Loading...
HomeMy WebLinkAboutSE202000019 Review Comments Waiver, variation or substitution requirement 2021-03-25SHIMP ENGINEERING, P.C. Design Focused Engineering March 25, 2021 Christopher Perez Albemarle County Community Development 401 McIntire Road, North Wing Charlottesville, Virginia22902 RE: SE202000019 CB RISTIAN AID MISSION ENTRANCE — SLOPES WAIVER Dear Chris, Thanks for your review of SE202000019, a request for critical slopes disturbance to establish a new entrance location off of Broomley Road to the Christian Aid Mission property. In response to comments received and a follow-up meeting between Planning, VDOT, and Engineering, we specifically focused on addressing Comment #1 from Engineering, "A waiver is required for access aisles greater than 10%. It appears the road can be relocated where it enters the existing improvements to provide a 10% or less max grade. Additional exhibits will be needed if the waiver is requested." We revised the proposed entrance grade to a max of 10% and included a curb along the northside of the proposed accessway, this ultimately reduced the amount of critical slopes disturbance and so we have revised our request to request 4,950 SF of slopes disturbance. This request is reflected in the updated exhibit sheets and project narrative. If you have any questions, please do not hesitate to contact me at kelseykshimp-en ing eering com or by phone at 434-227-5140. You can also contact Justin Shimp at Justin@shimp-en ing eering com. Best regards, Kelsey Schlein Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com SHIMP ENGINEERING, P.C_ Design Focused Engineering Project Narrative For: Special Exception for Christian Aid Mission Parcel Description: Tax Map 59, Parcel 23G1 Initial Submittal: Date October 26, 2020 Revised: Date(s) January 11, 2021 March 25, 2021 Pre-App Meeting Date: Date June 8, 2020 ACREAGE EXISTING LAND USE COMP PLAN ZONING DESIGNATION TMP 59-23G1 12 AC Commercial Semi -Public Rural Areas Office Additional Zoning Considerations: Entrance Corridor, Critical Slopes Location: Northeast corner of the intersection of Route 250 and Broomley Road Project Proposal: Christian Aid Mission is the owner (the "owner") of tax map parcel 05900-00-00-023G1, a 12-acre property located at the northeastern corner of the intersection of Ivy Road (Route 250) and Broomley Road (the "property"). The owner desires to construct a full -access entrance to the site from Broomley Road; construction of this entrance will require disturbance of 4,950 square feet of critical slopes. Although the property is zoned commercial office, it is designated within the Rural Areas of the Albemarle Comprehensive Plan and therefore, granting of a special exception is required for the disturbance of these slopes. A special exception request for slopes disturbance on the property to establish an entrance from Broomley Road was previously brought before the Board of Supervisors in 2014. Staff recommended approval of the 2014 special exception request, siting that slopes disturbance was necessary to establish a safer site entrance to the property and that the slopes slated to be disturbed appeared to be man-made. The request was denied by the Board of Supervisors with several of the Supervisors siting the premature nature of the request with the impending reconstruction of the Broomley Road Bridge. In the Board minutes from August 13, 2014, it is noted that, "[Supervisor Palmer] thought the Broomley Road entrance could potentially work and could improve the safety of the area, but there is a bridge going in and the corridor will probably look much different after that happens. She added that she would not approve the Broomley Road entrance as this time. Ms. Palmer said that they do not want to put in an entrance they have to live with that is in the wrong spot, and they may be creating something very dangerous that will be there for years — so they could look at this at a later date and put the entrance further back if they choose," And it is noted that Supervisor Sheffield "said that if Broomley Road is required, he does not support the expansion [of the Regents School] because he does not support use of that road — specifically because 912 E. High St. Charlottesville, VA 22902 1434.22Z51401 shimp-engineering.com there is a better opportunity to create the entrance once the bridge is built;" additionally, Supervisor McKee) "stated that the new bridge will go out to bid in December, so the construction will start fairly quickly and will take 18 months — so that area would look very different. She said that approving an entrance onto Broomley Road would be very short sighted, because it is possible they could end up with an entrance VDOT might not approve, or would not be safe, so it is just not the time to be putting an entrance there." With the reconstruction of Broomley Road bridge completed in late 2015, this request to disturb critical slopes to establish a full access entrance from Broomley Road may now be considered in the context of a corridor with significant road improvements that have been made since the request was previously evaluated by the Board of Supervisors. In addition to the road improvements that have been completed since the 2014 special exception was heard before the Board of Supervisors, this request also differs from the 2014 request because the proposed location of the entrance is several hundred feet north of the entrance location proposed in 2014. The proposed entrance location that necessitates the disturbance of critical slopes with this request is nearly 460' from the signalized intersection of Route 250 and Broomley Road; this spacing exceeds the minimum spacing required between full access entrances on collector streets and signalized intersections. The 2014 Board minutes reflect the concerns from neighbors regarding the spacing of the Broomley Road entrance from the Broomley Road and Route 250 intersection; this proposed redesign of the entrance location addresses many of those concerns relating to the location of the 2014 entrance proposal and the entrance has been moved several hundred feet north with this request. A third reason that this proposal differs from the 2014 special exception request is that with the approval of SP201800011, the Regents School of Charlottesville was granted approval to operate on a property off of Reservoir Road in Albemarle County and so in anticipation of the Regents School of Charlottesville moving to their new location off of Reservoir Road, the owner requests the Board of Supervisors approve the disturbance of critical slopes for the construction of a full access entrance off of Broomley Road to better serve the Christian Aid Mission and/or a future user on the property with a safer full access entrance once the property is no longer encumbered by the conditions triggered by the operation of a private school use. Previously, the entrance request was made to better serve the Regents School traffic however, this request is focused on how the property will function and serve its users with safe points of ingress and egress once the school is no longer operating on the property. The partial access entrance constructed by Regents School of Charlottesville restricts exiting movement to right -out only. Presently, the Regents School of Charlottesville effectively manages their traffic to ensure traffic exiting the site needing to travel east makes a U-turn in a designated location on private property however, a by -right user may not have the ability to manage their traffic as effectively as a private school and so drivers who need to head east out of the site are likely to make an illegal U-turn at Broomley Road, or use private parking lots along Route 250 to turn around and head east. Allowing for a full -access entrance on Broomley Road allows traffic from the site traveling east to exit the site and make a controlled left turn movement onto Route 250 at the stop light at the intersection of Route 250 and Broomley Road. The applicant proposes, as a condition of critical slopes disturbance approval, that the existing channelization island at the entrance at Route 250 remain in place, guiding right -out traffic to make use of SE 2020-00019 12 the existing entrance, while left -out traffic would use the Broomley Road entrance to make a controlled left turn from Broomley Road and head east on Route 250. In accordance with Sec 4.2.5(a.)(1.) address the following (the public, health, safety, and welfare factors): Rapid and/or Large -Scale movement of soil and rock The disturbance of critical slopes will require cutting into existing native soils (see attached section exhibit). Cutting into existing native soils and existing slopes does not create high risk of rapid or large- scale movement of soil and rock, as opposed to place fill on top of a sloped area. Cut slopes are no steeper than 2:1. Adherence to County erosion and sediment control measures, as well as stormwater regulations shall protect against erosion that could lead to rapid or large-scale movement of soil and rock. Excessive stormwater run-off An engineered ditch and swale are proposed along the southern edge ofthe new entrance and accessway and a curb is proposed along the northern edge of the accessway to prevent excessive stormwater run-off. A drainage inlet is to be provided at the end of the ditch, piping stormwater to the existing riprap on the other side of the entrance. The proposed stormwater management features must additionally be in accordance with County regulations, which are in place to effectively manage stormwater run-off. Siltation of natural and man-made bodies of water, loss of aesthetic resources The proposed improvement will be subject to the County's Water Protection Ordinance, with erosion and sediment control measures provided at the time of construction. While a stream exists approximately 700' northwest of the proposed entrance, a railroad right-of-way with an accompanying ditch is present between the property and the stream. With the proposed ditch, the presence of the railroad bed, and compliance with the County ordinances in place, it is highly unlikely that impacts would directly affect the stream. As the critical slopes have been previously graded by the Virginia Department of Transportation during the reconstruction of the Broomley Road Bridge and during the construction of the ditch adjacent to Broomley Road, they do not provide an aesthetic resource in this area. In the event of septic systems failure: a greater travel distance of septic effluent This factor is not applicable, as the site will connect to public sanitary services as there is a standing approval for public sanitary connections for existing buildings. In accordance with Sec. 4.2.5.3, please consider the following findings: a. Strict application of the requirements of section 4.2 would not forward the purposes of this chapter or otherwise serve the public health, safety or welfare; The construction of a safer entrance from Broomley Road that would facilitate controlled left -out movements from the property may better forward the health, safety, and public welfare than the preservation of critical slopes that were man-made and a portion of which were recently disturbed with the reconstruction of the Broomley Road bridge. b. Alternatives proposed by the developer or subdivider would satisfy the intent and purposes of section 4.2 to at least an equivalent degree; There are no proposed alternatives proposed with this request; the installation of an entrance anywhere on Broomley Road would require disturbance of critical slopes. SE 2020-00019 13 c. Due to the property's unusual size, topography, shape, location or other unusual conditions, excluding the proprietary interest of the developer or subdivider, prohibiting the disturbance of critical slopes would effectively prohibit or unreasonably restrict the use of the property or would result in significant degradation of the property or adjacent properties; or The critical slopes disturbance is necessary to establish a safer entrance. At a time when the property is not encumbered by the conditions of the special use permit which are triggered by the active operation of a private school on the property, the owner may remove the existing right- in/right-out island at the property's entrance from Route 250 if there were no conditions, such as those that may be imposed with the approval of a special exception, prohibiting the removal of the island and this condition may create unsafe conditions both for those exiting the property and those traveling on Route 250 by creating a conflict point where angle collisions may be more likely. d. Granting the modification or waiver would serve a public purpose of greater import than would be served by strict application of the regulations sought to be modified or waived The disturbance of critical slopes would allow for a safer entrance to be installed which would more significantly serve the public safety than would the preservation of these particular critical slopes that are subject to this disturbance request. Proposed Condition of Approval: Channelization island in Route 250 Commercial Entrance to remain to prevent left turn egress movements from the site to Route 250. Summary of Attached Exhibits: Two exhibits are provided with this submittal and per request of the County, VDOT crash data is provided. An alternative entrance exhibit was requested by the County, to see if moving the entrance to the existing gravel road was feasible. While it is feasible, the travelway is increased in length to meet the required grade and results in increased critical slopes disturbance, the location of the entrance proposed with this application meets VDOT intersection spacing standards and minimizes slopes disturbance when compared to the alternate location shown in the exhibit. A cross section of the proposed entrance depicts the cut section into critical slopes, which demonstrates that the accessway and adjacent ditch would act as a graded bench. The graded bench would be constructed within the existing critical slope, capturing stormwater run-off rather than allowing drainage to sheet flow across a steep slope. Attachments: Entrance Location Exhibit Section A -A' Exhibit VDOT Collision Data SE 2020-00019 14 10 0 r A' _ --- ---- =�-- \� a 1 F �J — _ - r I a i :' r + / r i r 640 _ . _ , _- . _- . _ Proposed grade ---- - - - - -_ -------------------------------------- ---- -- ` ----------------------------------------- 630 - — — — — — — — — — — — — — — — 5H R i - - - - - - - - - - - - - - - - - - - - - - ----------------------------- - - - - ---6.O`-------------24'---------- ----"----------Fxistingg�ede -------------------------------------fltT�H----------AGGESSWAY-------------- ��-- ----------------------------------------------------------------------------------"-%%------------------------------ 620- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — �' — — — — — — — — — — - ----------------------------------------------------------------------------------------------------------- �. ----------------------------------------------------------------------------------------------------- -. -- ----- -----------------------------------------------------------------------------------------------------------_ - 10 20 30 CRITICAL SLOPES DISTURBANCE Graphic Scale: 1 "=10' SECTION A -A' EXHIBIT Prepared by. Shimp Engineering TAX MAP PARCEL 05900-00-00-023G1 January 11, 2021 40 0 40 80 120 Graphic Scale: 1"= ENTRANCE LOCATION EXHIBIT TAX MAP PARCEL 05900-00-00-023G1 Prepared by. Shimp Engineering January 11, 2021 March 25, 2021 TAX MAP PARCEL ZONING 59-23G 1 Commercial Office OWNER/DEVELOPER MAGISTERIAL DISTRICT Samuel Miller Christian Aid Mission 555 Broomley Road SOURCE OF TITLE Charlottesville, VA 22901 DB 4327 PG 504, 506 PLAN PREPARATION Shimp Engineering, P.C. 912 East High Street Minimum Spacing Standards for Commercial Entrances Functional Classification Design Speed Type Minimum Spacing Required Spacing Provided Existing Route 250 Minor Arterial 45 mph Type 4 - Partial Access 250 ft 609 ft Entrance Proposed Broomley Minor Collector <- 30 mph & Type 2 - Unsignalized/Full 440 ft 460 ft Road Entrance 35-45mph Crossover `Virginia Department of Transportation, Appendix F, Access Management Design Standards for Entrances and Intersections, Table 2-2 Minimum Spacing Standards for Commercial Accesses, Intersections, and Median Crossovers - - - Charlottesville, VA 22902 / C (434) 227-5140 \ SOURCE OF BOUNDARY AND TOPOGRAPHY Boundary & topographic survey provided by: Kirk Hughes & Associates, February 27, 2006, revised November 8, 2019 CRITICAL SLOPES CALCULATION Critical slopes calculated only in area around proposed entrance with surveyed topography - - — - - - - - - - - - -------' CRITICAL SLOPES DISTURBANCE - - - Proposed 4,950SF of critical slopes disturbance—__--------------------------------------------------------- — — —- _ W �� -• -].. -- O — _ Q _ _ ____________------------------ / / / / _ � _ _ / s{ r4=y✓/j�fi�i��� Y SX�irytf��ff�i, . -ii // � � \ � !\ \1 t — / ✓ ,/ /r y ------------- ------------- y' - - ___ _ _ _ _11 ----------------- -- - - - \ \ --_ - f'f _ _ _-- —_ = - - _ \ — — — `\ \ W — �/[ 3 � _ ---- �I �. -,A n/ �%✓/ % 1. / ___--`_ \.. .`� _------- _ \ — _ _ a a ,, x✓ F _ .. _ _ i v,� ✓'j/ I / \\``. -- _ --_ --_ _ — _ AA __ ___ N. In ` \ `\ I I \ V'/ �_ i \ I ,� _SHIMP �z �-- kJ zr ��� 'I NGINEERING2 - LAND PLANNING -PROJECT MANAGEMENT \ ¢ Q _ ------------------- --p \ \ `\ 11 ` `\ 912 E. HIGH ST. 434.227.5140 t - - - \ J / I;/ , tf/ \ i_n - 7 ��,�`2. .-• i 1 -- - __ _ CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM ---------------------- - I�,-------------- / ------ W p �., _ / N � `\ � Z /- - - _ fj I ` / I 11459 TI AMP 45183 I \V/ , L !J / I 11 / / i' '> ," ``` / ..._ F.�... _ :. \ / / � �- �o�lo �\ \\ (r8I0NAL I o e i//✓ I l i �// E�i V /� ` `v `v `vv V �` +i I �i i i i i �� r 1 I I / > I IIII 1 SPECIAL EXCEPTION EXHIBITS CHRISTIAN r i l 1 1 1 \ 1 111�1 II r 1, ( r / / - -__ i / r 1FIy/ r I ( ;A _ AID MISSION I r r - ----------------- _ - \ - ALBEMARLE COUNTY, V IRGINIA --------- SUBMISSION: -- ---2020.10.26 REVISION: 2021.03.25 I + / N 79470 .Q / _______ _ _ 1 _ I ------- I o FILE NO Vi ` 19.068 -------- » U \ EXISTING & PROPOSED -. ENTRANCES 40 0 40 80 120 t Scale: 111=40' C 1 SITE AERIAL � w I v ¢ w o z� J z :I I :I 160 240 iI J i/i ------- ----- t/r, - $ /r r/ ///-' �zo� \ - ter- / v /� - / / j//ter//i _ f/ �//7f/ / _ - _ _ _ 1/�► _1�/'� X �',(/a X * —� N -r �%' -- - ---- - '-- lXX Y �_ \ Y y /✓�/� '/ i/ / r' _ -- fY// X - __-_ --- vi I I — % 7/ < ///�/ /�+/ / // // /� / /✓//i//y�Y /x � ' % / n--------------- = Yrr, / w I f// '// i N Y 6c�0 b&g / - _ -G54"" ----- / _ / �� aw y i / /f 5 F�� , --__-- `\\— IN__-----_ \\ \ \ _ _ — f IN IN IN I IM�II ,/ \ \ \. ` �lii ��__% % \ \ \ \ \ / ✓% _ _sr¢e� __� �^\ �\„ \\ �\ \, \ \I �..i _ `��\ \\ •,. � a, as a\ -`� � �� ����—?�A'a )A t.' _— —__�� Viala la AAA IN I aAA\ i / al / .v ; - vi /"• N, I _ a — x i<o >N, oo,i �.�.-_ ---_ ji rr l�.� A V \ a a A T;: AV A--��_.— — / is y / t..' \a..a A.` v IN � I, P/ * I IN IN \ �_ r - + - a_----- I -. . EXISTING CONDITIONS CRITICAL SLOPES SHOWN PROVIDED BY ALBEMARLE COUNTY GIS :1 1 :1 160 240 i/ SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM NLTH Op o �tJS�� J JUSTI� o. HIMP 45183 T/lr`r AT P.�J SPECIAL EXCEPTION EXHIBITS C H RISTIAN AID MISSION ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.10.26 REVISION: 2021.01.11 2021.03.25 19110/6/ EXHIBITS PROPOSED ENTRANCE & SLOPES DISTURBANCE 80 ° 8° I60 240 CRITICAL SLOPES SHOWN DERIVED FROM SURVEYED TOPOGRAPHY, KIRK HUGHES & ASSOCIATES, FEBRUARY 27, 2008, Scale: I °=80' REVISED NOVEMBER 8, 2019 C 2 VDOT CRASH DATA SE202000019 CHRISTIAN AID MISSION CRITICAL SLOPES DISTURBANCE REQUEST Collision Data Location: Route 250, MP 90.7 to MP 91.6; generally, this is from .25 miles west of the intersection of Broomley Road and Route 250 to .6 miles east of the Broomley Road and Route 250 intersection. The existing entrance to tax parcel 59-23G1 from Route 250 is approximately 600' east of the intersection of Broomley Road and Route 250. Source of Data: The data provided in this crash data report was pulled from VDOT's Crashtools8_2 Timeline: This crash data was collected from 12/26/2014 to 9/20/2020 Summary: There were 49 collisions along this .85 mile stretch of Route 250 between the end of 2014 and the fall of 2020. There was one collision near the entrance of the existing entrance to the property from Route 250, this one collision was a rear end collision caused by a vehicle following too closely. Two of the 49 collisions along this stretch were angle collisions, angle collisions are typical with collisions occuring from vehicles turning into or out of entrances. Collision Map (Figure 1): aemonm seiecueee a t hm nuomn Na Flo,do, Dr Die eaua�eatl iy SITE NORTHRIDGE ®eoz� mepm. a ov�sremrt�o SHIMP ENGINEERING, P.C. Collision Data (Figure 2): The data provided below corresponds to the data plotted in Figure 1 .m.w. ".m flIN a0.00 w.q 62M c.... ml.io.. C0 .Mxl.xtcs. •.00 roxu7 3015 Imx.r ON 100 1 am 2W 2 =16 ON 0.00 ON a00 1.00 Oa0 0 0..0 100 0 1 400 5 .11 am ON ON am 100 a00 0 ON 1.a0 0 1 am 10 3016 ON am ON ON am 100 0 ON ON 1 1 low 11 x016 ON 0.00 ON 0.00 ON Sa0 0 ON ON 4 4 a00 10 mM am 0.00 am am ON Aa0 0 am ON 2 2 6aU 6 100 am I'm a00 aa0 11.m 1 a- 4- 1 11 -M 19 a of 9 0 0 0 9 0 0 0 0 a 9 0 0 0 a a a 9 0 0 a 9 a 0 0 0 a 9 0 0 0 a 9 a 0 ....... ...... 9 ....... ...... ......... ........ .I..... ..... ...... ...... ....., a pa p 6 .... .... __ __. l . ........... 1 .............. t 1 1 1 t 1 1 1 1 1 8 g f as qa f 9 R Y 0 p f L p 4 C 0 Y 8 Y 9 Y p L L p 8 Y 4 0 9 f 8 fl R 0 W W R R R R W W fl fl W W fl W fl W W W W R fl W fl W W fl fl W W W fl fl W .6�llm�q ■im 19� ■fC..w ■aYF1.aClO�n 9m.a.fm ■im q..■im Vq.gs1.4. Collision Data near Existing Property Entrance (Figure 3): There was one collision in very close proximity to the existing property entrance since late 2014. This was a rear end collision that was caused by a vehicle following too closely. SHIMP ENGINEERING, P.C. Collision Data for Angle Collisions: There were two angle collisions along this .85 mile stretch of Route 250 since late 2014. Angle collisions are typical with collisions occurring from vehicles turning into or out of entrances. SHIMP ENGINEERING, P.C.