument specific to current geometric design of Wahoo Way (attached image removed in comment response). RESPONSE: A new access easement will be recorded prior to final site plan approval. g. Provide /show /label hotel loading space. RESPONSE: This comment will be addressed with the hotel's final site plan. h. Clarify via label /dimension the short arc -pedestrian facility at intersection Wahoo Way and 5th St. to clearly define how 10' multi -use path along 5th St. connects with 5' walk along Wahoo Way, RESPONSE: Clarification will be provided via labels/dimensions with Block 3 (offrce)'s final site plan. This path will be provided with Block 3 final SDP. 9. C9: Label island dimensions and curb radii at right -in /right -out entrance on Old Lynchburg Road. RESPONSE: Entrance/curb dimensions are provided on the site plan sheet. 10. C10 a. Provide spot grading near islands to ensure runoff reaches inlets without nuisance ponding. RESPONSE: Comment received. Spot grading is provided on the grading plan. b. Clarify how proposed UG detention and inlet conveyance system discharge to existing SWM infrastructure. If discharge is via storm pipe between the two 28-apt buildings to property to the immediate west, with WPO show compliance with channel and flood protection at this discharge point. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com RESPONSE: this is no longer applicable, however this would be provided with the potential future Block 1 apartments development. c. Provide flowlines that clarify direction of flow in storm pipes. RESPONSE: Flowlines have been provided. Please see the utility plan sheet. d. Label underground detention system. RESPONSE: this is no longer applicable, however this would be provided with the potential future Block 1 apartments development. 11. C10, CI a. Show /label proposed utility easements. i. Recommend label private drainage easements. RESPONSE: Private drainage easements are not proposed at this time. Public drainage easements shown. ii. Label public drainage easement downstream of proposed SWM facility. RESPONSE: Public drainage easements are now labeled on the site plan. iii. Public SWM facility and public drainage easements require plat with deed, and recordation prior to FSP approval. RESPONSE: Comment received. iv. Acquire and reference recorded public drainage easement across TMP 76-46C 1 (Mountainwood Properties) that receives ABC development runoff. RESPONSE: This is no longer applicable, however this would be provided with the potential future Block 1 apartments development. v. Ensure post -developed storm runoff across TMP 76-46C1 is non -erosive. RESPONSE: This is no longer applicable, however this would be provided with the potential future Block 1 apartments development. b. Ensure easement widths are consistent with easement width diagram, p. 15, ACDSM. RESPONSE: Noted, drainage easement widths are consistent with diagram. c. Indicate any existing trees to be preserved. RESPONSE: No trees are proposed to be preserved. 12. C I I a. Apparent ponding at N comer of block 2 hotel parking lot: Revise to eliminate nuisance pending. RESPONSE: This was addressed with WPO202000058. b. Apparent pending at N corner of block 3 office parking lot. Revise to eliminate nuisance pending. RESPONSE: This was addressed with WPO202000058. c. Apparent ponding at N corner of 6,000 SF retail parking lot. Revise to eliminate nuisance pending. RESPONSE: This was addressed with WPO202000058. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com d. Provide spot grading throughout to ensure runoff reaches inlets, without nuisance ponding. RESPONSE: Comment received. Spot grading has been included on the grading plan. This was also addressed with WPO202000058. e. Wherever grades concentrate runoff against curbing, revise proposed CG-2 to CG-6 [ref. 18-4.12.15. g ]. RESPONSE: Noted. Please see the revised curbing. This was also addressed with WPO202000058. f. Provide additional proposed grade labels, for example: i. Graded slope area N of hotel parking lot, RESPONSE: This will be addressed with Hotel Block 2's final site plan. ii. Hotel parking lot, and, RESPONSE: This will be addressed with Hotel Block 2's final site plan. iii. Impervious paved areas N of self -storage. RESPONSE: Please see the revised grading plan. g. Retaining walls >3' ht. require a building permit. Retaining walls >4' ht. require sealed design (PE) plans. Retaining wall design review by Engineering is required prior to FSP approval. RESPONSE: Noted, we have hired Circeo Geotechnical Engineering to complete this, it will be uploaded when received. h. Provide wall elevation details for retaining wall at W end of self -storage. RESPONSE: Wall elevations are provided with this submission. 13. C12: Provide horizontal sight distance that avoids landscape /sight fin 'flicts. RESPONSE: Comment received. Sight distance has been provided at the new entrance on Old Lynchburg Road. Please note that required sight distance for a 35-mph road is 390', while the required entrance spacing is 250'. Full 260' sight distance from entrance to intersections is achieved Vehicles leaving from the proposed entrance will have adequate visibility of the Old Lynchburg intersection, allowing for safe movement out of the site. If you have any questions or concerns about these revisions, please feel free to contact me at Keane@shimp-en ine eering com or by phone at 434-227-5140. Regards, Keane Rucker Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com