Loading...
HomeMy WebLinkAboutWPO202100014 Correspondence 2021-03-29® COLLINS ENGINEERING March 25, 2021 Frank Pohl, PE Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Berkmar Overlook —Townhouses— VSMP Plan(WP0202100014) 20o GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Thank you for your comments dated March 17, 2021 on the above referenced project. Below are our detailed responses to your comments. Should you have any questions during your review and approval of this project, feel free to contact Scott Collins at scottPcollins-eneineerine.com or at (434) 293-3719. A. Stormwater Pollution Prevention Plan (SWPPP) 1. Acknowledged. A copy of the DEQ Construction General Permit has been provided. B. Pollution Prevention Plan (PPP) 1. No comments C. Stormwater Management Plan (SWMP) 1 d�L.,nulaa�o1 2. Erosion and Sediment Control Plan (ESOP) 1. The county project number has been added to the cover sheet. 2. The proposed impervious areas are shown on the plan sheet. 3. The plan sheet has been updated and yard inlet locations are now consistently shown with the WPO 201900050 Amendment #1. Also, the requested Swale has been added between lots 26 and 27. 4. Acknowledged. 5. The area associated with this plan is shown and labeled on sheet 3 and is 0.70 acres. This area is located within the existing/permitted limits of disturbance. 6. The limits of disturbance shown and labeled on sheet 3 match the registration statement and is 9.69 acres. The area associated with this plan is located within the existing/permitted limits of disturbance. 7. The front roof drains for lots 7-52 will tie directly into the lightly shaded roof/yard drains shown in front of the buildings on sheet 3. The front roof drains for lots 1-6 will drain to the cul-de-sac. The rear roof drains for lots 1-52 will tie directly into the lightly shaded roof/yard drains shown behind the buildings on sheet 3. Also, a note has been added in the upper -right corner of sheet 3 that mandates the Contractor tie the proposed applicable roof drains directly into the roof/yard drains. 8. The plat has not been approved yet, and TMP numbers have not been assigned to the lots. 9. The existing and proposed easements are shown on the plan sheet. 10. The plan set name has been updated to'Berkmar Overlook —Townhouses' to alleviate any confusion between the two projects. 11. A copy of the DEQ Construction General Permit has been provided. 12. The notes about offsite improvements have been removed. 13. The notes about sediment basin calculations have been removed. Sincerely, Scott Collins