Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO202000032 Plan - VSMP 2021-04-15
VSMP PLAN 1300 RICHMOND ROAD -FLOW AUTOMOTIVE LEGEND OWNER/DEVELOPER Owner: Flow 1300 Richmond LLC EXISTING NEW DESCRIPTION loor lem,271 Winston-Salem, INCN27101 Winston-Salem, bthomas@flowauto.com BOUNDARIES BENCHMARK ZONING SITE PROPERTY LINE HC - Highway Commercial Entrance Corridor ADJACENT PROPERTY LINE Amendment to SDP199500042 BUILDING SETBACK With SP199400004 Ll PARKING SETBACK SITE TEXT SETBACKS 10 10 PARKING COUNT Front (measured from right-of-way or exterior edge of sidewalk if the sidewalk is outside of the TOPOGRAPHY right-of-way): Building: Min - 10 feet, Max - 30 feet` INDEX CONTOUR Parking: Min - 10 feet, Max - None INTERVAL CONTOUR 'None on any lot abutting a principal arterial highway or interstate m Side & Rear (if abutting lot is zoned residential, rural areas, or Monticello Historic District): 311.5 x x' SPOT ELEVATION Building: Min - 50 feet, Max - None n9 311.5 TC x x TOP OF CURB ELEVATION Parking: Min - 20 feet, Max - None Side &Rear (if abutting lot is zoned commercial or industrial): 311.5 TW x x' TOP OF WALL ELEVATION Building: Min - Accordance with Building Code, Max - None 311.5 BW x x'p BOTTOM OF WALL ELEVATION Parking: Min - None, Max - None - "' . "' - STREAM MAGISTERIAL DISTRICT - - STREAM BUFFER Rivanna 100 YEAR FLOODPLAIN SOURCE OF TITLE BUILDING BUILDING TMP 78-6 : DB 5272 PG 714 TMP 78-7 : DB 5272 PG 714 RETAINING WALL SOURCE OF BOUNDARY AND TOPOGRAPHY STAIRS Boundary & topographic survey provided by: EDGE OF PAVEMENT Roger W. Ray & Associates, Inc. (01/07/2020), updated (0311612020) - - ROAD CENTERLINE w/ portion from LIDAR retrieved (01/30/2020) Delineation of LIDAR & Surveyed Topo Shown Sheet C3. FRONT OF CURB Topography field verified by Justin Shimp, P.E. (03/25/2020) BACK OF CURB I CG-12 TRUNCATED DOME BENCHMARK SIDEWALK Datum for topography is NAVD 88 Benchmark located in parking lot near existing building on TMP 78-6 elevation 420.08. & BIKE PARKING HANDICAP ACCESSIBLE AISLE FLOODZONE HANDICAP PARKING According to the FEMA Flood Insurance Rate Map, effective February 4, 2005, MATERIAL (Community Panel 51003CO287D) a portion of this property does lie within a 1% annual chance floodplain. CONCRETE RESERVOIR WATERSHED RIPRAP 0 ASPHALT This site is within the Upper Rivanna River Watershed. EC-2 MATTING EC-3 MATTING WATER & SANITARY SERVICES 0 WETLAND Site is served by Albemarle County Service Authority. All sanitary lines on site are private. TREELINE X X FENCE GENERAL CONSTRUCTION NOTES FOR UTILITY EROSION AND SEDIMENT CONTROL PLANS -0- -0- UTILITY POLE m m GUY WIRE 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. ono ono OVERHEAD UTILITY 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications ucu ucu UNDERGROUND UTILITY of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. OSTORM X 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. STORM MANHOLE 4. A co of the approved erosion and sediment control Ian shall be maintained on the site at all times. PY PP P O O DROP INLET 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by STORM SEWER the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and ROOF DRAIN sedimentation as determined by the plan approving authority. SANITARY 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site CO SANITARY MANHOLE development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. SANITARY SEWER MAIN 9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. S S SANITARY SEWER LATERAL 10. All fill material to be taken from an approved, designated borrow area. WATER 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, W W rubbish, and other debris. WATER LINE 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. O O WATER METER 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 0 o 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. WATER METER VAULT 15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any hazard to tt FIRE HYDRANT persons, physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or FIRE DEPARTMENT CONNECTION collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where GAS applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. GAS ens GAS LINE 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre, and in the months of September EASEMENTS to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved CONSTRUCTION by the County erosion control inspector. - - GRADING 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 ACCESS nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% SIGHT DISTANCE Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. UTILITY 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to - - - - - - STORMWATER FACILITY MAINTENANCE be repaired immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment STORMWATER ACCESS to half their height must be cleaned and repaired immediately. DRAINAGE 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. SANITARY 21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection Ordinance WATERLINE section 17-204G.) 22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity - - GASLINE commenced. (Water Protection Ordinance section 17-207B) LAND USE SCHEDULE EXISTING Area % Building 39,330 SF 6.8% Pavement 218,787 SF 37.8% Sidewalk 5,334 SF 0.9% Undeveloped 315,799 SF 54.5% Total= 579,250 SF (13.30 ac.) PROPOSED Area % Building 51,686 SF 8.9% Pavement 233,216 SF 40.3% Sidewalk 4,550 SF 0.8% Undeveloped 289,798 SF 50.0% Total= 579,250 SF (13.30 ac.) "<Z COUNTY of ALBEMARLE Department of Community Development Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: I. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4, Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide scaled computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Rasements - Show all planed easements with dead book references labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safely provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers - biofiller media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, taxing or test pit reports and materials certifications. Biofilter media must bean approved state mix. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. GENERAL NOTES 1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are based on information and data furnished to the owner and engineer by the owners of such underground facilities or others. The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work. 2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to protect structures from damage. Replacement of damaged structures shall be at the contractor's expense. 3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the owner can make necessary arrangements to modify/protect existing structures from damages. 4. The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and the Virginia Department of Transportation prior to completing any off -site work. 5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start of construction. 6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and engineer. 7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist. 8. All bare areas shall be scarified, limed, fertilized, seeded and mulched. 9. All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements. 10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11. Retaining walls require separate building permits. 12. All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building Department from the main to the structure. 13. Building or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a permit. Asbestos removal permits are required is positive for such from Albemarle County and VDOLI. Contact VDOLI for additional requirements and permits for demolition projects. 14. Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain, or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. WP0202000032 TAX MAP 78 PARCELS 6 & 7 ALBEMAR VICINITY MAP SCALE: 1"=2000' Map provided by Google.com LE COUNTY, VIRGINIA SHEET INDEX (14 TOTAL) C1 COVER C2 SITE OVERVIEW C3 EXISTING CONDITIONS & DEMOLITION C4 GRADING & UTILITIES C5 E&SC NARRATIVE C6 E&SC PLAN PH 1 C7 E&SC PLAN PH 2 C8 E&SC PLAN PH 3 C9 E&SC PLAN PH 4 C10 STORM DETAILS C11 E&SC DETAILS C12 PRE DEVELOPMENT DRAINAGE MAP C13 POST DEVELOPMENT DRAINAGE MAP C14 INLET DRAINAGE MAP C15 DRAINAGE DETAILS SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Sheaf Phone: 434-227-5140 Clusiottesmile, VA 22902 shimp-engineenng.wss U STIN .SHIMP � Lic. . 45183 11112, w 4`Ssrr>..1.. S- VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. COVER SHEET C1 OF 15 19.078 1 C1 ses THIS PROPERTY CORNER IS APPROXIMATE ' ONLY. g PLATS OF RECORD SHOW THE PROPERTY LINE TO FOLLOW THE STREAM. HOWEVER, NOTES H� ON SURVEYS OF THE ADJACENT PROPERTY STATE I THAT THE STREAM WAS RELOCATED AT THIS / uN ' yp oW CORNER BY VA. DEPT. OF HWYS. NO n.e4', $ EVIDENCE OF THE ORIGINAL STREAM LOCATION EXISTS. x M THE CORNER PROPERTY LINE SHOWN HERE ON F \\ d IS TO THE CENTER OF THE EXISTING STREAM. / T.M. 78-8B FF "� T.M. 78-58K / WILTON, LLC / �'\`\\\•• g JAM S A., JR. &PE4GG19W. DETTOR D.B. 11 D.B. 11 &125 PLAT D.B.37 D.B. 2700 317 - PLAT ZONED R10 / D.B. 391-296 PLAT D.B. 201-455 PLAT ZONED: R1 PROPERTY LINE IS SHOWN AS \ �\ \� 't`�\\ \\•9` �<0,1,\\ THE STREAM ON PLATS U ` \ C GS\ \\ $ •`' 3 ' •W �; m" RECORDED IN D.B. 201-454 & O rR \ \ W h M h ,am' m. GAP \\\`.\'xr\ \\ '' mA ry 4? .1 h AI` D.B 1198-307 & 308 ` / `\ \\ �1 \ \\ Sy BS/r \`--__\ " n g y w rP 0.038 ACRE T.M. 78-58G'i`r \ , \ \ \\\\ \\\ `�\ \ FqV \\`.._.._..._._,. .. a _ _ y^^ �� —i \\/ / XI I i PANTOPS CORNER, \ \ \ \' \ \ \ \ \ F \_� <-= -_' _.......... snxEAM cLAssFlc noN - OVERLAP ..._..._.._.._...p LC. \ \ \ \ \ \� \\ `\� \\ \\-_ _..._... ..._......._... J--/___"._...,... _..._ L1 L2 PER uscs MAPS. F Lt 0 RL GAP �\ ,.A.. VE A \ _-_ — — — \-_- .. _. _.. 3 bERIFIED 5-21-20 Y ��G�i D.B. 4358-684. 1 ` \ `� \ \ \_ — — — — ___---'' _ _I -_ \\ _ ..._. .. _ JUSTIN sHIMP. P.E. - 688 PLAT \u '\� \ \ \ \ \ 1 I' v. `� ,_ - '- S_-.-._... _.-iwil-0.008 ACREX,A O�4CREFx ----- \0 002 ACREZONED: HC \� /----- �\ \ -IRON FOUND\y� 100 YR FLOODPLAIN. -�DFOC APH COMPANY OF VIRGINIA EASEMENT (D.B. / PH ONE AND lEtf.C£1_- �/ , MERICAN \1E 960»L_ - - I, \ \ \ \ ---J� .. � .. � --_- `\ BBBNO ...,..._. / \x NE AS SNO ---- - - � \ L15 IRON FOUND IN `-_- - �Tltll'H�1111_DJ d-1 YfRCJANLE LOCATIONOF--'A �BPHON 990-3>P%T REC —XO-` ...118 -�� 1�\y \ MONUMENT -\'\'\ 1\IN \ ---520'SANITARY - ''--" EANO HC�/ �\\ \ \` -`\ -�/ /\ `- OMDANY — J 1 y `-_� - / `l (D.B. 154E-598) ♦.- 4y6) P RGIN/A.6.� I ~\ �\�''o' \ �\ - i - `, L — II 1\ \ \ \ ---_— W\R FLoow„='�. _ ,�„�„� ♦,\ PRESERVED SLOPES Sao- — T - `x=eP RAP `------� - —` ---------- IRON FOUND 1 _ - FOUND 1 �/ -- sPeRMANEm1-GDNS_TRucnorT\ �. \\ \�� , -----------�- ,/^� Ex. of \ ----- / AND GRADING EASEMENT\ \ \ `\ \� ` •1 ` --__- I / — — — — — — EX. DI \ //' rya..- (D.B. 4553-Q3) \ ` ` \>O � ¢ \ � // 20 PRIV 1 \ \ \\ \\ \ \ - — — _ DRAINAGE EASE D,r, I I \\ _ k( ---- �( T M 78- — — — 36, 2,6�2,9 LAT), , I� `/ N/.' ! ------ —--------------------LOT— v 7. , C E --- A / 360 CI — d I \ \ — Rs -w 5.5E ACRES (DOES NOT INCLCUTE—— LOW\30.0` — — _''�� ,— v ~�� p' —----------- ----------OV€RLAFS,—OR_GAPS) I /: /' /'' ------ FLOW— n\I� _ 1300 RICHMOND LZ—C—_ �J D. �72y \\ -__ - __-_----_ - IRO , D7B. 440-37 PLA 370 —0.8_ 5 ; --------- D.B.D B 1168 546 ------- & ----------fTrB.—�-29_=569 D.B. 201-454 PL /�./%, ,��/ i , --_--- ---- / / / ,/,/ , ,/__ - ____ 1 /j' // a" /' -\�-__--_-- -\ - --z80_ - - _ - _ /i'/__,! �• M IIIII �s� .SAN MH//l' \\ _ _ MAI�AGk`D\ SLOPES \ \ __ - xi EX. ONE STORY /\ ` \I \ B METAL -- --- 1 ,..( , / �/ // // ____ / \ \ ` _ 1 IIJ / - -- _ 0#K BUILDING �__ j 'G/'/, / i// / /J '' �__ -�- \ I 1 \ \ � ` ___--/ 1 I \ i+ : - - - �-_ "h\ \ 11 1 290 - ro /i / // / /i%/_____ - \ `� \\ \\ ---------------- i / ------ kr / i / /"'' — ` - ------------------ /I ------------ -- \ , \-------- --- SHIMP ENGINEERING ... ♦ ♦ `.'-.=� ' - 1 1 1 f / / / // / 1 \ — — - _- --__ - LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT -- - m ......... _ ---- ___ ___ � ---�--__-__-____ _- _ _- � — —_—_ _______, Design FocusedEngineering 3:' ,�.............�'....'.'.'.'.'...�'. .+.+.+.+.+.+.+.+.+.+.+.+.+1. ','-'.•.• l'.. --- -- ___- __r - — _-__ --__-- \` I / / / '\ ----______---- _-____ 912 East High $In;e1 Phone: 431-22]-5140 �! \\ 1\. \ �. s s �s - ____- ___ _l - �?>` --- l / l I 1 / I ' ________— — — —--______________ _ — — — CMdonesmile. VA 22902 shimp-engineenng.wm .'.'.'.'.'.'...L'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'. _ _ /. / ________________ m1 \ XlXlXlXlXl'l\. Dom.+ : : ':':':':-. `� ' - _ _ '.. '`�' �ti ��� / l l I I ______ _________________ ________ LIMITS OF DISTURBANCE I :;.si4j . s :.j D �x---x— \� �— / , I , `----------- �g�s �s .` , - 1 g 1 \ `. -� SLOPES ,/ / , LINE BEARIN DIST CE tt- --- --- _ � -___ r / / / I 13P-701, L2 S74'S0'04'y/22.88 / - - ��" ,\\ -x_ — --- __ x% / �11LD: �qS� - --t3, ,-�8'50'19"E 47.65 '6' .: 4oa- N 1 s_—� _ \'_ \ - _ - / I 1 1 I L4j I N89'09'36"E ,-2E.51 :•. i =x - . MH, I I' , I l _ a .. - /\s ' I I (% 3- _ S542T37'E z,.,4 / — V TIN HIMP + +++s 1 ` \� l 1 1 I __ / L6 S4514'437 �.86 :� \s N & -- Lic. 45 ' \\ \s \ \\ \� r,. I / I I 1Z_--'S60'42'33"E / -/ 7.93 ^" It �%-I Ar r' -- V . � �. �l & -_ aD'. I I 1 1 /'/ L8 N75'32'OOJEI 162.8)/-' .... 1 V I \ I \.EX. BOLLARDS °oa - _ ' I l T- ---- L9 575 200"E J 58.18 SIQJ,� — DI +++. 0 N7930141111101011111111 W 4620 VBENC MAPK k \ \ 1 - - ' I l / I I 1 / / 1 M4s N4 L s T ,t, \ ':' - c/c - - l 1 1 , I I l / L71 N60'42'S3"W 12.51 I: \ \\ -� ^ +.+.'.'.'.'. `\ I / I I I j 1 /� / — — L12' S�9'30'14'E 103t \ \ \ 1 � A +a s I l l� l l I I I /L13 S8T0T09'Fy/'- 40.48 ' VSMP PLAN '+:.;� .+.. vs ; 1 ; / 4 5627-0� E 9.35 _ _ ALBEMARLE COUNT IRGINI :/ :++++++++.l+.xs C/0 J I I ; 1 1 / _ - -- Y, V . . . . ` ' I 1 I L15 S35'O5'12'E '6.74 Ex. , Ex 'Il E uP 1 N '' L`1J, ` i T ' I ' I I I l L76/' N75'32'00"W /-- /73.82 T.M.78-5A I In 1300 RICHMOND , Ex. s" O 1 I _ / \ I I 1 I I / L17 575'32'00" 37.1E % / DA TR E GA R E, :.,r ------ - _ ROAD -FLOW PANTOPS CORNER, LC / K EE oAK THE I / , , ' +•+•+•+•+•'+/' I / , L18 S22'35'13"W ,--t3�<' '" - AUTOMOTIVE D.B. 4358-684, / / u°= '++'+'+'+'+'+�': �Q\ a1o���,' // \ \ �----- L19 N65Ys'5o"w x 25.22 688 PLAT I / / / 8� 1 + ++�A�'.'+'+'+/+'+ EX. ONE STORY STUCCO `Ex""" IIII / I I , ZONED: HC , , ^ )? &BLOCK BUILDING _ '.I ' - 75 OR y 'L20`- N35'OS'12"W /' 13. / SIGN -\/ �P � SUBMISSION: E � I x i ii s � EX.O x ..'. E% DI MA,(LB -� (— — — � / _ °� -- _ r - - - 02 0 K i EE OA Tft E OA ift / AK THE , v ' + - --- + / / _-- z y ( ---" 2020 06 REVISION: �" 01) 2020.10.22 PP XI TE OC ON OF N < — — + / —J 02 2021.02.02 + / sY♦ l / \ : NT L LE ON CO A 0 / . \ y _ -- / 1 / ,/ \-- / C w ;NI EA MET (®N + + ADEo ; / ; 03 2021.04.14 Ex Ex. ,-> Ex. Ex. X' E EX ( / �+ ' / ES / / / ' % EX. PO \ SHRUBS O �SHMUBS� :�.� + \ — / \ - - E% SLOPES+ xANI / t1 F D S7U PN/C / / -- i 1 W :.. .:.."• _ + .: ' c., ". \N6938 46 Lf p x/ - T J R B / / - l NAI ':�.. T, yA1U / ,/i1BURjJiIM/ IµI APPROXIMATE LOCATION Ojj;/ / / SET ( OINT IVIr COMBINED UTLITY EASEM - - - - - - - - - - - - F OEPCO, CENTEL &IACSA _ V FILE NO. / FOR VEPCO, CENTEL h I 'D.E. 1168-Safi) AULT L ASCA ,/ APPRO XIMAIIE LOCATION OF 20' , BEGIfINING) I 1 (D.B. 132J-145) / WATERLINE EASEMENT / P.B. 154E-598) ! # , ' ,/' 19.078 I c \ , SITE OVERVIEW \ \ ` \ T-121.9 S. ROUTE1250 c-242.53\ / RICI71'MOND ROAD/) ARIABLE \\11 ,_---_ WH R/W HWY/ P.B. XI-200 \ --- SHEET C2 OF 15 — \ D.B. 116546 /% 5 C \ / `\ — — — — —\ --- \\ `\ �B. 229-56� \ / \ ` \ \ I f I 1 \ \ \ ---_ _ \ \ - \ I I +/- bop To / \ \ \ 1 \ / -- \ D.P. 229-56� \ ��\ - \ \ \ 1 \\ \ \\ -�\ 1 \ \ \ • TO�rN AND COUNTRY LN / / \, 1 \ f SCO�b: 1 "=5 ' i �`�; ' � tb \ \jelimmm'ss seem As ss— ♦ \ \ \ \ ' � ,.�.!"'^sYR FLOOD IN -- �- - _____ ----- _------_`_ ------ FOL jDo _ _ __ MITS OF DISTURBANCE // /� — — — — — — — — — — — — — \ NOT TO ENCROACH ON = — / / — _ \ 2 •4 JYci -PRESERVED-SLOPES — _ _ _ — �, — — — _ — — — U _ _ — — — — 35000 — \ \ 00* _ 350— ♦/ \ - \ / -- AND GRADING EASEMENT^ V A v v \ v\ �• ♦ +� — u^�--.-as_+-�, IRON I / / �PER#4ANfNT-60NS�TRUCTIO� A V Av ♦ _-_ - - / EX. DI FOUND / \ \ \ \ \ \ \ oy \ \ \ _ -� / — — EX. DI 20' PRIVATE1 \ / /N (D.B. 4553-473) \\ \ \ \ \3>0 --- --- y — 3 fi 1 / \ \ \ \ % \ \ � - 60 — � DRAINAGE EASEM�'J (D.B - - — - _\� T q — -- _` 361 -2fid; 219 I LAT)1- - I.M,7CJ-7 ��,----- \ T Q -360� C /� l' - ---------------------�� U— j _cr _ ------- vvvvvv, �'��'v67���1C �v vv Q -� _ 5.59 ACRES DOES NOT INCLU ---- �//�E� 0vv - �.�_— -I w i ----- OVERLAPS --OR G --- /� vvv vv v s 7 �� I� FLOW 1300 RICHMOND LZ� - _ \� 370 iv T, v 3 v --_ �- -- i�� vvvvv �� 'D.B\.vP\ v v - L - '1�------0,3-_ 5272-714��� ice/ j vv - - ■�- D.B. 1168-546, D.B. 440-3.7_ PLAT, �w--------------- -� \�.V /� / LEGEND E SAN MH — ---_ fl.B.-2�-569 8c D.B. 201-454 PLA /,% �,/% TOPO Z- �3ao / A . �J�, �s �s - v �'/ ��// / // / EXISTING PAVEMENT 3eo _ - _ - RV - - \ SAN MH - / / , +,*,* GRAVEL TO BE REMOVED % - _ I / / _ _ - EXISTING PAVEMENT TO _ � � / _ REMAIN I / r---------------� _ T_ ---- - RESERVED- ■� EX. ONE STORY METAL �- ----- �ti OPEs \ & BLOCK BUILDING 671 1 \ 04+ — —�\ ` �_ / \ v��� / T + + + + + + + + + + + + + + + + + + + +. —___ �_ + mac_ —__� —� -»1\\ �\ �\ \ — _ —_ ,I / .. EX PA,VEb1ENT + + ++ o� EX�AVEM�W TBR \ \ - ; ` ; \ \� % > _ - _ - - ■ _ _ - - _ - - _ - - _ o I \ + + + + + + + + + + ..... + + + + + + + + + + + + + + + + + + + + ems_ — �- - \ +5. , \ \■ --F_ — _ — \,r / , / , / / a o + + + + + + + + + + + = + + + + €XJ S'f9EKPI�€S + �= /+ /+ + / + + + + ��_� z s E �-� N _��-L +++++++++++ �___ �—_ -_+++ems+—+++_++ ,++ _/ +_��_— so / } 10-71 + + + +- �� + + I r �s 5 -- �. M _ \+ _ J +� J .%� I I \ SLOPES / // / / w+++++++++ +.,++ r--- _ - y� +++++++++ ,+ ++++ ter.• \ 1 + + + + + + �S --- — + + + + + + + + + ��+ +�+�+ + + + + + + _ _ Z I - _-- 410� J I �'� rl----___ ��+ + + + + OLE 1 -�-- x �^� -x- _x �_ - i I \ 1 +� �I I I I �� I I �0 1 v++ t +++�� +� ■ X 1� x - �OP�C�R -V _ o��« / / fi33J-701, — — -_------__ 707 P AT ---- - I 7- _ _ + + _ — _ _ _ _ + + + + + 404, jONE ST Y STUC _ X.ISTEPS�B� �J I l I `U ++++++ + \+ + + + + + + + + + + + + + + + + + + �, ;--------- -- ---- ----- ---- x' _x — -- - _ - x. MM / EX GRAVEL TBR / T �I, L x + + + s . �� i + + + + + + + + + + + + + + + + + + + + + + + + 1 + / QSA(R RRY v �v �� + +\ ��•/ \' a /e + + + + + + / 1 I SH uBS S \\ \\ --__ + + + + 777 ■ \ M ENGINEERING \ SHI P / '/ ■ \ EX. \ \ + + + + + + + + + + + + + + + + + ' , \ \ �\ } X\ / / / — LNG S DESIGN CIVIL ENGINEERING PROJECT MANAGEMENT / \ \ `/ EXlSHRUBS PER\ \ + + + + + + \ + + + + + + + + + + + + 1 W \ ` \ 1 I ' , l 1 Design Focused Engineering \ TBR 4 I 1 I 912 East High Sheaf Phone: 434-227-5140 \ \ + + + + + + + + + + + + + + + + + T, + + + + IU Z \ \ _ _ LE UdVIPSTEF� l l l I / I g _ \ / `\ �— — — — — — _ _ — D, O , ' I , I Chatlottesmile. VA 22902 skimp-engineenng.wm + + + + + + + + + + + + + + + + + + + + + �+ Q Ai i EX. v - �m s� I I / SHR ES -41@—_ — r• ■s it �.. ++++++++++++++++++++++ ■ � �� I� �� �`� >EX. BOLLARDS S / _ _ S� DI BENCF{f-0AT ■ S'.HAG NA�IL S i ■ A - ELE TION 42�.08 T.M. 785A STOPS CORNER, LC D.B. 4358-684, 688 PLAT ZONED: HC I * - ++ 401 \ 1 -S If OLLY ■ I---_ - / I I R - ' 'C/0 T / + + + + + + + , + + + + + + + + + + + \ 4� r J / 1 I / / \ , +LA ++++++++++++++fin - \ -- \ �- 4 ++ \ +++++++++++++++++++++++++++ I I , v s �� + + v EX. +\ + + ^ UP EX DI TOP TO +++�++�- v _ ■ SHRUBS EX. LP EX. LP 1 E X' P ' u,7 vI I I I O O O \ X +++++++++++SJ'+++ EX. r ' R + L O+TBR + + ++++/+ I o, +• / -- --- - X+SAN+ +++ \ +�a �Q+ + ++ EX. ONE STORY CO -- v� 1 STUC Ex. MH\ % .+ Q �. + & BLOCK BUILDING +++ I + +� +++++ ++ XR GM _ � , X ' N E LP x h k X. L EX DI 1.1 /�>LCC X.L �j" + + + + + + + "O RE R + + + + ■ �� �' ++++.++++ ■ X, \ 7 / + . + TRANSFORMER+ v o ++++++++ + + ORTION OF BUILDING TB j EX. ++ x +++ +�+ O ■ TBR \ SHRUB . . . . + . . __ + + TBR EX + . + SHRUBS + . + + . + TR T + + TBR X DRAIN TBR ./ v +++ . . . .-+++++++++ EX, 4 . . . . . + / / i o H1U8 X. ++ R + + + + + + + + + + \+ + + + / X +++ + +++++- Y. 9 -+++ + + + + ++++ + +++++++ + + ++ ++ + + + + +++ + + + + + t + +++ + APP�OXI TE\LOCATIONXOF�� �/� SIGN + v STOP +EE>TB E - -+ / 1 NTF�AL LEP+kIONE/ CO PANS' OF� /� F /. + + .--+ + + + + + + + \ \ \ \ - x +- EX + + +� VI GINI EA EME T S ,� + + WV + + + + + + + + + + + + + + + + + + + + / + + + + + + + + + + + + + + + + + + + + _ � EX. �P � + + + + O� PO (LP EX. LP EX. LPX. LP H +++++ + + ++++++++++ ++++++++++++ ++ ++ +++ ++++ ++++ TB ++++ + + / / / S PES A AGED O ----- EX. p �s EX. � E UI EX > + + + + + + + �+ ++- �� - / / SHRUBS 0 2 - EX. POLIklili + +—+— + + + + + + + + + + 4 + + + + + + + + + + + + + + + + + + - + + Q- + . . + X: PAVEMENT TBg+ - — + + . . + \ EX. 3" GRO NHNO COVER T0� - /' + + + + 3 / + + + + +++ + +++ + + + + + + + +++ + +++ + + + + + + + + + + + P ACED - - / s + rn + + + + \ - - SLOPES 3 HRRUB� 4+++ +++ P - ..�,�` T TLIMITSO ENCROACHOF + + + + + —� --_ -- ---- 1 + + + + 1 i + + + + — + + +cpsa_t n \ + SPACES' bIINU PARKING ' +++++++*+++++*+++++*++ + I F/� + + + + X. �M T TO AI I ro TB + + + + + + + + + + + + + ♦ � + + + + + EN No ti6 � EX 4 — — + + 4 + X• + + + + + V �' ��-.-ram �� cas— - cns —r ws— c.: _ — cyn� + + + + + + + + + :E _ ------ — — _ -- dcu+uc+µ�l „ ` x ucu �cuOH ucu uc �^U�^T� `� a uNu \ cu * * ■ EX. 15" / \ 1,... ' ?;N$9'3S'46, E *XK12"EE�X. EX// / •� � + AK THE 9" p — — — — - I / J Y 'o - /FF' 7 U STIN . SHIMP � . 45183 A 11112, w ss,.,,.,4. e VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. 19.078 EXISTING CONDITIONS & DEMOLITION q� 7 , 1 _ - O� UN y / APPROXIMATE LOCATION OF / ■ / / SETN AI DINT MR 1 OAK TREUTI u , c c� p ( _ / O IBUR�IGM N SHEET C3 OF 15 // COMBINED UTILITY EASEMENT / / 0 I FO VEPCO, C EL AC 1PK TREE, WM •,°. " u�� / H� / / ••�••� ••�••�• BEGI NINGT••�••T••�•• ` 30 30 60 90 FOR VEPCO, CENTEL & �j I I (D.B. 1168-546)I 1 VAULT ASCA / APPR AT RLI LOCATION OF 20' / N I I I ` ( { / WATERLINE EASEMENT I I I ��`�•. \ J / (D.B. 1327-145) (P,B. 1549-598) 1 ' �' Scale: 1"=30' JbN 36 \ r♦�--WIDTH 3:1 SIDE OR ���-- _.... _.IsIs r_ /��`--__- --- IiemiieIwIss loom LL @ET -- \ -�-- FOL v WAL p - ♦/__ _ -� B1 O Mqx h,F/c ♦ \ \ DE�SIGNRC3/110E T 1 \ \ \ r - y{�S OF DIS TOP OF 6' DAM 346 / - - - - YP R.ET. WALL C S 10N \ �� NCB �6 IN 2:'h OPE �kjFT \\ ALL-WITHU�tADE HC \ ___ ---_- ---350 4 q(C\ �BEHIND RE .�WAL Ui,JI \ ♦�� -N `= / g0 F� �\ \ \ �\ ♦ APPROX. 5, 0 SF -- /\ It- - \ / •_ a / N CZ DI-3B \ 0 \ \ ♦♦\ � \� �\ � \�`♦� - � N ND - /-_ - ,,�-`?-__ _'--- - - --- ---- - \ \ \\�/i _ �� \ \ ♦ 48"C0NC-RISER ' .L I9G \\ �•7 \ \ \` \ � \ � \`�.. /TRASH RAC / �. �-_ --- � \ \ _ NEW GR-'l A V A �v `gad 0- ,/ / / I� CLASS Al RIP RAP �\ \ \F OCS OUTLET OF DITC / V ♦ V v♦� ♦- - - / 7.5' MINIMUM WIDT - - W 4A � � ♦-- 40LENGTH, 9" DEPTH. O \ \ _ / / PLACE RIP-RAP.OVER --EX DI F UND. I / - % TRNC \ \\ \ \ ♦ - - - / IR IA 11�•9W-iNING, NEW 10' SWM I�i _�, \• / Q ---- ' / GR ING EA \ \ \ NE V.W. ACI TY AS E PLACEI�RA2-TO-- - \ \ - - - - ACCESS EASEMENT EX. DI '� 20' PR �i (D.B. 455 473) 96 v v `� A �3>0 A _ -50 v _ ARMOR THE DAM - - -360 - 11 1 \ \ O \ _DR GE EASE fi D.B. / _ % OPPOSITE INCOMING _ 1 \ r A DET 'JFR BE -N -\� DITCH - '�361 -2 21 If�LAT) I / / )\FROM E WE SI - .r h 1/ 0 A ID RBA C----- \ \ \ SO CTI A D AIN S CE 56 _ - -- -- -- -- -- -- -- -- - - \ \ � SHAL BE F EASTE H j / / - \ 9 9� m \ \ \ ♦ --- -` ���.p I� NEW V.W. PUBLIC I ^ \ � \ � \ \ � � • of 0 DRAINAGE EASEMENT -- -- -- - -- -- _ / ,,,CONNECT TO �� \ \ \ - �♦ �- ,4' -_--- - - - - - - DO i ❑_P�RO�POSED20GRADl9 � � \\ NEW 2 o �____-_--- ` 370� w ------ T. v J------ — ITH --- ---__ - �� \� /.' / /� //// ice/ II / / \ \\ \ \ \ -_-.` ■w \ Ti SAN MH EX. SAN MH Y GME — -----� — v — —3/0� \ \_ x Al C \ ---- I 1' V/ / 97 eW1RESERVED ■� EX. ONE STORY •ice -SLOPES METAL/ — —02 x 3 a — — ♦� _ems♦ L BL L� NC — _ 1 I OCK BUI I 4 #�1290 ///I- /rn o------------�I _ - - �\ - \ NEW VW P11�LIC ♦ \/�///-- / I 1---------------- - --_- .-. ��;�.-.��,�� DRAII�'A�E EASEMENi� --- -- - --__ /k//� //- - - - - _ - // iL- r ----- x ------ - - - / / j���g6 TE - - - X 3'r�6,W Q2�a 0 F E W JN TO -EX, - \ ■ - - - --■- y - -x _ -- l l I I ro /L6 ---- - -£ / 04 - - - - - - - - - - a 5 - - - - - NL C NOrRI<T: - -S \ ` �� ■ \ - --x----- / / I / / / / / / / / / / (a- +c ' i'"t��� R'A�L — \ — \ — -- \ — — — ■ - — — — — —_ _ // / ' a 05 3, — x 4 A NTA x ••� \ 96 FHA ll CH 'WPA 5 _ \ c / ■ 05 _ _ - 4 M �GFI s 5 \ W _\ A STOP / ■ O6 r N WM_— N R \ 62 M ,\ �� �� V DR�i+--MANAGED/ D O-7 Z y>�y r : _\— SLOPES / // I I .r•-- v,� � � �w � �- I NENI'10' SWM 1.�� � � � / / l 1 � s \ 10,_ _-_Y�-RLI r/` 'P/ 02 GVIw '� 'Xl L� -x-� - -_ / / / •/ FIR w EX. M 27 �X NC I o VER -RO R° �° - 9� ^ V 6 NE HA /x - _-A-CCESS E F-M€NT--��------_ -- - - /� H �47 0� ELINE A _ _ 04 - - - X. 3 \ X _ os NEW G� R° P -- - 06 n 4�• NEW�STAIRS C/ �' 10 R° �R° 4 I. ,,.TE - ----_ 90- _ _ — — — — 707 P AT C� Y --� 6 27) s' 1s€�� \ / 1 09�0 —_o�__ /o h 3 Eu vnRl - — _ — — ---- ------ —_—_ --- — — — / - _ _ I ACC€SS EASEMENT=ac-- L� - - - - / r _ _ 3 \\ zs a3 404 4 x_ _x = _- -x _ _ I i / 7 I /� _ ► C,; 6 p �� BATTERY BATTERY ----- --�� -X -x_ � _ �� � - MM I IIf I I j _ / :� /■ '-- ---- - 1 ... �,I &3 �1 J I }UILb'�IG BIII - o I m I STORAGE STORAGE /-...... ------ �__ -� X - - - -- SEGMENTAL LOCK � // ■ / EX. SALES C E � � - --_ � ,NSW SALES _--� � I �\ Iw BUILDING BUILDING / / ET., / (TO REMAIN — — 0- F- E 416.6Y� N I w 's r/ y' a WALL B MAI NEIGH 4/ 20'� ` v 1= -- - �w �, i 1 SHIMP ENGINEERING / / ■ FFE 420.77 \ \ LAND PLANNING SITE DESIGN CIVIL ENGINEERING PROJECT MANAGEMENT W/42�iHAND AIL y / \ 4� �\ \ .o �\ .� I /� al �I �S, \ � �. X\ / / l I' 1 / / - I I I BFE 406.77 0 \ \ I SERVICE �� p� °/ ■ I NEW PVC INTO\ / / I / / / Design Focused Engineering S RVI E \ aD a RELF�PTION �T' 15LOMAX. ---� 15• I ro yLt .k.\S\ANITARY WITH S \ \ X / / I / I 7j� 57 '■: E EP 10 \ \ HEIGHT 70 --- --�&� w NEW ems' ` _ MPSTE l' 1 I g 4� I HEIGHT = 30" y I X OR N C/0 � � - _ - _ _ - - - - �I I � / / / Ch East m h Street Phone a3422]-5140 / - y —ChetlotlesNlle. VA 22902 skimp-engineenng.cOm Z m 1 I I\ B�R 6" SDRMIN� COVER �BOLLARDS e 30 R, X ■ \ I I 20 — ■ .. �� 410 / € 3 ■ I 1% MINSLOPE- ° '•.., '.�, �ffi BOL1A I1 'L BEN MARK: l� 2 0 06. I MAG NA L S T ■11 4 l j l r �( I 1 I � ELfi VAI IOU=42�.08 � � � �/ 4b6� i ,. C5. � tP N. /.p o / / L-- - -- Vrr, EW VARIABLE WIDTH I l I l l i I �/// \ �' I I 1 II ', \ \ 1 ■ \ /13 ' .� �e CCESS EASEMENT.SHIMP ��.30�• � v 11 y � � v 9 � CB746.EXTENDED � BUILDING Al - .�4�5183 EXISTING SERVICE CURB MAHT. z.a' 12� w� 12 PROVIDE 4" FRB j FF APPROX a NEW W. P LIC �- I z _ t .�2 so a ABOVE TOP OF \ / REMAIN4 LLo � � I\� i i ✓ c o E ROX 40 ' I� i l l l l ssto;•vnt � DRAINAGE ASE ENT I 3 X so / \ I PAVEMENT. �� l TO EX.� x �1 EX. ■ 12 vI _ I T.M. 78.5A /- I TO i► ��;r- ( � 1 � D1 14 ao STOPS CORNER, LC f ) o o ! 3 14 '44 --- '; / VSMP PLAN D.B. 4358-684, �� / y BUILDING/ / / ALBEMARLE COUNTY, VIRGINIA / / 14 �i� 9U A2 / / v 688 PLAT ,' / �� 14 473 6" DIP FIRELINE EXISTING SERVICE / // // y �w FIFE APPROX 414.75 EX. MH 1300 RICHMOND % / ROAD -FLOW ZONED: HC / � I' I TO REMAIN AUTOMOTIVE LLLE zo 14 6 - .. Y a E. LP EX. LP EX, L EX DI i'li LB I �NV 131.7 6 e �••�..�� � _ , O // I i,�0 !0 SERVIC NEW 6" SDR-35 r SUBMISSION: ��� . R I LATERAL PROVIDE ---- � / I i sa 3' MIN. COVER & ..�..�.. X'�� / 2020.06.02 E. oo io § 0 \ � -, � � � 1-%i�11N. SLOPE so B j \ I SHARED ----_ / J / / 15 I ----� BUILDING A 3 -- \ REVISION: //7 �F_� �=o x16 I L M. NEW AUDI OFFICE / v 01) 2020.10.22 // NEW V.W. PUBLIC ♦� BEND NEW 1C SWL A CES / '' SALES SPACE �— BUILDING A4 „ /p / �, 02 2021.02.02 �� E iI r,. BUILDING ) L - DRAINAGE EASEMENT "\� CS,•,.,. LDIN N w i / �� G E / sruEAs MENT F FFE W PORSCHE 19 03 2021.04.14 I I F417.00\ E \ ) 00 _/ x._ SA 417_Op LES BUILDING � 19� ` / APP�OXI�ATE\OC�TION\,OFF \ \ v/ 9 15 -- FFE / 419.50 NT`AL LEP`HONEICo�IPAN`Y o A \ \ \ /A/ \ ♦ SIGN w _W NCR s" Dip wyw F I__------ / v v v v v v v v v v v I — / " VI GINI EA EME T ( ♦ W N!EW DI-7 " x i♦ I 15" CON 6 O• - 17a - ---- PO (LP EX. LP EX. LP CP H 13 � I \ 16R0x �0 1Sw ''3 19'0 �x19- �` / / A AGED O p 90' BEND 16 1$• . S PES - _7g 74 ice' 18 LIMITS OF DISTURBANCE 1g"♦/ �/ / FILE NO \ - - - - -- - - - - -SLOPES ■ - --- d _ RNAGED 0 0 -- ---- --- - HO i cas NOT TO ENCROACH 0 / f °ns cas cns / EXISTING PARKING x 30 � � � +� _ _ 3 �` , , \ ..:., r r SPACES TO REMAIN � 20 �i� / � / / / 19.078 Sz 4 - �- - �.r - �s—cas—cns—cas—cns— t ♦/ / � 9 EX �/OAS -_ --- ------ -- ---_ - - -- `\ _ /� ,-- ,1 GRADING & UTILITIES 470 �� rn _ 3 I ry �. � 2 4 .. HU ucu, ucu0 c uw ucu �ocu°H ucu—uc 0i'IV / y// // \ ��•\— / \. / �—ucu-'. �� ° / _r / SHEET C4 OF 15 / APPR /i / /j /j /i / / / /j // // j jj /i jj j // // C MBINED UTILITY EA �cu a �—E _.cas_ _.-0- 0 COMBINED UTILITY EASEMENT / / // / / /j i i ./ �i !i !/ ! �i !/ /j ! �i !i !j I FO VEPCO, CENTEL & ACSA ■ j -° . �'°�,_ _ / NI7 / rr NINGT ( j / i / ^ / FOR VEPCO, CENTEL & / rr� ..�. I D.B. 1168-546)I ■ / . j /i �,� --� 30 30 60 90 �� ASCA APPROXIMATE LOCATION OF / I ILL &OVERLAY APPROX. I � i � /j /' // / j // // . �iiiiiiiiiii (D.B. 1327-145) / WATERLINE EASEMENT ILL &OVERLAY APPROX. o I 1,648 SF PER WP-2 MILL & OVERLAY APPR .�! !j !ji - / (P.B. 1549-598) 537 SF PER WP-2 y- I ` @70 SF PER WP-2 0 rr�_ ,W., Scale: 1"=30' PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION PROJECT DESCRIPTION THIS PROJECT PROPOSES AN ADDITIONAL BUILDING AND PARKING LOT UPGRADES TO A SITE WITH TWO EXISTING BUILDINGS USED FOR THE SALE AND SERVICE OF AUTOMOBILES. THE TOTAL AREA OF DISTURBANCE IS 4.62 ACRES. THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. 2. INSTALLATION OF PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH THE PLAN. 4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS. ADJACENT PROPERTIES CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. THIS PROPERTY IS BORDERED ON THE NORTH BY PROFFIT RD; THE EAST/SOUTH BY MAPLE GROVE CHRISTIAN CHURCH; AND TO THE WEST/SOUTH BY BRIGHT BEGINNINGS ENVIRONMENTAL CONTROLS PRESCHOOL. OFFSITE AREAS SOIL MAY NEED TO BE IMPORTED FROM THE SITE FROM SITES WHICH SHALL HAVE EROSION CONTROL PERMITS. SOILS THE SITE CONTAINS THE FOLLOWING SOIL TYPES: 12D - CATOCTIN SILT LOAM - 15 TO 25% SLOPES, HSG B 23B - YADKIN CLAY LOAM - 2 TO 7% SLOPES, HSG B 71D - RABUN CLAY LOAM - 15 TO 25% SLOPES, HSG B 79B - MEADOWVILLE SILT LOAM - 2 TO 7% SLOPES, HSG B 88 - UDORTHENTS, LOAMY - 2 TO 25% SLOPES, HSG D CRITICAL AREAS EROSION & SEDIMENT CONTROLS 1. SAFETY FENCE: A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF AN EROSION CONTROL MEASURE. STD. AND SPEC. 3.01. 2. CONSTRUCTION ENTRANCE: INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. 3. SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS FOR THE PURPOSE OF INTERCEPTING SILT -LADEN RUNOFF BEFORE IT IS DISCHARGED FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE. 4. TEMPORARY SEDIMENT TRAP: A SMALL PONDING AREA, FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET ACROSS A DRAINAGE SWALE, TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS FOR ENOUGH TIME TO ALLOW MOST OF THE SUSPENDED SOLIDS TO SETTLE OUT. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SPEC. 3.13. 5. TEMPORARY DIVERSION DIKE: A RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA WHICH DIVERTS SEDIMENT -LADEN RUNOFF TO A SEDIMENT TRAPPING STRUCTURE. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SPEC. 3.09. 6. TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. 7. PERMANENT SEEDING: PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. 8. MULCHING: APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE MOST EFFECTIVE. 9. DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND AIRBORNE MOVEMENT OF DUST. 10.INLET PROTECTION: INLET PROTECTION MEASURES AROUNF THE NEW INLETS SHALL BE PROVIDED IN ACCORDANCE WITH STD. AND SPEC. 3.07. SILT FENCE, STRAW BALES OR TEMPORARY STONE APPLICATIONS SHALL BE APPLIED AS APPROPRIATE FOR CURRENT GRADE CONDITIONS. 11.OUTLET PROTECTION: RIP -RAP SHALL BE PROVIDED AT THE OUTFALL OF CONVEYANCE CHANNELS, CULVERTS, AND STORM SEWERS IN CONFORMANCE WITH STD. AND SPEC. 3.18. OUTLET PROTECTION SHALL BE INSTALLED WITH ACCOMPANYING STORM SEWERS AND SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRED IF NECESSARY. ANT SEDIMENT BUILD UP SHALL BE REMOVED. PERMANENT STABILIZATION AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: PHASE 1 1. INSTALL CONSTRUCTION ENTRANCES AND INLET PROTECTION ON ALL EXISTING INLETS. 2. INSTALL SILT FENCE AROUND SEDIMENT TRAP 2 LOCATION. 3. INSTALL SEDIMENT TRAP 2 WITH TEMPORARY DIVERSION DIKES. 4. RELOCATE STOCKPILE IN SEDIMENT TRAP 1 LOCATION, THEN INSTALL STORM PIPES Al-A4 USING SILT FENCE AS PROTECTION. 5. INSTALL REMAINING SILT FENCE AND SEDIMENT TRAP 1. USE CAUTION WHEN DIGGING AROUND EXISTING UTILITIES - EXISTING STORM PIPES TO REMAIN IN THIS PHASE. 6. INSTALL DIVERSION DIKE TO SEDIMENT TRAP 1. 7. CALL FOR INSPECTION OF EROSION AND SEDIMENT CONTROLS. PHASE 2 1. BEGIN GRADING AROUND SEDIMENT TRAP 2 TO PREPARE FOR INSTALLATION OF RETAINING WALL. 2. INSTALL PORTIONS OF RETAINING WALL AROUND SEDIMENT TRAP AND BEGIN TO FILL BACK PARKING LOT AREA. 3. LEAVE EXISTING STORM PIPES IN PLACE WHILE PIPES Al-A5 ARE BEING CONSTRUCTED. DO NOT INSTALL INLET TOPS DURING THIS PHASE; INSTEAD KEEP MANHOLE BASES TEMPORARILY BLOCKED. 4. WHEN READY TO CONNECT A5 TO A5a, THE EXISTING OUTLET PIPING MAY BE REMOVED. NOTE THAT OUTLET CONTROL EXISTS IN STRUCTURE A5a WHICH MUST BE REUSED OR RECONSTRUCTED FOR NEW PIPE OUT. 5. BEGIN MASS GRADING FOR NEW BUILDING AND LOWER PARKING AREA. PHASE 3 1. BEGIN CONSTRUCTION OF NEW BUILDING, THEN PLACE FILL FOR SERVICE RECEPTION RAMP. DIG OUT DETENTION POND DURING THIS PHASE IF EXTRA FILL IS NEEDED. 2. KEEP NEW INLETS COMPLETELY BLOCKED UNTIL TRAVELWAYS ARE STABILIZED WITH STONE. THEN ADD INLET PROTECTION. 3. KEEP SEDIMENT TRAP 1 IN PLACE UNTIL UPSTREAM SITE IS STABILIZED, THEN REMOVE TO FINISH PARKING AREA. 4. ONCE ROAD CONNECTING TO PANTOPS CORNER WAY IS BUILT, IT MAY BE USED AS A CONSTRUCTION ENTRANCE. 5. ONCE PIPE El-A3 IS INSTALLED AND UPSTREAM AREA IS STABILIZED WITH STONE, INSTALL DIVERSION TO DIRECT WATER TO INLET El. 6. REMOVE SEDIMENT TRAP 2 AND FINISH RETAINING WALL AROUND SEDIMENT TRAP 2 AREA. 6. ONCE FRONT BUILDING IS COMPLETE, INSTALL NEW MIDDLE ENTRANCE TO SITE. PHASE 4 1. REMOVE SEDIMENT TRAPS AND FINISH PARKING AREAS. 2. APPLY PERMANENT SEEDING TO ANY DISTURBED AREAS & LOW MAINTENANCE GROUND COVER TO ANY SLOPES 3:1 OR STEEPER. 3. INSTALL NEW PARTIAL ACCESS ENTRANCES. 4. ONCE ALL WORK IS COMPLETE, REMOVE INLET PROTECTION. 5. CALL FOR FINAL INSPECTIONS. 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. EROSION & SEDIMENT CONTROL PERMITTING CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. GENERAL NOTES 1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. 2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, UTILITIES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. ANY DAMAGE CAUSED BY THE CONTRACTOR OR ITS SUBCONTRACTORS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR OR REPLACE. THIS EXPENSE IS THE CONTRACTOR'S RESPONSIBILITY. 3. REPLACEMENT OR REPAIR OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK. 6. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 7. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 8. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL BOUNDARIES, BUILDINGS, VEGETATION, AND OTHER PERTINENT SITE ELEMENTS. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS, INSPECTIONS, BONDS, AND OTHER RELATED ITEMS IN ACCORDANCE WITH LOCAL AND STATE POLICY. STORMWATER MANAGEMENT NOTES: 1. STORMWATER ON SITE IS ANALYZED AT FIVE DIFFERENT POINTS OF OUTLET. THE MAIN POINT OF ANALYSIS IS POA 1, WHERE A DETENTION POND COLLECTS RUNOFF AND RELEASES IT AT A RATE WHICH COMPLIES WITH CHANNEL PROTECTION REQUIREMENTS OF 9VAC25-870-66-B(3). THE RUNOFF FROM THIS DRAINAGE AREA IS RELEASED INTO A MAPPED FLOODPLAIN, MEETING FLOOD PROTECTION REQUIREMENTS. ALL OTHER DRAINAGE AREAS TO THE VARIOUS POINTS OF ANALYSIS MEET BOTH CHANNEL & FLOOD PROTECTION REQUIREMENTS AS THEY EITHER SATISFY THE ENERGY BALANCE EQUATION WITH AN IMPROVEMENT FACTOR OF 0.8 OR ARE RELEASED TO A MANMADE CONVEYANCE CHANNEL WITHOUT CAUSING EROSION OF THE SYSTEM, AND THEIR POST DEVELOPMENT 10 YR, 24 HR STORM PEAK FLOW RATE IS LESS THAN IN PRE DEVELOPMENT CONDITIONS. 2. WATER QUALITY WILL BE ADDRESSED BY PURCHASE OF 2.59 LBS NUTRIENT CREDITS TO MEET THE VRRM REDEVELOPMENT NUTRIENT REMOVAL REQUIREMENTS PER 9VAC25-870-63. 3. DETENTION POND COORDINATES: • (38.0355706,-78.4510122) MINIMUM STANDARDS (MS) All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 14 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4.TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfoll device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9.WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: o.No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17.CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18.TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High S1me1 Phone: 434-227-5140 Clusiottesmile, VA 22902 shimp-engineenng.wss U STIN . SHP 45183IM w VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. E&SC NARRATIVE SHEET C5 OF 15 19.078 C5 \-- - ----- - SEQUENCE OF CONSTRUCTION -PHASE 1 ❑❑❑❑X. YR FLOODPLAIN ' \\�-___ ----_- -----\ --------�-- \ / _ 1. INSTALL CONSTRUCTION ENTRANCES AND INLET PROTECTION ON ALL _ -- — EXISTING INLETS. MITS OF DISTURBANCE / / _—_ D — — — — — — _ _------- _ 2. INSTALL SILT FENCE AROUND SEDIMENT TRAP 2 LOCATION. NOT TO ENCROACH ON _ PREs€ftVED sLo s 350 3. INSTALL SEDIMENT TRAP 2 WITH TEMPORARY DIVERSION DIKES. m . I /'f �\ ��� \1 +� \ \ \ ♦'�\�_ -- \ — �— --- _— — ----- 4. RELOCATE STOCKPILE IN SEDIMENT TRAP 1 LOCATION, THEN INSTALL .b I I ON F UND n LL 1: \:..- 1 m T.M. 785A STOPS CORNER, LC D.B. 4358-684, 688 PLAT ZONED: HC G F — —� s _ — STORM PIPES Al—A4 USING SILT FENCE AS PROTECTION. Sao - X 5. INSTALL REMAINING SILT FENCE AND SEDIMENT TRAP 1. USE CAUTION S \\ —350—�, — WHEN DIGGING AROUND EXISTING UTILITIES — EXISTING STORM PIPES TO --- ` F o 1 -- _ ---- — REMAIN IN THIS PHASE. ---- roP DRY sr�o AGE_3e4 v + � v . � J- oop � � / I I ' " _ � _ _ _ _ — — — �� _ — �,���� \ 6. INSTALL DIVERSION DIKE TO SEDIMENT TRAP 1. TOP WET STORAGE \ \ \ ��l' Ll _ / I BOTTOM 28'z14' O 379 A \ v A \ \ v v �i� _ - - _ I �)•�__ CM P EX, DI ' ` ~— :' ,----_ 7. CALL FOR INSPECTION OF EROSION AND SEDIMENT CONTROLS. vv v .3) v v v --- — — EX DI v2 �— — —3so — \ \ 0 _ ----- v / BERM \ \ n dam, \ \ \\ \ — - = h �, T. M 7 Q _ 7— I SOIL EROSION & SEDIMENT CONTROL SYMBOLS - - CJ1 / SYMBOL N0. TITLE Q �- - A A v Y7-ACV V - ♦ �� Q - - / 3.02 CONSTRUCTION ENTRANCE v a �' S 59 ACRES (DOES NOT INO1 T) /' ' / ' O _ _ \\\'\E� U O\� \ �.♦ _ x W----_--------- ^\ \ \ •5 /' ///'/ X X 3A5 SILT FENCE \ — \ > 3.07 INLET PROTECTION D � ` \ — -- — � ♦ — ��♦ ��N OVERLAPS--OR_GAPS) 'I 1 I � /'��/// \ \ \� \ \ — — — -3%O� N �� FLOW /� L� I1 ^ I� \Xl,� T IV -- / / / / / /' 3.09 TEMPORARY DIVERSION DIKE �`� \ \ \ \ \ \ ♦ �; — 1 300 RIC V O VD —�� �_ � \ i3.12 TEMPORARY DIVERSION 370 / — —�-- -0,3,— 5272 714 / /, // [DRAWN TO SCALE] 3.13 TEMPORARY SEDIMENT TRAP .B.. �� PEA \ �- _ � N --- - _ I _ =' — - /' / / 3.18 OUTLET PROTECTION — ------ D.B. 1168-546, D.B. 440— PEA1�+ \ /� /// 3.31 TEMPORARY SEEDING EX. STOCKPILE SILT FENCE T ♦ \ \ -\_ - ■ - _ - _ _ _ - _ GG /' -REM IN UNTIL STOCKPILE IS \ ♦ \ \ -- _ / / / , /' 3.32 PERMANENT SEEDING / fl—B.— 2��-569 8c D.B. 201-454 PEA "� 3.35 MULCH REMOVED AND STABILIZED. v ' AN MH - l / f: s � SAN MH — / 3.39 DUST CONTROL � /�'// � / / /' �� DIG CAREFULLY M / )—�-�--%y�� _ _ _ ---- AROUND EXISTING I I —370_ LIMITS OF DISTURBANCE - - _ UTILITIES- ____ - _ s D- BLOCK L / rr-- - - - - - - - - - -------- — I_� s[o�eR ■� EX ONE STORY META // l/l/ /-----------_____-- — — BOTT0IA 58'x24' o3as •���+. — BUILDING �/- / — - _ TOP WET STORAGE 392 \ ' I #1290 t +I ,I + [ + + + + + + + + + - �- > — — - I fjl 7 TOP DRY STORAGE 394 h I+ _+++ + + + + WP0201800088 / .-+-+ + PLACED BASED ON FIELD - .402-+- 1 _ _I - _ - % o +_ VERIFIED LOCATION OF - -+-+_. . �+ +, j ' / / / / / �+ PRESERVED SLOPES. STOCKPILE •_+ _ - _ , 4` / + +--+_+ --- � + +�-_ __ + TO BE MOVED FOR A NEW-+-�� -- _ --__ ----_ . . . . . . ++ -� - - \ -- - SURVEY TO CONFIRM LOCATION - - � � � ■ � � — � - -■- -■ - —* — � / / / / / / / I I _-� / + + OF SLOPES -- _ � �+ +�_ _+ + + --__ ++ +�-_ -\\ N TALL THIS PORTION\ --�f-- \ +++EX P`PMVEMENT+ +++++++ + - EX PAVEM�NT+ii - - �� T > -OF STORM PIPE. KEEP - - - ■ _ _ - - - - _ / / 1 / / + + + + + + + + + +\ + - — "k — _ - - { \ MANHOLES SEALED _ _ _ \ \ / / / / / / I + + + + + DURING PHASE 1. + - - — 'm. + + + + + + + + + + + + + + + + + + + + + + + + + + + 0 + + + + + + + + + + + + + + + + + + + + + + �y/p-��y S X. INV 386.09' ■ + + + + + + + + + + + + + + r�—+ + + + + + - - * + +S i.►• > Y/-. _+ +\ ` + _Fr�■y���_—ti_�c-ps�cns—c � + I — '.`— ��_ — M + +. a r / � , 1 \\ LOPES / / / 1 r 5 + + + , �+ S - ++ blll++ - - EX' + + k I-}' RELOCATE PORTION OFj - + / , . i - - �� / / / / \ . o r - - - - _ - _ - / I STOCKPILE TO INSTALL A4 h FOLE -- _ 470� + + EX+ _ - -7 / SEDIMENT TRAP -� __ >X � � -x x _ - -- / -� \ 0 — + + + + + + + + + I _ EXISTING rn I I /a�,/ S{IM TRAP 1 DRAINAGE AR I --___ —__— _—__ 1 LOCATION / I �+ + + �+ + + + _t . — y ��' i+ .'+ :\ _ — — _ __-- n yF 1707 P III + _ ' AT + +\+ +++++++++ + +ter+: � r + + + + + + 404�` + 1 \ ' --'dE _�—_-400— — _ _ _ _ 0 _ / X EX s . ------ --- x — x — — x — — _ _ _ _ J / �I d:lr�i / ONE ST Y STUC _ K.ISTEPs TBR `� + GRAVEL TBR - / -- x� --- — x. My +++++ x ' \----_—_------ -- / + \ + + + STQCKPIL++E+ + + + + + AR RRY SH UBS `oTl S \\ \\ — _ ---- + - N . + + + + + + + + + + + + + + + + + + + .. + + + + + r SHIMP ENGINEERING ■ EX. \ ( j IUNIPER _� ' \ \ + + + + + v ++ + + + + + + + + + + + + + N s v / LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 6 / ' \ S14RUSS \ \ ♦ W \ TBR \ f + + + + + + + + Q L s� — — — _ I I I 912 East High S1me1 Phone: 434-227-5140 ChatloOesNlle, VA 22902 /+ / +++ + + + + + + OOtt + + I EX. \ +ry_+ + + + + + + + + + + + 1+ \ + + + + + + + + + + - / — — — m c �, _ _ �L'D -_u ° / 1 \� ,�\� , If skimp-engineenng.tOm kuljJ / �o G R + ++. .......� ALEMARLE INIhFPVSMP PLAN L 0 TBR + /+ f 0 * * * * * + y + l /v COUNTY, VIRG A +-+++-+- + ++- +++ ++++BAN + + + 0fin +* Ex. ONE STucco ,EX°MH � 1300 RICHMOND STORY / ' + - &BLOCK _ +++ + + BUILDING '1 oP st�N ,Bra + _ —". LSIGN AUTOMOTIVE WIN I an I � " + X. GM s I a E LP x hX. 1.1 /�VLE� .X. 1� -�.- - IVI v o o x �; X.o EX DI LP TBR 5 + + + �. + 1 �..�..�' .d / -0- RE R + + � + + + +� - ■ ��� -�' / SUBMISSION: XFJ715, /'L x 19' " + + TRANSFORMER+ \ `ZO`Z0 06' 02 o ++++++++ ORTION OF BUILDING TB j EX. x +++ �+�++ C _ TER \ SHRUB . . . . + . . __ _ _ _ + +' TBR ++ EX. +++ +++ ++ - �. SHRUBS+ +++ ++++++-+-+-+ / - \ / REVISION: + TR T . + . . + + + + + + + + + TBR + + X DRAIN TBR - + . + + . + + + + . ./ / EX. y 01) 2020.10.22 +/+ + + + + + + + + + + + + + + + HfHe x. s P TBR +++++++ + + 02) 2021.02.02 + + + + + + + + + + + \+ + + + i I X� ++++ + �++++++ x. s� •++++ ++++++++'+++++ +++ ++ + + + + + + + + + + + + j � �� � + + + + + + / / / 03) 2021.04.14 ' STOi - �'E + + ++ + + + + +++ + + + + + + + + + / / ♦ WV - x +- EX i + EX / EX. LP EX. LPX. LP H -++ - + + + + + + + + ++ + + + + + - + + - + + + LEX. + ++++++.y++++++++++ + ++ ++ ++ +++ ++- - / ,++++++ ' ' / SA PESED + a - - - - � PLACED SHRUBS o rn + + + + + + X+ RAVEMENT TB + _ _ + + + + + + + + + - + + + + \ - ov SLOPES X. ON - d i t + + + + + + + + + IMITS OF DISTURBANCE + +++++ , + + + +++++++ +++ + ++++ + / / FILE NO. _ A�`0'ED yII �MENT TO AINOT TO ENCROACH + 0,6 / "1 X i * + EXISTING PARKING + . + + + + + + + + + + + + + + / \ rc��"i- SPACES TO +_QA 1GM TB + + + + + + + + + + + r + + + + + + + + + + ♦ / �� c��c+n+ c< - ±+u�a +++++++++++++++'++++++++ +++ + --- ---- — — 3 TO BE \ — + - - E&SC PLAN PH 1 ------ ---- educo ---- _ — — _ _ - .y > ,.,o d. bcu ucu ucu ucu—uc :'\. + + TR 9 i-\ \ \ '• .:. w , - 'N89'38'46, ` ;..: ". E// / EEOE K EEEX _ � AK X yA11. ■ OAK TR '. " 6444 SETINT TBR AK TREE IIOAKOAK TREE■ _C 6 SHEET C6 OF 15 ING ..�..T..�..� II II II ! VAULT tiL I,-- ------ �,� / r r. Scale: 1"=30' w \ — ----- — SEQUENCE OF CONSTRUCTION — PHASE 2 • . _'.. YY��-� \ \ \ \ \360 \ \ \\!_ '�\\ \�—�YiYY�t�--��--- wes ❑❑,❑❑ } $ IX \ k\� \ \ \\ \ \\\ \� \\ \\���--`YR FLOODPLAIN /- ----_ -- -/---�-�-- __ \- 1. BEGIN GRADING AROUND SEDIMENT TRAP 2 TO PREPARE FOR \max * �� ----- __ - INSTALLATION OF RETAINING WALL. \ \ MITS OF DISTURBANCE / / _-__ D — — — _ — ------ ---_ 2. INSTALL PORTIONS OF RETAINING WALL AROUND SEDIMENT TRAP AND NOT TO ENCROACH ON = - - , / _ \ � — / tom\•. \�-PRESERVEasLG�s I - - ---__- __� --__ 350 — BEGIN TO FILL BACK PARKING LOT AREA. w / ��*�\. \ ` _ \ ♦: \-/ \ - �_ ---- -------- 3. LEAVE EXISTING STORM PIPES IN PLACE WHILE PIPES Al-A5 ARE BEING m / `\\ \\' �� \� ��.♦�-- J ^_ _____ G F� -__�� - _ CONSTRUCTED. DO NOT INSTALL INLET TOPS DURING THIS PHASE; INSTEAD X v, KEEP MANHOLE BASES TEMPORARILY BLOCKED. " ` v — _ — - �, - 4. WHEN READY TO CONNECT A5 TO A5a, THE EXISTING OUTLET PIPING CONNECT TO PR s __ X sad .-- — —350- — — — �,•r - - �--_ _�_ --- - MAY BE REMOVED. NOTE THAT OUTLET CONTROL EXISTS IN U STRUCTURE A5a GRADING FROM SDP2 , , I DRY ST_20 AGE_384 t \ \X ♦ �iLAl7� � ♦ l 1 < I-- _ _ _ TOP WET STORAGE \ / \ \ ___•_� T ____ ♦ / / \ ; ,�, 75 -- - - WHICH MUST BE REUSED OR RECONSTRUCTED FOR NEW PIPE OUT. / BOTTOM 28'z14' O \ \ \ \ \ \ ' MP . -_ - - I�ONN \ •, - / / / EX DI __.!' ,5. BEGIN MASS GRADING FOR NEW BUILDING AND LOWER PARKING AREA. \ ST2� �* vv 3> -mow EX. DI _360— �, v vv _fir-_ B S -- _ �,� T° M . 7 q — 7 —! �, SOIL EROSION & SEDIMENT CONTROL SYMBOLS _ 8 / '� - - SYMBOL N0. TITLE KEY g' \ \ \ t �: \\ � I - - / � 3.02 CONSTRUCTION ENTRANCE CE \ \ \ \ r t 1 \�O\ \ � � _ - 1/ _ X 3A5 SILT FENCE _ - - \ ��\ I \\ \\ .5 /'/// ////ice X SF _ / 5.59 ACRES DOES NOT INCLU�E-�— _ _ M / ° n — _ \ \ \ \ _ ♦ 111��� \ \ / �` D /� �` 1 / ® 3.07 INLET PROTECTION IP II 98 \ \. D��� \ \\ \ \ - \\ \\\-=- 7 �' xi\�, �MN I --_.- O V ER LA�.7-.__OL_ VA�J ) _ \ 1 Iv, \/ /'/ �// /////i 3.09 TEMPORARY DIVERSION DIKE &D '•y—(� - _ - - - - _ - - L� - 3.12 TEMPORARY DIVERSION �2�7 \\ \ \ \ -- - ` FLOW 1300 RICHMOND 370 / - - ' -\- _ - -- - \,' , / / j / / 3.13 TEMPORARY SEDIMENT TRAP ST h SEDIMENT TRAP 2 DRAINAGE AN \�\ B PEA -�,�_ 5272-714 � \ � / / / / / / [DRAWN TO SCALE] Q / // 0.89 ACRES - \ \ \ - - -_ ; / ' / / / \ \ - / \ \ \ \ _ / / / 3.18 OUTLET PROTECTION OP _ _ - - r- D.B. 1168-546 D.B. 440-37 PLAT L / / // / , / \ \ � _\- - � \ - - - - - — - - � /" / / i �� 3.31 TEMPORARY SEEDING TS \ fl , B ,- 2��— 5 6 9 & D.B. 2 01— 4 5 4 P L A / // / /' 3.32 PERMANENT SEEDING �S AN MH 3.35 MULCH �390 - �- / - - A ■� I 1 S �s SAN MH - '-� j:' A �j//'/ // ///////�--�� 3.39 DUST CONTROL IN - LIMITS OF DISTURBANCE — — "� e I / � ` �+r►, � � - - \ � ----" - :� RESERVED- - 1 I I EX. ONE STORY _ S a — r / / - _ •. SE'S — & BLOCK METAL LOP BUILDING / + + + + + + + + + + ® ' #1290 ...... + + + + + + + _ _ - + + + + + + + + + + + + + + + + + + > ++ + + + + + + + + + + + + o4+ + + + + + + +vim + + + + + + // \�� I I ` �- �_ \ vt�� , / / / / / + + + + + + + + + + +� + + + + + + + .... + + + + + + + + + + + + + + + + + v- + + / CO /L--- - ++++++++ +mot+��� +++}+++++}+++++ ++++\ t�+++++++++++++++°+++++°+++++°+++++°+++ +-�'-r ±.+_= \ ----♦--a--_-__-// '/ / / 1 ++EX P&VEMEN +�++++++++i:\+ + + + + + + + + + + + + + + + + + ---- _ T — — + + + + + + + + + + + + + ++ ++++++++ + + + + + + + +�+ + + + + + + ... + + +'+++++ +++++'+++'+ + + + + + + + + + + C + } + �pp - - - - — — o t + + . + + . + + - - - ANAG - o _ s s m D -- \ v EDP / / 1 —/ s M J--� \ SLOPES X / "]III' I � D 10 71 L� + + + + + + + + + + + + 4 + 1�- _ _ il� S _ i- + + + + + + + + + + + + + 0 - I _ + + + + + + + EX+ _I 5 - .. /- TJC(` y �410, ��� -- % DLE 1 -x- x + t+ �' X x = ���--_� aS�F R _ _� -- — — o- / / / 33J-701 / \ kidF•C//�+++ "—x —x -- l I NII I DI .I I i -----_ R X. My +_+++++ + + + +EX` ONE STY STUC + EX GRAVEL + + + +— -=-- / / _ -+\+ ++++++++++.7 VR RRY + . + + . + + SH ue5+ ++++++++++ + + SHI P ENGINEERING LAND PLANNIN SITE DESIGN CIVIL ENGINEERING PROJECT MANAGEMENT / ■ - A j��EX. A� + + + + + + + + + + + + + \ �� X / / / / / GISI GNICI GI 1 ( � j IUNIPER + + + + + + + + + + +++ % ++-' 2 s `\ \ `/ + + + + + + + + + + + + + + O \ ` \ / / ' 1 / 1 Design Focused EngineeringSHRUBS N \ TBR \ I I I 912 East High smet Phone: 431-227-5110 ■ + +++ + +++ + + + + + + + + + +� + U Z \ \ U --_ L�UdvIPSTE l l l I / I g / I \ + + + + + + A3 - / Q A S - - - - - - _ - - _ D O 1 I / / Chanotlesmile. VA 22902 shimp-engineenng.wm EX. v - tnm sv I I / ti fit• BA �_ - - r+ \ Hz .zL '1/lillrt \ / TBR EIS 47 5 E ,� II \\I I•l�li.lt;L l•=i'I �•I I� � 6- I- I I � r tY.-- �-T C/J I ->EX. BOLLARDS - . y _ .. • u _------ I �� I I � + + + + + + + + + +' X. �.— I 4`1 ♦ I� T--- I I 1 OLLY ♦,---- ----' I I I I �1� BEN MARK: ■ ++ + + I + A'+ + +I N \ • + + + + + + + R + + + + + + + + + + MAG NA L S r �..�..�. .�.. _\+ ■ + + + + + +++ ++++++ + + ++ ++++ +++++ +++++ +++++ \ 4 J E ,i + + + + ELEVAI IO =42 .08 ■ A �¢ i \\ +++++� ++++++++++++++ a \ \ :4+++++++++++'�" � � s \ � / / I I I / \ STIN .SHIMP =+++N++++++++++ Lic. 45183 +++�+++++++ ++ +, v s / + + + - v+ �+ + + + + ONAy - EX. of -� + + + + +i- - I ■ SHRUBS +\+ 1 iEX+ M}�+ EX DI TOP TO LP EX. LP EX. LP E XI P ■ ,n + + +v/ + + + - 0 o- o- U TYP k `+++++� ++ I I / / J I - I + + + + + + + + I T.M. 785A + r ■ EX. Rm .+++++.+++++.+ + - / STOPS CORNER, LC ) �� �� s oP ;+;+ LP +;+;+;+;+;+;+; -- i VSMP PLAN �� GN , R + . L 0 TBRI . . . . /+ D.B. 4358-684 = o + + + + + + + + +' , ALBEMARLE COUNTY VIRGINIA 688 PLAT // �� -'+- +-'+'+ +++�,,� ,L+IN + EX. ONE �� 1300 RICHMOND + 0 + + STORY STUCCO �Ex. MH �� � / / Ir '++�s++++ ROAD -FLOW i ZONED: HC �I // // , + +'+ +'+ + + r + + +'+ + + + &BLOCK BUILDING �I N / / y / 1P x : 414 �+,��.`:++.I� X. GM wv v I AUTOMOTIVE v x�+ BR P, N E LP hX. 1.1 AYLCC X. + + +\ + + + + + V O O k / X, O EX DI / LP TEI S" ++++++\«+++++++++ )♦ I �--�YY�y,�_ .I / 4 RE R +� ■ X ��,� �' / SUBMISSION: t o +++++++++" + + + + + + II I w TRANSFORMER+ - \ ORTION OF BUILDING TB 2020.06.02 X. x +++ +�+ TER \ HRUB . . . . + . + _ — + + ++ EX. +++++++++--- ++ .-, \ REVISION: + + + + + + + + . + SHRUBS 1 + . + + . + + + + + + + + + + + X DRAIN TBR I + + + + + + + + + ./ . . . . . . . . . . . . . . . TBIR EX, 1 0+ + + + + + + + + + + I t y p 01) 2020.10.22 i EEP INLETS +� O + + + + + + + +++ +++ + + + + HRU8 X. S P TBR + + + + + 02 2021.02.02 ++++ COMPLETELY - - + + + + + + , 'R + \+ + + + + + + + / / / V ) LOCKED WHILE / + + + + + + + + + + + + + + j\+ + + + + / ' 03) 2021.04.14 / * + + RKING AREAS ./ + + + ++++ + +++++++ + + ++ ++ + + + + +++ + + + + + t + + +++ + + + + / STOiP + RAREEM EID� EN XEE>TB ® E + ++ + + + + + + ++++++ +++ ++ ++ ++ ++ ++ -- - + +++�+ SIG++ + + + LJ REPL CE I LET + + + + + + �-+ + + + + 'PRO CT10 + +i + + ++_E)(. _ + � + -++++ - + + + / X • WV x EX - i U + + F + + + + + + + + + + + + + + + + L F + + + + _ . EX. LP � - +� +�+ + O� EX. LP EX. LP X. LP +++++++ ++ +++++ +++ ++ ++ + - TB +++w* / / / S ES A AGED ODEX p EX. E UI EX > + + + + + + + �+ + + + + ++- - - + SHRUBS 0 2 - + t,+ + L x\ ANAGED / +++++++++ \ � � S R B / +++++ + t �. � - ++ - - Q X. PAVEMENT TBg+ \ - GROUN-D-CMR TEY� + + + ++.+ + / PLACED UBS FILE NO SHR - 0U - -- SLOPES ♦ ON d -LIMITS OF DISTURBANCE + + + + + +++ +++++ + / / .^ � X. MENT TO AIEXI TO ENCROACH + + + + + + + + + + + O 1> - - i +++ ��+ 3 X .$ + + + + + + _ \iFiSerf '/ SPACES' TO PARKING +++ +++++ ++++++++++++ n zm q _ — — _ — —4 R X. A �': :. A61GN TB _ - - T - - + + / dr III �' +++++++++ 19078 + + i + �� \ +-r---Y� - cs -� wsq� + + + + + + + + + , , + 3 TO BE + \ / ^ / — _- —_ --- -- — — — E&SC PLAN PH 2 5" dcu+vcu� -- w d.. " ` _�EAKITREFD EE12 EX. 9" _ _ �11,1 H OH + / ucu ucu ucu uc �u I\ .. , — — — ,• .., .. ?.N$9'3S'46,'x.' ,..: , E+++ _"�. EE - - / o=TR / �IeuRTGM ■ Nosy // / ■ /� � SETN( IOINT i TBR ■ �1 OAK TR AK TREE OAK TREE OAK TIRE c W SHEET C7 OF 15 O�� �__ / ON \ 1' u VAULT ti� ( / 30 30 60 90 C7___1j Scale: 1"=30' r x 19' " + G C - ES-� _ _ SEQUENCE OF CONSTRUCTION -PHASE 3 \ \ \ \ \ \ \ �SLT !\ SIDE LOP + �� ��c�� = X X / /' _ _ X T� TwxB \� \�\ x as --_ ----- _ --'\ -- 1. BEGIN CONSTRUCTION OF NEW BUILDING, THEN PLACE FILL FOR SERVICE }� oMgx E N� WAS \�. SF o --- ---_ _ _-- AMP. DIG OUT DETENTION POND DURING THIS PHASE IF EXTRA FILL _ � � RECEPTION R yFiG� O • Iw 71R E T 1\\ - OFDIS TOP OF 6' DAM 346 _' -_ - _ ----_______- - S NEEDED. P�oFXr S E ION. /// _ - - - - - 3sa 2. KEEPNEWINLETS COMPLETELY BLOCKED UNTIL TRAVELWAYS ARE STABILIZED �6 2:'h OPE ylj FT w IN ALL -WITH �ADEkiO \ \ _ N _ \BEHI RE WAL bNl ` ♦�� - \ \ _ _ APPROX5, 0 SF WITH STONE. THEN ADD INLET PROTECTION. yr „ / F \ '�♦ \\ \ \ �\ \ ♦ . a x \\ ��♦\ - N ND - - - -- 3. KEEP SEDIMENT TRAP 1 IN PLACE UNTIL UPSTREAM SITE IS STABILIZED AND \� �x♦�� ` - --4-CON( RISER / - F --\ DOWNSTREAM DETENTION POND IS COMPLETE, THEN REMOVE TO FINISH PARKING - ` /TRASH RAC ' - AREA. CLASS Al RIP RAP - _ M �X oM ' \ �: N oNo Jo n R c r 1 Ar OUTLET of DITCH/ -_ -- \ _ 4. ONCE ROAD CONNECTING TO PANTOPS CORNER WAY IS BUILT, IT MAY BE ST-z TO \ w a S K \ ` / \p gcM RIP-RAP.ovYER USED AS A CONSTRUCTION ENTRANCE. BACKFlLLED.� \a s IL\ \ \ o _ ♦ / Ex of� `� 5. ONCE PIPE El-A3 IS INSTALLED AND UPSTREAM AREA IS STABILIZED WITH \ \ Lp D 7.5' MINIMUM WIDT _ _ ♦ , LENGTH, 9' DEPTH. ♦�__ - a �_,�r ' 1 0' L I ON I �� ANE TR /\ \ / j STONE, INSTALL DIVERSION TO DIRECT WATER TO INLET E1. FIUND ��, / - v ` v v I 1 tlW- NING, NEW 10' SWM ` o AN cR we EA \ \ \ 3 NE __'WV. qcl rY As E PLAC-RA�TO-- - - - - ACCESS EASEMENT Ex. DI 2 6. REMOVE SEDIMENT TRAP 2 AND FINISH RETAINING WALL AROUND SEDIMENT HE DAM -36 (D. B. 5 473) \ �O �\ \ �0 \ 51 v / ARMOR T0 - E / OPPOSITE INCOMING ET _ CDR TRAP 2 AREA. DTJON BE \ -N - �\ DITCH - - - = `361 7. ONCE FRONT BUILDING IS COMPLETE, INSTALL NEW MIDDLE ENTRANCE TO SITE. �C�NST ICTIRO A DE AINE SICE 56 c�., ♦" I -_ / - --- \ - S SHAL BE F EASTE 60 SOIL EROSION & SEDIMENT CONTROL SYMBOLS /�.� \ \ \ ♦ _ - ♦ I NEW V.W. PUBLIC -- -- -- -- -- -- -- \ / / SYMBOL N0. TITLE KEY 1 DE 0 A ID RBA C - 11 _ � ♦ � �0 DRAINAGE EASEMENT ONNECT TO \ " __ --- --__ - _ - - - - - - - - - - - - - - _ _ _. - - - - - - \ / / / 3.02 CONSTRUCTION ENTRANCE CE / PROPOSED GRADI \FI-EXI \ `\ \ \ \ \ \ - - \`_ _ - - ♦ -r3 X X _ EROIM-SD.e201 9 PLASTIC NE 2 \ \ \ \ _ ♦ / m N -- - - 1 / / / / / / i 3.05 SILT FENCE SF -370� N - - - - - �.. ✓ / / / 3.07 INLET PROTECTION IP __ - I _---------------- / / / / / 3.09 TEMPORARY DIVERSION DIKE ®D EN STORM STRUCTURE E \ \ \ 370 _ - - I - \ - / / / / /'(18 IS INSTALLED AND PARKING \ k \ / � / \ �-- / / 3.12 TEMPORARY DIVERSION UPSTREAM OF SEDIMENT \ \ \ \ \ \ - _ - 1 1 -- - / / / / 3.13 TEMPORARY SEDIMENT TRAP ST 13 STABILIZED WITH \ \ 0 • �r l \ -- \ // / / / / [DRAWN TO SCALE] INSTALL DIVERSION \ \ _ - - - vfi- IM W TH�� - _ _ _ _ AND IN TO REMOVE B-10 CY SILT SACK TO \ ` \ - - -- ♦"' \ -- - - - - - - - - - - - - _ _ - - - - - - �,,-' \ / / j / i / % / / 3.18 OUTLET PROTECTION OP REMOVE SEDIMENT FROM \ - - - - - ~ / / / PUMPED RUNOFF. CLEAN _ 1 SAN MH - - - __ - / /, / / / / / / �--�� 3.31 TEMPORARY SEEDING TS a' - /RUNOFF HALL SHEETFLOW � - I - _ - I IVERSION N BE < _ ♦ DOWN SLOPE _ //3.32 ,per I y �O LOCA AS NEEDED \ - `♦ - / 5 - -__ '// / 335 MULCH SEEDING - _ 390_ - - - - _ \ \ _ .I 9 EX. SAN MIT - / // / / / / I I / D To TACT RETwALL - • c ' \ / / //' [�9 / --- - _ \/''/ 3.39 DUST CONTROL / I Sri 3 / 88 CLIENT --- - I I �370�\_� /' V///// X A - 0 \- LIMITS OF DISTURBANCE w I / IP SIG REr EX. ONE q 6 ., V✓ WA/E _ _ RESERVED--� - STORY METAL HAND D - - _ .�i OPES \ & BLOCK BUILDING 02 x R - I - w E w w a 039 ♦AID 0 9w - t - #1290- DI-3A •� _ \ ,NEW ■\ I ---- ---- --- --- _ ti/I/ / / / // / / / - 030 03a -- �'-- ••-�60.,�- - DRAT37 0 03 0 _ \ / f \ • 4 B 1 p0 w w/ 03° X _ 1g HppE \ \ _ - - _ - - / / / / - -- - 066 /L 6 - - - 75 4 a \3 � w \ w 02aa �� TIE NEW P NTO �" ♦ - - - f-i _ --x _ _ ----- / .------- W GONG. RET. WA -SfliN- L-AL ET \ ■ --.- -... -.. ON W $X. HEIGHT 4' - _ -- -` \ / . � / ■ / a ` 0z W/ �L"1111 DRAIL ` --_ - _ _ , / / ` -`-■ \ x0524 \ 439 42 SNr 03 w� , \� P I ON IN PLACE \ 596 05 O6 W A( ZC�RX CK fT O�W S - _ _ _ /� - - T� v ' / l l 1 W L Al ° N CONNECTING 4 R ";;. � "'�W P CORNER WAYTING . v v HqN �GHr s 5 S W V A v - - .. IS W . 1 06 V \ 3 R \ 6 2 ., F, W \ l NT1 ..� N V • t C - -- ---- �P�\ 5 w �w o -F� -_ ;... \ ANAG€D / / D 10-71 .1Lz zo\ - -� \--�- SLOPES \/ •w y0 01 \ J �w 0�� -NEW 10' SWM 1.�' //: / / L-w Evd M 5 -v 1p ,N--- 00 ��/ 02 9' �- �- I ACCESS E M€NT--�'I ` \ 410- _w \ EX. MA - - 04 07 0 E 02 ® 3 n 127� Aix 1 ,: VER R0 RG ERG - 3 ♦ � � x - c- �- k\ 02�FENCF -_-__ _- � -_ ,� ti �p G W a" DPE. rtu \ 'RG �\�� ♦ �< X= _ �- --_ i % / / / / 'I�. .�331J-701, - - - - 06 - - - - JJJ n 4�' NE TAIRS C/ a ae 10 R° �eG 4 I _ - ------ ----- _-----_ - 90- [ r/07 P AT - ----� 6;27) 6" 'RISERS 0§' ----0 /0 y '3 VAR _ - - _ ---- ---- - %'� �-- �AC�=S EASNENT=ac-- jfL� �400- / 3 a3 404 �� _x _- x __ _ _ - - Ei I / �_<6 p \ i� BATTERY BATTERY __ �� ----x -x -x_-P- _ --��� X. M I / / / '- - ---- - 1 / 300 1 BU I LINI G B - o _ I T \ STORAGE STORAGE / ^ ----� _ SEGMENTAL LOCK EX. SALES C E 16 47 NEW SALES __--� 1, "\♦-- BUILDING BUILDING ET., / (TO REMAIN) `, A �° �v ° _ - I As P a ` . --FFE 416.E N KEEP INLET LOCKED UNTIL WALL B MAI HEIGH 4' /. 2077 \ I= \\ - p SEDIMENT TRIP IS REMOVED. I / I I I , SHIMP ENGINEERING / FEE 420.77 ' ` / / I / 1 / r \ LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT W/ 42"11 HAND AIL j / REMOVE TRAP�ONCE SITE IS - 1/ BEE 406.77 x vSERVICE �v I STABILIZED. I v x 0� Design Focused Engineering T / \ Im-,\ p� ♦ AdF NEW PVC INTO \ 9 S RVI E \ aD`a RELF�PTION `T�V 15LOMAX. ---� 15. \� \s. \ �> .h E EP 10 = -20' 70 --- Io O \\, ii,• g yly �(. ANITARY WITH ` '�. �X I I � \ \ HEIGHT - O - 91z East High VA2 Phoneiginea27-5,a0 HEIGHT = 30" � y -- �-&� ,TX. OR NEW C/0 s � \ - - - - - - - - - - - - QPSTE / I I l Chanotlesville. VA22902 skimp-engineenng.com 11 R wJ m - -- 2 77 A r. 1-630 16 X s �� ♦.Z \ 4 20 - 1 ♦I W 6" SDRv-35 LATERAL �Sv v vI I I /' :>EX. E01 ARDS 02- _ _ \ BROVIDE 3' lCOVER Sivv - It - - / / II I II / SLOPE --P[ _ i. _ IV i�� A \_410 i I v �---- / NV �-y `-- I BENC MARK: ■ 2 0 08. � � i � L i i � I I i� i 1 I kr MAG NA L 5 T ■ I- 11 3 I 4v v,'v �0/Oi J 1' ELE TTo� ga�.oe 1 / •- - vv v 3 a Ew VARIABLE WIDTH \S ----- `��� I// __�� I/ A, /r_-_- � A A-�� 30' z� \ v Av 1� ♦ v v v�vs � l lII II II I `}SHIMP CSS EASEMENT 00 \s 1, Lic. .45183 CB1tlfi,�EXTENDED BUILDING Al CURB MFX_HT. 2.5' EXISTING SERVIGE12°o w4 ' - PROVIDE 4" �bRB �v LL NE w w. PL TC�1 ° v 12 so9 ABOVE TOP of C/O FFE APPROX 404 D�AINAG ASE ENT I _ 32 X so �� I `� t� 12 PAVEMENT. I `� TO REMAIN -� A V 12 C 0 12 X7 II /PAH J I EXx 1 EX. LP & 4 14 vv� -- 1 / L / � P .� - I I / I j � I T.M. 785A � - � / I , To D1 � 14 ao 7 STOPS CORNER, LC f ) o 0 T" l 3 14 V4" - '; i l VSMP PLAN / �� I / D.B. 4358-684, - o, y / BUILDING / AL BEMARLE COUNTY, VIRGINIA / / 14 / �! 9U NG A2 / / v / / 14 473 EXISTING SERVICE i r'/ v '� 688 PLAT / / / �� / W FEE APPROX 414.75 vEX. MH - � / I 1300 RICHMOND ZONED: HC _ - I I I ,6� TO REMAIN ROAD -FLOW / AUTOMOTIVE / -Ex �/ o , , Yo zo V,IAILB ��NV 13L7 6 5 �••.�r�..�-- II IVI a E - EX. LP EX L EX DI S a•.`O /p SERVIC SUBMISSION: � � � � O / / ,\' NEW 6" SDR-35 R I LATERAL PROVIDE / 3' MIN. COVER & / i 50 ------ ,6 2020.06.02 Do D s , 1%1v11N. SLOPE SHARED �_ \ / � 15 � I ��-� _---� BUILDING A3 �- \ ,�, REVISION: _ �: / �, / \� ° X16 I L M. NEW AUDI OFFICE v o1) 2020.10.22 / / NEW V.W. PUBLIC NEW 10' sw�n ACES I i j ';r' SALES SPACE �- BUILDING A4 /p / 02 2021.02.02 ti r,. BUILDING - DRAINAGE EASEMENT "\� CS,•,.,. LDIN N sc i G E / €EAS VENT I FF FFE W PORSCHE 19 `\ 03 2021.04.14 E \ 4 00 17 .0 / 0 X. _ SA 417_00 LES BUILDING � 19� ` / APP�RIOxIw�TION�oF%�\\ - FFE 419.50�\ C\ENTFAL LEPHONEE oo�OAN`Y oFv A \ \ \ /A \ ♦. w =w - -w -/w 'a, t VI GINI EA EME T V V V V V V V V \ ♦- W L (�__. A \ \ \ \ \ I NEW DI-7 -1 x x A 15" CON 6 7a - - - _ -PO (LP EX. EX. LAP CP. PH 3 / 1 z '\ 16R0 x Is i BSo 16�' :>' , 19'0 �x19'° /� o S DES \\ - - - - - - / I / \ Q ' 17 ---- X �i _ 1s FILE NO - - - - -- - - - - -SLOPES ■ 3 X X - ON I• ANAGED „ I'lD E cu O O i g �5 cqs-_ 7a i � �8 LIMITS OF DISTURBANCE " � / cns�NOT TO ENCROACH X O p - - - - - -- -x \ \ ...,� - - _ / EXISTING PARKING 30 Tl z - - - - - - _ _ _ _ 4 0 \� X X \ � - - SPACE TO sREMAG,, - GAs- 20 / / , 19.078 IIIIIIII 4 __--_---_ - 1 3 �I l ram` -- - -�� cns cns f-■T�,{199Ex ��/���`V��/ /�/ Jj /���� _ �__ E&SC PLAN PH 3 E ---- - _ - --_- HU ucu- - c uw ucu �ocuOH ucu-uc 0 �" _ 3 NE "T ,� \ \ _--_ I:a o 20 1�'/ w -use- UCU� U UGU QGU � gppR ji / / i j/ jj / / / / // jj / / ji jj / / C MBINED UTILITY EA �ucU - OHIJ SHEET C8 OF 15 NOp \ / COMBINED UTILITY EASEMENT /_/ j ! / / j ! / / j I FO VEPCO, CENTEL & ACSA . i . UFu • ucu -- / / FOR VEPCO, CENTEL & / --�----�-- -- I D.B. 1168-546)I ♦ i ji ---� 30 30 60 90 [^' / / APPROXIMATE LOCATION OF I NINGT ( I j / j !j / j ii // �•� K ASCA / / I ILL OVERLAY APPROX. / j / / / : Gu" V (D.B. 1327-145) / WATERLINE EASEMENT ILL &OVERLAY APPROX. o I 1,648 SF PER WP-2 MILL & OVERLAY APPR -■ass !j !ji - / (P.B. 1549-598) 537 SF PER WP-2 y- I ` @\70 SF PER WP-2 0 ■■�_ ,W„ Scale: 1"=30' .. •' " - - -iWl H •1 SIDE ';LOP ---�.� \36p \�- �T; 3' �- ---� : ���=X:`�-''X X = x �1 ES - SEQUENCE OF CONSTRUCTION -PHASE 4 ������,�� \ \ \ �" >t�cC- --- - --- -- ❑❑,❑❑, WMAINTENANGE GR�UN \ \� !„�e�� �' ��44 ' \\_--_ ---_--------\--�-- sEL \\ \ SF " _ 1 REMOVESEDIMENT RAPS AND FINISH PARKING AREAS. - SEE�CIRCE-0 INx Wfl� }� � -- _ ' - --- - =- - p \ DE�scN`3/11 to SE T 1� OF TOP OF 6' DAM 346 ° / ---------- 2 APPLYPERMANENTTSEEDINGNTOANY DISTURBEDAREAS& LOW Hr \ok 4 rZP. RErWAL\ �TTION - / - _= - - - MAINTENANCE GROUND COVER TO ANY SLOPES 3:1 OR STEEPER. IN ALL TH Ao \ _N _ 3sD 3. INSTALL NEW PARTIAL ACCESS ENTRANCES. ( �BEHI RE WAL Ui,JI \ ♦�� `/ 40 - e \ \ APPROX. 5, o sF \ - - - _-------- 4. ONCE ALL WORK IS COMPLETE, REMOVE INLET PROTECTION. ;•\ a N CZ DI-3B o �.;`\\� \\ ���� 5. CALL FOR FINAL INSPECTIONS. ' - _ G -� 2.•� \� v /TRASH RAC CLASS Al RIP RAP- a-`_ \ \ \ ♦ \�LOOgp� 38 AT OUTLET OF DITC I I \\v\ v \ v ♦- - - 40 - A / �,,0' LENGTH: 9" DEPTH, \ \ \ 7.5' MINIMUM WIDT o /RO�Nc - PER ANENTNG A TRUC \ \ \\80\ \ WD4\� \ \ \ .\ \ \ \ N\V.W. ACI TY AS ` • /IEX, DI - PLACE RAA�TGO_ - I -'ES NEW 1 � _ / (D.B. 455 473) 96 v v A `� A •3�0 A _ -50 v / ARMOR THE DAM ACCESSEASEMENT EX. DI '.� 2 DE TON BE _- _ ! ODIP�OSITE INCOMING - -DR361 -2 T I LAT) 1 // SOIL EROSION 8 SEDIMENT CONTROL SYMBOLS \ T 1 \FROM E WE SI - / - - \\ \� 3•• \ \ \ \ \ �C`${NS\CTI </� DE AO AE ID RBAACTEf{N -60 6�-o mot` / ---- -----. _ �u //-- N0. TITLE KE SYMBOL Y F 98° OP \ sQ \ >\> \ - ♦�-� ^ G I NEW V.W. PUBLIC - ---- - ------ ------ L._/ � _ _ - � A V 8 A V � % � O DRAINAGE EASEMENT ---- - ---- - / 3.02 CONSTRUCTION ENTRANCE CE OD' F1�DM-GT TO 201 9 A NEW �2 \v \ \ �v \ C GROUND La OVER-R�5�:11 OR - \ - -_ - _.---------- �. V A\ //' X X 3A5 SILT FENCE SF 1 ) - \ - \ ' / ^ ` ---- - - - - - - - _ - - - _ - - _- / /' ® 3.07 INLET PROTECTION IP / ❑ - PROPOSED GRADI \ � \ \ \ \ C ♦ M \ I^ 3.09 TEMPORARY DIVERSION DIKE �D I AGRAN SUM \ N / 3.12 TEMPORARY DIVERSION J \ 370 /- [DRAWN TO SCALE] 3.13 TEMPORARY SEDIMENT TRAP ST 3.18 OUTLET PROTECTION OP WgTH /• �r� \ -` /\ 331 TEMPORARY SEEDING I' I , / / \ ♦ \ \ \ \ \ - - - - ` 1 - - - 3.32 PERMANENT SEEDING I n / / -��� - \ - - - '' ---- 1 I SAN MH ----- - I ~/// /' '� / / - - ♦ - - _ - 380 6' 1 I 3.35 MULCH - - MI �D1 Sys SEX. SAN MH _ \ / / // / / / �� 3.39 DUST CONTROL C 9 93 / �- _-- _ O ■ Gh'IENT - - - - -- - -/ ---� - I� I ` -370� IN LIMITS OF DISTURBANCE 97 aw I / y€iG RE r - - - - .� EX. ONEBLOCK ,- j , -•; 9 6' ., V✓ „WALL ' -- _ - �- RESERVED-- _ TORY _ METAL �� SCOPES // �// // / j/ �// E w 4 3 HAND'AIL o fiw _a+,• L .# #7290UILDING 02 X 3 9t _ o DI_ A .� - _ -NEW V.W:-P11�LIC ' I ----------- -- ---� ti 1/ / l / // \ 36 03a-.-•-�614�- - DRAIf�'A;E EASEMENT � -- _------- /}/ / / / ////// - a - - - /ly \4p 0331 \� �� u 026 \\--- \ -- / / B 1 00 s 0300 \ - - 1 S„ OP 98 - - 47' \ 1 1 - - --` - - /� / / / / / / / \ OW TAA4KENANCE GROUND \ - - - - - - - /LB --_- ---__ 12 LOVER SLOPES3.1 OR x�I6 -\<u ■ � - \ � ----i £y- -x_ / Oq - - - - - - , 4 X \ STEEPER (LOW GROW � IN 02 GONG RET - - - - - - _ �° ■ \ - � - - - - � - � - - - x--- ��, TsuMAc) �w HEIGHT 4'-. ,W \ - - - - 052a -\_ �■ \ --- _ ------_---- I I 96 x 42 ALL NrA 6 X �b�W \\� Q W 2 ■ \-� -_-- --� -� - - �� \ / / / \ 5 05 06 �� l cK - a s �s���. D1 - - ---- - \\ 4 • H N. ECGN fT s s �w �W \\ A •' ��- s- ° I /\ ■w1 06 v R \06z .t' .\ �W�w \ 4 0 �-F'v�\_ _9�c-LNAs-_ c-as� c .�-- 38o \ W O� - - _ 'F ---- -�� .. \. -- . \- ANAG€D� / i / D 1 O 7 �W I J . ��••i- I NENI'10'SWM 1.� \ >/ // / / Il S P w EX� M s �� ,(p `�- 00 \?/ 02 ACCESS ® 410, _w �w EX. M \ :fit - - 04 0.7 X. 0 E \ -- _ - ,,X X"� -x- x �- <5 - - - _ - _- -- 02 ]] 27� \�X DPE. 1 "� VER rso ec Aso Leo --_ _ -� 3 -x -� x _ -k c_ \ � oe�F �' �- -� .. � t�0, / / / �3�-701, 06 77 IRSG a 6� Ro - d�. f '�---------� 4G 6,27\) 6TAISERS� / a\ \ 1p 09 Rc O�-v .4/O f 3 AE.CfSS E �^--__-_ - 90- _ _ ------ S' II O --- - - \ - - __-- ---- -- - 7 7 P T - '�� ASEMENT=ac-- L� n ---- ---- - / - - v- 0 C -- _ �40 0- - - - - 7 - ►.C,6zs p �� /\ BATTERY BATTERY ��x- x--------PXJ - -�� _ MM �1"I // /■ '-- ---- - 1 ... , / 163� �1 BUI�`NG B 0 I m. ,I �., ___ STORAGE STORAGE // ----------- X X / ■ / � --- _ \ z '- BUILDING BUILDING / EX. SALES E - NEW SALES � W / � , Iw �--------- SEGMENTe � _... 4 - /III I � � 70 - g �, / I (TO REMAIN) -FFE 416.6Y� _ N o \ I 1 AL LdCK ET., / � � A � � a WALLBMA'IHEIGH 4/ 207� v 1= �, SHIMP ENGINEERING / / . FFE 420.77 \ \ ` / / I / LAND PLANNING SITE DESIGN CIVIL ENGINEERING PROJECT MANAGEMENT W/ 4 ". HAND AIL /-\ �� �- \P -� I X / I 1 / BFE 406.77 ox \ \ I - SERVICE W Design Focused Engineering S RVI E \ aDa RELF\PTION �T�V 15. -_ 1s --._ ___ I �w_ \ s' \ flx .. / I I / s�------ L�UdvIPSTE �> l E EP 10 AO - - Z \ �� U\ / / I / , 912 East High $In;e1 Phone: 43a-227-51a0 / r \ \\\ HEIGHT \' �, -�& Q \ `\ -- -_ �FD, O / I' I 1 1 CMdotlesmlle, VA 22902 shimp-engineenng.com MAX. HEIGHT = 30" �/ n \ r: �630- 1630 ---__ X .5 ► �V j j s v4 ♦.\g 9 BOLLARDS 20 _ o .... .-5 410 ■I i--i--� ----I / . aENc MAaK: ° I 3 j L C O e MAG NA L S T ■ I 1. ELE TLo� qz� oe I 4 � � �1 �1 ■ / � f f 1 W6� I I i � !P � 1 I ..�.. .. EW VARIABLE WIDTH �\/, I I sTn� SHIMP > II , \ \ 1 ■ \ OW MAI TENANCE GRWN /13 1 1e I CCESS EASEMENT � � \ TTT � - 30' �°• \ COVER LOPES 3:1 OR 1 v, p \ \ \ �S _I _ ,. 21 \ STEEPE (LOW GROW d I C EXTENDED �y I. BUILDING Al / I I I I �.1C. .4u51Q83 =_� I I \ FRAGR T SUMAC) / e,\ \ EXISTING I. N/ I I I l A r�✓I �4' o ';\ 12°° y ( cuRB MAHT. z.a' v �s NG SERVICE i2 PROVIDE 4" FRB j FFEAPP a NEW W. P LIC [- I 2 \ t .�2 so a ABOVE TOP OF \ / RE 4 _ \ f � �` �, j j I\ o o R 0 X 40 _ssto>'vnt � _ DRAINAGj ASE NT I ■ 3 X125o x .I V� I PAVEMENT. �� TO MAIN >----- I / 1 I I ^v 3 ./ // I LP Ex.y xy \ Ex. ■ 12 & �I - -� --- - � I I M ��r T.M. 785A To a II II 1 D1 �' 14 a0 STOPS CORNER, LC ) \\\� i \o 0 ! 3 14 1/47' - \ / VSMP PLAN D.B. 4358-684, - �� y BUILDING ALBEMARLE COUNTY, VIRGINIA A / / �� 14 ���490 EXISTING A2 688 PLAT / 4 SERVICE i ,EX MH 1300 RICHMOND FFE APPROX Y w ZONED: HC �I / 414.75 TO REROAD - FLOW MAIN \� 1 1 AUTOMOTIVE sTOP / IL / / 'SIGN ■ � �S \ I \ { �/ I p 1 In 14 / �D 13L7 62° _,�1\--�....�------- I, II IVI N E LP EX. LP EX L EX DI VA n.ILB 6 ', O // � I� RECEPTI ---- - / SUBMISSION: ------.. 76 2020.06.02 / 0 0 § I 5°�� - SHARED '°--- -- REVISION: / 15'° � I 6 � __---� BUILDING A3 I ,/, � ° � �� � ' ° x 01) 2020.10.22 16 I L - a M: NEW AUDI OFFICE B p / NEW V.W. PUBLIC NEW 10' Sw�n A CES i " r' SALES SPACE r BUILDING H // / 02 2021.02.02 ti r,. BUILDING I �f9 L DRAINAGE EASEMENT "\� •-. CS,•,.,. LDIN N so i � G E I / / � / � €EAS MENT FFE FFE � W PORSCHE 19 `\ / 03 2021.04.14 E I \ °° 417.00 � SALES 1s \ / � X. _ � 17 417.00 BUILDING � � / �PP�,oxI�ATE\oCATIOrAOF%� \ \ \ \ V, SIGN v A 15 I _ -- FFE 419.50 �� / NT3AL LEP oNE Go�AN� o /i \ ♦. -w \w t-------� V V V ` V V V V V V \ w I w VI GINI EA EME T ( ♦ W N1EW DI-7 x x i♦ v v v v v v , X 15" CON 6 °■ -PO (LP EX. LP EX. LP . CP H 3�I-j' \ 16R0 x 1So 16s' '' 3 i 19'0 �r19� j / / A AGED o 16 �, S PIES o- 16 xl6 1 17 --- ':`+s:r'. 2p♦ // \\------ / X 7a i �8 LIMITS OF DISTURBANCE 1 g♦/ / FILE NO - - - - -- - - - - SLOPES ■ - - d _ RNAGED Hp F - 0 0 - ---- --- - cns NOT TO ENCROACH 32 X .�6 / cas - cas / EXISTING PARKING 30 � ' -__ _ 3 �` � \ -.:, �� SPACES � 20 \♦�� L' // 19.078 =z q - _ �-. - �s-cas-cas-ws-cns- t ♦/ / D A 9 EX/�� 4 so. __ --- ------ -- ---_ - - _ `\ - ,� ,-- ,1 E&SC PLAN PH 4 .. nns / - -- x 4 / - - - - -ucu, vcu0 c uw ucu �ocuOH ucu- uc 0 cu- 3 E T \ ucu �pcu - u�- ucu __- _ _ _ 2 i '� ,. - - - - - ■ �- , �C MBINED UTILIT. ... .. 8'46" W q �-Z \ ■ NA ■ -ucu-' c' ucv' '�`;J:k1 -i i / // // N / APPR SET ( OINT YEA -ucu NO° / COMBINED UTILITY EASEMENT / / / p _ ___ FO VEPCO, CENTEL &IACSA WM p - u N eea- w- \ / 0/ SHEET C9 OF 15 / \ / FOR VEPCo, CENTEL & / - --- ---- NINGI - -- I I (D.B. 1168-546) VAULT 'SG -� 30 30 60 90 C ^ASCA / APPROXIMATE LOCATION OF 20' WATERLINE EASEMENT I I -��-. \ 1 (D.B. 1327-145) // (�j,6. 1549-598) o 1 - V o .-�_ 9 Scale: 1"=30' 401 391 391 381 381 37 371 STORM PROFILE A1—A6 C10 1" = 30' HORZ 1" = 10' VERT 41STORM PROFILE A3a—E1 11 C10 1 = 30' HORZ 1" = 10' VERT A4 4G 410 m 00 1U N 410 I 0 405 O 3 z 400 IIIr 395 II 390 00 W of 385 "3 405 400 395 390 Izz 10+50 11+aQ5 > > STORM PROFILE A4—A4a � ■=:1e111�■— I� o� � gTlT�ir•,alb�-n�t>•�•T— • 5 :e `A 360 355 350 345 340 335 330 325 420 (A 5) 415 410 x 405 ZC 400 L N rr 395 n D 0 390 > AS DO A . � 1 • �n1I��' c •� I� rr.�.r � ar—r—.r_m••Iw•es••r� • 61E1e!��© iF mf00 C10 1" = 30' HORZ 1" = 10' VERT 10+50 420 415 410 405 400 395 0 D2 D3 425 420 in 415 410 405 0 400 ~ 410 L) I 405 3 z 400 390 3851 On ro a M D 0 0 o - 00 M v� w 115.66 LF - M 0 0 z - o > 10+50 11 +00 >z z 5 STORM PROFILE D2—D3 C10 1" = 30' HORZ 1" = 10' VERT F1 F2 o > 10+50 11 +00 >z z 5 STORM PROFILE D2—D3 C10 1" = 30' HORZ 1" = 10' VERT F1 F2 !97lyMr!/�IIlrli�'ih'69�dX�L'� u ���•lirainii•1ira�i 10+00 10+50 11+00 STORM PROFILE F1—F2 1" = 30' HORZ C10 1" = 30' HORZ 1" = 10'-V€R� 1" = 10' VERT I NEW 20'TP aE1C--- DRAINAGE-EASEMENI` ----ESMTf CONTINUES TO _ PROPERTY LINE. REFER T\ _ ESMT CLASS Al RIP RAP/0 SUB20210 00053 PLAT, AT OUTLET OF F1. - F1 — �-- 3ao — �340 7.5' M N4M4M-W@ — EX. RIP F GRASSED EMERGENCY CONC. CRADLE / '��I I ��`' SPILLWAY- Q 3— NEW V.W. SWM FACILITY EASEMENT � T "���' i --WID,TH, 3:1 SIDE sLOPES,_---�%�,� i / �1 i ES1,7 YR 44 i 0 --- — � RS TOP OF 6' DAM 346 44 40 —_—_ APPROX. 5, SF------_ 0 ND --48"CONC-+RISER X. _ /TRASH RAC FLOp 0 38 � N✓E W' FACILITY AS 50 \ DETENTION BE _ T IN\FROM TiHE WE 'Al - N \ C`NS ALL AND AIN CE -56 SHALL E F E TE - 60 SIDE\TO A ID R C _ 60 S V vv 8 DETENTION POND OUTLET F1 C 1 0 SCALE: 1 "=30' r l CLASS Al RIP RAP OUTLET OF DITC, �7.7.5' MINIMUM WIDTH/ 40 LENGTH, 9" DEPTH. / / I IR dA`F� 14•BW—tiNING, r—�, PLACE�R}�RA�TO-- _ /� / '. ARMOR THE DAM OPPOSITE INCOMING I DITCH _ INEW V.W. PUBLIC ro C�ODRAINAGE EASEMENT 360 355 350 )6' �345 340 335 330 5 11+5U A L TACKWEL[ ALL AROL #6 X 1 SPACER (TYPICAL PLAN VIEW L 72" J ORESSURE RELIEF +OLES 1 /2" DIA. A MIN. )RT BAR SI: REBAR 425 420 415 410 405 11+54N0 _CA.1n) M A3 6 un � B1 B2 OO J m O r M �i u - 0 00 a I— N U UJ a ¢ o_ TI -- -- --- I„111 25.50LF — o ---- x a --_------ NcY ------ '------- 117.58 - M M 0 co 0 10+50 11+00 11+50 12+00 +50 13+00 13+50 O > 4+ m Z >Z > o- Z Z_ > CO > z M Z z_ > z O3 STORM PROFILE A3-132 1 = 3U HUKL 1" = 10' VERT Existing Storm Conveyance Channel Calculations Q2 Q10 Channel Bottom Channel Side Side Channel Q2 Q10 Mannin SCC g's Velocity Depth (cfs) (cfs) Shape Width (ft) Depth Slope 1 Slope 2 Slope N (fps) (ft) To Pond 11.51 18.05 Trapezoid 3 0.67 2:1 2:1 0.25 0.03 10.077 0.407 To Stream 5.09 16.70 Trapezoid 3 0.67 2:1 2:1 0.05 0.03 4.605 0.597 IM UILL111111/riA/ - TECHNICAL NOTE TN 2.02 Minimum and Maximum Cover Heights for Corrugated HOPE Pipe (per ASTM F2648) May zozo Introduction The information in this document is designed to provids answers to general cover height questions; the data provided is not intended to be used far project design. The design procedure described in the Structures section (Section 2) of the Drainage Handbook provides detailed information for anatyang most common installation conditions. This procedure should be utilized for project specific designs. The two common cover height concerns are minimum cover in areas exposed to vehicular Me and maximum cover heights. Either may be Considered 'worst case° scenario from a loading perspective, depending on the project conditions. Minimum Cover in Traffic Applications Pipe diametersfrom 4-through 48-inch (100-1200 mm) installed in traffic areas (AASHTO H-25 or HS-25 loads) must have at least one foot (0.3m) of cover over the pipe crown, while 60-inch (1500 mm) pipe must have at least 24 inches (0.6m) of cover. The backfill envelope must be constructed in accordance with the Installation section (Section 5) of the Drainage Handbook and the requirements of ASTM D2321. The backfill envelope must be of the type and compaction listed in Appendix A5, Table A-5-2A of the Drainage Handbook. In Table 1 below, this condition s represented by a Class II material compacted to 90%standard Proctor dens although other material can rovide similar strength at slightly lower levels of compaction. riY. 9 P tren9 9 ty P Structural backfill material should extend to the crown of the pipe; the remaining cover should be appropriate for the installation and as specified by the design engineer. If setttement or rutting is a concem, it maybe appropriate to extend the structural backfill to grade. Where pavement is involved, sub -base material can be considered in the minimum burial depth. While rigid pavements can be included in the minimum Cover, the thickness of flexible pavements should not be included in the minimum Cover. Additbnal information that m affect the Cover requirements is included in the Installation section Section 5 of the Drainage may req ( ) ag Handbook. Some examples at what may need to be considered am temporary heavy equipment, construction leading , paving equipment and similar loads that are less than the design load, the potential of pipe flotation, and the type of surface treatment which will be installed overtire pipe cone. Please note ttetTable land 3 am based on the installation of N-12 and MEGA GREEN (per ASTM F2648) pipe under pavement using a uniform bwkfill type and compaction level, as depicted in Figure 1. Table 1 Minimum Cover Requirements for N-12eand MEGAGREENTM Pipes (per ASTM F2648) with AASHTO H-25 or HS-25 Load Inside DlID, Minimum curs Inchens finum rum feet m 4(101(1200) 1(0.3) 80 (1500) 2 (0.6) Maximum Cover Wall thrust generally governs the maximum cover a pipe Can withstand and conservative maximum cover heights will result when using the information presented in the Structures section (Section 2) of the Drainage Handbook The maximum burial depth is highly influenced by the type of backfill and level of compaction around the pipe. General maximum cover limns fix NA2 and MEGA GREEN (per ASTM F2648) pipe are shown in Table 3 fora variety of backfill conditions. Table 3 was developed assuming pipe is installed in accordance with ASTM D2321 and the Installation section (Section 5) of the Drainage Handbook. Additionally the calculations assume no hydrostatic load around the pipe, incorporate the maximum safety factors represented in Structures section of the Drainage Handbook, use material properties consistent with the expected performance characteristics far N-12 and MEGA GREEN (per ASTM F2648) materials as shown in Table 2 below, and assume the native sail (irHsihi) is of adequate strength and is suitable for installation. For applications requiring fill heights greater than those shown in Table 3 or where hydrostatic pressure due to groundwater is present, contact an ADS engineering representative. Figure 1 ADS N-12 and MEGAGREEN (per ASTM F2648) Trench Detail Under Pavement F T MIN.COVERTO MIN.COVERENRIGID PAVEMENT, H FLE%IBLE pAVEMENT, H L SPRINGLINEFILL UNCH 4'(100 mm)FORDDING 1-24"Him rum - flan rum)PIPE 6'(150mm)FOR — SUITABLE 30'-60'(750 mm-1500 mm)PIPE MIN. TRENCH WIDTH FOUNDATION Table 2 ADS N-12 and MEGAGREEN (per ASTM F2648) Mechanical Properties sil Design Compressive Design Ten He Initial So- or Cell Class Fu E Fu E Strain (%) Strain (°,) i i i i ASTM D3350 424420C-410" 9.7 4.0 3,000 110,000 800 21,000 435420C-12-60" Note: Minimum covers presented hem were calculated assuming Class It beclMll material compacted to 90%standard Proctor floo density mound the pipe and structural ba�N M the crown ofthe pipe, as mconrmendedin Section 5 of the Drainage Handbook, with an ackifionallayerWcnmpacled halite lane sub -base fora total coveres will In shallow IreFic installations, especially where pavement is involved, a good quality compacted material to grade is required W prevent surface seMement and nufing. 1e90TRUEMRtI •W. HI11RIm,0Hol26 (Willi snroo"Item0 1 2 1610TRUEMON &VD. HIDWN, OHA'ffie sociallrosul"P.mn ATN2.02 •ADS2r120 ATN2.02 OADS2020 10 1 HDPE PIPE COVER NOTES \ C1 0)NOT TO SCALE TOP STIFFENER NOT REQUIRED TOP IS 14 GAGE CORRUGATED METAL OR 1/8" STEEL PLATE. PRESSURE RELIEF HOLES MAY BE OMMITTED, IF ENDS OF CORRUGATIONS ARE LEFT FULLY OPEN WHEN THE TOP IS ATTACHED. CYLINDER IS 16 GAGE CORRUGATED METAL PIPE OR FABRICATED FROM 1 /8» STEEL PLATE. NOTES: 1. THE CYLINDER MUST BE FIRMLY FASTENED TO THE TOP OF THE RISER. 2. SUPPORT BARS ARE WELDED TO THE TOP OF THE RISER OR ATTACHED BY STRAPS BOLTED TO TOP OF RISER. 4d I SECTION A —A ISOMETRIC ANTI —VORTEX TRASH RACK 9 DETENTION POND TRASH RACK C10 NOT TO SCALE 12 Tr • o o cape I ppOppO00c e'9 Op 00 *a0!0,0a*,, N • 0, popoe� •°d 00000 o p o�01 • a• d•p° • Isuun�lr it i 11N11' TRASH RACK yr lun'e nml. riot¢ .r, o.r„r a Inewtr III" Vlxe• nnA •.mine xr ... ..r... n„I. • dlo•u rue eylinllul Inn. I11' Vr.o,. xun i tale,[ m :cox xr ..Mmne s.,lmbm- lu,..,r ,.anal PL\STI(. \ or u a. m x la e0noes (iirMWr IA _^.ODI 1\f. m1-1111-ern 11 ORIFICE TRASH RACK DETAIL CIO NOT TO SCALE 410 ',405 F C400 0 r= 390 0305 SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Street Phone: 4M-227-5140 Charlottesville, VA 22902 shimpengireering.com U STIN .SHIMP � Lic. . 45183 ssillAIAT M J VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. STORM DETAILS SHEET C10 OF 15 1 = 3U HUKL 1" = 10' VERT Existing Storm Conveyance Channel Calculations Q2 Q10 Channel Bottom Channel Side Side Channel Q2 Q10 Mannin SCC g's Velocity Depth (cfs) (cfs) Shape Width (ft) Depth Slope 1 Slope 2 Slope N (fps) (ft) To Pond 11.51 18.05 Trapezoid 3 0.67 2:1 2:1 0.25 0.03 10.077 0.407 To Stream 5.09 16.70 Trapezoid 3 0.67 2:1 2:1 0.05 0.03 4.605 0.597 IM UILL111111/riA/ - TECHNICAL NOTE TN 2.02 Minimum and Maximum Cover Heights for Corrugated HOPE Pipe (per ASTM F2648) May zozo Introduction The information in this document is designed to provids answers to general cover height questions; the data provided is not intended to be used far project design. The design procedure described in the Structures section (Section 2) of the Drainage Handbook provides detailed information for anatyang most common installation conditions. This procedure should be utilized for project specific designs. The two common cover height concerns are minimum cover in areas exposed to vehicular Me and maximum cover heights. Either may be Considered 'worst case° scenario from a loading perspective, depending on the project conditions. Minimum Cover in Traffic Applications Pipe diametersfrom 4-through 48-inch (100-1200 mm) installed in traffic areas (AASHTO H-25 or HS-25 loads) must have at least one foot (0.3m) of cover over the pipe crown, while 60-inch (1500 mm) pipe must have at least 24 inches (0.6m) of cover. The backfill envelope must be constructed in accordance with the Installation section (Section 5) of the Drainage Handbook and the requirements of ASTM D2321. The backfill envelope must be of the type and compaction listed in Appendix A5, Table A-5-2A of the Drainage Handbook. In Table 1 below, this condition s represented by a Class II material compacted to 90%standard Proctor dens although other material can rovide similar strength at slightly lower levels of compaction. riY. 9 P tren9 9 ty P Structural backfill material should extend to the crown of the pipe; the remaining cover should be appropriate for the installation and as specified by the design engineer. If setttement or rutting is a concem, it maybe appropriate to extend the structural backfill to grade. Where pavement is involved, sub -base material can be considered in the minimum burial depth. While rigid pavements can be included in the minimum Cover, the thickness of flexible pavements should not be included in the minimum Cover. Additbnal information that m affect the Cover requirements is included in the Installation section Section 5 of the Drainage may req ( ) ag Handbook. Some examples at what may need to be considered am temporary heavy equipment, construction leading , paving equipment and similar loads that are less than the design load, the potential of pipe flotation, and the type of surface treatment which will be installed overtire pipe cone. Please note ttetTable land 3 am based on the installation of N-12 and MEGA GREEN (per ASTM F2648) pipe under pavement using a uniform bwkfill type and compaction level, as depicted in Figure 1. Table 1 Minimum Cover Requirements for N-12eand MEGAGREENTM Pipes (per ASTM F2648) with AASHTO H-25 or HS-25 Load Inside DlID, Minimum curs Inchens finum rum feet m 4(101(1200) 1(0.3) 80 (1500) 2 (0.6) Maximum Cover Wall thrust generally governs the maximum cover a pipe Can withstand and conservative maximum cover heights will result when using the information presented in the Structures section (Section 2) of the Drainage Handbook The maximum burial depth is highly influenced by the type of backfill and level of compaction around the pipe. General maximum cover limns fix NA2 and MEGA GREEN (per ASTM F2648) pipe are shown in Table 3 fora variety of backfill conditions. Table 3 was developed assuming pipe is installed in accordance with ASTM D2321 and the Installation section (Section 5) of the Drainage Handbook. Additionally the calculations assume no hydrostatic load around the pipe, incorporate the maximum safety factors represented in Structures section of the Drainage Handbook, use material properties consistent with the expected performance characteristics far N-12 and MEGA GREEN (per ASTM F2648) materials as shown in Table 2 below, and assume the native sail (irHsihi) is of adequate strength and is suitable for installation. For applications requiring fill heights greater than those shown in Table 3 or where hydrostatic pressure due to groundwater is present, contact an ADS engineering representative. Figure 1 ADS N-12 and MEGAGREEN (per ASTM F2648) Trench Detail Under Pavement F T MIN.COVERTO MIN.COVERENRIGID PAVEMENT, H FLE%IBLE pAVEMENT, H L SPRINGLINEFILL UNCH 4'(100 mm)FORDDING 1-24"Him rum - flan rum)PIPE 6'(150mm)FOR — SUITABLE 30'-60'(750 mm-1500 mm)PIPE MIN. TRENCH WIDTH FOUNDATION Table 2 ADS N-12 and MEGAGREEN (per ASTM F2648) Mechanical Properties sil Design Compressive Design Ten He Initial So- or Cell Class Fu E Fu E Strain (%) Strain (°,) i i i i ASTM D3350 424420C-410" 9.7 4.0 3,000 110,000 800 21,000 435420C-12-60" Note: Minimum covers presented hem were calculated assuming Class It beclMll material compacted to 90%standard Proctor floo density mound the pipe and structural ba�N M the crown ofthe pipe, as mconrmendedin Section 5 of the Drainage Handbook, with an ackifionallayerWcnmpacled halite lane sub -base fora total coveres will In shallow IreFic installations, especially where pavement is involved, a good quality compacted material to grade is required W prevent surface seMement and nufing. 1e90TRUEMRtI •W. HI11RIm,0Hol26 (Willi snroo"Item0 1 2 1610TRUEMON &VD. HIDWN, OHA'ffie sociallrosul"P.mn ATN2.02 •ADS2r120 ATN2.02 OADS2020 10 1 HDPE PIPE COVER NOTES \ C1 0)NOT TO SCALE TOP STIFFENER NOT REQUIRED TOP IS 14 GAGE CORRUGATED METAL OR 1/8" STEEL PLATE. PRESSURE RELIEF HOLES MAY BE OMMITTED, IF ENDS OF CORRUGATIONS ARE LEFT FULLY OPEN WHEN THE TOP IS ATTACHED. CYLINDER IS 16 GAGE CORRUGATED METAL PIPE OR FABRICATED FROM 1 /8» STEEL PLATE. NOTES: 1. THE CYLINDER MUST BE FIRMLY FASTENED TO THE TOP OF THE RISER. 2. SUPPORT BARS ARE WELDED TO THE TOP OF THE RISER OR ATTACHED BY STRAPS BOLTED TO TOP OF RISER. 4d I SECTION A —A ISOMETRIC ANTI —VORTEX TRASH RACK 9 DETENTION POND TRASH RACK C10 NOT TO SCALE 12 Tr • o o cape I ppOppO00c e'9 Op 00 *a0!0,0a*,, N • 0, popoe� •°d 00000 o p o�01 • a• d•p° • Isuun�lr it i 11N11' TRASH RACK yr lun'e nml. riot¢ .r, o.r„r a Inewtr III" Vlxe• nnA •.mine xr ... ..r... n„I. • dlo•u rue eylinllul Inn. I11' Vr.o,. xun i tale,[ m :cox xr ..Mmne s.,lmbm- lu,..,r ,.anal PL\STI(. \ or u a. m x la e0noes (iirMWr IA _^.ODI 1\f. m1-1111-ern 11 ORIFICE TRASH RACK DETAIL CIO NOT TO SCALE 410 ',405 F C400 0 r= 390 0305 SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Street Phone: 4M-227-5140 Charlottesville, VA 22902 shimpengireering.com U STIN .SHIMP � Lic. . 45183 ssillAIAT M J VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. STORM DETAILS SHEET C10 OF 15 IM UILL111111/riA/ - TECHNICAL NOTE TN 2.02 Minimum and Maximum Cover Heights for Corrugated HOPE Pipe (per ASTM F2648) May zozo Introduction The information in this document is designed to provids answers to general cover height questions; the data provided is not intended to be used far project design. The design procedure described in the Structures section (Section 2) of the Drainage Handbook provides detailed information for anatyang most common installation conditions. This procedure should be utilized for project specific designs. The two common cover height concerns are minimum cover in areas exposed to vehicular Me and maximum cover heights. Either may be Considered 'worst case° scenario from a loading perspective, depending on the project conditions. Minimum Cover in Traffic Applications Pipe diametersfrom 4-through 48-inch (100-1200 mm) installed in traffic areas (AASHTO H-25 or HS-25 loads) must have at least one foot (0.3m) of cover over the pipe crown, while 60-inch (1500 mm) pipe must have at least 24 inches (0.6m) of cover. The backfill envelope must be constructed in accordance with the Installation section (Section 5) of the Drainage Handbook and the requirements of ASTM D2321. The backfill envelope must be of the type and compaction listed in Appendix A5, Table A-5-2A of the Drainage Handbook. In Table 1 below, this condition s represented by a Class II material compacted to 90%standard Proctor dens although other material can rovide similar strength at slightly lower levels of compaction. riY. 9 P tren9 9 ty P Structural backfill material should extend to the crown of the pipe; the remaining cover should be appropriate for the installation and as specified by the design engineer. If setttement or rutting is a concem, it maybe appropriate to extend the structural backfill to grade. Where pavement is involved, sub -base material can be considered in the minimum burial depth. While rigid pavements can be included in the minimum Cover, the thickness of flexible pavements should not be included in the minimum Cover. Additbnal information that m affect the Cover requirements is included in the Installation section Section 5 of the Drainage may req ( ) ag Handbook. Some examples at what may need to be considered am temporary heavy equipment, construction leading , paving equipment and similar loads that are less than the design load, the potential of pipe flotation, and the type of surface treatment which will be installed overtire pipe cone. Please note ttetTable land 3 am based on the installation of N-12 and MEGA GREEN (per ASTM F2648) pipe under pavement using a uniform bwkfill type and compaction level, as depicted in Figure 1. Table 1 Minimum Cover Requirements for N-12eand MEGAGREENTM Pipes (per ASTM F2648) with AASHTO H-25 or HS-25 Load Inside DlID, Minimum curs Inchens finum rum feet m 4(101(1200) 1(0.3) 80 (1500) 2 (0.6) Maximum Cover Wall thrust generally governs the maximum cover a pipe Can withstand and conservative maximum cover heights will result when using the information presented in the Structures section (Section 2) of the Drainage Handbook The maximum burial depth is highly influenced by the type of backfill and level of compaction around the pipe. General maximum cover limns fix NA2 and MEGA GREEN (per ASTM F2648) pipe are shown in Table 3 fora variety of backfill conditions. Table 3 was developed assuming pipe is installed in accordance with ASTM D2321 and the Installation section (Section 5) of the Drainage Handbook. Additionally the calculations assume no hydrostatic load around the pipe, incorporate the maximum safety factors represented in Structures section of the Drainage Handbook, use material properties consistent with the expected performance characteristics far N-12 and MEGA GREEN (per ASTM F2648) materials as shown in Table 2 below, and assume the native sail (irHsihi) is of adequate strength and is suitable for installation. For applications requiring fill heights greater than those shown in Table 3 or where hydrostatic pressure due to groundwater is present, contact an ADS engineering representative. Figure 1 ADS N-12 and MEGAGREEN (per ASTM F2648) Trench Detail Under Pavement F T MIN.COVERTO MIN.COVERENRIGID PAVEMENT, H FLE%IBLE pAVEMENT, H L SPRINGLINEFILL UNCH 4'(100 mm)FORDDING 1-24"Him rum - flan rum)PIPE 6'(150mm)FOR — SUITABLE 30'-60'(750 mm-1500 mm)PIPE MIN. TRENCH WIDTH FOUNDATION Table 2 ADS N-12 and MEGAGREEN (per ASTM F2648) Mechanical Properties sil Design Compressive Design Ten He Initial So- or Cell Class Fu E Fu E Strain (%) Strain (°,) i i i i ASTM D3350 424420C-410" 9.7 4.0 3,000 110,000 800 21,000 435420C-12-60" Note: Minimum covers presented hem were calculated assuming Class It beclMll material compacted to 90%standard Proctor floo density mound the pipe and structural ba�N M the crown ofthe pipe, as mconrmendedin Section 5 of the Drainage Handbook, with an ackifionallayerWcnmpacled halite lane sub -base fora total coveres will In shallow IreFic installations, especially where pavement is involved, a good quality compacted material to grade is required W prevent surface seMement and nufing. 1e90TRUEMRtI •W. HI11RIm,0Hol26 (Willi snroo"Item0 1 2 1610TRUEMON &VD. HIDWN, OHA'ffie sociallrosul"P.mn ATN2.02 •ADS2r120 ATN2.02 OADS2020 10 1 HDPE PIPE COVER NOTES \ C1 0)NOT TO SCALE TOP STIFFENER NOT REQUIRED TOP IS 14 GAGE CORRUGATED METAL OR 1/8" STEEL PLATE. PRESSURE RELIEF HOLES MAY BE OMMITTED, IF ENDS OF CORRUGATIONS ARE LEFT FULLY OPEN WHEN THE TOP IS ATTACHED. CYLINDER IS 16 GAGE CORRUGATED METAL PIPE OR FABRICATED FROM 1 /8» STEEL PLATE. NOTES: 1. THE CYLINDER MUST BE FIRMLY FASTENED TO THE TOP OF THE RISER. 2. SUPPORT BARS ARE WELDED TO THE TOP OF THE RISER OR ATTACHED BY STRAPS BOLTED TO TOP OF RISER. 4d I SECTION A —A ISOMETRIC ANTI —VORTEX TRASH RACK 9 DETENTION POND TRASH RACK C10 NOT TO SCALE 12 Tr • o o cape I ppOppO00c e'9 Op 00 *a0!0,0a*,, N • 0, popoe� •°d 00000 o p o�01 • a• d•p° • Isuun�lr it i 11N11' TRASH RACK yr lun'e nml. riot¢ .r, o.r„r a Inewtr III" Vlxe• nnA •.mine xr ... ..r... n„I. • dlo•u rue eylinllul Inn. I11' Vr.o,. xun i tale,[ m :cox xr ..Mmne s.,lmbm- lu,..,r ,.anal PL\STI(. \ or u a. m x la e0noes (iirMWr IA _^.ODI 1\f. m1-1111-ern 11 ORIFICE TRASH RACK DETAIL CIO NOT TO SCALE 410 ',405 F C400 0 r= 390 0305 SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Street Phone: 4M-227-5140 Charlottesville, VA 22902 shimpengireering.com U STIN .SHIMP � Lic. . 45183 ssillAIAT M J VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. STORM DETAILS SHEET C10 OF 15 Maximum Cover Wall thrust generally governs the maximum cover a pipe Can withstand and conservative maximum cover heights will result when using the information presented in the Structures section (Section 2) of the Drainage Handbook The maximum burial depth is highly influenced by the type of backfill and level of compaction around the pipe. General maximum cover limns fix NA2 and MEGA GREEN (per ASTM F2648) pipe are shown in Table 3 fora variety of backfill conditions. Table 3 was developed assuming pipe is installed in accordance with ASTM D2321 and the Installation section (Section 5) of the Drainage Handbook. Additionally the calculations assume no hydrostatic load around the pipe, incorporate the maximum safety factors represented in Structures section of the Drainage Handbook, use material properties consistent with the expected performance characteristics far N-12 and MEGA GREEN (per ASTM F2648) materials as shown in Table 2 below, and assume the native sail (irHsihi) is of adequate strength and is suitable for installation. For applications requiring fill heights greater than those shown in Table 3 or where hydrostatic pressure due to groundwater is present, contact an ADS engineering representative. Figure 1 ADS N-12 and MEGAGREEN (per ASTM F2648) Trench Detail Under Pavement F T MIN.COVERTO MIN.COVERENRIGID PAVEMENT, H FLE%IBLE pAVEMENT, H L SPRINGLINEFILL UNCH 4'(100 mm)FORDDING 1-24"Him rum - flan rum)PIPE 6'(150mm)FOR — SUITABLE 30'-60'(750 mm-1500 mm)PIPE MIN. TRENCH WIDTH FOUNDATION Table 2 ADS N-12 and MEGAGREEN (per ASTM F2648) Mechanical Properties sil Design Compressive Design Ten He Initial So- or Cell Class Fu E Fu E Strain (%) Strain (°,) i i i i ASTM D3350 424420C-410" 9.7 4.0 3,000 110,000 800 21,000 435420C-12-60" Note: Minimum covers presented hem were calculated assuming Class It beclMll material compacted to 90%standard Proctor floo density mound the pipe and structural ba�N M the crown ofthe pipe, as mconrmendedin Section 5 of the Drainage Handbook, with an ackifionallayerWcnmpacled halite lane sub -base fora total coveres will In shallow IreFic installations, especially where pavement is involved, a good quality compacted material to grade is required W prevent surface seMement and nufing. 1e90TRUEMRtI •W. HI11RIm,0Hol26 (Willi snroo"Item0 1 2 1610TRUEMON &VD. HIDWN, OHA'ffie sociallrosul"P.mn ATN2.02 •ADS2r120 ATN2.02 OADS2020 10 1 HDPE PIPE COVER NOTES \ C1 0)NOT TO SCALE TOP STIFFENER NOT REQUIRED TOP IS 14 GAGE CORRUGATED METAL OR 1/8" STEEL PLATE. PRESSURE RELIEF HOLES MAY BE OMMITTED, IF ENDS OF CORRUGATIONS ARE LEFT FULLY OPEN WHEN THE TOP IS ATTACHED. CYLINDER IS 16 GAGE CORRUGATED METAL PIPE OR FABRICATED FROM 1 /8» STEEL PLATE. NOTES: 1. THE CYLINDER MUST BE FIRMLY FASTENED TO THE TOP OF THE RISER. 2. SUPPORT BARS ARE WELDED TO THE TOP OF THE RISER OR ATTACHED BY STRAPS BOLTED TO TOP OF RISER. 4d I SECTION A —A ISOMETRIC ANTI —VORTEX TRASH RACK 9 DETENTION POND TRASH RACK C10 NOT TO SCALE 12 Tr • o o cape I ppOppO00c e'9 Op 00 *a0!0,0a*,, N • 0, popoe� •°d 00000 o p o�01 • a• d•p° • Isuun�lr it i 11N11' TRASH RACK yr lun'e nml. riot¢ .r, o.r„r a Inewtr III" Vlxe• nnA •.mine xr ... ..r... n„I. • dlo•u rue eylinllul Inn. I11' Vr.o,. xun i tale,[ m :cox xr ..Mmne s.,lmbm- lu,..,r ,.anal PL\STI(. \ or u a. m x la e0noes (iirMWr IA _^.ODI 1\f. m1-1111-ern 11 ORIFICE TRASH RACK DETAIL CIO NOT TO SCALE 410 ',405 F C400 0 r= 390 0305 SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Street Phone: 4M-227-5140 Charlottesville, VA 22902 shimpengireering.com U STIN .SHIMP � Lic. . 45183 ssillAIAT M J VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. STORM DETAILS SHEET C10 OF 15 Note: Minimum covers presented hem were calculated assuming Class It beclMll material compacted to 90%standard Proctor floo density mound the pipe and structural ba�N M the crown ofthe pipe, as mconrmendedin Section 5 of the Drainage Handbook, with an ackifionallayerWcnmpacled halite lane sub -base fora total coveres will In shallow IreFic installations, especially where pavement is involved, a good quality compacted material to grade is required W prevent surface seMement and nufing. 1e90TRUEMRtI •W. HI11RIm,0Hol26 (Willi snroo"Item0 1 2 1610TRUEMON &VD. HIDWN, OHA'ffie sociallrosul"P.mn ATN2.02 •ADS2r120 ATN2.02 OADS2020 10 1 HDPE PIPE COVER NOTES \ C1 0)NOT TO SCALE TOP STIFFENER NOT REQUIRED TOP IS 14 GAGE CORRUGATED METAL OR 1/8" STEEL PLATE. PRESSURE RELIEF HOLES MAY BE OMMITTED, IF ENDS OF CORRUGATIONS ARE LEFT FULLY OPEN WHEN THE TOP IS ATTACHED. CYLINDER IS 16 GAGE CORRUGATED METAL PIPE OR FABRICATED FROM 1 /8» STEEL PLATE. NOTES: 1. THE CYLINDER MUST BE FIRMLY FASTENED TO THE TOP OF THE RISER. 2. SUPPORT BARS ARE WELDED TO THE TOP OF THE RISER OR ATTACHED BY STRAPS BOLTED TO TOP OF RISER. 4d I SECTION A —A ISOMETRIC ANTI —VORTEX TRASH RACK 9 DETENTION POND TRASH RACK C10 NOT TO SCALE 12 Tr • o o cape I ppOppO00c e'9 Op 00 *a0!0,0a*,, N • 0, popoe� •°d 00000 o p o�01 • a• d•p° • Isuun�lr it i 11N11' TRASH RACK yr lun'e nml. riot¢ .r, o.r„r a Inewtr III" Vlxe• nnA •.mine xr ... ..r... n„I. • dlo•u rue eylinllul Inn. I11' Vr.o,. xun i tale,[ m :cox xr ..Mmne s.,lmbm- lu,..,r ,.anal PL\STI(. \ or u a. m x la e0noes (iirMWr IA _^.ODI 1\f. m1-1111-ern 11 ORIFICE TRASH RACK DETAIL CIO NOT TO SCALE 410 ',405 F C400 0 r= 390 0305 SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Street Phone: 4M-227-5140 Charlottesville, VA 22902 shimpengireering.com U STIN .SHIMP � Lic. . 45183 ssillAIAT M J VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. STORM DETAILS SHEET C10 OF 15 PL\STI(. \ or u a. m x la e0noes (iirMWr IA _^.ODI 1\f. m1-1111-ern 11 ORIFICE TRASH RACK DETAIL CIO NOT TO SCALE 410 ',405 F C400 0 r= 390 0305 SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Street Phone: 4M-227-5140 Charlottesville, VA 22902 shimpengireering.com U STIN .SHIMP � Lic. . 45183 ssillAIAT M J VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. STORM DETAILS SHEET C10 OF 15 STONE 70' MIN. CONSTRUCTION ACCESS 3" SM-2A ASPHALT TOP `COURSE 2% �( 2% STONE CONSTRUCTION ACCESS 2% 5" M:N, 21A AGGREGATE BASE PROFILE MIN. - ASPHALT PAVED WASHRACK 2% 2% 12' MIN.* *MUST EXTEND FULL WIDTH `---® POSITIVE DRAINAGE I TO SEDIMENT OPERATION OF INGRESS AND EGRESS II TRAPPING DEVICE PLAN 12' EXISTING PAVEMENT EXISTING SITIVE DRAINAGE SEDIMENT 4PPING DEVICE FILTER CLOTH J _--` SECTION A -A A ]lllllil lull water tap of 1 hich lllust be histalled v6t11 a llllllilll[1111 1 hich ballcock shutoff value supplyhig a wash hose with a diameter of 1.5 itiches for adequate constant pressure. Wasli water unlst be carried away frolli the entrance to an approved settling area to remove seduuellt. All sedfirletlt shall be prevented from ellteLiLig stoma drams, ditches or watercourses. PAVED WASH RACK NO SCA_E PAVED CONSTRUCTION ENTRANCE (CE Not To Scale TABLE; 3.31-C TEMPORARY SEEDING PLANT MATERIALS, SEEDING BATPS, AND DATES N M w oo SEEDING RATE NORTH* SO[TrHS PLANT all 5/1 8/IS 2I15 Sll 9l1 SPECIES CHARACTERISTICS Acw loon a' m to to to to to 4I30 Blls Illl d/30 9l1 11/I5 OATS l W. (up to TOO lbs., 21be. X - Use spring varieties (e.g., Noble). (/� vewl not bee thin 5016a.) RYE° 2 W. (9p n 110 IN.. 2.5 IN. % - X X - % Use (or lue fill xdivga, winter raga's � na Ims tlan so Ibs.) er. rmemte6 cold me lmv mimrre. GERMAN MILLET SO lbs. epprox, l lb. - X - - X - Wumwew vmuW. Dies at firer (Styria ileliul (trot. Mry b eddd to summer miiea. ANNUAL RYEGRASS` b01he. 19 IN. % - % X X Mry be 4dded b mian. Will (� mmd-n0r9m1 mow mrt nr l,lnet etarm. WEEPING IS lbs. 5'h X Wum-season permoid, Mry LOVEGRASS booth. Tolerator hd, dry slops (EeusaiE curvWal and aia, bfenile it.. My be added to mixes. KOREAN 2516e. eppmx. 1'h % X - Warm season amlW legume. LESPEDEZA` IN. T9lerats mid it.. May M f <eocde sue) eddei to miiw. " Northern Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and coastal Plain. e May be used as a cover crop with spring seeding. a May be used as a cover crop with fall seeding. X May be planted between these dates. - May nal be planted between these dates. 2 TEMPORARY SEEDING 011 j Not To Scale RIGHT-OF-WAY DIVERSION (RWD Not To Scale Compacted Soil 18" min. Flow 4.5' min. � DIVERSION DIKE (DD) PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20 Ibs/acre. May 1 through August 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Foxtoil Millet - 20 Ibs/acre. August 16 through October 31: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20 Ibs/acre. November 1 through February 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 Ibs/acre; Winter Rye - 20 lbs/acre. MULCHING SPECIFICATIONS: Straw or hay at a rate Of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from CITY Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 Ibs. per acre of 10-20-10 (10 bs. per 1,000 square feet) or equivalent. LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) For slopes steeper than 3:1 grade, Mix the following seeds at 30 Ibs/acre each, along with EC-2 Matting (Total 150 lbs/acre): Virginia Wildrye (Elymus virginicus), Little Bluestem Grass (Schizachyrium scoporium), Purpletop (Tridens flovus), Broomsedge (Andropogon virginicus), and Indian Grass (Sorghostrum nutons). 5 )PERMANENT SEEDING (PS C11 Not To Scale GRAVEL CURB INLET SEDIMENT FIL TER GRAVEL FILTER RUNOFF WATER SEDIMENT J CONCRETE GUTTER 12" WIRE MESH FILTERED WATER a, e' .:''..Pr .. IF J 12"� CURB INLET SPECIFIC APPLICATION r�l THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE 6 INLET PROTECTION (IP) f 11 Not To Scale WE MNitER s Er n¢xltss A 1• TM. e MX. R r' T0.. E V TM. W 2• TOL. e STEEL N.44X1461 r1^N"4.0ap e" xr 24• 24 le•.060• ar 4- 2" n^ WN 1 - tt• 24'.060' w^ 4r 49- 24- n-/3o•,ors^ '. sr 4- a6-o7s^ +r e0- se^M. le^ 7e^ 4• 5`1 W. -/.I 87' CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE S UPPOR T) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 6'MAX. FLOW] 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. .01 FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,VA. DSWC Sherwood and Wyant 8 ITEMPORARY SILT FENCE (S C11 Not To Scale PLATE. 3.05-2 Sediment Trap Design Data Weir DA Wet Wet Area 1 Dry �o� Area No. A B C H Z (ft.) Lengt (Acs. Vol. D1 Vol. Cy (sq. Vol. D2 2 (sq. (ft) h ) (Req.) (ft) (Prov.) ft.) (Req.) (ft.) Cy ft.) (ft.) (PCy 1 394.0 392,0 389.0 2.O 3.0 14.6 2.44 163.5 3.0 178.0 1860.0 163.5 2.0 167.4 2660. 0 2 384 382 379.0 2 2.0 5.4 0.90 60.0 3.0 60.0 680.0 60.0 2.O 68.7 1176.0 •• 1 (EXCAVATED) +/ \FILTER CLOTH \ ORIGINAL GROUND EL=C ELEV. *SEE PLATE 3.13-1 COARSE AGGREGATE CLASS I RIPRAP CROSS SECTION OF OUTLET CLASS I RIPRAP LENGTH (IN FEET) _ 6 X DRAINAGE AREA (IN AC.) /DIVERSION DIKE 1 ' / COARSE AGGREGATE / EXCAVATED !/FILTER CLOTHj��� AREA �� **COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 OUTLET (PERSPECTIVE VIEW) 9 )TEMPORARY SEDIMENT TRAP (ST C11 j Not To Scale Id NKLH WIIK Nu ULNINLU CHANNEL PIPE OUTLET CONDITIONS W=dO+ La I f La _ depth SECTION A -A FILTER CLOTH KEY IN 6"-9°; RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. Lo IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. (MIN.) IPE OUTLET TO WELL EFINED CHANNEL Specifications OP Location do (in) 3do (in) La (ft) d50 (in) depth (in) W (ft) Condition Al Outlet 1.5 4.5 6 6.0 9.0 4.5 Channel Ditch Outlet Into Pond - - 40 6.0 9.0 7.5 Channel F1 Outlet 2.5 7.5 16 6.0 9.0 7.5 Channel Class Al Riprop for all outlets 10 OUTLET PROTECTION C11 Not To Scale SOIL STABILIZATION MATTING SLOPE INSTALLATION FILL SLOPE SECTION SOIL STABILIZATION MATS SHOULD toBE INSTALLED VERTICALLY Q 5' DOWNSLOPE FOR BEST RESULTS. 0 TOE MAINTAIN SLOPE ANGLE SLOPE LINING (WET SLOPE) TREATMENT - 2_ POLYPROPELYENE NON -WOVEN (NEEDLE PUNCHED) GEOTEXTILE FILTER CLOTH (BEHIND TREATMENT SOIL BOTTOM OF CUT SLOPE 7 NOTE: SLOPE SURFACE SHALL BE SMOOTH AND FREE OF Q ROCKS, LUMPS OF DIRT, GRASS AND STICKS. MAT SHALL BE PLACED FLAT ON SURFACE FOR PROPER SOIL CONTACT. 4' DIRT SHALL BE TAMPERED PRIOR TO LAYING TOP LAP OVER BERM TRENCH INTO BERM AND PROGRESS DOWNSLOPE SLOPE LINING (DRY SLOPE) BOTTOM OF FILL BOTTOM OF CUT TREATMENT - 2 OR SHOULDER BREAK POINT 11 BLANKET MATTING BM C11 Not To Scale TOP of CUT SLOPE TABLE 335-A ORGANIC MULCH MATERIALS S AND APPLICATION RATES RATES: MULCHES: NOTES: Per Acre Per 1000 sq. ft. Straw or Hay 1§ - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower winter cover) or by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 15001bs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf areas. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 195 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 Its nitrogen per ton. Do not use in fine turf mew. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 Co. 1-2 Col. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. " When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2D00 lbs./ac. or 45 lbs./1000 sq. ft. SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Street Phone: 4M-227-5140 Chadoaesvllle, VA 22902 shimpengineering.com U STIN - SHP 45183IM VW11112" S%rtAIAT M J VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. E&SC DETAILS SHEET C11 OF 15 C11 ) Not To Scale ES-2 END SECTION Not To Scale Not To Scale C11 T.M. 78-58G1 PANTOPS CORNER, LC. D.B. 4358-684, 688 PLAT ZONED: HC POA PREDEV DRAINAGE AREA TO POA 4 0.271 AC WITHIN LIMITS OF DISTURBANCE, CN = 95 TOC = 5 MINS T.M. 78-5A PANTOPS CORNER, LC D.B. 4358-684, 688 PLAT ZONED: HC — — — — ' ... ------- \\ �\ JSp \\ \�\ ` \\` 3-� '~��• ♦�. 0/ \ I—��/ `— —/ YR FLOODPLAII�„__ - Yid ./ �' �- - __-___ - SUMMARY OF DRAINAGE AREAS DISTURBED AREA UNDISTURBEDAREA DA AREA (AC) CN AREA (AC) CN TO PDA 1 DIRECTLY 1.615 88 0.068 67 TO EX DET PIPE, THEN P0A1 0.874 96 1.198 95 TO POA 2 1.02 65 1.82 65 TO POA 3 0.316 98 1.534 94 TO PDA 4 0.271 95 TO POA 5 1 0.3541 92 yR'F aDPLAIN — �,�,' --___ - --_ �----------\--- ----- y / - --___-I no , PREDEV DRAINAGE AREA TO POA 2 — ,---� — — — — — _ — — _ _ - - --- --__ / _ ' -- �.— ——------- —350 1.02 AC WITHIN LIMITS OF DISTURBANCE, CN = 65 ------------ 1.82 AC OUTSIDE LIMITS OF DISTURBANCE, CN = 65 ----- - ---- \ --- / - �� TOC = 5 MINS 350_ — � / I �\ �1_,-_ \ \ \` / /• iL0 DPLa/N-� gyp - _-__ — — — _ _•-� �_ \� �V � A v�V Av ` ` V vv vvv v�A\ � _ \�-• , �� —360— .\ \ \ \ \ \- � ---------- - - - - - - - - - - - - I \ // .00 1 / / / \ \ \ \ — --— ' — — --'' \\/tt` —37 / \ "go I/ \ . \ \ \\ - ;;--- �_ I I HSG B ---___ %,' ---- - - - -- %/, 37 ------------__ _ — 380 y \ �390 X�Y—Yr—Xc--yr�, _ ♦ -! -____ —370 EX. ONE _ I STO I I �� kl�k�-- ---_ _•'��•`�� v� .. �. I I'll & BLOCK BUILMETALDING •.� X� _ .• .. — I 1 #1290 I __ xnftn y _ _ ,_ I� 11\ ___-.-._ --- - +.xd 'LAW \•1 \\\__-__ __----- ----- - -190, _ r _ - PREDEV DRAINAGE AREA TO POA 1 00 410 M" 1.615 AC WITHIN LIMITS OF DISTURBANCE, CN = 88 ----- ---- -= -- - -- — --- — MH 0.068 AC OUTSIDE LIMITS OF DISTURBANCE, CN = 67 - --* _ -------------- - —_— — �___ } --- - — 7 390- -- — --- TOC = 5 MINS 40, / / r 40 — --- — _ EX. ONE STORY STUCCO i /f W/ BASEMENT 170 y SG D \ 71D \ v -4is \ to ` , \ \ \ 0, I NAG NNA ML 9 T r U - ' \ r s, PREDEV DRAINAGE AREA TO POA 3 I I 0.316 AC WITHIN LIMITS OF DISTURBANCE, CN = 98 1.534 AC OUTSIDE LIMITS OF DISTURBANCE, CN = 94 %' I I TOC = 5 MINS / , / • \ \s EX. ONE STORY SIUCCO & BLOCK Bi d PREDEV DRAINAGE AREA TO EXISTING DETENTION SYSTEM & POA 1 ♦ _ `� 0.874 AC WITHIN LIMITS OF DISTURBANCE, CN = 96 \ ♦ —��'~" 1.198 AC OUTSIDE LIMITS OF DISTURBANCE, CN = 95 TOC = 5 MINS - --' --' _ _ I 1 \ \ — — — — _----------- -- l� l I, lili�liill/^--------- i ///T�/q 0,'�4 F/ FRS, LC 111 i i 1DI1'i/ 110-71—_----- ,' � l bl .l.b 571��91—TkIR 5�-8' i P It \' / 1 f3p-701, / I 1 I --- Il�i�lil I \ 1\\ �\\ • \ l /, j _ ��_ __ — V--.a �� --410 I it a•I •�.. �.. N — O \ 420 / P 0 �'>r+•rr �.. �.rr�arc�ii.�.rli wE✓r�-�r..rE 11 I I - / PREDEV DRAINAGE AREA TO POA 5 3354 AC WITHIN LIMITS OF DISTURBANCE, CN = 92 TOC = 5 MINS \ \ 40 0 Scale: 1 "=40' SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High Sliest Phone: 434-227-5140 CharlottesNlle. VA 22902 shimp-engineenng.wm U STIN .SHIMP � Lic. . 45183 w �SS7n•.r4t �� VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. 19.078 PRE DEVELOPMENT DRAINAGE MAP SHEET C12 OF 15 C12 T.M. 78-58G1 PANTOPS CORNER LC. D.B. 4358-684, 688 PLAT ZONED: HC PREDEV DRAINAGE AREA TO POA 4 0.105 AC WITHIN LIMITS OF DISTURBANCE, CN = 65 TOC = 5 MINS STORMWATER MANAGEMENT NARRATIVE \\ \\_- Runoff from the site is analyzed at five points, labeled POA1 thru POA5. The drainage areas to t\ \ `\ points of analysis 1 thru 3 are separated into disturbed and undisturbed area, since the ....... improvement factor is only applied to the disturbed portions. Points of analysis 4 and 5 include onlydisturbedarea, since adisturbances create no change o e drainage patterns outside the limits of disturbance in those areas. Drainage areas to POA 1 are further separated into \ - ---= _- \ \ \, \ \ \\ \� �\ \ I - ... _... _... \ \ \ \.- -_, _ '- ._ .._ _ � ' _ \��_ drainage to the existing detentions stem on site and drainage straight to POA 1. All end up at \ ` ` \\ \ \ \` --------_---; - _ _..._..._..._..._...- POA 1, but this separation was usedo ensure that the existing detention system will continue to _ _ -----' - ------------- X. function as designed. The post -development drainage area acreage and curve number to the N,\ � \ \ existing detention system are less than in pre -development conditions. Runoff to POA 1 is held in a detention pond and released at a peak flow rate that complies with channel protection \ \ ` r`�. _ ----- requirements set forth in 9VAC25-870-66-B3 (energy balance equation). Floodpr otection is met as runoff is outlet into a mapped floodpI in.Runoff to all other points of analysis complies with\\ 7 9 -, --- - , ' '----- _ \\\ flood protection requirements as the post -development 10 yr, 24 hr storm is released at a peak / / — —360- ` —_ -\ .�� \\ flow rate less than in pre -development conditions. Channel protection requirements are met at all \ \ �' ` �� — — - S G B points of analysis. POA 1 - POA 4 are analyzed according to 9VAC25-870-66(B)(3). POA 5 is \ `\ \ - analyzed according to 9VAC25-870-66(B)(1)(a). \ �� \ �\ \\ PdS IK -QRAI AREA TO PffA 2 O A f \ - -- �� ��� \ `\\\,S 0 �3 i A 1�VITHTId LlM D§T BANCE \,N � 61 — — \\�\�� \�0 AAYR -C��QWrS`IDE -LtMI O� Dh�T�R�Aid E,--OR} \ -- `Al.\ `\\ �� `\`36 5 INS, _ / SUMMARY OF DRAINAGE AREAS ♦♦\\\\\\\\\\\\\\ \\ \ `�\ '�•\ •�YR FLOODPL i �_--_ __ ---- _ ^`-- / 350 DISTURBEDAREA UNDISTURBEDAREA DA AREA (AC) CN AREA (AC) CN TO PDA 1 DIRECTLY 3.13 89 0.692 58 TO EX DET PIPE, THEN POA1 0.571 98 1.238 95 TO PDA 2 0.236 61 1.18 58 TO PDA 3 0.123 95 1.506 97 TO PDA 4 0.105 65 TO PDA 5 0.315 93 —360— — � _ � — ) \I �\ � �'' SUMMARY OF STORMWATER QUANTITY CALCULATIONS � 1 ■y \ `\ 3y50\ A-C-,WITHM-0mil�S-01' 1� _ I _ _ \ II ,''/ / , ` \ \ \\\ \ Q I�RBANCEr-CN-=�� - 3�D � - - /.',' //' — — — — — — , I� \ �6 PG OUTSIDE" uS OF,--- • _ — y---------- 1O - ,'''''- �- - ___ =_='; \ \ 7 \\ \ ISTUnANCE,�C---_ _ POA QIALLOWABLE (cfs) Q1 PROPOSED (cfs) Q10 PRE (cfs) Q10 POST (cfs) 1 8.85 4.83 27.97 38.21* 2 1.41 0.49 7.29 3.74* 3 7.48 6.92 14.39 12.91 4 1.11 0.09 2.12 0.38 51 NAI 1.221 2.67 2.41 *Discharges to Mapped Floodplain - — — —_ —__----------__''�'''//// -- 5 M1NS 360— -.-.< -- ___ __- 1 a --- ♦ `__ ``_ `-� y_c_r. y-� � _ � � III � / �/ , / ,/, �,i i jr \I 1 1 \ ____ ----_---\\ - _ _ � -'-- _ ter\ '+w ♦ � II III � ----_ � / / /'i-- ______ `\ /\ _- _ ------ - - - \ — -._ --- — _ — J - l �. 4i 9 - -,'�'` __ V - p7�� '.` ?. �... 1 , \\ �\ `- ,�' // / I I /j I I D/'7'1 A/10-71 _ ' j a b A- ,- SHIMP ENGINEERING � - , �•y•- \ 1 I 1 l ` � _ — — / , / (a . I �I$7 1, �F \ LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT �410 � M ._. _ \ \\\ 1 ` _ _ _ _ _ _ _ - ' i � / /l 'l 'l 'III 1 H 1 ' 91 � \ - Design Focused Engineering ■■■■■■ M 'w _ - _ _ IIII���� �a _ � — i / / / {I3{. I 3p — 912 East High Sliest Phone: 431-227-5140 —1 701, 5J� - _ _ _ _-390- - — - / / ' ' / Ill y -' - _ - _ - -� -� l j n Chatl tl II VA 22902 _—___--A __--------_-- —� �I J I'/O o esvi e. skimp-engi�enng.com r __ _ Lt1 7 P A T _ £SSE ENT 40 ACC AS M N _ _ —400— �- — ---- -----____ _--__--- / , I IZ;JjV D:I NCI e 4 F _ Im '40 — / V STIN SHIMP Lic. .45t183 _`� \ \ I. EW VARIAB`M LE DTH ` 1 \/ ' \ . CESS EASEMENT I P�TQ_EV DRAINAGF, AREA TO PO 3 i i I1 I till l /' 1 1 WITHIN LIMIT OF DISTU BANCE, CN = 95 /1 �- 0 C 0 1 I E OF DIST RBANCE, CN = r' I I l I �l' l - i --¢ - _ - `vj _ M i I i Ali I VSMP PLAN I ---'' ALBEMARLE COUNTY, VIRGINIA T.M. 78-5A I O TPANTOPs CORNER, Lc XT A E AREA 1300 RICHMOND T D.B. 4358-684, E TO SYSTill i ,-- ROAD FLOW 688 PLAT & POA 1 / 410 ZONED: HC 0.571 AC WITHIN LIMITS AUTOMOTIVE is U --i �I I 1 2 8 A TjiDI IT _/4 i •=:ayy�.. `♦ -�_ --_ - i — - SUBMISSION: / _ - ( 2020.06.02 PORTION OF POSTDEV v ' /�- v..- V ,' DRAINAGE AREA TO POA 1 REVISION: � ; � ,_� \ / , / / i -�v ,/ / / /' 01) 2020.10.22 HSG B % / /' `� �i�, ,� / / _ ,02) 2021.02.02 '/f i II - 03) 2021.04.14 `\ POSTDEV DR - '.TO --- \ mi EXISTING DETENTION __ - �------- _ — — -- __---_ /�J --- -- ---f ---, w_ _, , ;� /--_ --- FILE NO - 19.078 Oi It . II �1 �, I_h�S-i7+�_, POST DEVELOPMENT �' / POSTDEV DRAINAGE AREA TO POA 5 a 1 N -- =, DRAINAGE MAP \ 0.315 AC WITHIN LIMITS OF DISTURBANCE, CN = 93 ` N \ TOC = 5 MINS \ \ �\ \ \ `\ , / / \ \ --\ - \ ( \ \ \ , \ \ \ \ I/ , \ _ , ' SHEET C13 OF 15 ME I ME Scale: 1"=40' C13 T.M. 78-58G1- PANTOPS CORNER, D.B. 4358-684, -------''--- i_---I 688 PLAT \ I \ \', .,- ,_ ��------------------------ ZONED: HC / CLASS Al RIP RAP / - - / AT OUTLET OF F1. F7 - �- - FLOOOPLAIN _ ---_- \ - \30.-340— �340- 7.�' MWIMHM-0.9BT \- — — �00 �� I • _-_ -- GRASSED EMERGENCY CONC. CRADLE f _' I �. --- \ SPILLWAY- 7• i��������� �� i--�`_--_--------- \-iVl H, 3:1 SIDE SLOPS f 1���--_---/ 4 5/�-_----`-_--- `\`--___-__ _ ---_-_ YY / �\��� �•100 YR FLOODPL 'i�'�_ -_-_-____ -_-_- ^`__-`-- -_' /- ''--_-_-' \ \ _ - \\ `� \\ `- �� - — -- \ - /- \�.\ _----- - 350 - - __-__- - -48"CONC RISER- '- \ \ \ `\ \ ` �\ �\ `-�� - �_ /TRASH RACI / / --_-- �'•�- `\ -` --- \� �\ '� � / -'- — /' II O'49�A_C LASS Al RIP RAP \ \\ \ \ \ \\\\\ -- \ - \`-ra FLOODPL / , T OUTLET OF DIT I / `\ \ \ -\\ \ \ \- _ - 5' MINIMUM WID C = 0.H� \ \ \\ \ \ \ \\ \\�- - - - / 0' LENGTH, 9" DEPTH._ -- I CE RIP-RAP.OVER `\\ \\ \\ - - IRAfi114BM�LINING,---__-�/ - ARMOR CE`RIFd2D TO-_ - - - - - - -36 / OPPOSITE INCOMING °- - \ DE TION -BASIN �O"BE - v_- / E _-- - DITCH �1T INIFROM E LOWER SIDE \C`1\1 CTl AND MAINTENRNLE -_ _ ' 1/1, __--___\ y \ 8 \ \ \ \ \ \\ '$ MOH - 6O 1 I / `\ \ HAL E F E EASTERN SIDE A ID NRBA CT RN � LOPES -- - ----- i \ 1 - --- --____ 1 / _ - \ _ 370 -----RT17AF AT - ql -` �I \-___-__^__-- -_-- \\ \I /� -------------'i i OUTLET_45'-- ES-r- _------MINIMUM WIDTH 1\\ ___-__ _'__---_-'' I / / / ( - - --- `- _ --- - \--------' / \ \ / /// , , '/ - '-------------- _ < - - - - \ ` - --- 360 - III - I - - -� --- ,_-_-- m 1 I11 I I \ 11 ,' _____ - STR. A3a - - - -- ---- - - ---- / // / / ,'/'/' r-- -- - - - - - - I 1 I \ 0.05 AC - \ - - - // ' -- \\ / (■ten � - C - 0.73 -_ _ `--- - \�- ` � —--'--_-----'__- - -' � I I I � � _ - — - �// - I l i � i / '///'/ /, / �- - _ Bp' 6' - - \ - 11 I I I I /\ a' l / / / / / / // /// / i� 0. 5 AC; C = 0. 7 NE 4 `• --\ - II I 1 -_-__ y7 �/' /I / / // /////// /'-------- OF\ \ \ `- / ■■_■■ DI- A / -� ``\ - ___-\ \ rrAVti1 N1�I I -----_-_ /\ // // / / // / / ////' '------ / =n •• - `- - III I1-________ // /' / // / ////// / /' - DP--- --\ \ 11111 \ \ _---____-__ ____-__--__ // / / / % // / / /' \\ \\ \` -- ` �_— — -_ - - - - - - - - - - - r \I\\\ \ ; — \----------------- ------ ------------ ---- — — --- ---- - -- `-_-- ---- - -- - _ ---- ---- i / / i ill -`---- ------------ ST DI ----- - ----_ --- ---- �- 0.49 ■ �o� - / / %l/ b!�. 4,51�5791'T+iR 57-8 i 41 N ♦■ B�DPE.1 _ ��� --■ - -_- --- - ---_- -- -_ - /{B.I 3�-701, / --- C -„ a �\ _-_-_- --- = 3so - _ - _ _---- / M 707 P AT / _ ■ �— _ - -- / r A f55EASEMENT TH— �0�1 1 I --___ V 404_ ❑ PC-__- -- -400- - _-------__-- - _-_-_ _ - Z�J�JLD: EiS _ \ / \ �0 STIR. A4 h - .14 AC ffw \ \\ \\------- ------------- \ \ - ENC I��� _-- - -_ _ 1 oo d e - — I EW VARIABLE 'MDTH ---- 11 \1 \\ d�29 A ■ / �S\ASEMENT ------ -\� \✓i - / / / \ / - C\-0.8- I I alto ■■lt■■ ■■lt■■lt■■lt■■ ■�■■lt■■lt■■lt■■ ■■ 1 I �, --- I I I l / ' T.M. 78-5A I D, PANTOPS CORNER, LC D.B. 4358-684,'- - 688 PLAT '/ /' i p I / � �A,o ZONED: HC //� I 1' I I / ' I , I I - INC 0 00 1.7 -----_ ; Ij I 71 -- i / ■ STR. D2 ■ \\ /�" / // / 10 AC C 0.90 NIEW DI-7So \ - --- STR. D3 ----- \ I t2 AC \------ 3 \ `---------------- -------- N e C = 0.84 / `-_________--__-_-- — 0 \ ♦/ / / ' �-410—_ - _--_____-----�'- _410 � -\\\ � \ � ♦ / / JAI _ / / / _ 40 0 40 80 12 SHIMP ENGINEERING LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 912 East High S1me1 Phone: 434-227-5140 Clusiottesmile, VA 22902 skimp-engineenng.wm U STIN .SHIMP � Lic. 4 . 5183 A �Ivl i � ,a�Jw1I VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. 19.078 INLET DRAINAGE MAP SHEET C14 OF 15 C14 Scale: 1 "=40' LD-204 Stormwater Inlet Computations Inlets on Grade Only Sag Inlets Only E U 2 (n N ~ m E o a)C n O U NO Q E L O ,� O W U '-' C ro E (Lj is U Ci > >O, t c10i a <p F Cy Z y C C 2 n O U N 0 n N %� > a o N x C9 .O• (,J 'O co m a1 F rA § U O L n 0 > C U W o aai V Ol c Ci v N tillC T m C7 L ani (] O n o 0 O = 0 U 2 N a (n O O n a 1 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 22 23 1 24 (ft) (ac) (in/hr) (cfs) (cfs) (cfs) (ft/ ft) ( ft/ ft) (ft/ ft) (ft) (ft) (cfs) (cfs) (ft) (ft) (ft) D3 DI-36 10 0.42 0.84 0.35 6.5 2.30 - 2.296 0.013 0.035 0.037 0.21 0.50 0.42 5.82 0.35 4.0 1.41 - 1.413 0.013 0.16 0.50 0.31 4.20 A5a* DI3B 6 0.41 0.85 0.35 6.5 2.27 - 2.268 0.013 0.054 0.025 0.080 0.22 0.50 0.44 4.38 0.35 4.0 1.40 - 1.396 0.013 0.16 0.50 0.32 1.99 E1 DI-313 6 0.49 0.82 0.40 6.5 2.59 - 2.592 0.013 0.0247 0.037 0.080 0.24 0.50 0.48 4.16 0.40 4.0 1.60 - 1.595 0.013 0.17 0.50 0.35 2.36 B2 DI-3B 12 0.26 0.70 0.19 6.5 1.21 - 1.205 0.013 0.089 0.020 0.080 2.42 0.17 100% 1.21 0.00 0.19 4.0 0.74 - 0.742 0.013 1.75 0.14 100% 0.74 0.00 131 DI313 6 0.05 0.77 0.04 6.5 0.25 - 0.246 0.013 0.089 0.020 0.080 1.16 0.09 100% 0.25 0.00 0.04 4.0 0.15 - 0.151 0.013 0.97 0.08 100% 0.15 0.00 A3a DI3A 4 0.05 0.73 0.04 6.5 0.24 - 0.237 0.013 0.015 0.015 0.09 0.50 0.17 5.81 0.04 4.0 0.15 - 0.146 0.013 0.06 0.50 0.13 4.21 A6 DI-3B 10 0.29 0.89 0.25 6.5 1.65 - 1.651 0.013 0.027 0.030 0.17 0.50 0.35 5.76 0.25 4.0 1.02 - 1.016 0.013 0.13 0.50 0.25 4.17 A4a DI3C 12 0.14 0.62 0.09 6.5 0.58 - 0.580 0.013 0.01 0.013 0.06 0.50 0.12 4.91 0.09 4.0 0.36 - 0.357 0.013 0.05 0.50 0.09 3.55 A4 DI-36 6 0.14 0.65 0.09 6.5 0.60 - 0.602 0.013 0.027 0.045 0.12 0.50 0.25 2.75 0.09 4.0 0.37 - 0.370 0.013 0.09 0.50 0.18 1.99 A3 D1-3C 12 0.49 0.85 0.41 6.5 2.69 - 2.686 0.013 0.02 0.020 0.18 0.50 0.35 8.86 0.41 4.0 1.65 - 1.653 0.013 1 1 1 1 0.13 1 0.50 1 0.26 6.41 1 LLD-204 INLET CALCULATIONS C15 LD-229 Storm Drain Design Computations 1300 Richmond Road From Point To Point Catch A (ac) Runoff Coef Inc AC Accum AC Tot Tc (min) Tot Int(10yr) (in/hr) Tot Flow(10yr)(cfs) Up Inv El Dn Inv El Pipe Len (ft) Inv S % Pipe Dim (in) Pipe Cap (cfs) Velocity (ft/s) Flow time Inc (min) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 F2 F1 38.21 338.00 337.50 64.3 0.78% 30 40 9.1 0.12 D3 D2 0.42 0.84 0.35 0.35 5.00 7.10 2.51 411.00 406.73 115.66 3.69% 15 14 8.6 0.22 A5a A5 1.08 0.82 0.89 0.89 5.00 7.10 6.30 405.10 399.62 78.78 6.96% 15 18 13.6 0.10 E1 A3a 0.49 0.82 0.40 0.40 5.00 7.10 2.83 390.80 389.45 208.05 0.65% 15 6 4.6 0.75 B2 B1 0.26 0.70 0.19 0.19 5.00 7.10 1.32 392.40 392.23 25.5 0.65% 15 6 3.8 0.11 B1 A3a 0.05 0.77 0.04 0.22 5.00 7.10 1.59 392.03 389.45 117.58 2.20% 15 11 6.1 0.32 A3a A3 0.05 0.73 0.04 0.66 5.00 7.10 4.68 389.25 387.69 240.12 0.65% 15 6 5.1 0.78 A6 A5 0.29 0.89 0.25 0.25 5.00 7.10 1.80 402.04 399.62 20.17 12.00% 15 24 11.6 0.03 A5 A4 1.14 5.00 7.10 8.10 399.42 393.95 66.18 8.27% 15 20 15.5 0.07 A4a A4 0.14 0.62 0.09 0.19 5.00 7.10 1.35 395.77 393.95 75.22 2.42% 15 11 6.0 0.21 A4 A3 0.14 0.65 0.09 1.42 5.00 7.10 10.10 389.95 387.69 28.24 8.00% 15 20 16.2 0.03 A3 A2 0.49 0.85 0.41 2.49 5.00 7.10 17.71 384.69 382.99 64.13 2.65% 18 19 11.9 0.09 A2 Al 2.49 5.00 7.10 17.71 376.78 375.00 55.48 3.21% 18 20 12.6 0.07 2 LLD-229 STORM DRAIN CALCULATIONS C15 Flow Pantops LD-347 Hydraulic Grade Line n= 0.012 Junction Loss Outlet Water Inlet Water Structure Surface Surface Number Elev.* Do Oo Lo Sfa% Ht VD Ho O; Vi Qivi Hi Angle Ho Ht 1.3*Ht 0.5Ht Final H Elev. Rim. Elev (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) A2 377.98 1.50 17.70 55.5 2.42% 1.34 12.6 0.62 17.70 11.9 211.2 0.77 39 0.95 1.57 0.78 2.127 380.11 387.46 A3 385.89 1.50 17.70 64.1 2.42% 1.55 11.9 0.55 4.68 5.1 24.0 0.14 73 0.25 0.80 1.04 0.522 2.074 387.96 400.39 A3a 390.25 1.25 4.68 240.1 0.45% 1.07 5.1 0.12 1.59 6.1 9.7 0.20 41 0.25 0.37 0.49 0.243 1.315 391.56 403.75 Bl 393.03 1.25 1.59 117.6 0.05% 0.06 6.1 0.15 1.32 3.8 4.9 0.08 90 0.15 0.30 0.39 0.194 0.254 393.29 396.85 B2 393.40 1.25 1.32 25.5 0.04% 0.01 3.8 0.07 0.00 0.0 0.0 0.00 0 0.00 0.07 0.09 0.043 0.052 393.45 396.85 *Outlet WSE is listed as the greater of either the calculated tailwater or the invert out. LD-347 HYDRAULIC GRADE LINE CALCULATIONS COUNTY OF ALBEMARLE Department of Community Development Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signal and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the Lille sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatmenl(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide scaled computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage must be within platted casements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions: fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers - biofrlter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biel titer media must be an approved stale mix. 13. Access roads - show location of access roads, surface treatment. drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. VSMP AS -BUILT REQUIREMENTS 5 C15 Flow Automotive Pond Riser Buoyancy Calculation Riser Dimensions: D= 48 H= 6.66 'above pond bottom Riser Volume= 83.7 cubic feet Buoyant Force =p*V = 62.41 b/cf *61.1 cf Buoyant Force = 5222 Ibs 1.25x BF = 6528 Ibs (factor of safety) Volume of Concrete in Riser Thickness=6" around 48" diameter Concrete Volume = 56.9 cf Base Weight =p*V = 150 1 b/cf * 44.2 Riser Weight= 8535lbs Riser Weight > 1.25*Bouyant Force RISER FLOTATION ANALYSIS sP - Rivanna River Nutrient Bank Certificate No, James-039 July 16, 2020 KENDRA PATRICK, EIT Project Engineer Shimp Engineering, P.C. 912 East High St. Charlottesville, VA 22902 Kendra(a)Shimp-Engineerinq.com With a copy to: Buddy Thomas ( loth omas(c�f Iowa uto. com Owner: Flow 1300 Richmond LLC Contact: Buddy Thomas ( bthomas(a)flowauto.com) Project: 1300 Richmond Road Project No.: 19.078 DEQ SWM No.: Location: 1300 Richmond Road Charlottesville, VA 22911 Coordinates: (38.03497,-78.45035) Legal Reference: TMP 78-6 & 78-7 Receiving Water: Meadow Creek H UC 12: 020802040401 Estimated Credits Required: 2.59 lb Dear Kendra and Mr. Thomas, SHIMP ENGINEERING ro LAND PLANNING I SITE DESIGN I CIVIL ENGINEERING I PROJECT MANAGEMENT Design Focused Engineering 0 912 East High S1met Phone: 401-227-5140 Chatlottesmile, VA 22902 shimp-engineenng.wss This letter is to confirm the availability to your project (referenced above ) of authorized Nutrient Credits sufficient to meet the your estimated requirements of 2.59 Nutrient Credits at our Rivanna River nutrient offset credit bank facility (the "Bank"). The Bank has been registered with the Virginia Department of Environmental Quality (DEQ). These Nutrient Credits are generated and managed under the terms of the Reduction Implementation Plan for the Bank dated November 2017, which was authorized by (DEQ) on September 5, 2018. The Bank has been authorized to provide Nutrient Credits for use in the .lames River watershed. These credits are transferable to those entities regulated under DEs Sloetre; Water Management program in accordance with VA Code 62.1-44.15:27. If we can provide further assistance please feel free to contact our office. Hotel Street Capi C, Bank Sponsor By Its M er Thomas m oss 1 540-68 -0171 ,Rivanna River Nutrient Offset Trading Bank, 31 Garrett Street, Warrenton, Virginia 20186 NUTRIENT CREDIT AVAILABILITY LETTER U STIN , SHP 45183IM w �SSrnrr.t �� VSMP PLAN ALBEMARLE COUNTY, VIRGINIA 1300 RICHMOND ROAD - FLOW AUTOMOTIVE SUBMISSION: 2020.06.02 REVISION: 01) 2020.10.22 02) 2021.02.02 03) 2021.04.14 FILE NO. STORM DETAILS SHEET C15 OF 15 C15