HomeMy WebLinkAboutARB202100027 Staff Report 2021-04-02ARCHITECTURAL REVIEW BOARD STAFF REPORT
Project #/Name
ARB-2021-27: 999 Rio Road Final Site Plan
Review Type
Final Site Development Plan
Parcel Identification
06100-00-00-154B0
Location
At the east corner of the intersection of Rio Road and Belvedere Boulevard. (See Figure 1.)
Zoned
Neighborhood Model District (NMD)/Entrance Corridor (EC)
Owner/Applicant
Windmill Ventures LLC/Shimp Engineering (Justin Shimp)
Magisterial District
Rio
Proposal
To construct the first phase of a mixed -use development including multi -family attached and single-family attached and detached residential units, with associated site
improvements. A 5,000-sf office building is planned for Phase 2.
Context
The subject parcel is comprised of a ca. 1960 residence and associated outbuildings and wooded area. In the immediate vicinity on the Entrance Corridor is a mix of
large-scale institutional development (Covenant Church to the northwest and CATEC to the southwest) and single-family detached residential development (Dunlora,
two- to three -stories) to the south and east. Single -story commercial development is found on the north side of the corridor just west of the railroad tracks, with
residential on the south side, and a mix of residential, institutional and office beyond. (See Figure 2.)
Visibility
The proposed development will be readily visible from the Rio Road Entrance Corridor. Once constructed, the office building will limit some views of the various
residential units.
ARB Meeting Date
April 5, 2021
Staff Contact
Margaret Maliszewski
PROJECT HISTORY/CHANGES
The ARB reviewed the initial site plan for this proposal on July 6, 2020. (See Figure 3.) Comments from that meeting are included in the Analysis section of this report. The attached units are distributed
differently than in the previous plan and the detached units are now all located in a row at the east end of the south side of the site. Parking between the office site and the attached units has been
extended closer to Rio Road. The sitting garden and dog park have swapped locations near the central Belvedere Blvd. entrance. A dumpster has been added at the southeast corner of the parking lot. The
retaining wall at the southeast corner of the site has been extended further west.
Figure 1: Aerial view highlighting the subject property.
r
Figure 2: Street view showing Covenant Church (left) to the northwest of the subject parcel, the subject parcel with the single -story brick residence (center),
and the Dunlora residential development to the east (right).
�I.
a _
j.
Figure 3: Initial Site Plan reviewed by the ARB on July 6, 2020.
2
i
N 0 m 40
MMIMM
Figure 4: Current site plan proposal with revised distribution of residential units.
ANALYSIS
REF
GUIDELINE
July 6, 2020
CURRENT ANALYSIS/ISSUE
CURRENT
RECOMMENDATION
RECOMMENDATION
ftrpose
1
The goal of the regulation of the design of development within the
Provide architectural
Two sets of architectural designs have been
See landscaping
designated Entrance Corridors is to ensure that new development within
designs with the next
provided for the attached townhouses. The 3-unit
recommendations.
the corridors reflects the traditional architecture of the area. Therefore, it is
submittal. The Rio Road-
and 4-unit blocks (those closest to the Rio Road
the purpose of ARB review and of these Guidelines, that proposed
facing elevation of the
EC) are identified as the Craig Units, and the 6-unit
development within the designated Entrance Corridors reflect elements of
office building and the
block is identified as the Habitat Units. The
design characteristic of the significant historical landmarks, buildings, and
Belvedere Boulevard-
Belvedere Blvd. -facing elevations of all the units
structures of the Charlottesville and Albemarle area, and to promote
facing elevations of the
have a sufficient level of architectural detailing
orderly and attractive development within these corridors. Applicants
multi -family units must be
such that the elevations do not appear blank or
should note that replication of historic structures is neither required nor
designed to appear as front
undesigned. Side elevations of both unit types have
desired.
facades, and side
elevations visible from the
less detail. There are windows at both levels, but
the sides are clearly secondary elevations.
13
Any appearance of "blankness" resulting from building design should be
relieved using design detail or vegetation, or both.
EC street must be treated
Additional trees west of Lot 1 would help mitigate
with architectural detail to
impacts.
eliminate blankness.
2
Visitors to the significant historical sites in the Charlottesville and
None at this time.
The proposed designs incorporate sufficient
None.
Albemarle area experience these sites as ensembles of buildings, land, and
elements of traditional residential design (masonry
vegetation. In order to accomplish the integration of buildings, land, and
and siding materials, gabled roofs, shed dormers,
vegetation characteristic of these sites, the Guidelines require attention to
grouped windows, porches) to establish
four primary factors: compatibility with significant historic sites in the
compatibility with the historic residential sites of
area; the character of the Entrance Corridor; site development and layout;
the county.
and landscaping.
Compatibility with significant historic sites:
None at this time.
The proposed brick and siding materials and their
distribution across the buildings, the shed and
None.
3
New structures and substantial additions to existing structures should
respect the traditions of the architecture of historically significant
gabled roof forms, the porches supported by simple
buildings in the Charlottesville and Albemarle area. Photographs of
columns, and the building heights of approximately
historic buildings in the area, as well as drawings of architectural features,
30'-33' result in buildings that are expected to be
which provide important examples of this tradition are contained in
compatible in scale, materials and form with the
Atmendix A.
area's historic structures. A 25' maximum height is
set for the office building, which is also expected
4
The examples contained in Appendix A should be used as a guide for
building design: the standard of compatibility with the area's historic
to be compatible with nearby development.
structures is not intended to impose a rigid design solution for new
development. Replication of the design of the important historic sites in
the area is neither intended nor desired. The Guideline's standard of
compatibility can be met through building scale, materials, and forms
which may be embodied in architecture which is contemporary as well as
traditional. The Guidelines allow individuality in design to accommodate
varving tastes as well as special functional requirements.
Compatibility with significant historic sites
Structure design
9
Building forms and features, including roofs, windows, doors, materials,
All the proposed units are two stories tall with a
Include brick in the
colors and textures should be compatible with the forms and features of the
pitched roof. The Craig Units have brick at the first
materials list for the Craig
significant historic buildings in the area, exemplified by (but not limited
story with siding above, or brick at both stories.
Units and indicate the
to) the buildings described in Appendix A [of the design guidelines]. The
The materials list on the drawings does not identify
proposed manufacturer and
standard of compatibility can be met through scale, materials, and forms
the brick, but a written description identifies it as
color in the list.
which may be embodied in architecture which is contemporary as well as
`Blue Ridge Regent." The physical sample has a
traditional. The replication of important historic sites in Albemarle County
light tan finish.
Provide a materials list in
is not the objective of these guidelines.
the Habitat Units
architectural drawings.
Paint for the Hardi-siding is Sherwin Williams
"Dovetail" — a medium grey. Trim is white and
Sherwin Williams Sealskin— a dark grey. Dormers,
gables and porch roofs help break up the roofline.
The main roofs have black architectural shingles.
The Habitat Units are proposed with horizontal
Hardi-siding in two very light colors (Cobblestone
and Light Mist) at the first and second stories and
vertical siding in two dark colors (Mountain Sage
and Countrylane Red) at the upper second stories
and gable ends. Roofs have black shingles. The
colors are generally consistent with those of nearby
development.
10
Buildings should relate to their site and the surrounding context of
The proposed houses are expected to be compatible
buildin s.
in height and general character with nearby
residential development but will have a different
5
It is also an important objective of the Guidelines to establish a pattern of
com atible architectural characteristics throughout the Entrance Corridor
in order to achieve unity and coherence. Building designs should
scale and character than the existing institutional
demonstrate sensitivity to other nearby structures within the Entrance
buildings that are nearby.
Corridor. Where a designated corridor is substantially developed, these
Guidelines require striking a careful balance between harmonizing new
The design of the future office building will play a
development with the existing character of the corridor and achieving
role in establishing compatibility and cohesiveness
compatibility with the significant historic sites in the area.
along the corridor.
12
Architecture proposed within the Entrance Corridor should use forms,
sha es, scale, and materials to create a cohesive whole.
11
The overall design of buildings should have human scale. Scale should be
The designs include material changes, grouped
None.
integral to the building and site design.
windows, brick detailing, dormers and porches that
hel establish human scale.
14
Arcades, colonnades, or other architectural connecting devices should be
Most of the units are attached in three blocks.
None.
used to unify ou s of buildings within a development.
15
Trademark buildings and related features should be modified to meet the
The designs may have been constructed in other
None.
requirements of the Guidelines.
locations, but they do not have the appearance of
trademark desi ns.
16
Window glass in the Entrance Corridors should not be highly tinted or highly
The written description of the buildings indicates
Provide the specs on the
reflective. Window glass in the Entrance Corridors should meet the
that window glass will meet the criteria, but this is
window glass. Show that
following criteria: Visible light transmittance (VLT) shall not drop below
not noted on the drawings.
Visible Light Transmittance
40%. Visible light reflectance (VLR) shall not exceed 30%. Specifications
(VLT) will not drop below
on the proposed window glass should be submitted with the application for
40% and Visible Light
final review.
Reflectance (VLR) will not
exceed 30%.
Accessory structures and equipment
17
Accessory structures and equipment should be integrated into the overall
Show the location of
Ground -mounted equipment is shown just west of
Move the equipment
plan of development and shall, to the extent possible, be compatible with
mechanical equipment
the Lot 1 unit. It is surrounded by a screening fence
located west of Lot 1 to
the building designs used on the site.
(building and ground
with a height of 4' 5%". A note on the site plan
eliminate visibility from the
mounted) on the site and
indicates that the fence material is wood, but the
EC.
architectural plans and
fence detail on sheet C10 does not identify the
show how it will be
material. Visibility from the EC would be
Add a note to the screening
screened from the EC.
eliminated if the equipment was located between
fence detail on C10 that the
units 3 and 4, where other equipment is already
fence material is wood.
proposed. In the current location west of Lot 1,
Indicate the finish.
landscaping would be needed to integrate the
fenced equipment into the surroundings.
Add landscaping on the
west side of Lot 1 to
establish a cohesive
appearance.
18
The following should be located to eliminate visibility from the Entrance
Provide a detail of the
A dog park fence detail has been provided. It
Add shrubs and a tree along
Corridor street. If, after appropriate siting, these features will still have a
proposed dog park fencing
shows a 4'-tall fence composed of wire mesh
the Belvedere Blvd.
negative visual impact on the Entrance Corridor street, screening should be
in the site plan. Chain link
behind horizontal wooden slats. Wire mesh has a
frontage of the dog park.
provided to eliminate visibility. a. Loading areas, b. Service areas, c. Refuse
fencing is not appropriate.
similar appearance to chain link. However, the dog
areas, d. Storage areas, e. Mechanical equipment,
park is located approximately 200' from the EC
f Above -ground utilities, and g. Chain link fence, barbed wire, razor wire,
and beyond two blocks of townhouses as viewed
and similar security fencing devices.
from the EC. The location will reduce visibility of
the wire mesh and the wooden slats help minimize
19
Screening devices should be compatible with the design of the buildings
and surrounding natural vegetation and may consist of. a. Walls, b.
impacts. Adding a tree and shrubs along the
Plantings, and c. Fencing.
Belvedere Blvd. frontage of the dog park would
further limit impacts.
21
The following note should be added to the site plan and the architectural plan:
Include the standard
The note is not on the architectural plans.
Include the standard
"Visibility of all mechanical equipment from the Entrance Corridor shall
mechanical equipment
mechanical equipment note
be eliminated."
note on the architectural
on the architectural plans.
tans.
22-
Lighting
None at this time.
No lighting is proposed.
None.
31
Landscaping
7
The requirements of the Guidelines regarding landscaping are intended to
Provide a complete plant
Along Rio Road, street trees are proposed in the
Add a large shade tree
reflect the landscaping characteristic of many of the area's significant
schedule with the next
right-of-way. Four large shade trees (American
along the Rio Rd. frontage
historic sites which is characterized by large shade trees and lawns.
submittal.
Elm Princeton) alternate with three ornamental
for a total of 5 large shade
Landscaping should promote visual order within the Entrance Corridor and
trees (Saucer Magnolias). One additional large
trees.
help to integrate buildings into the existing environment of the corridor.
Provide confirmation that
easements will not conflict
shade tree is required. The large trees are not
provided at the required caliper. One of the
Revise the planting size of
8
Continuity within the Entrance Corridor should be obtained by planting
different types of plant materials that share similar characteristics. Such
with the proposed/required
ornamentals is located over a water line.
the large shade trees along
common elements allow for more flexibility in the design of structures
landscaping.
Rio Road to 3%" caliper.
because common landscape features will help to harmonize the appearance
of development as seen from the street upon which the Corridor is
Resolve the ornamental
centered.
tree/water line conflict
along the Rio Road
32
Landscaping along the frontage of Entrance Corridor streets should
include the following:
frontage.
a. Large shade trees should be planted parallel to the Entrance Corridor
Street. Such trees should be at least 3% inches caliper (measured 6 inches
above the ground) and should be of a plant species common to the area.
Such trees should be located at least every 35 feet on center.
b. Flowering ornamental trees of a species common to the area should be
interspersed among the trees required by the preceding paragraph. The
ornamental trees need not alternate one for one with the laze shade trees.
They may be planted among the large shade trees in a less regular spacing
pattern.
c. In situations where appropriate, a three or four board fence or low stone
wall, typical of the area, should align the frontage of the Entrance Corridor
street.
d. An area of sufficient width to accommodate the foregoing plantings and
fencing should be reserved parallel to the Entrance Corridor street, and
exclusive of road right-of-way and utility easements.
33
Landscaping along interior roads:
Reduce the spacing of the
Ten large shade trees are required along Belvedere
None.
a. Large trees should be planted parallel to all interior roads. Such trees
proposed trees along
Blvd. Eleven trees are provided. Eight are proposed
should be at least 2% inches caliper (measured six inches above the
Belvedere Boulevard to
within 6' x 6' landscape easements. Four of these
ground) and should be of a plant species common to the area. Such trees
40' on center.
easements are bounded by the retaining walls that
should be located at least every 40 feet on center.
front the Craig units, the townhouses themselves,
and the sidewalk. This is a tight space, but may be
sufficient for the Princeton Sentry cultivar that is
specified.
34
Landscaping along interior pedestrian ways:
Identify the landscaping
The landscaped courtyard is associated with the
None at this time.
a. Medium trees should be planted parallel to all interior pedestrian ways.
proposed in the landscaped
office building, which is scheduled for a future
Such trees should be at least 2% inches caliper (measured six inches above
courtyard.
phase of development. Plants proposed for the
the ground) and should be of a species common to the area. Such trees
courtyard are not shown at this time, but street
should be located at least every 25 feet on center.
trees are proposed along Rio Road.
Sidewalks are provided along the eastern parking
row, along the central entrance road into the site,
and along the south side of Lots 1-7. Trees are
provided along some of these paths, but not
consistently (due primarily to the location of
utilities).
35
Landscaping of parking areas:
Provide a complete plant
In the initial site plan, trees were provided on both
Show the landscaping that
a. Large trees should align the perimeter of parking areas, located 40 feet
schedule with the next
the east and west sides of the eastern parking row.
is proposed in the screening
on center. Trees should be planted in the interior of parking areas at the
submittal.
The current plan includes notes stating that
areas on the northeast and
rate of one tree for every 10 parking spaces provided and should be evenly
screening will be provided along the northeast and
southeast sides of the site
distributed throughout the interior of the parking area.
southeast sides of the site in accordance with the
so that it may be reviewed
b. Trees required by the preceding paragraph should measure 2% inches
Code of Development. The planting widths vary
for consistency with the
caliper (measured six inches above the ground); should be evenly spaced;
from 2' to 6'. The Code of Development requires
guidelines.
and should be of a species common to the area. Such trees should be
that the design of the screening be coordinated with
planted in planters or medians sufficiently large to maintain the health of
adjacent residential property owners.
the tree and shall be protected by curbing.
10
c. Shrubs should be provided as necessary to minimize the parking area's
impact on Entrance Corridor streets. Shrubs should measure 24 inches in
heipht.
36
Landscaping of buildings and other structures:
Consider adding
One tree has been added at the south corner of Lot
Add trees and low planting
a. Trees or other vegetation should be planted along the front of long
landscaping at the comer
1. Multiple utilities cross the area between Lot 1
in the area between the
buildings as necessary to soften the appearance of exterior walls. The
of the site between the
and Rio Road, but low planting could help
developed portion of the
spacing, size, and type of such trees or vegetation should be determined by
office building and the Lot
integrate the development. Additional trees would
site and Rio Road to help
the length, height, and blankness of such walls.
1-2 building to help the
help mitigate the reduced level of detail on the Lot
establish a cohesive overall
b. Shrubs should be used to integrate the site, buildings, and other
visual transition between
1 townhouse side elevation.
development.
structures; dumpsters, accessory buildings and structures; "drive thru"
the varying building uses
windows; service areas; and signs. Shrubs should measure at least 24
and characters.
inches in height.
37
Plant species: a. Plant species required should be as approved by the Staff
Provide a complete plant
A plant schedule has been provided. The species
None.
based upon but not limited to the Generic Landscape Plan Recommended
schedule with the next
are found on the various lists.
Species List and Native Plants or Virginia Landscapes (Appendix D .
submittal.
38
Plant health: The following note should be added to the landscape plan: "All
Add the standard
The note is on the plan.
None.
site plantings of trees and shrubs shall be allowed to reach, and be
landscaping note to the
maintained at, mature height; the topping of trees is prohibited. Shrubs
landscape plan.
and trees shall be pruned minimally and only to support the overall health
of the plant. -
Development attern; Site development and layout
6
Site development should be sensitive to the existing natural landscape and
None.
All existing trees would be removed from the site
None.
should contribute to the creation of an organized development plan. This
with this proposal. Rolling terrain would not be
may be accomplished, to the extent practical, by preserving the trees and
evident. Trees are proposed along the streets.
rolling terrain typical of the area; planting new trees along streets and
Building mass and height are not expected to
pedestrian ways and choosing species that reflect native forest elements;
appear out of scale with the surroundings.
insuring that any grading will blend into the surrounding topography
thereby creating a continuous landscape; preserving, to the extent
practical, existing significant river and stream valleys which may be
located on the site and integrating these features into the design of
surrounding development; and limiting the building mass and height to a
scale that does not overpower the natural settings of the site, or the
Entrance Corridor.
39
The relationship of buildings and other structures to the Entrance Corridor
See # L
The development has a generally organized
None.
street and to other development within the corridor should be as follows:
character. The residential units are oriented parallel
a. An organized pattern of roads, service lanes, bike paths, and pedestrian
to the streets. Internal sidewalks would connect to a
walks should guide the layout of the site.
path along Belvedere Blvd. and Rio Road. There
are no connecting open spaces. All existing trees
n
b. In general, buildings fronting the Entrance Corridor street should be
would be removed to accommodate the
parallel to the street. Building groupings should be arranged to parallel the
development. Views are not expected to be
Entrance Corridor street.
negatively impacted.
c. Provisions should be made for connections to adjacent pedestrian and
vehicular circulation systems.
d. Open spaces should be tied into surrounding areas to provide continuity
within the Entrance Corridor.
e. If significant natural features exist on the site (including creek valleys,
steep slopes, significant trees or rock outcroppings), to the extent practical,
then such natural features should be reflected in the site layout. If the
provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance
apply, then improvements required by that section should be located so as
to maximize the use of existing features in screening such improvements
from Entrance Corridor streets.
f. The placement of structures on the site should respect existing views and
vistas on and around the site.
Site Grading
40
Site grading should maintain the basic relationship of the site to surrounding
Identify the retaining wall
Proposed grading increases the slope along the Rio
Indicate retaining wall
conditions by limiting the use of retaining walls and by shaping the terrain
heights on the grading
frontage and places the townhouses and parking
material(s) and color(s) on
through the use of smooth, rounded land forms that blend with the existing
plan.
area approximately 10' above the EC elevation.
the plan. A physical sample
terrain. Steep cut or fill sections are generally unacceptable. Proposed
The elevation at the street is 468'. The parking lot
may be necessary for
contours on the grading plan shall be rounded with a ten -foot minimum
Indicate retaining wall
closest to the EC is at an elevation of 475'. The Lot
review.
radius where they meet the adjacent condition. Final grading should achieve a
material(s) and color(s) on
1 townhouse has a finished floor elevation of 478'.
natural, rather than engineered, appearance. Retaining walls 6 feet in height
the plan. A physical
and taller, when necessary, shall be terraced and planted to blend with the
sample may be necessary
Retaining walls along the northeast and southeast
landscape.
for review.
sides of the site are proposed at 4' and 6' tall.
Materials are not indicated. Once the residential
units are constructed, the retaining walls will have
little visual im act on the EC.
41
No grading, trenching, or tunneling should occur within the drip line of any
None.
There are no trees that are designated for
None.
trees or other existing features designated for preservation in the final
preservation.
Certificate of Appropriateness. Adequate tree protection fencing should be
shown on, and coordinated throughout, the grading, landscaping and erosion
and sediment control plans.
42
Areas designated for preservation in the final Certificate of
Appropriateness should be clearly delineated and protected on the site
prior to any grading activity on the site. This protection should remain in
lace until com letion of the development of the site.
12
43
Preservation areas should be protected from storage or movement of heavy
e ui ment within this area.
20
Surface runoff structures and detention ponds should be designed to fit into
None.
No above -ground stormwater features are
None.
the natural topography to avoid the need for screening. When visible from
proposed.
the Entrance Corridor street, these features must be fully integrated into the
landscape. They should not have the appearance of engineered features.
44
Natural drainage patterns (or to the extent required, new drainage patterns)
should be incorporated into the finished site to the extent possible.
f.Ylhj113F111WO) 9SD[KIh51u1DI►117_VY[00
Staff recommends the following as the primary points of discussion:
1. The two architectural designs
2. Landscaping along Rio Rd. and Belvedere Blvd.
3. Equipment on the Rio Rd. side of Lot 1.
Staff recommends approval with the following conditions:
1. Include brick in the materials list for the Craig Units and indicate the proposed manufacturer and color in the list.
2. Provide a materials list in the Habitat Units architectural drawings.
3. Provide the specs on the window glass. Show that Visible Light Transmittance (VLT) will not drop below 40% and Visible Light Reflectance (VLR) will not exceed 30%.
4. Move the equipment located west of Lot 1 to eliminate visibility from the EC.
5. Add a note to the screening fence detail on C10 that the fence material is wood. Indicate the finish.
6. Add landscaping on the west side of Lot 1 to establish a cohesive appearance.
7. Add shrubs and a tree along the Belvedere Blvd. frontage of the dog park.
8. Include the standard mechanical equipment note on the architectural plans: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated."
9. Add a large shade tree along the Rio Rd. frontage for a total of 5 large shade trees.
10. Revise the planting size of the large shade trees along Rio Road to 3%" caliper.
11. Resolve the ornamental tree/water line conflict along the Rio Road frontage.
12. Show the landscaping that is proposed in the screening areas on the northeast and southeast sides of the site so that it may be reviewed for consistency with the guidelines.
13. Add trees and low planting in the area between the developed portion of the site and Rio Road to help establish a cohesive overall development.
14. Indicate retaining wall material(s) and color(s) on the plan. A physical sample may be necessary for review.
ATTACHMENTS
Attach. 1: ARB2021-27: 999 Rio Road combined site and architectural drawings
13
TABLE A This report is based on the following submittal items:
Sheet #
I Drawing Name
Drawing /Revision Date
999 Rio Road Final Site Plan
2/22/2021
SHEET INDEX
C1 COVER
C2 EXISTING CONDITIONS
C2 SITE PLAN
C4 UTILITY PLAN
C& OFF -SITE SEWER CONNECTION
CS UTILITY PROFILES
C7 GRADING PLAN
CS AMENITY & LANDSCAPE PLAN
Ce SITE, VDOT&ACSA DETAILS
C70 SITE, VDOT & ACSA DETAILS
C11 ACSA DETAILS
C12 MAINTENANCE OF TRAFFIC
Habitat For Humanity Townhomes Madagascar
6/19/2017
CS COVER SHEET
A.) FOUNDATION & BASEMENT PLAN
A.2 FIRST FLOOR PLAN -STAIR SECTIONS
A.3 FIRST FLOOR LAYOUT PLANS
AA SECOND FLOOR & ROOF PLANS
A.5.1 SECOND FLOOR LAYOUT PLANS
A.5.2 SECOND FLOOR LAYOUT PLANS
A.6 ELEVATIONS -WINDOW TYPES
A.7 ELEVATIONS -SECTIONS -DETAILS
AS PORCH SECTIONS
A.9 PORCH SECTIONS
A.10 SECTIONS -DETAILS
A.11 SECTIONS -DETAILS
1-9
999 Rio Townhouses — Craig Units: 3-unit building front & back elevation and upper & lower floor plans; 4-unit building front & back elevation and upper
2-12-2021
& lower floorplans; 3- and 4-unit buildings right & left elevations
Rezoning project proposal; EC Plan proposal; Sherwin Williams stain color print SW 3507 Riverwood; HFHGC Architectural Products sheets (2) with
Madagascar elevations and Hardiplank Mountain Sage, Countrylane Red, Cobblestone and Light Mist color prints; comment response letter; images (2)
showing low wall along street/sidewalk; Hardiplank samples in Mountain Sage, Countrylane Red, Cobblestone and Light Mist; Brick sample: General Shale
Blue Ridge Regent
14
OFA.0
1111
Architectural Review Board
o/.� County of Albemarle
Meeting Agenda for April 5, 2021
—44010 Community Development Department Virtual Meeting
lecix1.�
1. Call to order
2. Establish a Quorum
3. Disclosures
4. Public Comment
5. Consent Agenda—None
6. Regular Review Items
a. ARB-2020-112: Pet Supplies Plus Comprehensive Sian Plan
Staff: Khris Taggart
KAA-c.4 — b. ARB-2021-27: 999 Rio Road
Staff: Margaret Maliszewski
c. ARB-2021-26: Green Clean Car Wash
Staff: Khris Taggart
7. Work Session
a. ARB-2021-09: Caliber Collision: Rooftop equipment, fence design
8. Other Business
a. ARB-2020-69: Sleep Number: Building materials
b. EC Guidelines Discussion: I-64 (west end)
c. Approval of Minutes: March 15, 2021
d. Next ARB Meeting: April 19, 2021, 1:00 PM -VIRTUAL MEETING
NOTES REGARDING PUBLIC MEETINGS
1 This meeting is being held pursuant to and in compliance with Ordinance No. 20-A(16), An Ordinance to Ensure the Continuity of
Government During the COVID-19 Disaster.The opportunities for the public to access and participate in the electronic meeting are posted
on the Albemarle County website on the Albemarle County calendar Participation will include the opportunity to comment on those
matters for which comments from the public will be received
2. Each applicant is allowed to make a single presentation not exceeding 15 minutes in length. The applicant may divide the 15-minute
allotment among various presenters,but the total presentation time will not exceed 15 minutes.
3. Each member of the general public who wishes to speak on a matter shall be allowed one appearance not to exceed 3 minutes.
4. Any person aggrieved by any decision of the Architectural Review Board may demand a review of the application by the Board of
Supervisors. Such demand shall be made by filing a request therefore in writing with the clerk of the Board of Supervisors within ten
calendar days of the date of such decision For additional information see section 30.6.8 of the Zoning Ordinance.
NOTES REGARDING ARB ACTIONS
1. Certificates of Appropriateness are valid for the same period that the correspondmg site plan is valid If there is no site plan required for
the proposed work,the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity
must do so in writing.The letter must be received by the Director of Planning prior to the expiration date.