Loading...
HomeMy WebLinkAboutSDP198000053 Review Comments Letter of Revision 1 2021-04-07 (5)COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 (434)296-5832 4-7-2021 Charles Luck 9030 Stony Point Parkway, Suite 220 Richmond VA 23235 RE: LOR # 1 to SDP1980-53 ACSA Madison Office Park Pump Station Replacement Dear Sir: Your LOR application has been reviewed. In order for the amended site plan to be approved the following revisions are required: 1. [Comment] Prior to LOR approval ACSA shall approve the proposal, ARB review comments shall be addressed. Building Official comments shall be addressed. See below. Margaret Maliszewski — ARB 1. Revise the light fixture to a full cutoff style or to one that emits less than 3,000 lumens. 2. The revised roof color (matching the existing pump station roof) is appropriate. Please name the roof color Betty Slough — Building Official Add the following note to the general notes page: Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. Add the following note to the general notes page: Accessible parking spaces, access isles, and accessible route shall be installed in accordance with ICCANSI A117.1-09 and the 2015 Virginia Construction Code. Add the following note to the general notes page: ALL water lines, sewer lines, and fire lines from the main to the structure located on private property MUST have a visual inspection performed by the building department. Add the following to the general notes page: All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. Add the following note to the general notes page: Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a demolition permit. Asbestos removal permits are required ifpositive for such from Albemarle County and VDOLI. Contact VDOLI for their additional requirements and permits for demolition projects at 540-562-3580 x131. Richard Nelson —ACSA Comments pending, plan sent to ACSA on 4-7-2 1. If you already have their approval, please forward it to staff. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit a revised final site plan to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about the comments please feel free to contact me. Sincerely, Christopher Perez Planning Division, Senior Planner