HomeMy WebLinkAboutWPO202000030 Bond Estimates 2021-03-23Project Name: 2415 Ivy Road Commercial Redevelopment - VSMP WPO file number: WP0202000030 TM P(s): 06000-00-00-025AO Date Estimate Completed: 3/23/2021 Erosion and Sediment Control Bond Estimate Item Item Number r slablization (PS, TS) z silt fence (SF) 3 safety fence (SAF) 3 tree protection (TIP) 4 diversion (DD, FD, RWD) 5 temporary slope drain (TSD) pipe length -ft 6 Sediment Trap #1 / Riser 7 earthwork for trap/basin 8 -see trap direct entry values, below - height of dam at toe R 9 height of fill at faceoft R ro length of damItr r top width lz (area above transition 0 at 13 (total width of dam) 0 ft 14 (height below transitio 0 R 15 (area below transition: 0 at i6 (total fill volume) 0.0 cy 17 length of spillway -ft 18 width of spillway ft 19 structures for Sediment Trap 1 zo riser height ft u riser diameterMin in 22 barrel lengthIt barrel diameter 24 25 26 Sediment Trap #1 27 earthwork for trap/basin 28 height of dam at toe 0 It 29 Area floor 12 x 29' x 99' =1,435 SF height of fill at face 0 ft 30 Area top trap: 1/2* 60' * 139-3,900 SF length of dam 0 ft LMft 31 Ave Area uW1=2,668 SF lop width 32 bottom trap elev=557.19 (area above transition Oat 33 top dam elev -562 25 (total width of dam) 0 ft No. Unit Unit Cost Cost (installed) ­71acres $5,000.00 $14,300.00 1312.4 R $5.00 $6,562.00 382. R $5.00 $1,910.00 1178. ft $5.00 $5,890.00 R $13.00 $24,108.50 pipe diameter -in $0.00 $0.00 cut at high side ft ft cut at faceoft length of cutft width of cut (area below transitic 0 at (total width of cut) 0 ft (depth below transit 0 ft (area above transitic 0 at (total cut volume) 0.0 cy (TOAL CY estimate 0 cy $13.00 $0.00 (spillway stone tons 0 tons $50.00 $0.00 (riser unit price) $150.00 $339.00 base plate or fdn -cy $200.00 $710 (barrel unit price) $50.00 $1,781.50 barrel collars $0.00 $0 baffle length R 0 $5$50.00 $0 cut at high side Lft ft cut at face ft length of cutft width of cut (area below transitic 0 at (total width of cut) 0 R 3/23/2021 Project Name: 2415 Ivy Road Commercial Redevelopment - VSMP WPO file number: WP0202000030 TM P(s): 06000-00-00-025AO Date Estimate Completed: 3/23/2021 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 34 Vol. =Ave. Area x 5.06= 13,497 cf (height below transitio 0 ft (depth below transit 0 ft 35 =500 e9 (area below transition; 0 sf (area above transitir 0 sf 36 (total fill volume) 0.0 by (total cut volume) 0.0 cY 37 direet entry Cale. / JA 3-23-21 length of spillway ft (TOAL CY estimate 0 by ® $13.00 $6,500.00 38 width of spillway -ft (spillway stone tons 5.3 tons $50.00 $265.00 39 40 Sediment Trap #2 ' 41 earthwork for trap/basin 42 height of dam at toe ft cut at high sideoft ft 43 Area floor: 1/2x 7 x 33' =116 SF height of fill at faceoft ft cut at faceft 44 Area top trap: 1/2x 27 x 55' =742 SF length of damft length of cutft 45 Ave Area tmp2 = 429 SF top width width of cut 46 bottom trap elev=554 la .a above transition 0 sf (area below transitir 0 sf 47 top dam elev=559 (total width of dam) 0 ft (total width of cut) 0 ft 48 VoL=Ave. Amax 5'=2,145 of (height below transitio Oft (depth below transit Oft 49 --79.44 e9 (area below transition: 0 sf (area above transitir 0 sf 50 (total fill volume) 0.0 by (total fill volume) 0.0 by 51 direet entry Cale. /JA 3-23-21 length of spillway ft (TOAL CY estimate 0by 79.4 $13.00 $1,032.72 52 width of spillway -ft (spillway stone tons 0.4 tons $50.00 $20.00 53 40 41 earthwork for trap/basin 42 height of dam at lee oftft cut at high side oftft or 43 Area flo1/2x 13' x 51' =332 SF height of fill at faceft cut at faceft 44 Area top trap: 1/2x 25' x 6T-775 SF length of damft length of cutft 45 Ave Area uW3 = 554 SF top width width of cut 46 bottom trap ehwv 557.5 transition 0 sf (area below transitir 0 sf 47 top dam elev=561.5 (total wicin of dam) 0 ft (total width of cut) 0 ft 48 VoL=Ave. Area x 4'=2,214 cf (height below transitio Oft (depth below transit Oft 49 =82 e9 (area below transition: 0 sf (area above transitir 0 sf 50 (total fill volume) 0.0 by (total fill volume) 0.0 by 51 direct entry Cale. /1A 3-23-21 length of spillway -ft (TOAL CY estimate 0by ® $13.00 $1,066.00 52 width of spillway ft (spillway stone tons 0.3 tons $50.00 $15.00 53 3/23/2021 Project Name: 2415 Ivy Road Commercial Redevelopment - VSMP WPO file number: WP0202000030 TM P(s): 06000-00-00-025AO Date Estimate Completed: 3/23/2021 Erosion and Sediment Control Bond Estimate Item Item Number 55 56 57 6o 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth location, NE, ST3 width survey and layout (price per 0.1 mi.) acres mobilization Temporary Access road - CRS access road Temporary Culvert No. Unit Unit Cost Cost (installed) 7 $100.00 $700.00 4 $200.00 $800.00 ■ft width 0 ft 0 $0.00 $0.00 ft width 0 ft 0 $0.00 ft channel width MM"ft 0 $0.00 $0.00 0 $2,500.00 $0.00 J. Mde,w., 3/2321 WP0202000030_lvy Road Commercial Redev_ESC Bond_032321ja.xlsx $2,000.00 $2,000.00 $3,500.00 $0.00 �ft length -ft 6.0 (tons) 54.0788 tons $60.00 $3,244.73 traps and basins $2,930.00 $2,500.00 $0.00 $0.00 cost sum $76,674.45 contingency $7,667.44 Total $84,360 3/23/2021