Loading...
HomeMy WebLinkAboutARB202100009 Action Letter 2021-04-08,S.{.OF AL8 County of Albemarle Community Development Department - Planning ��BGIN�t' April 6, 2021 Brett Flory Cross Architects, PLLC 879 Junction Drive Allen, TX 75013 RE: ARB-2021-09: Caliber Collision (TMP:04500-00-00-10600) Dear Mr. Flory, Khristopher Taggart ktaooartCc)albemarle.org Telephone: (434)296-5832 ext.3278 The Albemarle County Architectural Review Board, at its meeting on Monday, April 5, 2021, completed an advisory review of the above -noted application. The Board by a vote of 4:0, forwarded the following recommendation to the Planning Commission: The ARB recommends approval of the revised proposal because the screening of the rooftop equipment has a coordinated, appropriate appearance. The fence design illustrated in the revised concept plan is not approved and is subject to ARB review and approval with the site development plan. The ARB provided the following comments for the benefit of the applicant's future site plan submittal: 1. Revise the plans to show a dumpster enclosure that has a coordinated appearance with the overall development. 2. The additional mitigation measures shown for screening the rooftop equipment appear appropriate. 3. Revise the plans show a fence design that relates more closely to the building and the surrounding commercial context. Consider alternative, more durable screening materials. 4. Revise the plans to indicate a compatible color for the vision slats for the chain link fence. 5. No increase in chain link fence is approved. 6. Revise the site and architectural plans to include the standard mechanical equipment note. 7. Note that the site changes that are shown will require a Site Plan Amendment. A complete landscape plan should be provided with the first submittal of that amendment. 8. Revise the plan to show landscaping in the planting areas along the northern and southern perimeters of the site. 9. Provide a complete landscape plan with the first site plan submittal. 10. Include the plant health note on the landscape plan in the first site plan submittal. 11. Sign applications are required for all proposed signs. Note that the number of colors in the wall sign exceeds the guidelines maximum and internal illumination of the multicolor band will not likely be recommended. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at https://www.albemarle.org/government/community- development/apply-for/planning-and-site-development-applications. JITItdI5MA91l:74k1rA Y-111 WOMTO 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579 If you have any questions concerning any of the above, please feel free to contact me. Sincerely, /� t5 Khris Taggart, Planner cc: TAP Investments, LLC 2903 North Augusta St. Staunton, VA 24401 File W W W.ALBEMARLLORG 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579