Loading...
HomeMy WebLinkAboutSDP201900052 Action Letter 2019-10-24COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 229024596 Phone (434) 296-5832 October 24, 2019 Jeff Carter Carter Engineering Consultants 3651 Mars Hill Rd, Suite 2000 Watkinsville, GA 30677 jeff@carterengineering.net RE: Conditional Approval of SDP201900052 W4 Development Car Wash — Initial Site Plan Dear Mr. Carter: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are received: 1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of all easements for facilities for stormwater management and drainage control. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. Applicable fee. See Sec. 35.1. Please submit 13 copies of the final plans to the Community Development Department. The assigned Lead Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the final site plan, please work with each reviewer individually to satisfy their requirements. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the attached conditions from the following agencies/reviewers have been obtained: SRC Members: Albemarle County Planning Services (Planner)- 3 copies Albemarle County Engineering Services (Engineer)- 1 copy Albemarle County Information Services (E911)- 1 copy Albemarle County Building Inspections — 1 copy Albemarle County Fire & Rescue — 1 copy Albemarle County Service Authority — 3 copies Virginia Department of Transportation- 2 copy Albemarle County Planning Services (Architectural Review Board)- 1 copy Please contact Mariah Gleason at the Department of Community Development at mgleasonkalbmarle.org or (434) 296-5832 ext. 3097 for further information. Sincerely, Mariah Gleason Department of Community Development, Planning Division Senior Planner Albemarle County Planning Services (Planner) Mariah Gleason, mgleason"bemarle.org — Required changes to be addressed prior to final site plan approval: 1. [17-403] Groundwater assessment. The applicant paid the fee for a Tier IV Groundwater Assessment, however, this assessment is not needed as the property is currently served by municipal services. Please work with the lead planner to request a refund of this fee. 2. [ZMA198700007, 32.5.1(c), 32.5.2(a)] Setbacks. a. In the project notes, revise the setbacks to those listed below. (Note: These setbacks were established by the approved rezoning plan, ZMA198700007.) i. Building setback: 30ft min ii. Parking lot setback: 1 Oft min b. Depict the setback lines on the plan maps for at least the existing and proposed site plans. 3. [32.5.2(i), 32.5.2(m), 4.12] Travelways and easements a. Please ensure all travelways are measured from face -of -curb to face -of -curb. It appears some travelway measurements provided on the plan may be measuring from back -of -curb to back -of -curb. (Note: All travelways must be at least 12ft wide.) b. Provide deed book and page numbers for all access easements shown on the plan. c. Provide a 2-way ingress/egress from the parking lot area to accommodate employees and emergency vehicles. The current site configuration forces employees and emergency vehicles to go through the queuing area before reaching the parking lot. d. At the property's entrance/exit, provide pavement marking to indicate when 2-way vehicular travel becomes 1- way queuing for the car wash facility. This will ensure that egress from the site is not obstructed. e. Specify the direction of travel for the 12ft travelway shown between the queuing lane area and the car wash. f. Adjust the moveable bollard/traffic cone label such that it accurately indicates where these improvements will be placed. g. On Sheet 3, please remove the two vehicles symbols adjacent to, but not within, the queuing area. They appear to be left over from a previous version of the plan. 4. [32.6.2(a), 32.5.2(a)] Application reference number. On the cover sheet, please include the initial site plan application reference number — SDP201900052. (Note: The final site plan will be given a separate reference number so it is suggested that room be reserved so this information can be easily added in the future.) 5. [32.6.2(h)] Signature panel. Provide the following signature panel on the cover sheet. APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION 6. [Comment, 32.5.2(a)] Sheets. The sheet index provided on the cover sheet suggests that several sheets may still be in process. Please be aware that any sheet included in the Table of Contents must be provided before final site plan approval can be granted. 7. [32.5.2(a)] Magisterial District. Include in the project notes or on the cover sheet that this property is in the Rio magisterial district. 8. [32.5.2(a)] Zoning. Revise the following. a. In the project notes, combine both "Current Zoning" and "Proposed Zoning" line items into one line item that is simply labelled "Zoning". Site plans do not typically distinguish between current and proposed zoning districts unless a change to the zoning classification is being proposed. b. As part of the zoning notes, include the overlay districts to which this parcel subject. This can be done in parenthesis following the zoning district. (Note: This parcel is subject to the following overlay districts: Airport Impact Area, Entrance Corridor, and Managed Steep Slopes.) 9. [32.5.2(b)] Building height. Note that the maximum building height for this district is 65ft. 10. [32.5.2(f)] Watershed. Indicate on the cover sheet or in the project notes whether the property is located within a watershed of a public water supply reservoir. (Note: The property is located in the South Fork Rivanna watershed which is not a water supply watershed, however this information must be noted on the plan.) 11. [32.5.2(a)] Owner. Similar to the "Developer" and "Engineer" information provided in the project notes, include information regarding the parcel owner as well. 12. [32.5.2(a)] Information Sources. Provide both the source of the topography and source of the survey. 13. [Albemarle County Engineering Policy] Benchmarks. Reference the benchmarks used for surveys. 14. [32.5.2(a)] Abuttingparcel information. Please include the zoning district and present uses within the abutting parcel information label(s). 15. [32.5.2(a)] Departing lot lines. Depict the departing lot line for tax map parcel TW 45-94A (SCT Rio Hill LLC) along U.S. Route 29. 16. [32.5.2(a)] Parcel boundary. Provide curve data for CI, C2, and C3. 17. [32.5.20), 32.5.2(1), Albemarle County Engineering Policy] Utility easements. Indicate the deed book and page reference for all existing utility easements located on the property. 18. [32.5.2(d)] Slopes. Demonstrate where managed steep slopes areas are located on the property. 19. [32.5.1(c)] Dimensions. Show the dimensions of the building footprint on the plan. 20. [32.5.2(n), Albemarle County Engineering Policy] Retaining wall. Label the maximum height of the retaining wall. 21. [Albemarle County Engineering Policy] Sight distance. Indicate the available sight distance for left turn lanes. 22. [32.5.2(b), 4.12] Parking schedule. a. The required parking for this application is 30 parking spaces. Anything over a whole number rounds up to the next whole number, as the use requires more than [insert lesser number] of parking spaces. Please revise. b. Indicate which spaces will be used as employee parking spaces. Staff recommends providing at least one parking space per employee, being mindful of parking needs during overlap times if shift work is anticipated. 23. [32.5.2(n)] Paving materials. Indicate the proposed paving materials for the parking lots and driveways. 24. [32.5.2(n), 4.12.19] Dumpster pad. Provide a detail for the dumpster pad in accordance with Sec. 4.12.19. 25. [32.5.2(q)] Traffic generation figures. Provide traffic generation figures for the property in accordance with Sec. 32.5.2(q). 26. [32.5.2(n), 4.15.5] Proposed sign. If the applicant plans to locate a sign on the property, the intended location of the sign must be shown on the site plan. Please be aware that signs are not approved with the approval of site plans, they are approved through separate permits. See Sec. 4.15 for more information. 27. [32.5.2(e), 32.7.9.4] Landscape features to remain. On Sheet 2, provide a note/label regarding the general composition of the vegetated area at the rear of the property (i.e. evergreen, deciduous, mix of type). For the portion of the wooded area that will remain, provide a Conservation Checklist (attached). (Note: If ARB agrees, preserving this wooded area may act as a substitute for providing an additional large tree along Woodbrook Dr. See review comment #28b below) 28. [32.5.2(p)] Landscape Plan. a. It appears the symbology for the large trees species may have been accidental switched in the legend. Revise. b. Like parking, when calculating the number of street trees needed, if more than`Y' (whole number) of trees are needed, please round up to the next whole number. c. Due to the presence of an overhead power line across the front of the site, the applicant may also need to work with Dominion Power to ensure that the proposed placement of street trees along U.S. Route 29 does not interfere with power line maintenance. d. Staff recommends removing from the plan proposed sodding that falls outside the property boundary. e. See comments from the ARB review regarding other landscaping -oriented comments. 29. [32.5.2(n)] Outdoor lighting. Please be aware that if lighting over 3,000 lumens will be provided onsite, an outdoor lighting plan and schedule, in accordance with Sec. 4.17, will need to be provided as part of the final site plan per Sec. 32.6.2(k). 30. [Comment] Will off -site, temporary easements be needed for construction? Other SRC Reviewers: Albemarle County Engineering Services (Engineer) Emily Cox, ecox2(a),,albemarle.org — Requests Changes, see comments attached Albemarle County Information Services (E911) Andrew Slack, aslackkalbemarle.org—No Objection Albemarle County Building Inspections Michael Dellinger, mdellinger"bemarle.org — Requests Changes, see comments below 31. Add the following note to the general notes page: a. Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. b. Accessible parking spaces and access isles shall not have a surface slope greater than 1:48. Access isles shall be at the same level as the parking space they serve. c. ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the building department. d. All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. e. Building or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a permit. Asbestos removal permits are required if positive for such. Contact VDOLI for additional requirements and permits for demolition projects. Albemarle County Department of Fire Rescue Shawn Maddox, smaddox(2,,albemarle.mg — Requests Changes, see comments below 32. A knox box will be required on the structure. Please add a note indicating the requirement and that the location can be coordinated with the fire marshal's office. 33. The I T travel way must provide 20' of travel width for emergency apparatus as there is no other way to service the building. 34. Provide the location of the closest hydrant. If the hydrant is more than 250' from the structure then a hydrant must be provided on site. Any existing hydrants identified for use must not impact travel lanes when used for fire suppression. Albemarle County Service Authority Richard Nelson, melson e serviceauthority.org — Requests Changes, see comments below 35. Add note that contractor is to verify sewer lateral size and to connect to it if the lateral is 6". 36. Provide fixture counts and proposed max flow. 37. Show ACSA water main easement. 38. Trees are not permitted in ACSA easements. 39. Call out existing water meter as 1-inch. 40. Contact Tim Brown for information on ACSA car wash program. tbrown@serviceauthority.org. Virginia Department of Transportation Adam Moore, adam.moore2vdot.vir ig nia. og_v — Recommendation, see comments attached Albemarle County Architectural Review Board Patricia Satemye, psatemyegalbemarle.org — Requests Changes, see comments attached County of Albemarle Department of Community Development Memorandum To: Mariah Gleason From: Emily Cox Date: 21 Oct 2019 Subject: W4 Development Car Wash — Initial Site Plan (SDP201900052) The initial site plan for W4 Development Car Wash has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO plan must be submitted and approved before final site plan can be approved. Application can be found here: 2. Show the deed book and page for all existing easements. 3. There appears to be managed slopes on the property. Please show the managed slopes. 4. Proposed grading should show the top and bottom elevations of the retaining wall. A building permit will be necessary for walls over 3 ft. in height. 5. Please label the curbing (CG-6, etc). 6. Sidewalk abutting parking area should be 6' wide. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 orange Road Culpeper Virginia 22701 Stephen C. Brich, P.E. Commissioner October 22, 2019 Mariah Gleason County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP-2019-00052- W4 Development Car Wash L. Initial Site Plan Dear Ms. Gleason: The Department of TrIportation, Charlottesville Residency Transportation an6 Land Use Section, has reviewed the above referenced plan as submitted by Carter Engineering, Consultants, dated August 21, 2019 and find it to be generally acceptable. Please note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B (1) and F, as well as any other applicable standards, regulations, or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Molfre, P.E. Area Land Use Engineer Charlottesville Residency WE KEEP VIRGINIA MOVING COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 9724126 October 23, 2019 Greg DeBacker FBG Law Firm 2500 Daniells Ridge Road, B200, S3A Athens, GA 30606 RE: ARB-2019-102: W4 Car Wash Initial Plan (TMP 04500-00-00-093C0) Dear Mr. DeBacker, At its meeting on Monday, October 21, 2019, the Albemarle County Architectural Review Board unanimously voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: Regarding requirements to satisfy the design guidelines as per § 18-30.6.4(2), (3) and (5): A Certificate of Appropriateness is required prior to final site plan approval. 1. Ensure that the site plan building footprint, renderings, and building elevations show the same design and details, including the depth of the bays. 2. Provide material and color samples, for all materials. Include material and color information for all materials and building components on the architectural elevation sheets (01-A1 and 01-A2). Indicate on the drawings the material and color for the overhead door on the north side (exit) of the tunnel. Provide material and color samples for the canopies, vacuum equipment, and auto sentry and gate equipment. 3. Clearly specify if the large window area on the south end of the front of the building is an overhead door or a window. If it is an overhead door, it is preferred that it be glazed. 4. Show all structures and equipment in the site plan and renderings. Include vacuum canopies in all graphics to allow for a complete review. 5. Ensure that all structures are designed to appear fully integrated into the overall site. 6. Ensure that the material and color of the overhead door on the north side of the building is integrated into the design of the building and the character of the EC. If it is an overhead door, it is preferred that it be glazed. 7. Submit a window glass sample and specs with the next submission. 8. Add the standard window glass note to the drawings with the next submission: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. 9. Provide detail drawings and color samples for the vacuum and auto sentry equipment. 10.Provide in the plan all pay station and vacuum station -related elements (canopies, trash cans, lighting, pay stations, etc.). 11. Eliminate the under -mounted LED lights contained in the vacuum equipment. Provide drawings that confirm the lack of illumination. 12. Provide a dumpster screen detail in the site plan. 13. Ensure the dumpster is shown in the same location throughout all drawing sets. 14. Provide preliminary information on vacuum and pay station -related signage for review. 15. Revise the drawings to show where building- and car wash -related equipment is located. If the location is inside the building, note this on the plans. If located on the rooftop, provide a roof plan showing equipment locations, and show the equipment locations and heights on the elevation drawings. 16.Add the standard mechanical equipment visibility note to the drawings with the next submission: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 17.Provide a complete lighting plan for review. Include all building- and ground - mounted lights in the lighting plan. Include specifications and manufacturer's cut -sheets for all proposed light fixtures. 18. Remove the light fixtures shown above the three awnings in the middle bay of the EC elevation. 19. Include the following standard note on the lighting plan: Each outdoor luminaire equipped with a lamp that emits 3, 000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle. 20. Provide the required large shade trees along the EC. Locate these to be outside of the power easement. 21. Provide flowering ornamental trees interspersed among the required large shade trees. 22. Revise the plant schedule so that the shade trees along the EC are 3'/" caliper at time of planting and the street trees proposed for Woodbrook Drive are 2'/i' caliper at time of planting. 23. Provide one more large tree parallel to Woodbrook Drive. 24. Add one more medium or large shade tree 2'/z caliper at planting to the planting area adjacent to the sidewalk on the west side of the building, near the southern entrance. 25. Add two more medium or large shade tree 2 % caliper at planting to the planting areas adjacent to the sidewalk perpendicular to the building that connects the parking lot, entry aisles and building. 26. Provide at least four large trees along the west, and one more large tree along the north, perimeters of the parking area. These trees must be at least 2 %" caliper at time of planting. 27. Provide screening for the vacuum stations, the auto sentry and gate, and all associated equipment. Provide screening shrubs along the southern and northern borders of the property and along portions of the EC frontage that are not screened by the building. The screening shrubs must be of a species, spacing, and height that will provide the screening of all mechanical equipment at the time of planting. If screening of mechanical equipment is provided elsewhere then provide screening shrubs to the south, along the stormwater management basin, at a minimum planting height of 24" to minimize the impact of the stacking area. 28. Provide large shade trees, 2'Y2" caliper at planting, in the planting island between the entrance drive aisle and the parking spaces to help screen the vacuum equipment. 29. Revise the planting height for the Inkberry and Yaupon Hollies to be at least a minimum of 24". 30. Provide shrubs or other vegetation along the front of the building. 31.Add the standard plant health note to the landscape plan: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 32. Provide a pedestrian connection between the internal sidewalk and the sidewalk along the edge of the EC. 33. Provide a label specifying the maximum height of the proposed retaining wall. 34. Revise the proposed contours such that they appear natural, rounded and do not have less than a ten -foot radius throughout the site and where they blend with the existing topography. 35. Provide the conservation checklist in the site plan. 36. Provide a tree protection fencing detail in the site plan and show the tree protection fencing in the Grading and Draining Plan sheet. 37.Sign applications are required for all proposed signs. Eliminate cabinet style signs or limit them to secondary signs. All cabinet type signs must have opaque backgrounds. Reduce the number of colors used in the sign to be no more than three (including white). Eliminate overly intense colors from the sign proposal. • Regarding recommendations on the plan as it relates to the guidelines: 1. Consider balancing the heights of the towers. 2. Consider moving the building further away from the EC, while maintaining parking and equipment behind the building (as viewed from EC). 3. Consider shifting the travel lane to the south to create additional planting area for screening in the planting island. • Regarding recommended conditions of initial plan approval: Prior to Initial Plan approval: None. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Provide the conservation checklist in the site plan. 2. Provide a tree protection fencing detail in the site plan and show the tree protection fencing in the Grading and Draining Plan sheet. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.orq/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, , Paty aterre Senior Planner cc: Allen & Allen Properties 1809 Staples Mill Road Richmond, VA 23230 File County of Albemarle Conservation Plan Checklist — To be placed on Landscape Plans (Handbook, pp III-284-111-297 for complete specifications) The following items shall be shown on the plan: ❑ Trees to be saved; ❑ Limits of clearing (outside dripline of trees to be saved); ❑ Location and type of protective fencing; ❑ Grade changes requiring tree wells or walls; ❑ Proposed trenching or tunneling beyond the limits of clearing. 2. Markings: ❑ All trees to be saved shall be marked with print or ribbon at a height clearly visible to equipment operators. ❑ No grading shall begin until the tree marking has been inspected and approved by a County Inspector. 3. Pre -Construction Conference: ❑ Tree preservation and protection measures shall be reviewed with the contractor on site. 4. Equipment Operation and Storage: ❑ Heavy equipment, vehicular traffic and storage of construction materials including soil shall not be permitted within the driplines of trees to be saved. 5. Soil Erosion and Stormwater Detention Devices: ❑ Such devices shall not adversely affect trees to be saved. 6. Fires: ❑ Fires are not permitted within 100 feet of the dripline of trees to be saved. 7. Toxic Materials: ❑ Toxic materials shall not be stored within 100 feet of the dripline of trees to be saved. 8. Protective Fencing: ❑ Trees to be retained within 40 feet of a proposed building or grading activity shall be protected by fencing. ❑ Fencing shall be in place and shall be inspected and approved by a County Inspector prior to grading or construction. 9. Tree Wells: ❑ When the ground level must be raised within the dripline of a tree to be saved, a tree well shall be provided and a construction detail submitted for approval. 10. Tree Walls: ❑ When the ground level must be lowered within the dripline a tree to be saved, a tree wall shall be provided; and a construction detail submitted for approval. 11. Trenching and Tunneling: ❑ When trenching is required within the limits of clearing, it shall be done as far away from the trunks of trees as possible. Tunneling under a large tree shall be considered as an alternative when it is anticipated that necessary trenching will destroy feeder roots. 12. Cleanup: ❑ Protective fencing shall be the last items removed during the final cleanup. 13. Damaged Trees: ❑ Damaged trees shall be treated immediately by pruning, fertilization or other methods recommended by a tree specialist. NOTE: IT IS THE DEVELOPER'S RESPONSIBILITY TO CONFER WITH THE CONTRACTOR ON TREE CONSERVATION REQUIREMENTS. OWNER SIGNATURE (DATE) CONTRACT PURCHASER SIGNATURE (DATE) 5/1/06 Page 1 of 1