Loading...
HomeMy WebLinkAboutSDP200800006 Correspondence Letter of Revision 2 2021-04-07TIMMONS GROUP April 7, 2021 Paty Saternye Senior Planner Community Development 401 McIntire Road, North Wing Charlottesville, VA, 22902 RE: Letter of Revision (#2) — Rev. 1: April 7, 2021 Monticello Visitor Center & Smith History Center SDP-2008-006 Dear Mr. Saternye, 608 Preston Avenue P 434.295.5624 Suite 200 F 434.295.1800 Charlottesville, VA22903 wwatimmons.com Planning— Paty Saternye: 2. [32.5.2(e) & 32.6.2(j)] Landscaping features; Landscaping plan. Address the following: a. Provide an updated Landscaping Requirements chart (from Sheet 32 in SDP2008-6), and ensure all minimum requirements are still met. Rev. 1: Comment not yet fully addressed. Address the following: i. On Sheet L6.02 the previously approved landscaping chart and parking lot tree schedule has been included. With one exception, this chart is as previously discussed. However, then reduction of parking spaces (a net reduction of 6 space) must be updated in the chart. It is no longer accurate to state that 113 parking spaces were "New Parking Spaces': Since this is for the full Minor Amendment (after LOR #2) 107 spaces should be listed and not 113. On Sheet L6.02 the number of "New Parking Spaces" has been reduced to 107 to account for the removal of 6 spaces. ii. A separate Landscaping Requirements chart has been included on Sheet L6.00, showing the "Landscape Requirements— County of Albemarle" for the parking lot. Revise this chart as follows: a. Revise "Project: Enslaved Burial Ground" to read instead "Project: Enslaved Burial Ground (Changes with LOR# 2 only. See Sheet L6.02 for overall project information for SDP2008-6)". On Sheet L6.00 the Landscape Requirements chart project title has been updated to "Project: Burial Ground for Enslaved People (Changes with LOR# 2 only. See sheet L6.02 for overall project information for SDP2008-6)". b. Remove (from Sheet L6.00 only) from the chart the lines for "Preserved forested area." and "Total incl. Canopy Bonus (1.25 ENGINEERING I DESIGN I TECHNOLOGY preserved area):" and "Required minimum canopy (20%of property area):". Those three lines exist (and should remain) on L6.02. These three lines in the chart on Sheet L6.00 are not only redundant to what is shown on L6.02 but the values provided are also different and therefore contradict the other provided information. These three lines have been removed from the Landscape Requirements chart on L6.00. c. Add at the top of the landscaping schedule on Sheet L6.00, just above the "QTY" and "Botanical Name" column headings, the following: "Project: Enslaved Burial Ground —Tree additions for LOR# 2. See other sheets for additional plant schedules)". At the top of the landscaping schedule on Sheet L6.00 the following heading was added "Project: Burial Ground For Enslaved People — Tree additions for LOR #2. See other sheets for additional plant schedules. e. Rev. 1 [New Comment]: Sheet A200 has been added to show the location of the benches, which was requested. However, the landscaping shown does not appear to be proposed landscaping since it shows trees in the middle of the trails in more than one location. Either remove the landscaping from this sheet or discuss with plan reviewer. Sheet A200 has been revised to remove the landscaping from the sheet. [32.5.2(n)] & 32.6.2(k)] Outdoor lighting. Include a Photometric Plan that shows the equivalent information that was provided in LOR #1 and shows any and all modifications to the lighting and lighting locations from what was shown on the LOR #1. Rev. 1: Comment not yet fully address the following: a. No bollard lighting is shown on LOR# 2. Therefore, Sheet E0.0 from LOR# 1 also needs to be updated to no longer shown that lighting fixture. Sheet E0.0 has been added to the set with the bollard lights struck out. b. Remove note #2 from Sheet E1.0 since lighting fixtures are no longer shown along any of the walkways. The referenced note has been removed. 6. [Comment] The LOR submission has also been reviewed by Engineering, ARB, and Fire Rescue. Inspections comments are still pending. Attached please see the Engineering comments. ARB and Fire Rescue had no objections. Inspections comments will be forwarded to you when they are available. Rev. 1: Comment not yet fully addressed. See the attached Engineering comments. There were no prior ARB, Fire, or inspections comments and as such it is expected there will be no new comments with the minor plan changes made between submissions. Per below engineering has no further review related comments and only that the WPO plan must be approved first which is understood. I am in the process of getting the two signatures required on the SWPPP to obtain WPO approval so as not to hold up this approval. CDD Engineering —John Anderson 04-06-2021: 1. Prior comments [12/11/2020 5:52PM email] are addressed. Engineering has no objection to LOR2 per se, but WPO202000054 approval is required prior to LOR2 Approval. Sincerely, Bry�ki, PE Project Manager