Loading...
HomeMy WebLinkAboutZMA201900008 Study 2021-04-02 (2)DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB I RAMEY KEMP ASSOCIATES T 804 217 8560 Moving forward. 4343Cox Road Glen Allen, VA 23060 April 2, 2021 Mr. Kevin McDermott Albemarle County 401 McIntire Road Charlottesville, Virginia 22902 Phone: (434) 296-5832 Reference: Rio Point —Traffic Impact Analysis (TIA) Dear Mr. McDermott, Ramey Kemp & Associates, Inc. (RKA) has performed a Traffic Impact Analysis (TIA) for the proposed 328- unit multi -family development located on the southwest corner of the Rio Road at John Warner Parkway / CATEC Driveway intersection. The access plan includes one full -movement driveway and one right -in only driveway on Rio Road and a stub -out for a future connection on the south side of the property. If approved, the proposed development is expected to be built in 2023. Figure 1 shows the site location and study intersections, and Figure 2 shows the preliminary site plan. The purpose of this letter report is to provide the following: ■ Trip generation calculations ■ Evaluation of turn lane warrants for the site driveways ■ Capacity and queueing analysis of the study intersections Existing Roadway Conditions Route 631 (Rio Road) is a four -lane divided Minor Arterial with a 2019 Virginia Department of Transportation (VDOT) average daily traffic (ADT) volume of approximately 28,000 vehicles per day (vpd) and a posted speed limit of 35 miles per hour (mph) north of the John Warner Parkway intersection. Rio Road becomes a two-lane Major Collector with a posted speed limit of 35 mph south of the John Warner Parkway intersection. South of the Pen Park Road / Waldorf School Road intersection, the approximate 2019 VDOT ADT of Rio Road is 9,300 vpd. Route 2500 (John Warner Parkway) is a two-lane Minor Arterial with a posted speed limit of 35 mph in the vicinity of the site and does not have a VDOT published ADT volume. Based on discussion with the County, the ADT is approximately 17,500 vpd. Route 768 (Pen Park Road) is a two-lane local road with a 2019 VDOT ADT volume of approximately 4,400 vpd, and a posted speed limit of 35 mph in the vicinity of the site. Route 1177 (Dunlora Drive) is a two-lane local road with a 2019 VDOT ADT volume of approximately 2,400 vpd, and a posted speed limit of 35 mph in the vicinity of the site. I<AIL rameykemp.com Transportation Consulting that moves us forward. DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Moving forward. Rio Point - Albemarle County, VA 1 2 Figure 3 shows existing lane configuration. Existing Traffic Volumes The AM peak hour (7:00 to 9:00 AM) and PM peak hour (4:00 to 6:00 PM) turning movement counts were conducted by Burns Service, Inc. during the week of August 27, 2018 at the following intersections: ■ Rio Road at John Warner Parkway / CATEC Driveway ■ Rio Road at Dunlora Drive ■ Rio Road at Pen Park Road / Waldorf School Road The AM peak hour (7:30 to 8:30 AM) and PM peak hour (4:45 — 5:45 PM) turning movements counts for Rio Road at Dunlora Forest Drive were conducted by RKA during the week of August 19, 2019. Note that some volumes have been increased, as necessary, to balance between the study intersections. Additionally, the 2018 and 2019 traffic counts were used due to the currently reduced traffic volumes resulting from the COVID-19 pandemic. Based on discussion with the County and VDOT, the 2018 peak hour traffic volumes were grown by an annual rate of 2.0% for three years to estimate the existing 2021 peak how traffic volumes. The traffic count data are enclosed, and the existing volumes are shown in Figure 4. Background Traffic Growth Based on discussion with the County and VDOT, an annual rate of 2.0% was used to grow the 2018 peak how traffic volumes for five years, and the 2019 volumes for four years, to estimate the 2023 peak how traffic volumes. Approved Development Traffic Based on discussion with the County and VDOT, five approved developments near the site are included in this TIA. Belvedere Residential is partially built -out, with 190 single family homes and 90 townhomes remaining to be built and is located at the end of Belvedere Boulevard. The trip generation potential of Belvedere Residential during a typical weekday, AM peak hour and PM peak hour was estimated using the methodologies published by the Institute of Transportation Engineers (ITE) Trip Generation Manual — IOth Edition. Table 1 ITE Trip Generation — Belvedere Residential — Weekday —10" Edition Weekday Land Use Daily Traffic AM Peak Hour PM Peak Hour (ITE Land Use Code) Size (vpd) (vph) (vph) Enter Exit Enter Exit Enter Exit Single Family Detached Housing 190 homes 938 938 35 106 118 70 (210) Multifamily Housing (Low -Rise) 90 units 330 330 10 33 34 20 (220) Total Trips 1,268 1,268 45 139 152 90 Transportation Consulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Rio Point - Albemarle County, VA 1 3 Moving forward. Figures 5 and 6 show the trip distribution and assignment for Belvedere Residential. Dunlora Park Residential consists of 28 single family homes and 14 townhomes and is located on Varick Street. The ITE trip generation potential of Dunlora Park Residential is shown in Table 2. Table 2 ITE Trip Generation - Dunlora Park Residential - Weekday -101 Edition Weekday Land Use Daily Traffic AM Peak Hour PM Peak Hour (ITE Land Use Code) Size (vpd) (vph) (vph) Enter Exit Enter Exit Enter Exit Single Family Detached Housing 28 homes 161 161 6 19 19 11 (210) Multifamily Housing (Low -Rise) 14 units 51 51 1 6 6 4 (220) Total Trips 212 212 7 25 25 15 Figures 7 and 8 show the trip distribution and assignment for Dunlora Park Residential. Lochlyn Hill Residential is partially built -out, with 129 single family homes and 14 townhomes remaining to be built and is located on the south side of Pen Park Lane. The ITE trip generation potential of Lochlyn Hill Residential is shown in Table 3. Table 3 ITE Trip Generation - Lochlyn Hill Residential - Weekday -10' Edition Weekday Land Use Daily Traffic AM Peak Hour PM Peak Hour (ITE Land Use Code) Size (vpd) (vph) (vph) Enter Exit Enter Exit Enter Exit Single Family Detached Housing 129 homes 657 657 24 72 82 48 (210) Multifamily Housing (Low -Rise) 14 units 51 51 1 6 6 4 (220) Total Trips 708 708 25 78 88 52 Figures 9 and 10 show the trip distribution and assignment for Lochlyn Hill Residential. Transportation <AlkConsulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Moving forward. Rio Point - Albemarle County, VA 1 4 The SOCA Fieldhouse is a proposed indoor soccer fieldhouse, to be located at the end of Belvedere Boulevard. In addition to one indoor field, the development plan also includes a synthetic field, 3 full-sized natural surface fields, and 2 half -sized natural surface fields, all of which will be outdoors. The ITE trip generation potential of the SOCA Fieldhouse is shown in Table 4. Table 4 ITE Trip Generation — SOCA Fieldhouse — Weekday —1011 Edition Average Daily Traffic AM Peak Hour PM Peak Hour Land Use Size (vpd) (vph) (vph) (ITE Land Use Code) Enter I Exit Enter Exit Enter Eait Soccer Complex 8 fields 286 286 5 3 96 50 (488) Figures 11 and 12 show the trip distribution and assignment for the SOCA Fieldhouse. The Center at Belvedere is a recreation center for senior citizens, located on Belvedere Road. The project is set to be constructed in two phases, with the first phase, a 43,240 s.f recreation center, already built out. An additional 16,760 s.f building is planned to be constructed in the future. The ITE trip generation potential of The Center at Belvedere is shown in Table 5. Table 5 ITE Trip Generation — The Center at Belvedere Senior Center — Weekday —10t' Edition Weekday Land Use Daily Traffic AM Peak Hour PM Peak Hour (ITE Land Use Code) Size (vpd) (vph) (vph) Enter I Exit Enter Exit Enter Exit Phase 1— Recreational 43,240 s.f. 623 623 50 26 47 53 Community Center' (495) Phase 2 — Recreational 16,760 s.f 242 242 19 10 18 21 Community Center' (495) Total Trips 865 865 69 36 65 74 1. ITE has no data for a senior recreation center. The trip generation estimates shown are for a standard recreational community center (all ages) and likely over -estimate the number of trips that would be generated by the proposed use. Figures 13 and 14 show the trip distribution and assignment for The Center at Belvedere. The total approved development trips are shown in Figure 15. The total approved development trips were combined with the background growth to estimate the 2023 no -build traffic volumes, which are shown in Figure 16. Additionally, Figure 17 shows a 2023 no -build scenario including the construction of the planned roundabout. Transportation 'OR'<oA Consulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Moving forward. Rio Point — Albemarle County, VA 1 5 Trip Generation The trip generation potential of the proposed neighborhood during a typical weekday, AM peak hour, and PM peak hour was estimated using the methodologies published by the Institute of Transportation Engineers (ITE) Trip Generation Manual —10`h Edition. Table 6 summarizes the trip generation calculations. Table 6 ITE Trip Generation —Typical Weekday — 10o' Edition Average Daily Land Use Traffic AM Peak Hour PM Peak Hour (ITE Land Use Code) Size (vpd) (vph) (vph) Enter Exit Enter Exit Enter Exit Multifamily Housing (Mid -Rise) (221) 328 units 893 893 31 87 85 54 It should be noted that Rio Road is an existing transit corridor, and some of the future residents living along Rio Road will likely use the transit service. This will reduce the number of vehicles on Rio Road. To be conservative, this reduction was not applied to the trip generation potential of the site or the surrounding approved developments. Site Traffic Distribution The following site traffic distribution was applied based on coordination with the County and VDOT: ■ 32% to / from the north on Rio Road ■ 32% to / from the south on Rio Road ■ 31 % to / from the south on John Warner Parkway ■ 2% to / from the east on Pen Park Road ■ 1% to / from the south on Waldorf School Road • 1% to / from the north on CATEC Driveway • 1% to / from the north on Dunlom Drive Figures 18 and 19 show the site trip distribution and site trip assignment, respectively. Figure 20 shows the projected 2023 build -out peak hour traffic volumes without improvements and Figure 21 shows the projected 2023 build -out volumes with a roundabout. VDOT Turn Lane Warrant Analysis The projected build -out AM and PM peak hour traffic volumes at the proposed site driveways were compared to the turn lane warrants in the Virginia Department of Transportation (VDOT) Access Management Design Standards for Entrances and Intersections: Rio Road at Right -in Only Driveway ■ A southbound right -turn taper on Rio Road is warranted in the PM peak hour only Rio Road at Full -Movement Driveway: ■ A northbound left-tum lane on Rio Road is warranted ■ A southbound right -turn taper on Rio Road is warranted in the PM peak hour only Transportation I<AlkConsulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Moving forward. Rio Point — Albemarle County, VA 1 6 Intersection Spacing Standards VDOT requires at least 250 feet of separation between partial access driveways and full -movement driveways / intersections on Major Collector roadways. The proposed right -in only driveway is approximately 190 feet south of Dunlora Drive and 305 feet north of the proposed full -movement driveway. The proposed right -in only driveway does not meet VDOT's minimum intersection spacing standards, so an Access Management Exception (AME) request will be submitted. VDOT requires at least 335 feet of separation between full -movement driveways and intersections on Major Collector roadways. The proposed full -movement driveway is approximately 735 feet north of Dunlora Forest Drive. The proposed full -movement driveway exceeds VDOT's minimum intersection spacing standards. Traffic Capacity Analysis Traffic capacity analysis for the study intersections was performed using Synchro 10, which is a comprehensive software package that allows the user to model signalized and unsignalized intersections to determine levels -of - service based on the thresholds specified in the Highway Capacity Manual (HCM) — 6n' Edition. All queues reported are the maximum SimTraffic queues based on the average of 10 microsimulation runs. Note that Rio Road is considered an east / west roadway but is north / south in the vicinity of the site. Additionally, John Warner Parkway, Dunlora Drive, Pen Park Road, and Waldorf School Road are all east / west roadways in the vicinity of the site. Table 7 summarizes the capacity analysis results for the signalized intersection of Rio Road at John Warner Parkway / CATEC Driveway, and the Synchro and SimTraffic outputs are enclosed for reference. Table 7 Level -of -Service Summary for Rio Road at John Warner Parkway / CATEC Driveway CONDITION LANE GROUP Storage Length AM PEAK HOUR PM PEAK HOUR L ane Lane Lane Overall Lane Lane Lane Overall (it) LOS Delay Queue LOS LOS Delay Queue LOS (sec) fr (Delay) (sec) (it) (Delay) EBL 200 F 114.4 79 F 114.7 235 EBT/R 300 D 43.5 364 E 58.9 919 will, - F 83.6 482 F 83.3 673 Existing (2021) WBT - B 13.8 374 D B 13.1 390 D WEIR 500 A 7.2 24 A 7.4 35 Traffic Conditions NBUT 75 F 85.6 124 (51.3 sec) E 78.8 124 (54.5 sec) NBR - E 68.1 200 E 64.6 184 SBUT - F 113.6 22 F 103.6 29 SBR 125 F 1 98.5 1 4 1 1 FLIOL5 11 Transportation I<AlkConsulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Moving forward. Rio Point - Albemarle County, VA 1 7 Table 7 (Continued) Level -of -Service Summary for Rio Road at John Warner Parkway / CATEC Driveway AM PEAK HOUR PM PEAK HOUR LANE Storage Lane Lane Lane Overall Lane Lane Lane Overall CONDITION GROUP Length (it) LOS Delay Queue LOS LOS Delay Queue LOS sec fr ela sec fr(Delay) EBL 200 F 114.7 149 F 115.0 251 EBT/R 300 D 49.2 548 F 97.1 1,356 No -Build (2023) WBL - F 83.3 589 F 85.7 820 Traffic Conditions WBT - B 16.1 407 E B 15.2 614 E WBR 500 A 7.2 24 A 7 35 Without pfBL/T 75 F 89.4 124 (55.3 sec) E 79.3 124 (67.7 sec) Improvements NBR - E 78.6 213 E 64.9 183 SBUT - F 113.6 29 F 103.6 28 SBR 125 F 98.5 9 F 101.5 9 EBL/T - B 12.1 71 E 36.5 352 EBT/R 300 B 12.1 71 E 36.5 352 No -Build (2023) WBU/L - B 10.0 100 A 9.6 109 Traffic Conditions WBT/R 500 C 20.4 561 B B 13.4 180 C With Roundabout' NBU/L/T 125 A 8.5 31 (11.0 sec) B 10.7 17 (17.3 sec) NBR - A 0.2 0 A 0.2 0 SBL/T - B 12.1 1 B 11.5 2 SBR 125 B 14.1 0 B 13.5 1 EBL 200 F 114.4 204 F 115.0 298 Build 2023 ( ) EBT/R 300 D 50.5 542 F 107.5 1,353 WBL - F 83.3 658 F 94.8 840 Traffic Conditions WBT - B 16.1 468 E B 15.3 649 E Without Improvements NB /T 75 F 104.8 124 (58.8 sec) F 805 1244 (74.2 sec) NBR - F 86.0 217 E 69.0 197 SBUT - F 113.6 22 F 103.8 35 SBR 125 F 98.5 6 F 100.4 9 EBL/T - B 12.4 75 E 45.2 434 EBT/R 300 B 12.4 75 E 45.2 434 Build (2023) WBU/L - B 10.8 132 B 10.5 121 Traffic Conditions WBT/R 500 C 22.8 608 B B 14.1 183 C With Roundabout' NBU/L/T 125 A 9.2 39 (11.9 sec) B 11.5 22 (20.4 sec) NBR - A 0.2 0 A 0.2 0 SBUT - B 12.5 2 B 12.0 2 SBR 125 B 14.7 0 B 14.1 2 1. The 2023 Roundabout scenario is included to show that this intersection will achieve adequate LOS upon construction of the expected improvements. The actual timeline of constructing the roundabout is not known, as it is not a part of this development. Capacity analysis indicates that the intersection currently operates at LOS D during the AM and PM peak hours. Under no -build conditions without improvements, the intersection is expected to operate at LOS E during the AM and PM peak hours. Under no -build conditions with a roundabout, the intersection is expected to operate at LOS B during the AM peak hour and LOS C during PM peak hour. Under build conditions without improvements, the intersection is expected to operate at LOS E during the AM and PM peak hours. The County has submitted a SMART SCALE application to convert the existing intersection into a dual -lane roundabout. Under build conditions with a roundabout, the intersection is expected to operate at LOS B during the AM peak hour and LOS C during PM peak hour. Transportation �J<oAk Consulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Rio Point - Albemarle County, VA 1 8 Moving forward. Table 8 summarizes the capacity analysis results for the unsignalized intersection of Rio Road at Dunlora Drive, and the Synchro and SimTraffic outputs are enclosed for reference. Note that HCM 6 reports were used for the existing, no -build, and build without improvements scenarios. Table 8 Level -of -Service Summary for Rio Road at Dunlora Drive AM PEAK HOUR PM PEAK HOUR LANE Storage Lane Lane Lane Overall Lane Lane Lane Overall CONDITION GROUP Length 00 LOS DelayQueue LOS LOS Dela Y Queue LOS sec fr ela a sec fr (Delay)3 WBL' - F 57.2 130 E 39.1 52 Existing(2021) WBR' 200 C 15.3 119 B 14.0 71 N/A N/A Traffic Conditions BLI 50 A 9.5 71 A 9.6 89 SBT No -Build (2023) WBL' - F 138.3 392 F 70.0 98 Traffic Conditions WBR' 200 C 17.5 260 C 15.7 118 NBT/R - - - - N/A - - - N/A Without SBLZ 50 A 9.9 78 B 10.2 99 Improvements SBT No -Build (2023) WEIR' - C 24.6 537 C 17.1 276 Traffic Conditions NBT/R - - - N/A - - N/A With Roundabout SBT - - - - - Build (2023) WBL' - F 188.0 542 F 89.8 125 Traffic Conditions WBR' 200 C 18.9 300 C 16.3 111 NBT/R - - - - N/A - - - N/A Without SBLZ 50 B 10.2 87 B 10.4 99 Improvements SBT Build (2023) WBR' - D 28.2 541 C 17.9 324 Traffic Conditions NBT/R - - N/A - - N/A With Roundabout SBT 1. Level of service for minor approach 2. Level of service for major street left-tum movement 3. HCM methodology does not provide lane group or overall LOS, delay, and queue lengths for major street through movements or right turns at unsignalized intersections. Capacity analysis indicates that the minor street left -turn movement currently operates with long delays (greater than 50 seconds) during the AM peak hour and moderate delays (between 25 and 50 seconds) during the PM peak hour. Under no -build conditions without improvements, the minor street left -turn movement is expected to operate with long delays (greater than 50 seconds) during both peak hours. Under build conditions without improvements, capacity analysis indicates that the minor street left -turn movement is expected to operate with long delays (greater than 50 seconds) during the AM and PM peak hours. As part of the roundabout installation at the Rio Road at John Warner / CATEC intersection, Dunlora Drive will likely be converted to right -in / right -out operation because it will be located within the functional area of the roundabout. Under no -build conditions with a roundabout, the minor street right -turn movement is expected to operate with short delays (less than 25 seconds) in both peak hours. Under build conditions with a roundabout, the minor street right -turn movement is expected to operate with moderate delays (between 25 and 50 seconds) in the AM peak hour and short delays (less than 25 seconds) in the PM peak hour. Transportation I<AlkConsulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Rio Point - Albemarle County, VA 1 9 Moving forward. Table 9 summarizes the capacity analysis results for the unsignalized intersection of Rio Road at Dunlora Forest Drive, and the Synchro and SimTraffic outputs are enclosed for reference. Table 9 Level -of -Service Summary for Rio Road at Dunlora Forest Drive Storage AM PEAK HOUR PM PEAK HOUR CONDITION LANE GROUP Length Lane Lane Lane Overall Lane Lane Lane Overall (it) LOS Delay Queue LOS LOS Delay Queue LOS sec ft (Delay)' sec ft (Delay)' WBL' - D 28.8 38 D 30.1 28 WBR' 25 B 13.7 40 B 14.1 28 Existing (2021) NBT - - - N/A N/A Traffic Conditions NBR 200 - - - - - - SBL2 225 A 9.1 28 A 9.4 40 SBT - - - - - - - WBL' - E 36.2 46 E 36.8 29 No -Build (2023) WBR' 25 B 14.9 46 C 15.1 28 Traffic Conditions NBT - - - N/A - - N/A Without NBR 200 - - - - ImprovementS SBL2 225 A 9.4 33 A 9.7 50 SBT WBL' - E 36.2 44 E 36.8 32 No -Build (2023) WBR' 25 B 14.9 40 C 15.1 26 Traffic Conditions NNBR N/A N/A 200 - - _ _ _ With Roundabout SBL2 225 A 9.4 33 A 9.7 51 SBT - - I - I - I - - I - WBL' - E 38.5 58 E 44.0 35 Build (2023) WBR' 25 C 15.1 54 C 16.3 34 Traffic Conditions NBT - - - N/A N/A Without NBR 200 - - - - - - IrnprovementS SBL2 225 A 9.5 35 B 10.0 44 SBT - - - - - - - WBL' - E 38.5 54 E 44.0 30 Build (2023) WBR' 25 C 15.1 49 C 16.3 33 Traffic Conditions N/A _ _ _ N/A NNBR 200 - - With Roundabout SBL2 225 A 9.5 33 B 10.0 48 SBT 1. Level of service for minor approach 2. Level of service for major street left -turn movement 3. HCM methodology does not provide lane group or overall LOS, delay, and queue lengths for major street through movements or right turns at unsignalized intersections. Capacity analysis indicates that the minor street left -turn movement currently operates with moderate delays (between 25 and 50 seconds) during both the AM and PM peak hours. Under no -build conditions, with or without a roundabout, the minor street left-tum movement is expected to continue to operate with moderate delays (between 25 and 50 seconds) during both the AM and PM peak hours. Under build conditions, with or without a roundabout, capacity analysis indicates that the minor street left -turn movement is expected to continue to operate with moderate delays (between 25 and 50 seconds) during both the AM and PM peak hours. No improvements are warranted or recommended at this intersection at build out of the neighborhood. Transportation I<AlkConsulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Rio Point - Albemarle County, VA 1 10 Moving forward. Table 10 summarizes the capacity analysis results for the signalized intersection of Rio Road at Pen Park Road / Waldorf School Road, and the Synchro and SimTraffic outputs are enclosed for reference. Table 10 Level -of -Service Summary for Rio Road at Pen Park Road / Waldorf School Road AM PEAK HOUR PM PEAK HOUR LANE Storage Lane Lane Lane Overall Lane Lane Lane Overall CONDITION GROUP Length (rt) LOS Delay Queue LOS LOS Delay Queue LOS sec 1t Dela sec 1t(Delay) EBUT/R - C 26.3 114 C 24.7 42 WBL/T 350 D 42.4 193 C 25.6 70 WBR - D 37.4 145 C 30.5 71 Existing (2021) N13L 75 B 12.3 164 C A 8.1 31 B Traffic Conditions NBT NBR - 125 B B 19.4 14.1 289 150 (22.0 sec) B A 13.9 8.8 343 174 (13.2 sec) SBL 225 B 13.9 189 A 9.9 102 SBT - B 16.4 307 A 8.8 229 SBR 100 B 11.7 171 A 6.3 6 EBUT/R - C 32.1 135 C 27.7 40 WBUT 350 E 60.8 218 C 28.7 92 No -Build (2023) WBR - D 54.0 162 C 34.0 81 Traffic Conditions NBL 75 B 12.1 174 C A 7.9 43 B NBT C B 419 l�thout NBR 125 B 13.3 13.3 212 212 (26.0 sec) A 8.3 8.3 225 225 ( 14.5 sec) Improvements SBL 225 B 15.1 242 B 11.6 127 SBT - B 16.2 379 A 9.0 258 SBR 100 B 10.9 152 A 5.9 15 EBUT/R - C 32.1 129 C 27.7 48 WBUT 350 E 60.8 243 C 28.7 84 WEIR - D 54.0 138 C 34.0 70 No -Build (2023) N13L 75 B 12.1 166 C A 7.9 44 B Traffic Conditions NBT - C 20.6 440 B 16.4 426 nth Roundabout NBR 125 B 13.3 210 (26.0 sec) A 8.3 209 (14.5 sec) SBL 225 B 15.1 266 B 11.6 145 SBT - B 16.2 376 A 9.0 267 SBR 100 B 10.9 162 A 5.9 17 EBL[M - C 32.9 168 C 28.4 50 WBUT 350 E 63.2 258 C 29.5 85 Build (2023) WEIR - E 56.9 179 D 35.0 78 Traffic Conditions NBL 75 B 12.5 164 C A 7.9 54 B NBT - C 20.9 429 B 17.4 423 lithout NBR 125 B 13.2 224 (26.7 sec) A 8.2 224 (15.1 sec) Improvements SBL 225 B 15.4 181 B 12.3 135 SBT - B 16.9 321 A 9.0 239 SBR 100 B 10.8 118 A 5.9 22 EBL[M - C 32.9 126 C 28.4 52 WBUT 350 E 63.2 209 C 29.5 93 WEIR - E 56.9 150 D 35.0 87 Build (2023) NBL 75 B 12.5 164 C A 7.9 104 B Traffic Conditions NBT - C 20.9 338 B 17.4 423 97th Roundabout NBR 125 B 13.2 194 (26.7 sec) A 8.2 224 (15.1 sec) SBL 225 B 15.4 256 B 12.3 119 SBT - B 16.9 372 A 9.0 283 SBR 100 B 1 10.8 1 170 1 1 A 1 5.9 1 37 Transportatioi I<AlkConsulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Rio Point - Albemarle County, VA 1 11 Moving forward. Capacity analysis indicates that the intersection currently operates at LOS C during the AM peak hour and LOS B during the PM peak hour. Under no -build conditions, with or without a roundabout, the intersection is expected to continue to operate at LOS C during the AM peak hour and LOS B during the PM peak how. Under build conditions, with or without a roundabout, capacity analysis indicates that the intersection is expected to continue to operate at LOS C during the AM peak how and LOS B during the PM peak hour with all movements at LOS E or better. No improvements are warranted or recommended at this intersection at build out of the neighborhood. Table 11 summarizes the capacity analysis results for the unsignalized intersection of Rio Road and Full - movement Driveway, and the Synchro and SimTraffic outputs are enclosed for reference. Table 11 Level -of -Service Summary for Rio Road at Full -movement Driveway AM PEAK HOUR PM PEAK HOUR LANE Storage Lane Lane Lane Overall Lane Lane Lane Overall CONDITION GROUP Length tft) Delay Queue LOS Delay Queue LOS LOS (see) ft Dele )3 LOS (see) ft (Delay)3 Build (2023) EBL' - F 55.0 268 F 58.4 86 Traffic Conditions EBRZ - B 13.6 119 B 13.8 39 NBL 100 A 9.0 98 N/A A 9.3 77 N/A R Uhont NBT - - - - - - - ImprovententS SBT/R - I - - I - I - - - EBLI - F 55.0 164 F 58.4 87 Build (2023) EBR' - B 13.6 56 B 13.8 34 Traffic Conditions NBLZ 100 A 9.0 47 N/A A 9.3 70 N/A 1Tith Roundabout N13T - - - - - SBT/R I - I - - 1. Level of service for minor approach 2. Level of service for major street left -turn movement 3. HCM methodology does not provide lane group or overall LOS, delay, and queue lengths for major street through movements or right turns at unsignalized intersections. Under build conditions, capacity analysis indicates that the minor street left -turn movement is expected to operate with long delays (greater than 50 seconds) during the AM peak hour and moderate delays (between 25 and 50 seconds) during PM peak hours with the following improvements: ■ Construct a northbound left -turn lane on Rio Road with 100 feet of storage and 100 feet of taper ■ Construct a 100-foot southbound right -turn taper on Rio Road ■ Construct the site driveway with one ingress lane and two egress lanes Transportation �J<oAk Consulting that moves us forward. rameykemp.com DocuSign Envelope ID: 73C9ABF7-OA06-446D-886B-CBDAE2910EDB RAMEY KEMP ASSOCIATES Moving forward. Rio Point - Albemarle County, VA 1 12 Recommendations Based on the trip generation potential of the site, the following improvements are recommended: Rio Road at Right -in Only Driveway ■ Construct a 100-foot southbound right -turn taper on Rio Road ■ Construct the site driveway with one ingress lane Rio Road at Full -movement Driveway: ■ Construct a northbound left -turn lane on Rio Road with 100 feet of storage and 100-foot taper Construct a 100-foot southbound right -turn taper on Rio Road Construct the site driveway with one ingress lane and two egress lanes Figure 22 shows the recommended lane configuration. We appreciate your attention to this matter. Please contact me at (804) 217-8560 if you have any questions about this report. Sincerely yours, Ramey Kemp & Associates, Inc. EpLTH OF`/ 2 �c U MICHAEL D. BAILEY Y D. %Ua A54363 1177117127411 S/OnIALENG Michael Bailey, P.E., PTOE State Traffic Operations Lead Enclosures: Figures, VDOT turn lane warrant diagrams, Traffic count data, Synchro output Copy to: Mr. Adam Moore, P.E., VDOT Mr. Chris Henry, Stony Point Development Group Mr. Craig Kotarski, P.E., Timmons Group Mr. Kevin Miller, Stony Point Development Group Mr. Steven Blaine, Woods Rogers PLC Transportation I<AlkConsulting that moves us forward. rameykemp.com i" i Village Sq �L.-. . . o r iIN i g 4yGtY �-- MR =as�xR erda7cs-=m ? ag@gga€�y 2isa Moving forward. �R I(Alk RAMEY KEMP ASSOCIA Rio Point Preliminary Site Plan Albemarle County, Virginia Figure 2 1 Waldorf School LEGEND Existing Traffic Signal Existing Lane X' Storage (In Feet) X vpd Average Daily Traffic CATEC Driveway 500' f zoo's 300'� b 200' 2,300 vpd Dunlora 35 mph Drive h N 25' O O N O 1 N L f + L. If 350' 4,300 vpd pen Park } 35 mph Road n N Rio Moving forward. Existing (2021) R10 POlrii Lane Configurations Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 3 11 CATEC Driveway C 8 (30) 715 (675) 0 o a �j L► 514 (570) (16)14-� (874) 509 (38) 29 M r� v N p� fr Iv � 1 1 L► Waldorf School F��� M N O o a v v+ ova 66 (25) 70 (23) 24 (12) 14 (7) o r 0 a 194 (80) f l(o) t 157 (52) noaa IF (6) 22 F- (0) 2 —► `� (12)54� LEGEND X (Y) AM (PM) Peak Hour Traffic Rio 1 Dunlora unve Pen Park Moving forward. Existing (2021) R10 POlrit Peak Hour Traffic Volumes Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 4 CATEC Driveway LEGI X% (Y%) Entering FEE] Regional Trip Distribution Moving forward. Belvedere Residential R10 Point Distribution Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 5 CATEC Driveway LEGEND X (Y) AM (PM) Peak Hour Trattic Moving forward. Belvedere Residential R10 POlrit Assignment Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 6 CATEC Driveway 33% 33%—, e° (33%) m (34%) f 0 M Waldorf School f 0 M LEGEND X% (Y%) Entering (Exiting) Trip Distribution Xxi Regional Trip Distribution 33% Dunlora 33% Drive 67% M m M �v Dunlora Park Residential J Pen Park Moving forward. Dunlora Park Residential Rio Point Distribution Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 7 CATEC Driveway LEGEND X (Y) AM (PM) Peak Hour Trattic Moving forward. Dunlora Park Residential R10 Point Assignment Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 8 CATEC Driveway LEGEND X% (Y%) Entering (Exitin xx% Regional Trip Di! ochlyn Hill Residential Moving forward. Lochlyn Hill Residential R10 Point Distribution Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 9 CATEC Driveway LEGEND X (Y) AM (PM) Peak Hour Trattic Lochlyn Hill Residential Moving forward. Lochlyn Hill Residential R10 POlrit Assignment Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 10 40% Waldorf School X% (Y%) Entering (Exiting) Trip Distribution FEE] Regional Trip Distribution CATEC Driveway f (40%) ,1;- (20%) 40% —► 0 TN r 0 O 0 N 40% Rio 40% Road 60% -j `I f o a v �d �o > v ao m o Dunlora _ Drive SOCA Fieldhouse I Pen Park Moving forward. SODA Fieldhouse R10 Point Distribution Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 11 CATEC Driveway LEGEND X (Y) AM (PM) Peak Hour Trattic Moving forward. SOCA Fnmen use R10 POlrit Assignment Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 12 CATEC Driveway 30%1 Parkway 30% y 0 0 0 Waldorf School X% (Y%) Entering (Exiting) Trip Distribution FEE] Regional Trip Distribution 40% 60%40% � fl (► o 0 0 �o v v �d �o > v ao m o Dunlora Drive I I The Center at Belvedere Pen Park Moving forward. The Center at Belvedere R10 Point (Senior Center) Distribution Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 13 Waldorf School LEGEND X (Y) AM (PM) Peak Hour Traffic CATEC Driveway Rio f 11 (22) r 11 (22) 27 (26) (39) 42 �► N � O N b N 'd > 7 ^ Dunlora — — — — Drive The Center at Belvedere Pen Park Moving forward. The Center at Belvedere R1O POlrit (Senior Center) Assignment Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 14 CATEC Driveway 75 (83) 21 (63) (126)43— j� (8) 2 O v h 8 (5) N N 22 (13) Dunlora Drive v .. C` N b r_ M V Dunlora Forest Drive N 00 b r M V Waldorf School Pen Park Road Road r w, N W LEGEND X (Y) AM (PM) Peak Hour Traffic Rio Moving forward. Total Approved R10 POlrit Development Volumes Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 15 Waldorf School LEGEND X (Y) AM (PM) Peak Hour Traffic CATEC Driveway (17) 15 (1,035) 573 (48) 33 N N r� vM W MVl hl N I (' 8(31) f 819 (785) 556 (656) Vl N M a � V ... N 77 (31) 95 (37) Dunlora T (� N� �s 201 (83) f 1(0) 163 (54) 23 (6) W VI M (0) 2 a (12) 56 o C Rio unve Pen Park Moving lum rd. No -Build Traffic 23) Vol Rio POlrit Peak Hour Traffic Volumes Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 16 Waldorf School LEGEND X (Y) AM (PM) Peak Hour Traffic ! , Roundabout \0, - Right -in / Right -out Driveway CATEC Driveway 8(31) a = f 819 (785) 0 o v 501 (573) ,J + (, C► 55 (83) � 1 1 Rio Road (1,035) 573 (48) 33 n rn v e a N `O 172 (68) Danlora Drive M V O M N V1 r W M T (� N� �s 201 (83) f 1(0) 163 (54) 23 (6) W VI M (0) 2 a (12) 56 o C Rio Pen Park Moving forward. No -Build (2023) Ri o POPeak Hour Traffic Volumes Albemarle County, Virginia nth Roundabout RAMEY KEMP ASSOCIA Figure 17 CATEC Driveway 1% a 32% 31 % John Warner Rio Road Parkway 4"W°� I e e I v 7'' v I1% DnillOm Site Drive I I o 0 �n o M M I p Right -in On] Driveway I I a 0 �j I Full -movement I Driveway (65%) I (35%) m Dunlora Forest / Drive M N Waldorf School 2% Road M Rio Road 32°/U Moving Ioma"d ""'R 14CAM RAMEY KEMP ASSOCIATES Rio Point Albemarle County, Virginia Pen Park 2% Site Trip Distribution Figure 18 CATEC Driveway 0 10 (27) John Warner Parkway (2� v 0(1) Site I f I Right -in Ord n Driveway I I C rn Full -movement I Driveway (35) 57 (19)30� o 1 LEGEND X (Y) AM (PM) Peak Hour 0 M r �r7- �j (► Waldorf School 1 (2) Road (1) 0 0 Rio Dunlom Dunlora Forest Pen Park Moving to word. II'� Rio POlrit Site Trip Assignment Albemarle County, Virginia RAMEY KEMP ASSOCIP Figure 19 CATEC Driveway 8 (31) 819 (785) 0 o v 566 (683) John Warner �j Rio Road Parkway (1,035) 573 (74) 43 �D M " � I h � L. Site + o ;o, � I e I Right -in Only Driveway I N< a v Full -movement I Driveway (35) 57 I� (19) 30 + 4 0o r ^ M V Waldorf School Road (7) 23 J LEGEND (0) 2 (12) 56 y X (Y) AM (PM) Peak Hour Traffic Rio F` f a a M V a � C 77(31) 95 (38) f r— .o HIV / 202 (85) �L 1 (0) 163 (54) r— W Vl M r o N � h t� o0 M � a� Dunlora Dunlora Forest Pen Park Moving forxard. Build (2023) Peak Hour R10 Point Traffic Volumes Albemarle County, Virginia RAMEY KEMP ASSOCIA Figure 20 John Warner Parkway I I Site Right -in IDriver I CATEC Driveway 8(31) C f 819 (785) 0 o v 511 (600) (► 55 1 C;. (83) Rio Road L ( l �') f (� (35) 57 (1,035) 573 (83) 55 a (74) 43 M m a o V n Q �lO 172 (69) Dunlom Drive If a� a V, M s 00 �j i. Full -movement Driveway (35) 57 (19) 30 I� 1 LEGEND Waldorf School Road X (Y) AM (PM) Peak Hour Traffic !O1 Roundabout - Right -in / Right -out Driveway (7) 23 (0) 2 (12) 56 y Rio f M Dunlora Forest Pen Park Moving forward. Build (2023) Peak Hour Ri o POTraffic Volumes Albemarle County, Virginia With Roundabout RAMEY KEMP ASSOCIA Figure 21 John Warner Parkway I I Site I Right -in Drive\ CATEC Driveway c L 500' N_ -MR, r� • 300' Iri 200' H AI 0 } ull -movement / } Driveway a 1F 0 0 25' 1 }f 8 N LEGEND g Existing Lane Waldorf School � Recommended Lane Road N N 350' } Storage (In Feet) r Roundabout (Improvement by others) - Right -in /Right -out Driveway (Improvement by others) Rio Road 0 Ca Dunlom Dunlora Forest Pen Park Moving Ionaard. Recommended Lane Rio Point Configuration Albemarle County, Virginia RAMEY KEMP ASSOCIP Figure 22 F-78 L % Left Turns in VA 0(DesignSpeed)ii MENEEMEN Emommommommmommomo��o ����������������������■ 11 moommoommoommmmo MENNEN 800 2 700 a w 600 2 500 O Ur 400 Z O 300 a a O zoo 0 > 100 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) FIGURE 3-5 Ll 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) FIGURE 3-6 F-96 120 D 100 0 x x Cr a 80 U w J U_ x W � 60 Z R D F F x (g 40 Q x a 20 100 200 300 400 500 600 700 PHV APPROACH TOTAL, VEHICLES PER HOUR Appropriate Radius required at all Intersections and Entrances (Commercial or Private). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Right Turns For posted speeds at or under 45 mph, PHV right turns > 40, and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D K = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice. When right turn facilities are warranted, see Figure 3-1 for design criteria.' FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Rev. 1/15 F-96 120 D 100 0 x x Cr a 80 U w J U_ x W � 60 Z R D F F x (g 40 Q x a 20 100 200 300 400 500 600 700 PHV APPROACH TOTAL, VEHICLES PER HOUR Appropriate Radius required at all Intersections and Entrances (Commercial or Private). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Right Turns For posted speeds at or under 45 mph, PHV right turns > 40, and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D K = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice. When right turn facilities are warranted, see Figure 3-1 for design criteria.' FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Rev. 1/15 Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and John W. Warner) AM Peak Site Code Start Date : 8/29/2018 Page No : 1 Groups Printed- Cars +- Trucks CATEC Access John W. Warner Parkway Rio Road Rio Road Souhbound Westbound Northbound Eastbound Start Time Right Thru Left Aop Tm i Right Thru Left Am. Tow Right Thru 7 Left FA,p. TM i Right I Thru I Left I App. Tote) Int. Total 07:00 0 1 1 2 0 111 50 161 52 1 12 65 2 82 0 84 312 07:15 0 0 0 0 1 113 69 183 80 0 25 105 2 114 0 116 404 07:30 0 0 0 0 2 168 112 282 137 0 32 169 7 118 0 125 576 07:45 0 0 0 0 1 181 164 346 142 0 19 161 9 126 6 141 648 Total 0 1 1 2 4 573 395 972 411 1 88 500 20 440 6 466 1940 O8:00 0 0 3 3 1 153 112 266 140 1 24 165 10 101 5 116 550 0815 0 0 1 1 4 172 97 273 129 1 22 152 2 135 2 118 501 08:30 2 0 2 4 7 168 71 246 109 0 24 133 2 110 6 1 5 08:45 1 1 2 4 3 126 66 195 97 2 18 117 1 155 4 160 4765 Total 1 3 1 8 12 1 15 619 346 9801 475 4 88 5671 15 501 17 533 1 2092 Grand Total 3 2 9 14 19 1192 741 1952 886 5 176 1067 35 941 23 999 4032 Apprch % 21.4 14.3 64.3 1 61.1 38 83 0.5 16.5 3.5 94.2 2.3 Total % 0.1 0 0.2 0.3 0.5 29.6 18.4 48.4 22 0.1 4.4 26.5 0.9 23.3 0.6 24.8 Cars+ 3 2 9 14 19 1192 738 1949 886 5 176 1067 35 941 23 999 4029 % Cars+ 100 100 100 100 100 100 99.6 99.8 100 100 100 100 100 100 100 100 99.9 Trucks 0 0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 3 % Trucks 0 0 0 0 0 0 0.4 0.2 0 0 0 0 1 0 0 0 0 0.1 Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and John W. Warner) AM Peak Site Code Start Date : 8/29/2018 Page No :2 CATEC Access Souhbound John W. Warner Parkway Westbound Rio Road I Northbound Rio Road Eastbound Start Time I Right I Thru I Left I ppp. total Ri ht Thru LeftI App.Totai I Right I Thru I Left I App. anal Right I Thru I Left . Taal Peak Hour Analysts From U7:UU to MA5 - Peek 1 of 1 Pack Mmir fnr Fntim InlameMinn Raninc at n7 In iM. total 07:30 0 0 0 0 2 168 112 282 137 0 7 118 0 125 576 07:45 0 0 0 0 1 346 142 0 19 161 9 126 6 141 648 08:00 0 0 3 3 1 153 112 266 140 1 24 165 10 101 5 116 550 08:15 0 0 1 1 4 172 97 273 129 1 22 152 2 135 2 139 565 Total Volume 0 0 4 4 8 674 485 1167 548 2 97 647 28 480 13 521 2339 % App. Total 0 0 100 0.7 57.8 41.6 84.7 0.3 15 5.4 92.1 2.5 PHF .000 .000 .333 .333 .500 .931 .739 .843 .965 .500 .758 .957 .700 .889 .542 .924 .902 CATEC Access Out In Total 0 4 1 27 4 Ri9M TIhm Left Peak Hour Data m� 1 Oz a o 2 a a - t� Peak Hour Begins at 07:30 �? m p 1-2 A V N Cam + a O� rc + T maw Z L 7 ThRi h 92 598 7 11 out In Total Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and John W. Warner) PM Peak Site Code Start Date : 8/29/2018 Page No : 1 Groups Printed- Cars +- Trucks CATEC Access John W. Warner Parkway Rio Road Rio Road Southbound Westbound Northbound Eastbound Start Time Right I ThrU I Leff I UTm .Tay Ri hi ThnJ Left I UTm .Tay Right I ThrU I Left I UTm .Tay Right7TIIM7 Left UTm T. M1212i 16:00 3 1 2 0 6 3 145 119 0 267 111 0 7 0 118 8 186 2 1 197 588 16:15 4 0 2 0 6 3 137 124 0 264 132 0 7 0 139 7 199 1 1 208 617 16:30 2 0 1 0 3 5 145 143 0 293 130 1 9 0 140 7 183 3 0 193 629 16:45 1 1 1 0 3 2 159 125 0 286 151 0 9 0 160 6 205 3 0 214 663 Total 10 2 6 0 18 13 586 511 0 1110 524 1 32 0 557 28 773 9 2 812 2497 17:00 2 0 0 0 2 7 175 139 0 321 1 155 3 10 0 168 13 188 6 0 207 698 17:15 1 0 1 0 2 7 154 159 0 320 165 0 5 0 170 5 218 2 0 225 717 17:30 0 0 3 0 3 12 148 114 0 274 131 1 14 0 146 12 213 4 0 229 652 17:45 1 0 1 0 2 5 147 108 0 260 123 0 8 0 131 9 149 2 2 162 555 Total 4 0 5 0 9 31 624 520 0 11751 574 4 37 0 6151 39 768 14 2 823 2622 Grand Total 14 2 11 0 27 44 1210 1031 0 22851 1098 5 69 0 1172 67 1541 23 4 1635 5119 Apprch % 51.9 7.4 40.7 0 1.9 53 45.1 0 93.7 0.4 5.9 0 41.1 94.3 1.4 0-2Total % 0.3 0 0.2 0 0.5 0.9 23.6 20.1 0 44.6 21.4 0.1 1.3 0 22.9 1.3 30.1 0.4 0.1 31.9 Cars + 14 2 11 0 27 44 1210 1031 0 2285 1098 5 69 0 1172 67 1540 23 4 1634 5118 % Cars + 100 100 100 0 100 100 100 100 0 100 100 100 100 0 100 100 99.9 100 100 99.9 100 Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 % Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1 0 0 0.1 0 Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and John W. Warner) PM Peak Site Code Start Date : 8/29/2018 Page No :2 CATEC Access Souhbound John W. Warner Parkway Westbound Rio Road I Northbound Rio Road Eastbound Start Time I Right I ThrU I Left I UTm .Toni Right Thru I Left I UTm I App Tmi I Right I Thru I Left I UTm I App.Toni Right I Thru I Leff I UTm Toa Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 1 1 1 0 3 2 159 125 0 286 151 0 9 0 160 6 205 3 0 214 663 17:00 2 0 0 0 2 7 175 139 0 321 155 3 10 0 168 13 188 6 0 207 698 17:15 1 0 1 0 2 7 154 159 0 320 165 0 5 0 170 5 218 2 0 225 717 17:30 0 0 3 0 3 12 148 114 0 274 131 1 14 0 146 12 213 4 0 229 652 Total Volume 4 1 5 0 10 28 636 537 0 1207 1 602 4 38 0 644 1 36 824 15 0 875 2730 % ADD. Total PHF .500 .250 .417 .000 .833 .583 .909 .844 .000 .935 .912 .333 .679 .000 .947 .692 .945 .625 .000 .955 .952 N CATE i Access out Total O 47-1 lol 07 `c oE—L41 11 51 0 Right Thru Left UTm � Peak Hour Data North oc �d a � — Peak Hour Begins at 16:4552 We r� Cars+ J 5 Trucks O Ex� S3 Na 7 r UTm Lefl Thru Ri M 4 2 To� 574 1 ON In Total Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Dunlora) AM Peak Site Code Start Date : 8/29/2018 Page No :1 Grouos Printed- Cars +- Trucks Rio Road Dunlora Drive Rio Road Southbound Westbound Northbound Slart Time Thru I Left I App. Total Right I Left I Apo. Total Right I Thru Apo. Total Int. Total 07:00 48 5 53 7 5 12 4 60 64 129 07:15 61 6 67 14 7 21 1 88 89 177 07:30 117 5 122 22 10 32 1 149 150 304 07:45 127 15 142 9 29 38 10 159 169 349 Total 353 31 384 52 51 103 16 456 472 959 08:00 109 10 119 15 11 26 11 149 160 305 08:15 79 18 97 16 16 32 2 136 138 267 08:30 63 5 68 14 13 27 3 122 125 220 08:45 64 8 72 12 13 25 5 104 109 206 Total 315 41 3561 57 53 110 21 511 5321 998 Grand Total 668 72 740 109 104 213 37 967 1004 1957 Apprch % 90.3 9.7 51.2 48.8 3.7 96.3 Total % 34.1 3.7 37.8 5.6 5.3 10.9 1.9 49.4 51.3 Cars + 657 67 724 109 103 212 36 957 993 1929 % Cars + 98.4 93.1 97.8 100 99 99.5 97.3 99 98.9 98.6 Trucks 11 5 16 0 1 1 1 10 11 1 28 % Trucks 1.6 6.9 2.2 0 1 0.5 2.7 1 1.1 1.4 Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Dunlora) AM Peak Site Code Start Date : 8/29/2018 Page No : 2 Rio Road Southbound Dunlora Drive Westbound Rio Road Northbound Start Time Thru I Left Ipp. Total Right I Left I p. Total Right Thru I ADD. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 117 5 122 22 10 32 1 149 150 304 07:45 127 15 142 9 29 38 10 159 169 349 08:00 109 10 119 15 11 26 11 149 160 305 08:15 79 18 97 16 16 32 2 136 138 267 Total Volume 432 48 480 62 66 128 24 593 6171 1225 Rio Road Out In Total ®4 1 1135 4 2 4 Thru Left L+ 1 Peak Hour Data T 0.� North � � N p Peak Hour Begins at 07:30 ro �, = 9 Cars+>�+, � � p Twcksc oa o— Z �F* 593 24 ® 17 117 Out In Total Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Dunlora) PM Peak Site Code Start Date : 8/29/2018 Page No :1 Grouos Printed- Cars +- Trucks Rio Road Dunlora Drive Rio Road Southbound Westbound Northbound Slart Time Thru I Left I ADD. Total Right I Left I ADD. Total Right I Thru App. Total Int. Total 16:00 90 31 121 4 2 6 8 117 125 252 16:15 96 13 109 4 7 11 8 135 143 263 16:30 99 18 117 5 5 10 5 129 134 261 16:45 100 18 118 7 6 13 6 148 154 285 Total 385 80 465 20 20 40 27 529 556 1061 17:00 119 20 139 5 2 7 7 170 117 323 17:15 116 17 133 4 3 7 10 160 170 310 17:30 112 13 125 8 11 19 8 132 140 284 17:45 90 13 103 6 5 11 6 116 122 236 Total 437 63 5001 23 21 44 31 578 6091 1153 Grand Total 822 143 965 43 41 84 58 1107 1165 2214 Apprch % 85.2 14.8 51.2 48.8 5 95 Total % 37.1 6.5 43.6 1.9 1.9 3.8 2.6 50 52.6 Cars + 815 138 953 43 41 84 58 1103 1161 2198 % Cars + 99.1 96.5 98.8 100 100 100 100 99.6 99.7 99.3 Trucks 7 5 12 0 0 0 0 4 4 16 % Trucks 0.9 3.5 1.2 0 0 0 0 0.4 0.3 0.7 Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Dunlora) PM Peak Site Code Start Date : 8/29/2018 Page No : 2 Rio Road Southbound Dunlora Drive Westbound Rio Road Northbound Start Time Thru I Left Ipp. Total Right I Left I p. Total Right Thru I ADD. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 100 18 118 7 6 13 6 148 154 285 17:00 119 20 139 5 2 7 7 170 177 323 17:15 116 17 133 4 3 7 10 160 170 310 17:30 112 13 125 8 11 19 8 132 140 284 Total Volume 447 68 515 24 22 46 31 610 641 1 1202 Rio Road Our In Total 1 63�l 1 114 447 68 Thru Left 1 ~ Peak Hour Data 0 ma North ♦ p Lm^ fO O O Peak Hour Begins at 16:45 A O Cars + r ;7>ti Truk � o_ ua �� ht 1 1 jri 69 111 Out In Total Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Pen Park) AM Peak Site Code Start Date : 8/29/2018 Page No :1 Groups Printed- Cars +- Trucks Rio Road Pen Park Road Rio Road Waldrof School Road Southbound Westbound Northbound Eastbound Start Time Right I Thrtl I Left I PedS .rope Ri ht Thrtu LeftI Pede .rqd Right I ThrU LQR Petle .rope Right I ThrU I Left I Pede .rma m1opi 07:00 2 41 8 0 51 15 0 16 0 31 6 46 1 0 53 1 0 0 0 1 136 07:15 2 51 18 0 71 22 0 12 0 34 20 62 4 0 86 0 0 0 0 0 191 07:30 5 67 39 0 111 46 0 31 0 77 36 88 8 0 132 2 1 0 0 3 323 07:45 13 95 71 0 179 65 1 54 0 120 48 87 26 0 161 8 1 5 0 14 474 Total 22 254 136 0 412 148 1 113 0 262 110 283 39 0 432 11 2 5 0 18 1124 08:00 11 81 18 1 111 54 0 45 0 99 18 90 28 1 137 27 0 9 0 36 383 08:15 5 95 10 0 110 18 0 18 0 36 9 108 9 0 126 14 0 7 0 21 293 08:30 3 64 5 0 72 20 0 12 0 32 5 92 3 0 100 9 0 5 0 14 218 08:45 1 74 5 0 80 9 0 16 0 25 9 98 1 0 108 3 1 3 0 7 220 Total 20 314 38 1 373 101 0 91 0 1921 41 388 41 1 471 1 53 1 24 0 78 1114 Grand Total 42 568 174 1 785 249 1 204 0 454 151 671 80 1 903 64 3 29 0 96 2238 Apprch % 5.4 72.4 22.2 0.1 54.8 0.2 44.9 0 16.7 74.3 8.9 0.1 83 7 3.1 302 0 Total % 1.9 25.4 7.8 0 35.1 11.1 0 9.1 0 20.3 6.7 30 3.6 0 40.3 2.9 0.1 1.3 0 4.3 Cars + 42 568 174 1 785 249 1 204 0 454 151 671 80 1 903 64 3 29 0 96 2238 % Cars + 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 0 100 100 Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Pen Park) AM Peak Site Code Start Date : 8/29/2018 Page No :2 Rio Road Southbound Pen Park Road Rio Road Westbound Northbound Waldrof School Road Eastbound Start Time I Right I Thru I Left I Peds I App.Twat Ri ht ThN LeftI Peds I App Tm l Right I Thru I Left I Peds I App Tm l Right I Thru I Left I Peds T.. Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Beains at 07:30 07:30 5 67 39 0 111 46 0 31 0 77 36 88 8 0 132 2 1 0 0 3 323 07:45 13 95 71 0 179 65 1 54 0 120 48 87 26 0 161 8 1 5 0 14 474 08:00 11 81 18 1 111 54 0 45 0 99 18 90 28 1 137 27 0 9 0 36 383 08:15 5 95 10 0 110 18 0 18 0 36 9 108 9 0 126 14 0 7 0 21 293 Total Volume 34 338 138 1 511 183 1 148 0 332 111 373 71 1 516 51 2 21 0 74 1473 % ADD. Total PHF .654 .889 .486 .250 .714 .704 .250 .685 .000 .692 .578 .863 .634 .250 .863 .472 .500 .583 .000 .514 .777 Rio Road Out In Total I5T7 11 1® 34 338 138 1 Right h ru Left Peds �J 1 �► Peak Hour Data y F' ry J S W W N O N ot° North 4-- r� v E Peak Hour Begins at 07:30 w x N .o Cars r p n w 5� 30 y Trucks � � ma 0 Z F+ Lefl Thru Ri hl Peds 111 71 7 1111 7 537 556 1093 Out In Total Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Pen Park) PM Peak Site Code Start Date : 8/29/2018 Page No :1 Groups Printed- Cars +- Trucks Rio Road Pen Park Road Rio Road Waldorf School Road Southbound Westbound Northbound Eastbound Start Time Right I Thru I Left I PedS .rope Ri ht Thru Left I Pede .rqd Right I ThrU LQR Petle .rope Right Thru I Left I Pede .rma m1opi 16:00 0 78 14 0 92 11 0 12 0 23 12 109 1 0 122 1 0 2 0 3 240 16:15 2 86 18 0 106 19 0 9 0 28 20 128 2 0 150 4 0 1 0 5 289 16:30 4 83 28 0 115 21 0 9 0 30 18 105 0 0 123 3 0 2 0 5 273 16:45 0 99 23 0 122 23 0 15 0 38 16 129 0 0 145 0 0 1 0 1 306 Total 6 346 83 0 435 74 0 45 0 119 66 471 3 0 540 8 0 6 0 14 1108 17:00 1 100 29 0 130 18 0 14 0 32 22 161 4 0 187 2 0 1 1 4 353 17:15 2 93 29 1 125 19 0 15 0 34 24 148 3 0 175 8 0 3 0 11 345 17:30 0 89 24 0 113 14 0 5 0 19 27 126 0 0 153 1 0 1 0 2 287 17:45 0 87 18 0 105 14 0 13 0 27 20 112 0 0 132 0 0 0 1 1 265 Total 3 369 100 1 473 65 0 47 0 1121 93 547 7 0 6471 11 0 5 2 18 1250 Grand Total 9 715 183 1 908 139 0 92 0 231 1 159 1018 10 0 1187 19 0 11 2 32 2358 Apprch % 1 78.7 20.2 0.1 60.2 0 39.8 0 13.4 85.8 0.8 0 59.4 0 34.4 6-2Total % 0.4 30.3 7.8 0 38.5 5.9 0 3.9 0 9.8 6.7 432 0.4 0 50.3 0.8 0 0.5 0.1 1.4 Cars + 9 715 183 1 908 139 0 92 0 231 1 159 1018 10 0 1187 19 0 11 2 32 2358 % Cars + 100 100 100 100 100 100 0 100 0 100 100 100 100 0 100 100 0 100 100 100 100 Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Burns Service Inc. 1202 Langdon Terrace Drive Indian Trail, NC, 28079 We Count because YOU Count File Name : Charlottesville(Rio and Pen Park) PM Peak Site Code Start Date : 8/29/2018 Page No :2 Rio Road Southbound Pen Park Road Rio Road Westbound Northbound Waldorf School Road Eastbound Start Time I Right I Thru I Left I Pads I App.Twat Ri ht ThN LeftI Peds I A,, Tm i Right I Thru I Left I Peds I App Tm i Right I Thru I Left I Peds T.. Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Beoins at 16:45 mt Totai 16:45 0 99 23 0 122 23 0 15 0 38 16 129 0 0 145 0 0 1 0 1 306 17:00 1 100 29 0 130 18 0 14 0 32 22 161 4 0 187 2 0 1 1 4 353 17:15 2 93 29 1 125 19 0 15 0 34 24 148 3 0 175 8 0 3 0 11 345 17:30 0 89 24 0 113 14 0 5 0 19 27 126 0 0 153 1 0 1 0 2 287 Total Volume 3 381 105 1 490 74 0 49 0 123 89 564 7 0 860 1 11 0 6 1 18 1291 % App. Total PHF .375 .953 .905 .250 .942 .804 .000 .817 .000 .809 .824 .876 .438 .000 .882 .344 .000 .500 .250 .409 .914 Rio Road Out In Total ® 490 1 1134 3 381 705 1 Right h ru Left Peds �J 1 �► Peak Hour Data �°C North ~'c r� t Peak Hour Begins at 16:45 c v N x 0 Cars+ r w p w 5� 3O Trucks — �a w 0 `r Z F+ Lefl Thru Ri ht Peds 111 7 441 880 1101 ON In Total Ramey Kemp & Associates 4343 Cox Road Glen Allen, VA 23060 File Name : Dunlora Forest Drive AM Counted By: Rupinski Site Code : 00000001 Weather: Clear Start Date : 8/21/2019 Equipment ID: 4792 Page No 1 From North From East From South 07:45 AM 0 2 0 2 4 5 0 9 0 0 0 0 11 Total 0 5 0 5 15 9 0 24 2 0 0 2 31 08:00 AM 0 3 0 3 2 3 0 5 3 0 0 3 11 08:15 AM 0 0 0 0 6 2 0 8 2 0 0 2 10 Grand Total 0 8 0 8 23 14 0 37 7 0 0 7 52 Apprch % 0 100 0 62.2 37.8 0 too 0 0 Total % 0 15.4 0 15.4 44.2 26.9 0 71.2 13.5 0 0 13.5 0 Road Out In Total 23 a F 31 0 a 0 TMu Left Peds 1 '+ 11 Nodh N o' � 13 3w o 8/21/2019 07:30 AM ' 3 8/21/2019 08:15 AM > v Unshilted $ < ao o_m did I N RI M Pads T141 7 0 721 ON In Total Rio Road Ramey Kemp & Associates 4343 Cox Road Glen Allen, VA 23060 File Name Counted By: Rupinski Site Code Weather: Clear Start Date Equipment ID: 4792 Page No Dunlora Forest Drive AM 00000001 8/21 /2019 2 Rio Road Dunlore Forest Drive I Rio Road From North From East From South Start Time Thru Left Peds Right Left Peds Right Thru Peds Total Total Total Peak Hour Analysis From UC3U AM 10 Lid: 1b AM - Peak 1 Or 1 Peak Hour for Entire Intersection Renins at 07,30 AM Int. Total 07:30 AM 0 3 0 3 11 4 0 15 2 0 0 2 20 07:45 AM 0 2 0 2 4 5 0 9 0 0 0 0 11 08:00 AM 0 3 0 3 2 3 0 5 3 0 0 3 11 08:15 AM 0 0 0 0 6 2 0 8 2 0 0 2 10 Total Volume 0 8 0 8 23 14 0 37 7 0 0 7 52 . Total 0 100 0 62.2 37.8 0 100 0 0 PHF .000 .667 .000 .667 .523 .700 .000 .617 .583 .000 .000 .583 .650 0 Road Out In Total 23 9 F 31 0 a 0 Thru Left Peds 1 '+ Peak Hour Data T * p ° North N 3w o Peak Hour Begins at 07:30 A J � Unshifted O mo o_m did Thru Ri M Pads 0 7 0 14 7 21 Out In Total Rio Road Ramey Kemp & Associates 4343 Cox Road Glen Allen, VA 23060 File Name Counted By: Lee Site Code Weather: Clear Start Date Equipment ID: 4792 Page No Groups Printed- Unshi6ed Dunlora Forest Drive PM 00000007 8/21 /2019 1 Rio Road Dunlora Forest Drive Rio Road From North From East From South Start Time Thru Left Peds I App. Total Right Left Peds I App. Total Right Thru I Peds App. Total Int. Total 04:45 PM 0 3 0 3 2 2 0 4 1 0 0 1 8 Total 0 3 0 3 2 2 0 4 1 0 0 1 8 05:00 PM 0 5 0 5 1 3 0 4 1 0 0 1 10 05:15 PM 0 6 0 6 3 1 0 4 5 0 0 5 15 05:30 PM 0 5 0 5 5 1 0 6 2 0 0 2 13 Grand Total 0 19 0 19 11 7 0 18 9 0 0 9 46 Apprch % 0 100 0 61.1 38.9 0 100 0 0 Total % 0 41.3 0 41.3 23.9 15.2 0 39.1 19.6 0 0 19.6 0 Road Out In Total —111 19 F 30 0 19 0 Thru Left Peds 1 '+ 1 O ♦ p NS No th 3 p0 8/21/201904:45 PM 8/21/2019 05:30 PM 'm Unshifted 0 Thru RI M Peds s s0 9 0 7 9 FE11161 ON In Total Rio Road Ramey Kemp & Associates 4343 Cox Road Glen Allen, VA 23060 File Name Counted By: Lee Site Code Weather: Clear Start Date Equipment ID: 4792 Page No Dunlora Forest Drive PM 00000007 8/21 /2019 2 Rio Road Dunlore Forest Drive I Rio Road From North From East From South Start Time Thru Left Peds Right Left Peds Right Thru Peds Total Total Total Peak Hour Analysis From U4Ab F m to Ub:3U F m - Peak 1 Or 1 Peak Hour for Entire Intersection Ranins at 04:45 PM Int. Total 04:45 PM 0 3 0 3 2 2 0 4 1 0 0 1 8 05:00 PM 0 5 0 5 1 3 0 4 1 0 0 1 10 05:15 PM 0 6 6 3 1 0 4 5 0 0 5 15 05:30 PM 0 5 0 5 5 1 0 6 2 0 0 2 13 Total Volume 0 19 0 19 11 7 0 18 9 0 0 9 46 % App. Total 0 100 0 61.1 38.9 0 100 0 0 PHF .000 .792 .000 .792 MO .583 .000 .750 .450 .000 .000 .450 .767 0 Road Out In Total —111 19 1 30 0 19 0 Thru Left Peds 1 4 Peak Hour Data T ° roS� No�ih °0 s� 0 Peak Hour Begins at 04:45 P , 51 � m � Unshifted O a om 0 AN a✓ — Ti h RI M Peds 0 9 0 F7 9 16 Out In Total Rio Point - Albemarle County, VA Existing (2021) Conditions 1: Rio Road & John Warner Parkway & CATEC Driveway Timing Plan: AM Peak Hour --,* --1' --* 4e~ 4-4% t/*� tiI *j, Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ►j 0 + r Q IN Q F Traffic Volume (veh/h) 14 509 29 514 715 8 103 2 590 4 1 1 Future Volume (veh/h) 14 509 29 514 715 8 103 2 590 4 1 1 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 16 566 32 571 794 9 114 2 656 4 1 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 27 1365 77 598 1347 1153 196 3 710 10 3 11 Arrive On Green 0.01 0.40 0.40 0.34 0.72 0.72 0.11 0.11 0.11 0.01 0.01 0.01 Sat Flow, veh/h 1781 3419 193 1781 1870 1585 1752 31 1585 1439 360 1585 Grp Volume(v), veh/h 16 294 304 571 794 9 116 0 656 5 0 1 Grp Sat Flow(s),veh/hAn 1781 1777 1836 1781 1870 1585 1783 0 1585 1798 0 1585 Q Serve(g_s), s 1.7 23.0 23.0 60.5 39.8 0.3 11.9 0.0 21.6 0.5 0.0 0.1 Cycle Q Clear(g_c), s 1.7 23.0 23.0 60.5 39.8 0.3 11.9 0.0 21.6 0.5 0.0 0.1 Prop In Lane 1.00 0.11 1.00 1.00 0.98 1.00 0.80 1.00 Lane Grp Cap(c),veh/h 27 709 733 598 1347 1153 200 0 710 13 0 11 V/C Ratio(X) 0.60 0.41 0.42 0.95 0.59 0.01 0.58 0.00 0.92 0.39 0.00 0.09 Avail Cap(c_a), veh/h 78 709 733 723 1347 1153 200 0 710 97 0 85 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 94.5 41.7 41.8 62.7 13.1 7.2 81.4 0.0 50.2 95.4 0.0 95.2 Incr Delay (d2), s/veh 19.9 1.8 1.7 21.0 0.7 0.0 4.2 0.0 17.9 18.2 0.0 3.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 We BackOfQ(95%),veh/In 1.7 15.9 16.4 39.9 23.3 0.2 9.7 0.0 42.6 0.6 0.0 0.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 114.4 43.5 43.5 83.6 13.8 7.2 85.6 0.0 68.1 113.6 0.0 98.5 LnGrp LOS F D D F B A F A E F A F Approach Vol, veh/h 614 1374 772 6 Approach Delay, s/veh 45.4 42.8 70.8 111.1 Approach LOS D D E F Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 71.5 82.5 30.0 9.5 144.5 9.0 Change Period (Y+Rc), s 6.7 5.5 8.4 6.6 ' 5.5 7.6 Max Green Setting (Gmax), s ' 78 55 22 8.4 ` 1.2E2 10.4 Max Q Clear Time (g_c+I7), s 62.5 25.0 23.6 3.7 41.8 2.5 Green Ext Time (p-c), s 2.3 7.1 0.0 0.0 15.4 0.0 Intersection Summary HCM 6th Cirl Delay 51.3 HCM 6th LOS D Notes ` HCM 61h computational engine requires equal clearance times for the phases crossing the barrier. Synchro 10 Report RKA Page 1 Rio Point - Albemarle County, VA Existing (2021) Conditions 2: Rio Road & Dunlora Drive Timing Plan: AM Peak Hour Intersection Int Delay, slveh 4.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations I r 1� Traffic Vol, vehlh 70 66 629 25 51 493 Future Vol, vehlh 70 66 629 25 51 493 Conflicting Peds, #Ihr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 200 - - 50 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 MvmtFlow 80 75 715 28 58 560 MalorlMinor Minorl Wort Malor2 Conflicting Flow All 1405 729 0 0 743 0 Stage 1 729 - - - - - Stage 2 676 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Sig 1 5.42 - - - - - Critical Hdwy Sig 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 154 423 - - 864 - Stage 1 477 - - - - - Stage 2 505 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 144 423 - - 864 - Mov Cap-2 Maneuver 144 - - - - - Stage 1 477 - - - - - Stage 2 471 - - - - - Approach WB NB SB HCM Control Delay, s 36.9 0 0.9 HCM LOS E Minor LanelMaior Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (vehlh) - - 144 423 864 - HCM Lane VIC Ratio - - 0.552 0.177 0.067 - HCM Control Delay (s) - - 57.2 15.3 9.5 - HCM Lane LOS - - F C A - HCM 95th %tile Q(veh) - - 2.8 0.6 0.2 - Synchro 10 Report RKA Page 1 Rio Point - Albemarle County, VA Existing (2021) Conditions 3: Rio Road & Dunlora Forest Drive Timing Plan: AM Peak Hour Intersection Int Delay, slveh 0.6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations I if + if + Traffic Vol, vehlh 14 24 630 7 8 555 Future Vol, vehlh 14 24 630 7 8 555 Conflicting Peds, #Ihr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 25 - 200 225 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 16 27 700 8 9 617 MalorlMinor Minorl Malorl MAW Conflicting Flow All 1335 700 0 0 708 0 Stage 1 700 - - - - - Stage 2 635 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Sig 1 5.42 - - - - - Critical Hdwy Sig 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 169 439 - - 891 - Stage 1 493 - - - - - Stage 2 528 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 167 439 - - 891 - Mov Cap-2 Maneuver 167 - - - - - Stage 1 493 - - - - - Stage 2 523 - - - - - Approach WB NB SB HCM Control Delay, s 19.3 0 0.1 HCM LOS C Minor LanelMaior Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (vehlh) - - 167 439 891 - HCM Lane VIC Ratio - - 0.093 0.061 0.01 - HCM Control Delay (s) - - 28.8 13.7 9.1 - HCM Lane LOS - - D B A - HCM 95th %tile Q(veh) - - 0.3 0.2 0 - Synchro 10 Report RKA Page 2 Rio Point - Albemarle County, VA 4: Rio Road & Waldorf School Road/Pen Park Road Existing (2021) Conditions Timing Plan: AM Peak Hour --* --1' --v ,-4\ t r `► 1 f-~ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 49 4 F I + F ? r Traffic Volume (veh/h) 22 2 54 157 1 194 75 421 118 146 387 36 Future Volume (veh/h) 22 2 54 157 1 194 75 421 118 146 387 36 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-rbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 28 3 69 201 1 249 96 540 151 187 496 46 Peak Hour Factor 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 70 36 79 258 1 317 395 715 606 375 773 655 Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.20 0.06 0.38 0.38 0.09 0.41 0.41 Sat Flow. veh/h 0 178 396 746 4 1585 1781 1870 1585 1781 1870 1585 Grp Volume(v), veh/h 100 0 0 202 0 249 96 540 151 187 496 46 Grp Sat Flow(s),veh/hAn 574 0 0 750 0 1585 1781 1870 1585 1781 1870 1585 Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 9.8 2.1 16.6 4.3 4.1 14.0 1.2 Cycle Q Clear(g_c), s 13.2 0.0 0.0 13.2 0.0 9.8 2.1 16.6 4.3 4.1 14.0 1.2 Prop In Lane 0.28 0.69 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 184 0 0 259 0 317 395 715 606 375 773 655 V/C Ratio(X) 0.54 0.00 0.00 0.78 0.00 0.79 0.24 0.75 0.25 0.50 0.64 0.07 Avail Cap(c_a), veh/h 184 0 0 259 0 317 626 1209 1025 551 1209 1025 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.1 0.0 0.0 28.1 0.0 25.1 12.0 17.7 13.9 12.9 15.5 11.7 Incr Delay (d2), s/veh 3.2 0.0 0.0 14.2 0.0 12.3 0.3 1.6 0.2 1.0 0.9 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %le BackOfQ(951/o),vehAn 2.6 0.0 0.0 7.4 0.0 8.0 1.3 10.8 2.5 2.6 9.2 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 26.3 0.0 0.0 42.4 0.0 37.4 12.3 19.4 14.1 13.9 16.4 11.7 LnGrp LOS C A A D A D B B B B B B Approach Vol, veh/h 100 451 787 729 Approach Delay, s/veh 26.3 39.6 17.5 15.4 Approach LOS C D B B Timer - AssignedPhs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 13.5 32.6 20.0 11.4 34.6 20.0 Change Period (Y+Rc), s 7.3 7.3 * 6.8 7.3 7.3 * 6.8 Max Green Setting (Gmax), s 12.7 42.7 * 13 12.7 42.7 * 13 Max Q Clear Time (g_c+l1), s 6.1 18.6 15.2 4.1 16.0 15.2 Green Ext Time (p-c), s 0.3 6.7 0.0 0.2 6.0 0.0 Intersection Summary HCM 6th CVI Delay 22.0 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Synchro 10 Report RKA Page 2 Queuing and Blocking Report Existing (2021) Conditions Rio Point - Albemarle County, VA AM Peak Hour Intersection: 1: Rio Road & John Warner Parkway & CATEC Driveway Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T R LT R LT R Maximum Queue (ft) 79 364 334 482 374 24 124 200 22 4 Average Queue (ft) 14 197 167 249 144 1 85 131 3 0 95th Queue (ft) 52 306 282 418 302 11 141 205 13 2 Link Distance (ft) 1309 956 956 162 309 Upstream Blk Time (°/u) 6 Queuing Penalty (veh) 40 Storage Bay Dist (ft) 200 300 500 75 125 Storage Blk Time (°/6) 11 1 0 26 17 Queuing Penalty (veh) 32 2 0 155 18 Intersection: 2: Rio Road & Dunlora Drive Movement WB WB NB B12 SB SB Directions Served L R TR T L T Maximum Queue (ft) 130 119 280 100 71 42 Average Queue (ft) 42 44 58 6 25 1 95th Queue (ft) 93 99 204 55 59 26 Link Distance (ft) 506 236 918 162 Upstream Blk Time (°/6) 2 0 Queuing Penalty (veh) 10 0 Storage Bay Dist (ft) 200 50 Storage Blk Time (°/6) 0 0 3 Queuing Penalty (veh) 0 0 13 Intersection: 3: Rio Road & Dunlora Forest Drive Movement WB WB SB Directions Served L R L Maximum Queue (ft) 38 40 28 Average Queue (ft) 10 14 3 95th Queue (ft) 33 35 18 Link Distance (ft) 166 Upstream Blk Time (°/u) Queuing Penalty (veh) Storage Bay Dist (ft) 25 225 Storage Blk Time (°/6) 7 4 Queuing Penalty (veh) 2 1 SimTraffic Report RKA Page 1 Queuing and Blocking Report Existing (2021) Conditions Rio Point - Albemarle County, VA AM Peak Hour Intersection: 4: Rio Road & Waldorf School Road/Pen Park Road Movement EB WB WB NB NB NB SB SB SB Directions Served LTR LT R L T R L T R Maximum Queue (ft) 114 193 145 164 289 150 189 307 171 Average Queue (ft) 40 81 46 36 122 37 61 121 20 95th Queue (ft) 85 149 88 92 225 93 130 247 88 Link Distance (ft) 740 1306 976 523 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 75 125 225 100 Storage Blk Time (%) 0 0 18 8 0 Queuing Penalty (veh) 0 2 35 15 0 Network Sum Network wide Queuing Penalty: 325 SimTraff c Report RKA Page 2 Rio Point - Albemarle County, VA Existing (2021) Conditions 1: Rio Road & John Warner Parkway & CATEC Driveway Timing Plan: PM Peak Hour --* --1'-V f-~ 4-4% t r `► 1 Lane Configurations 0 + ? a' r #1 F Traffic Volume (veh/h) 16 874 38 570 675 30 40 4 639 5 1 4 Future Volume (veh/h) 16 874 38 570 675 30 40 4 639 5 1 4 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-rbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 17 940 41 613 726 32 43 4 687 5 1 4 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 28 1293 56 639 1340 1152 183 17 746 16 3 17 Arrive On Green 0.02 0.37 0.37 0.36 0.72 0.72 0.11 0.11 0.11 0.01 0.01 0.01 Sat Flow. veh/h 1781 3469 151 1781 1870 1585 1636 152 1585 1496 299 1585 Grp Volume(v), veh/h 17 482 499 613 726 32 47 0 687 6 0 4 Grp Sat Flow(s),veh/hAn 1781 1777 1843 1781 1870 1585 1789 0 1585 1796 0 1585 Q Serve(g_s), s 1.8 45.0 45.0 65.0 34.7 1.1 4.6 0.0 21.6 0.6 0.0 0.5 Cycle Q Clear(g_c), s 1.8 45.0 45.0 65.0 34.7 1.1 4.6 0.0 21.6 0.6 0.0 0.5 Prop In Lane 1.00 0.08 1.00 1.00 0.91 1.00 0.83 1.00 Lane Grp Cap(c),veh/h 28 662 687 639 1340 1152 200 0 746 19 0 17 V/C Ratio(X) 0.62 0.73 0.73 0.96 0.54 0.03 0.23 0.00 0.92 0.31 0.00 0.23 Avail Cap(c_a), veh/h 78 662 687 723 1340 1152 200 0 746 97 0 85 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 94.4 52.1 52.1 60.6 12.7 7.3 78.2 0.0 47.8 94.8 0.0 94.7 Incr Delay (d2), s/veh 20.2 6.9 6.6 22.8 0.4 0.0 0.6 0.0 16.8 8.8 0.0 6.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %le BackOfQ(951/o),vehAn 1.8 29.0 29.9 42.8 20.8 0.7 3.9 0.0 44.0 0.6 0.0 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 114.7 58.9 58.7 83.3 13.1 7.4 78.8 0.0 64.6 103.6 0.0 101.5 LnGrp LOS F E E F B A E A E F A F Approach Vol, veh/h 998 1371 734 10 Approach Delay, s/veh 59.8 44.4 65.5 102.8 Approach LOS E D E F Timer - AssignedPhs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 75.9 77.4 30.0 9.6 143.7 9.7 Change Period (Y+Rc), s * 6.7 * 5.5 * 8.4 6.6 * 5.5 7.6 Max Green Setting (Gmax), s * 78 * 55 * 22 8.4 * 1.2E2 10.4 Max Q Clear Time (g_c+l1), s 67.0 47.0 23.6 3.8 36.7 2.6 Green Ext Time (p-c), s 2.2 5.4 0.0 0.0 13.0 0.0 Intersection Summary HCM 6th CVI Delay 54.5 HCM 6th LOS D Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Synchro 10 Report RKA Page 1 Rio Point - Albemarle County, VA Existing (2021) Conditions 2: Rio Road & Dunlora Drive Timing Plan: PM Peak Hour Intersection Int Delay, s/veh Movement 1.4 WBL WBR NBT NBR SBL SBT Lane Configurations f I+ Traffic Vol, veh/h 23 25 658 33 72 537 Future Vol, veh/h 23 25 658 33 72 537 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 200 - - 50 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 25 27 708 35 77 577 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1457 726 0 0 743 0 Stage 1 726 - - - - - Stage 2 731 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 143 425 - - 864 - Stage 1 479 - - - - - Stage 2 476 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 130 425 - - 864 - Mov Cap-2 Maneuver 130 - - - - - Stage 1 479 - - - - - Stage 2 434 - - - - - Approach WB NB SB HCM Control Delay, s 26 0 1.1 HCM LOS D Minor Lane/Maior Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th °/dile Q(veh) RKA NBT NBRWBLniWBLn2 SBL SBT 130 425 864 - 0.19 0.063 0.09 - 39.1 14 9.6 - E B A 0.7 0.2 0.3 Synchro 10 Report Page 1 Rio Point - Albemarle County, VA 3: Rio Road & Dunlora Forest Drive Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations ►j r + r ►j + Traffic Vol, veh/h 7 12 679 10 20 540 Future Vol, veh/h 7 12 679 10 20 540 Conflicting Pads, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 25 - 200 225 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 8 13 754 11 22 600 Conflicting Flow Al Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 1398 754 754 - 644 - 6.42 6.22 5.42 - 5.42 - 3.518 3.318 155 409 465 - 523 - 151 151 465 509 409 0 0 765 0 4.12 2.218 848 848 Approach WB NB SB HCM Control Delay, s 20 0 0.3 HCM LOS C Minor Lane/Maior Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th °/dile Q(veh) NBT NBRWBLn1WBLn2 SBL SBT 151 409 848 - 0.052 0.033 0.026 - 30.1 14.1 9.4 - D B A 0.2 0.1 0.1 Existing (2021) Conditions Timing Plan: PM Peak Hour Synchro 10 Report RKA Page 2 Rio Point - Albemarle County, VA 4: Rio Road & Waldorf School Road/Pen Park Road Existing (2021) Conditions Timing Plan: PM Peak Hour --* --1'-V �*\ t /0� ti 1 4e~ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 46 a' r ►j + F I + F Traffic Volume (veh/h) 6 1 12 52 1 80 7 603 94 111 433 3 Future Volume (veh/h) 6 1 12 52 1 80 7 603 94 111 433 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-rbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 7 1 13 57 1 88 8 663 103 122 476 3 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 108 26 84 246 3 137 486 881 746 382 1000 847 Arrive On Green 0.09 0.09 0.09 0.09 0.09 0.09 0.01 0.47 0.47 0.07 0.53 0.53 Sat Flow. veh/h 295 303 971 1421 38 1585 1781 1870 1585 1781 1870 1585 Grp Volume(v), veh/h 21 0 0 58 0 88 8 663 103 122 476 3 Grp Sat Flow(s),veh/hAn 1569 0 0 1459 0 1585 1781 1870 1585 1781 1870 1585 Q Serve(g_s), s 0.0 0.0 0.0 1.4 0.0 3.1 0.1 16.9 2.1 1.9 9.2 0.1 Cycle Q Clear(g_c), s 0.7 0.0 0.0 2.1 0.0 3.1 0.1 16.9 2.1 1.9 9.2 0.1 Prop In Lane 0.33 0.62 0.98 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 219 0 0 249 0 137 486 881 746 382 1000 847 V/C Ratio(X) 0.10 0.00 0.00 0.23 0.00 0.64 0.02 0.75 0.14 0.32 0.48 0.00 Avail Cap(c_a), veh/h 428 0 0 447 0 360 857 1375 1165 640 1375 1165 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.5 0.0 0.0 25.1 0.0 25.7 8.1 12.6 8.7 9.4 8.4 6.3 Incr Delay (d2), s/veh 0.2 0.0 0.0 0.5 0.0 4.9 0.0 1.3 0.1 0.5 0.4 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %le BackOfQ(951/o),vehAn 0.5 0.0 0.0 1.3 0.0 2.3 0.1 9.9 1.1 1.1 5.2 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 24.7 0.0 0.0 25.6 0.0 30.5 8.1 13.9 8.8 9.9 8.8 6.3 LnGrp LOS C A A C A C A B A A A A Approach Vol, veh/h 21 146 774 601 Approach Delay, s/veh 24.7 28.6 13.2 9.0 Approach LOS C C B A Timer - AssignedPhs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 11.6 34.7 11.8 7.9 38.4 11.8 Change Period (Y+Rc), s 7.3 7.3 * 6.8 7.3 7.3 * 6.8 Max Green Setting (Gmax), s 12.7 42.7 * 13 12.7 42.7 * 13 Max Q Clear Time (g_c+l1), s 3.9 18.9 2.7 2.1 11.2 5.1 Green Ext Time (p-c), s 0.2 8.5 0.0 0.0 5.9 0.3 Intersection Summary HCM 6th CVI Delay 13.2 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Synchro 10 Report RKA Page 1 Queuing and Blocking Report Existing (2021) Conditions Rio Point - Albemarle County, VA PM Peak Hour Intersection: 1: Rio Road & John Warner Parkway & CATEC Driveway Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T R LT R LT R Maximum Queue (ft) 235 919 400 673 390 35 124 184 29 11 Average Queue (ft) 36 435 304 347 91 4 56 153 4 1 95th Queue (ft) 157 841 462 587 263 22 125 212 17 6 Link Distance (it) 1309 956 956 162 309 Upstream Blk Time (°/u) 0 0 13 Queuing Penalty (veh) 0 0 88 Storage Bay Dist (ft) 200 300 500 75 125 Storage Blk Time (°/6) 37 13 10 35 Queuing Penalty (veh) 184 61 61 15 Intersection: 2: Rio Road & Dunlora Drive Movement WB WB NB B12 SB SB Directions Served L R TR T L T Maximum Queue (ft) 52 71 309 111 89 151 Average Queue (it) 17 22 118 7 34 13 95th Queue (ft) 42 57 290 50 77 84 Link Distance (it) 506 236 573 162 Upstream Blk Time (°/6) 3 0 Queuing Penalty (veh) 25 2 Storage Bay Dist (it) 200 50 Storage Blk Time (°/6) 8 Queuing Penalty (veh) 41 Intersection: 3: Rio Road & Dunlora Forest Drive Movement WB WB SB Directions Served L R L Maximum Queue (ft) 28 28 40 Average Queue (ft) 7 8 9 95th Queue (it) 26 28 33 Link Distance (it) 350 Upstream Blk Time (°/u) Queuing Penalty (veh) Storage Bay Dist (ft) 25 225 Storage Blk Time (°/6) 4 2 Queuing Penalty (veh) 0 0 SimTraiBc Report RKA Page 1 Queuing and Blocking Report Existing (2021) Conditions Rio Point - Albemarle County, VA PM Peak Hour Intersection: 4: Rio Road & Waldorf School Road/Pen Park Road Movement EB WB WB NB NB NB SB SB SB Directions Served LTR LT R L T R L T R Maximum Queue (ft) 42 70 71 31 343 174 102 229 6 Average Queue (ft) 9 25 25 4 132 30 40 76 0 95th Queue (ft) 30 57 54 20 251 98 81 177 5 Link Distance (ft) 736 1306 976 546 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 350 75 125 225 100 Storage Blk Time (%) 15 3 Queuing Penalty (veh) 15 4 Network Sum Network wide Queuing Penalty: 497 SimTraff c Report RKA Page 2 Rio Point - Albemarle County, VA No -Build (2023) Conditions 1: Rio Road & John Warner Parkway & CATEC Driveway Timing Plan: AM Peak Hour �--,, 7 f-~ t 1 1 �' �► l r Lane Configurations 0 + ? *T if 4 F Traffic Volume (veh/h) 15 573 33 556 819 8 115 2 663 4 1 1 Future Volume (veh/h) 15 573 33 556 819 8 115 2 663 4 1 1 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-rbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 17 637 37 618 910 9 128 2 737 4 1 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 28 1276 74 643 1346 1152 196 3 750 10 3 11 Arrive On Green 0.02 0.37 0.37 0.36 0.72 0.72 0.11 0.11 0.11 0.01 0.01 0.01 Sat Flow. veh/h 1781 3413 198 1781 1870 1585 1755 27 1585 1439 360 1585 Grp Volume(v), veh/h 17 331 343 618 910 9 130 0 737 5 0 1 Grp Sat Flow(s),veh/hAn 1781 1777 1835 1781 1870 1585 1783 0 1585 1798 0 1585 Q Serve(g_s), s 1.8 27.7 27.8 65.5 51.2 0.3 13.5 0.0 21.6 0.5 0.0 0.1 Cycle Q Clear(g_c), s 1.8 27.7 27.8 65.5 51.2 0.3 13.5 0.0 21.6 0.5 0.0 0.1 Prop In Lane 1.00 0.11 1.00 1.00 0.98 1.00 0.80 1.00 Lane Grp Cap(c),veh/h 28 664 686 643 1346 1152 200 0 750 13 0 11 V/C Ratio(X) 0.62 0.50 0.50 0.96 0.68 0.01 0.65 0.00 0.98 0.39 0.00 0.09 Avail Cap(c_a), veh/h 78 664 686 723 1346 1152 200 0 750 97 0 85 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 94.4 46.5 46.5 60.3 14.7 7.2 82.1 0.0 50.1 95.4 0.0 95.2 Incr Delay (d2), s/veh 20.2 2.7 2.6 23.0 1.4 0.0 7.3 0.0 28.5 18.2 0.0 3.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 We BackOfQ(951/o),vehAn 1.8 18.8 19.3 43.1 29.2 0.2 10.9 0.0 51.4 0.6 0.0 0.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 114.7 49.2 49.1 83.3 16.1 7.2 89.4 0.0 78.6 113.6 0.0 98.5 LnGrp LOS F D D F B A F A E F A F Approach Vol, veh/h 691 1537 867 6 Approach Delay, s/veh 50.8 43.1 80.2 111.1 Approach LOS D D F F Timer - AssignedPhs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 76.4 77.6 30.0 9.6 144.4 9.0 Change Period (Y+Rc), s * 6.7 * 5.5 * 8.4 6.6 * 5.5 7.6 Max Green Setting (Gmax), s * 78 * 55 * 22 8.4 * 1.2E2 10.4 Max Q Clear Time (g_c+11), s 67.5 29.8 23.6 3.8 53.2 2.5 Green Ext Time (p-c), s 2.2 7.7 0.0 0.0 19.9 0.0 Intersection Summary HCM 6th CVI Delay 55.3 HCM 6th LOS E Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Synchro 10 Report RKA Page 1 Rio Point - Albemarle County, VA No -Build (2023) Conditions 2: Rio Road & Dunlora Drive Timing Plan: AM Peak Hour Intersection Int Delay, s/veh Movement 10 WBL WBR NBT NBR SBL SBT Lane Configurations f TO ►j + Traffic Vol, veh/h 95 77 703 34 55 534 Future Vol, veh/h 95 77 703 34 55 534 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 200 - - 50 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 108 88 799 39 63 607 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1552 819 0 0 838 0 Stage 1 819 - - - - - Stage 2 733 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 125 375 - - 796 - Stage 1 433 - - - - - Stage 2 475 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 115 375 - - 796 - Mov Cap-2 Maneuver 115 - - - - - Stage 1 433 - - - - - Stage 2 437 - - - - - Approach WB NB SB HCM Control Delay, s 84.2 0 0.9 HCM LOS F Minor Lane/Maior Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th °/dile Q(veh) RKA NBT NBRWBLn1WBLn2 SBL SBT 115 375 796 - 0.939 0.233 0.079 - 138.3 17.5 9.9 - F C A 5.9 0.9 0.3 Synchro 10 Report Page 1 Rio Point - Albemarle County, VA No -Build (2023) Conditions 3: Rio Road & Dunlora Forest Drive Timing Plan: AM Peak Hour Intersection Int Delay, s/veh Movement 0.7 WBL WBR NBT NBR SBL SBT Lane Configurations ►j f + I + Traffic Vol, veh/h 15 25 712 7 9 620 Future Vol, veh/h 15 25 712 7 9 620 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 25 - 200 225 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 17 28 791 8 10 689 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1500 791 0 0 799 0 Stage 1 791 - - - - - Stage 2 709 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 134 390 - - 824 - Stage 1 447 - - - - - Stage 2 488 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 132 390 - - 824 - Mov Cap-2 Maneuver 132 - - - - - Stage 1 447 - - - - - Stage 2 482 - - - - - Approach WB NB SB HCM Control Delay, s 22.9 0 0.1 HCM LOS C Minor Lane/Maior Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th °/dile Q(veh) RKA NBT NBRWBLn1WBLn2 SBL SBT 132 390 824 - 0.126 0.071 0.012 - 36.2 14.9 9.4 - E B A 0.4 0.2 0 Synchro 10 Report Page 2 Rio Point - Albemarle County, VA 4: Rio Road & Waldorf School Road/Pen Park Road No -Build (2023) Conditions Timing Plan: AM Peak Hour --,, --v 4-4% t `► 1 4e~ 1,* Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 a' ? t F I + F Traffic Volume (veh/h) 23 2 56 163 1 201 78 495 123 152 446 37 Future Volume (veh/h) 23 2 56 163 1 201 78 495 123 152 446 37 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-rbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 29 3 72 209 1 258 100 635 158 195 572 47 Peak Hour Factor 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 64 33 74 238 1 292 383 798 676 352 854 724 Arrive On Green 0.18 0.18 0.18 0.18 0.18 0.18 0.06 0.43 0.43 0.09 0.46 0.46 Sat Flow. veh/h 0 177 399 745 4 1585 1781 1870 1585 1781 1870 1585 Grp Volume(v), veh/h 104 0 0 210 0 258 100 635 158 195 572 47 Grp Sat Flow(s),veh/hAn 576 0 0 749 0 1585 1781 1870 1585 1781 1870 1585 Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 11.4 2.2 21.1 4.5 4.3 17.1 1.2 Cycle Q Clear(g_c), s 13.2 0.0 0.0 13.2 0.0 11.4 2.2 21.1 4.5 4.3 17.1 1.2 Prop In Lane 0.28 0.69 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 171 0 0 238 0 292 383 798 676 352 854 724 V/C Ratio(X) 0.61 0.00 0.00 0.88 0.00 0.88 0.26 0.80 0.23 0.55 0.67 0.06 Avail Cap(c_a), veh/h 171 0 0 238 0 292 591 1115 945 507 1115 945 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.9 0.0 0.0 31.5 0.0 28.5 11.8 17.8 13.1 13.7 15.2 10.9 Incr Delay (d2), s/veh 6.2 0.0 0.0 29.4 0.0 25.6 0.4 2.8 0.2 1.4 1.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %le BackOfQ(951/o),vehAn 3.2 0.0 0.0 9.3 0.0 10.2 1.4 13.4 2.7 2.8 10.8 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 32.1 0.0 0.0 60.8 0.0 54.0 12.1 20.6 13.3 15.1 16.2 10.9 LnGrp LOS C A A E A D B C B B B B Approach Vol, veh/h 104 468 893 814 Approach Delay, s/veh 32.1 57.1 18.4 15.7 Approach LOS C E B B Timer - AssignedPhs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 13.8 37.8 20.0 11.6 40.0 20.0 Change Period (Y+Rc), s 7.3 7.3 * 6.8 7.3 7.3 * 6.8 Max Green Setting (Gmax), s 12.7 42.7 * 13 12.7 42.7 * 13 Max Q Clear Time (g_c+11), s 6.3 23.1 15.2 4.2 19.1 15.2 Green Ext Time (p-c), s 0.4 7.4 0.0 0.2 6.9 0.0 Intersection Summary HCM 6th CVI Delay 26.0 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Synchro 10 Report RKA Page 1 Queuing and Blocking Report No -Build (2023) Conditions Rio Point - Albemarle County, VA AM Peak Hour Intersection: 1: Rio Road & John Warner Parkway & CATEC Driveway Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T R LT R LT R Maximum Queue (ft) 149 548 396 589 407 24 124 213 29 9 Average Queue (ft) 18 248 212 297 168 1 101 159 3 1 95th Queue (ft) 80 408 337 507 343 10 147 221 17 4 Link Distance (ft) 1309 956 956 162 309 Upstream Blk Time (°/u) 15 Queuing Penalty (veh) 118 Storage Bay Dist (ft) 200 300 500 75 125 Storage Blk Time (°/6) 20 2 0 41 22 Queuing Penalty (veh) 70 5 0 272 26 Intersection: 2: Rio Road & Dunlora Drive Movement WB WB NB B12 B10 SB SB Directions Served L R TR T T L T Maximum Queue (ft) 392 260 321 341 2 78 148 Average Queue (ft) 131 103 135 44 0 29 10 95th Queue (ft) 383 254 327 236 2 68 70 Link Distance (ft) 506 236 573 268 162 Upstream Blk Time (°/6) 6 8 0 0 Queuing Penalty (veh) 0 60 1 1 Storage Bay Dist (ft) 200 50 Storage Blk Time (°/6) 4 17 6 Queuing Penalty (veh) 3 16 31 Intersection: 3: Rio Road & Dunlora Forest Drive Movement WB WB SB Directions Served L R L Maximum Queue (ft) 46 46 33 Average Queue (ft) 14 15 5 95th Queue (ft) 40 38 23 Link Distance (ft) 138 Upstream Blk Time (°/u) Queuing Penalty (veh) Storage Bay Dist (ft) 25 225 Storage Blk Time (°/6) 9 5 Queuing Penalty (veh) 2 1 SimTraiBc Report RKA Page 1