Loading...
HomeMy WebLinkAboutWPO202000053 Correspondence 2021-03-25® COLLINS ENGINEERING March 24, 2021 Emily Cox Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Pleasant Green Phase ll— VSMP(WPO 202000053) 20o GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Thank you for your comments dated March 18, 2021 on the above referenced project. Please see the detailed responses below describing how the remaining comments were addressed. A. Stormwater Pollution Prevention Plan (SWPPP) 1. The areas have been updated to reflect a phase I total area of 15.51 acres (13.15 ac. onsite + 2.36 ac. offsite). 2. The form has been updated to address this comment. B. Pollutior -ntion P ^P) 1. Cc add C. Stormwater Management Plan (SWMP) 1-2 Ca 3. The FDP Plan number will be provided prior to final approval. 4-13.Cc 14. It is acknowledged that this issue will be required to be resolved prior to plan approval. 15. The water quality calculations have been updated to include the additional 2.36 acres noted above in comment A.1 and its 0.18lbs/yr of phosphorous nutrient credits purchase. This update is shown on sheet 16 and in the water quality calculations portion of the attached report. Please note, a revised and sealed cover sheet was added to the report as well. 16. The 0.27 Ibs/yr of phosphorous nutrient credits purchased for the vacation of an existing/offsite SWM Forest and Open Space Easement have been removed from the computations. A note referencing this has been added to the 'Pleasant Green Water Quality Master Plan' summary shown on sheet 16 and within the water quality portion of the calculations packet. 17. The sentence referenced in this comment has been removed from sheet 1. 18. Sheets 22, 23 and 24 have been added to the plans. In a March 23'd conference call it was determined the most important part of these sheets is the depiction of the SWM Forest & Open Space easements and their acreages. These easements and areas are shown on sheets 22-24 and the easements include a cross -hatch pattern. Also per this conference call, the conservation area below Level Spreader'C' was revised and is now simply shown within the proposed SWM access and maintenance easement. It was determined in the March 231d conference call that the filter strip areas and conservation area should be located within the proposed stormwater management access and maintenance easements and they do not require separate easements. And lastly, the'SWM Forest & Open Space Easement Notes' have been added to sheet 22 in the bottom -left corner of the page. D. Erosion and Sediment Control Plan (ESOP) 1-11.Co 12. The ESC sheets' labels have been revised to specify specific sheet numbers instead of simply stating 'See SWM Sheets' for details. E. Mitigation Plan 2. The mitigation plan has been updated on sheet 21 to show and label the inner 50' of the 100' buffer. Please note, the level spreaders, filter strips and conservation area in question are not located within the inner 50'. Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com or Graham Murray at graham@collins-engineering.com . Sincerely, Graham Murray, PE