Loading...
HomeMy WebLinkAboutWPO201900047 Plan - VSMP 2021-04-13 (4)BOHLERI Albemarle County Department of Community Development 401 McIntire Road Room 227 Charlottesville, VA 22902 Attn: John Anderson Dear Mr. Anderson: 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 o. 540.349.4500 April 13, 2021 Via Electronic Upload Re: WPO2019-00047 Virginia Stormwater Management Plan 3rd Review Response Hampton Inn 1628 State Farm Boulevard Charlottesville, VA 22911 Albemarle County BE #V172065 Bohler Engineering is pleased to submit on behalf of Shamin Hotels, the 41h Submission Virginia Stormwater Management Plan for the Hampton Inn project in Albemarle, Virginia. The following is our comment response letter addressing comments received from your department dated September 25, 2020. Each comment is addressed and responded to as follows: A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Comment 2: Provide the Notice of Permit Coverage, once issued. (Rev. 2, 3) Comment persists. Response 2: Acknowledged. Notice of Permit coverage will be provided once issued. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. This plan is disapproved. Comment 6: Section 8: Qualified Personnel must be identified prior to Grading Permit issuance. (VSMP /WPO Plan must be approved prior to approval of the Final Site Plan /FSP.) (Rev. 2) Comment persists. Applicant response: 'Acknowledged.' (Rev. 3) Persists. Applicant response (8/20/20 letter): 'Qualified personnel shall be identified prior to Grading Permit issuance.' Response 6: The Qualified Personnel will be identified once determined by the developer. w .BohIerEngineering.com BOHLERI John Anderson, P.E. Hampton Inn VSMP 3rd Review Response April 13, 2021 Page 2 of 3 Comment 8: Section 10: The Delegation of Authority should be provided prior to Grading Permit issuance. (Rev. 2) Comment persists. Applicant response: 'Acknowledged.' (Rev. 3) Persists. Applicant: 'The Delegation of Authority will be determined prior to Grading Permit issuance.' Response 8: The Delegation of Authority will be identified once determined by the developer. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved. The stormwater management plan content requirements can be found in County Code section 17-403. Note items 1, 3, below, this section, then skip this section (since comments addressed, or if they persist, are required to be met prior to Grading Permit issuance, not VSMP /WPO plan approval) and go to Sec. D. Erosion and Sediment Control Plan since several comments there more nearly pertain to the SWM Plan than the ESC Plan. Please address items 9, 12, 13 (Sec. D.) for SWM Plan and VSMP /WPO plan approval. Comment 1: (Rev. 3) Comment revised to read: Nutrient credits must be purchased prior to Grading Permit issuance, but purchase is not required for VSMP plan approval. Response 1: Acknowledged. Comment 3: Coordinate a stormwater control maintenance agreement with Ana Kilmer as soon as possible. Agreement is required under 17-415, and is prerequisite to both Grading Permit and FSP approval. (Rev. 2) Comment persists. Applicant response: 'Acknowledged.' (Rev. 3) Persists. Applicant: 'The Stormwater Control Maintenance Agreement shall be coordinated prior to final plan approval.' As follow-up: Engineering encourages coordination as soon as possible since Maintenance Agreement must be recorded prior to easement plat approval, and easement plat approval is required prior to VSMP /WPO plan approval. Response 3: Client is coordinating directly with the County on the Stormwater Control Maintenance Agreement. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, yet review comments listed in this section with prior reviews relate to SWM plan more than the ESC plan, and several persist. Please note items 9, 12, 13, below, and address for SWM Plan and VSMP /WPO plan approval. Comment 9: Note: PE -sealed geotechnical retaining wall design is required for Site Plan approval. (Rev. 2) Comment persists. Applicant response: 'Acknowledged. PE - sealed geotechnical retaining wall designs will be provided prior to Site Plan approval.' (Rev. 3) Partially addressed. As follow-up: Hillis -Carnes Engineering Associates retaining wall design titled Hampton Inn Charlottesville, d. 8/12/20 (10 sheets) indicate at least at one location along each of four (4) walls, labeled Walls 1, 2, 3, 4, where wall ht. from base of wall (proposed grade) to top of wall exceeds maximum ht. allowed for retaining walls located on managed steep slopes. Max. ht. does not exceed max. allowable (wall) ht. by much, but each wall appears to; for example: a. Wall 1, Sta. 1+20; 10-block ht., or-7.33' ht. b. Wall 2, Sta. 0+80; 10-block ht., or —7.33' ht. w . BohlerEngineering.wm John Anderson, P.E. BOHLERI Hampton Inn VSMP 3rd Review Response April 13, 2021 Page 3 of 3 c. Wall 3, Sta. 0+90; 9-block ht., or -6.66' ht. d. Wall 4, Sta. 1+10; 10-block ht., or -7.33' ht. Note: Height in excess of 6' could, as an option, be addressed with a 5 th wall, which itself may not exceed 6' max. ht. if located on managed steep slopes. Revise design to ensure max. wall ht. of each stepped retaining wall located on managed steep slopes does not exceed 6'. Response 9: The wall design has been revised to ensure all heights are below 6 feet and provided with this submission. Comment 12: Submit easement plat application for items listed at 10 and 11, above. Ensure easement width for detention system conforms with drainage easement diagram at ACDSM, p. 15; link to Design Manual: (Rev. 2) Comment persists. Applicant response: 'An easement plat will be provided prior to plan approval.' http://wvvw.albemarle.org/upload/images/forms center/departments/community_ development/forms/design - stand ards_manual/Albemarle_Cou nty_Desig n_Stand ards_Manual _2015-04-25_raft.pdf (Rev. 3) Persists. Applicant: 'Easement plat shall be submitted under separate cover.' Response 12:The Easement Plat has been revised and resubmitted. Comment 13: Note: Recorded deed of easement (deed /plat) is required prior to VSMP /WPO plan approval. (Rev. 2) Comment persists. Applicant response: 'Acknowledged. The recorded deed of easement will be provided prior to plan approval.' (Rev. 3) Persists. Response 13:Acknowledged. The easement plat has been submitted and will be recorded prior to plan approval. Please note: Only a few items required for VSMP plan approval, but these are critical: Comment 1: Max. retaining wall ht. ( Hillis -Carnes retaining wall design) Response 1: The wall design has been revised to ensure all heights are below 6 feet and provided with this submission. Comment 2: Easement plat recordation. SWIM facility /public drainage Response 2: The Easement Plat has been revised and resubmitted. Comment 3: No request for linework revisions Response 3: Acknowledged. Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (540) 349-4500. Sincerely, Bohler Engineering VA, LLC John C. Wright, P.E. JCW/jb H:\1TV172065�Administrative\Letters\210413 VSMP Plan 3rd Review CRL.doc www. BohlerEngineering.com