Loading...
HomeMy WebLinkAboutSDP202000018 Correspondence 2021-03-24 (3)SHIMP ENGINEERING, P.C. Design Focused Engineering March 24, 2021 Richard Nelson Albemarle County Service Authority 168 Spotnap Road Charlottesville, VA 22911 RE: Response Letter #4 for SDP-2020-00018 (Brady Bushey Ford — Major Amendment) Dear Richard, Thank you for your review of the major site plan amendment for Brady Bushey Ford. This letter contains responses to County comments dated March 23, 2021.Our responses are as follows: 1. Submit 3 hard copies and water/sewer data sheets for review and approval. RESPONSE: 3 hard copies will be submitted to ACSA. ' Please clarify what fixtures are serving what building. Audi/Porsche Service Building VW Mazda Total Lavatory 5 3 2 3 13 Urinal 0 2 0 0 2 Toilet 5 5 2 3 15 Fixture Value 60psi) # of Fixtures Fixture Value Lavatory 1.5 13 19.5 Urinal (Pedestal Flush 35 2 70 Toilet (Flush Valve 35 15 525 Site Total 614.5 Audi/Porsche/Service Buildin Fixture Value 60psi) # of Fixtures Fixture Value Lavatory 1.5 8 12 Urinal Pedestal Flush 35 2 70 Toilet Flush Valve 35 10 350 Audi/Porsche/Service Building Total 432 Volkswagen Fixture Value 60psi) # of Fixtures Fixture Value Lavatory 1.5 2 3 Urinal Pedestal Flush 35 0 0 Toilet Flush Valve 35 2 70 Volkswagen Total 73 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com Mazda Building Fixture Value 60psi) # of Fixtures Fixture Value Lavatory 1.5 3 4.5 Urinal Pedestal Flush 35 0 0 Toilet Flush Valve 35 3 105 Audi/Porsche/Service Building Total 109.5 3. Sheet C5: Adjust water main alignment as shown on PDF. RESPONSE: Comment received. The water main alignment has been adjusted to be pulled away from the parking spaces. 4. Call out WA tee and have a 6" reducer afterwards. RESPONSE: Comment received. Please see the updated utility plan. 5. Shift proposed FHA 2' away from edge of pavement. RESPONSE: Comment received. Please see the updated utility plan. 6. Labeling is congested behind Building B. RESPONSE: Thank you for bringing this to our attention. The notes have been adjusted for better legibility. 7. Move FHA closer to the end of island. RESPONSE: Comment received. Please see the updated utility plan. 8. Sheet C6: One of the proposed trees in a parking island is within the proposed easement. This may be corrected once the alignment is shifted. RESPONSE: Comment received. Please see the adjusted water main and ACSA easement and the revised landscape plan. 9. I will discuss the proposed trees within the ACSA easement along 250 with Pete and Jeremy. RESPONSE: Thank you, we have received ACSA's approval separately and have provided this documentation to ARB. If you have any questions or concerns about these revisions, please feel free to contact me at keane@shimp-en ing eering com or by phone at 434-227-5140. Regards, Keane Rucker Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com