Loading...
HomeMy WebLinkAboutSDP202000077 Correspondence 2021-03-29 (2)COLLINS ENGINEERING Date: 3/22/21 Attention: Albemarle County Fire/Rescue Project: White Gables Major Site Plan Amendment Project Fire Flow Requirements Dear Mr. Maddox: Please allow this letter to serve as a formal fire flow certification for the White Gables condominium buildings Pavilions II, IV, & VI. Below are the required ISO fire flow requirements for the buildings to service them with the necessary fire flow, based on ISO calculations for Needed fire flow. White Gables Pavilions II, IV, VI project ISO Calculations for Needed Fire Flow Known Factors: 1. Construction Class Factor = 0.8 2. Occupancy Factor = 0.85 3. Total Exposure = 1.0252 BLDG # BLDG Footprint Effective Area Construction Factor Needed Fire Flow Sprinkler Reduction Required Fire Flow Pav II 11843 26,250 2,250 1,960 490 1,500 Pav IV 11843 26,250 2,250 1,960 490 1,500 Pav VI 11843 26,250 2,250 1,960 490 1,500 If you have any questions, please feel free to contact me at (434) 293-3719. Sincerely, Scott R. Collins, PE Lic. No. 035791 3/22/21 <<