HomeMy WebLinkAboutSDP202000077 Correspondence 2021-03-29 (2)COLLINS ENGINEERING
Date: 3/22/21
Attention: Albemarle County Fire/Rescue
Project: White Gables Major Site Plan Amendment Project
Fire Flow Requirements
Dear Mr. Maddox:
Please allow this letter to serve as a formal fire flow certification for the White Gables
condominium buildings Pavilions II, IV, & VI. Below are the required ISO fire flow requirements
for the buildings to service them with the necessary fire flow, based on ISO calculations for
Needed fire flow.
White Gables Pavilions II, IV, VI project
ISO Calculations for Needed Fire Flow
Known Factors:
1. Construction Class Factor = 0.8
2. Occupancy Factor = 0.85
3. Total Exposure = 1.0252
BLDG #
BLDG
Footprint
Effective
Area
Construction
Factor
Needed
Fire
Flow
Sprinkler
Reduction
Required
Fire Flow
Pav II
11843
26,250
2,250
1,960
490
1,500
Pav IV
11843
26,250
2,250
1,960
490
1,500
Pav VI
11843
26,250
2,250
1,960
490
1,500
If you have any questions, please feel free to contact me at (434) 293-3719.
Sincerely,
Scott R. Collins, PE
Lic. No. 035791
3/22/21 <<