Loading...
HomeMy WebLinkAboutSDP202000024 Plan - Revision 2021-04-19 (2)GENERAL CONSTRUCTION NOTES FOR SITE PLANS (SOURCE: ALBEMARLE COUNTY ENGINEERING & PUBLIC WORKS POLICIES) 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR, THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL: VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE ALBEMARLE COUNTY DIRECTOR OF ENGINEERING, OR THE DIRECTOR'S DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). URCE: ALBEMARLE COUNTY ENGINEERING & PUBLIC WORKS POLICI 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND CONTROL SEDIMENT REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS FOR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOA.M. TO 9:00 P.M. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. MISCELLANEOUS NOTES 1. BASED ON GRAPHIC DETERMINATION, THE PROPERTY DESCRIBED HEREON LIES WITHIN FLOOD ZONE "X", AREAS OUTSIDE OF THE 0.2% ANNUAL CHANCE FLOODPLAIN, AS DETERMINED BY THE UNITED STATES FEDERAL EMERGENCY MANAGEMENT AGENCY, AND AS SHOWN ON THE FLOOD INSURANCE RATE MAP (FIRM) NUMBERS 51003CO278D WITH AN EFFECTIVE DATE OF FEBRUARY 4, 2005. 2. THIS PROPERTY IS SERVED BY PUBLIC WATER THROUGH ALBEMARLE COUNTY SERVICE AUTHORITY. 3. THE CONTRACTOR SHALL VERIFY ALL UTILITY INFORMATION PRIOR TO CONSTRUCTION TO INCLUDE TYPE AND SIZE OF PIPE AND SERVICES TO HIS OWN SATISFACTION. 4. THE COORDINATES AND ELEVATIONS SHOWN ARE TIED TO THE STATE PLANE COORDINATE SYSTEM. 5. HORIZONTAL DATUM: VIRGINIA STATE PLANE SOUTH ZONE NAD83 6. VERTICAL DATUM: NAVD88 GENERAL UTILITY NOTES 1. CONTACT MISS UTILITY AT 1-800-552-7001 48 HOURS PRIOR TO ANY GRADING OR DIGGING TO HAVE UNDERGROUND UTILITIES MARKED. THE CONTRACTOR SHALL VERIFY ALL UTILITY INFORMATION PRIOR TO CONSTRUCTION TO INCLUDE TYPE AND SIZE OF PIPE AND SERVICES TO HIS OWN SATISFACTION. 2. ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN TAKEN FROM AVAILABLE RECORDS. THE CONTRACTOR IS REQUIRED TO DIG TEST PITS IN ADVANCE OF TRENCHING IN ORDER TO DETERMINE THE EXACT LOCATION AND ELEVATION AT CROSSINGS. IF A CONFLICT IS, DISCOVERED, NOTIFY WW ASSOCIATES AT (434) 984-2700. PRIOR TO BEGINNING INSTALLATION OF UTILITIES, CONTRACTOR SHALL VERIFY INVERTS AT ALL CONNECTIONS WITH EXISTING UTILITIES PRIOR TO PURCHASING OR ORDERING ANY PRECAST STRUCTURES. 3. ALL HYDRANT LOCATIONS TO BE APPROVED BY THE ALBEMARLE COUNTY FIRE MARSHAL PRIOR TO FINAL APPROVAL BY THE COUNTY AND ARE TO BE INSTALLED ACCORDING TO COUNTY STANDARDS. 4. ALL BLASTING REQUIREMENTS TO INSTALL UTILITIES SHALL REQUIRE A PERMIT AND SHALL BE PERFORMED IN ACCORDANCE WITH THE ALBEMARLE COUNTY STANDARDS AND THE PROJECT SPECIFICATIONS. 5. ALL STORM SEWER SHALL BE CONSTRUCTED IN ACCORDANCE WITH VDOT SPECIFICATIONS SECTION 302 AND SECTION 232 AND AS SPECIFIED ON THE DRAWINGS. 6. THE CONTRACTOR IS REQUIRED TO PERFORM ALL TESTS REQUIRED BY THE COUNTY, ALBEMARLE COUNTY SERVICE AUTHORITY, AND RIVANNA WATER AND SEWER AUTHORITY TO SECURE ACCEPTANCE OF ALL UTILITIES. 7. ALL CONCRETE USED IN UTILITY CONSTRUCTION SHALL BE 4000 PSI CONCRETE IN ACCORDANCE WITH VDOT SPECIFICATION SECTION 217. 8. NO PLANTINGS OR ERECTION OF OTHER OBSTRUCTIONS SHALL BE MADE WITHIN FOUR FEET OF ANY FIRE HYDRANT.ALL HYDRANT BRANCHES SHALL HAVE A MINIMUM COVER OF 3.0'. 9. ALL UTILITIES TO BE PLACED UNDER EXISTING COUNTY STREETS MUST BE BORED OR JACKED UNLESS SPECIFICALLY APPROVED OTHERWISE OR NOTED ON THE PLANS. 10. WATER METERS SHALL BE LOCATED IN AN ACCESSIBLE LOCATION AND SHALL NOT BE INSTALLED UNDER EXISTING PIPING OR CLOSE TO OTHER FACILITIES. 11. WATER AND SEWER UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALBEMARLE COUNTY SERVICE AUTHORITY AND RIVANNA WATER AND SEWER AUTHORITY WATER AND SEWER CONSTRUCTION SPECIFICATIONS EXCEPT AS SPECIFIED IN GENERAL NOTE 13. 12. ALL PRIVATE WATERLINES SHALL BE PVC SCHEDULE 40. 13. A 10 FOOT HORIZONTAL SEPARATION SHALL BE MAINTAINED UNLESS OTHERWISE SPECIFIED BETWEEN ALL WATER LINES AND SANITARY SEWER LINES IN ACCORDANCE WITH STATE HEALTH DEPT. STANDARDS. 14. 20' WIDE EASEMENTS, CENTERED ON THE PIPELINE AND APPURTENANCES SHALL BE DEDICATED TO THE ALBEMARLE SERVICE AUTHORITY, EXCEPT WHERE THE LINE IS IN A PUBLIC ROAD RIGHT-OF-WAY. 15. 3' MIN. SEPARATION REQUIRED BETWEEN WATERLINE AND STORM SEWER CULVERTS OR 6" SEPARATION WHEN WATERLINE IS INSULATED. USE 1/2" THICK THERMA-CEL PIPE INSULATION IN 3'x4' SHEETS AS MANUFACTURED BY NOMACA, INC. OR EQUAL APPROVED BY ALBEMARLE COUNTY SERVICE AUTHORITY. INSULATION TO EXTEND 5' BEYOND CENTERLINE OF CULVERT IN BOTH DIRECTIONS OR 5' BEYOND ENDS OF CULVERT WHEN PARALLEL. 16. TOUCH READ METERS ARE BEING USED BY THE ALBEMARLE COUNTY SERVICE AUTHORITY. TO ACCOMMODATE THESE METERS, METER LIDS WILL REQUIRE A 1-3/4" HOLE TAPPED INTO THE CENTER OF THE LID. BLIND TAPS OR PLUGS SHALL BE PROVIDED TO PREVENT DEBRIS FROM ENTERING THE BOX PRIOR TO METER INSTALLATION. 17. CERTIFICATION THAT 95% COMPACTION IS OBTAINED SHALL BE PROVIDED FOR ALL FILL AREAS UNDER WATER AND SEWER LINES AND APPURTENANCES. THIS CERTIFICATION SHALL BE SIGNED BY A PROFESSIONAL GEOTECH. THE CERTIFICATION SHALL STATE THE EXACT AREA THAT THE CERTIFICATION APPLIES TO. 18. CONTRACTOR SHALL BE INFORMED AND SHALL COMPLY WITH THE VIRGINIA OVERHEAD HIGH VOLTAGE LINE SAFETY ACT. ANY COSTS TO COVER LINES OR DISCONNECT SERVICE TO NEARBY POWER LINES SHALL BE AT THE CONTRACTOR'S EXPENSE 19. CONTRACTOR SHALL COMPLY WITH NO LEAD REGULATIONS FOR WATER INFRASTRUCTURE. 20. ALL JOINTS ON PROPOSED WATERLINE SHALL BE RESTRAINED PER MANUFACTURERS RECOMMENDATIONS AND INSTRUCTIONS AND PER ACSA STANDARDS AND SPECIFICATIONS. SITE PLAN NOTES 1. ALL CONSTRUCTION SHALL CONFORM TO ALBEMARLE COUNTY AND VIRGINIA DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR TO VERIFY FIELD CONDITIONS PRIOR TO AND DURING CONSTRUCTION AND NOTIFY OWNER AND ENGINEER IMMEDIATELY OF ANY DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND APPROVED PLAN. 3. EXISTING MANHOLE FRAMES AND COVERS AND VALVE BOXES AND COVERS TO REMAIN SHALL BE ADJUSTED OR RECONSTRUCTED, AS NECESSARY, TO MATCH FINISHED GRADES. 4. ALL INTERNAL STREETS AND PARKING AREAS ARE TO BE PRIVATELY OWNED AND MAINTAINED, EXCEPT WHERE OTHERWISE NOTED. 5. EARTH SWALES AND STORM SEWER CONNECTIONS SHALL BE CONSTRUCTED IMMEDIATELY FOLLOWING CLEARING AND GRUBBING. 6. ALL ON SITE IMPROVEMENTS ARE SUBJECT TO INSPECTION UNDER ALBEMARLE COUNTY CODES. 7. ALL STAIRS WITH THREE OR MORE RISERS ARE TO HAVE HANDRAILS ON BOTH SIDES. 8. ALL CONDENSATE DRAIN AND OTHER PLUMBING CONNECTIONS ARE TO BE INSTALLED ACCORDING TO CURRENT PLUMBING CODE. 9. CONTRACTOR TO VERIFY ALL SITE PLANS AND PROFILES AND DETAILS FOR CONSISTENCY AND IF CONFLICT EXISTS, CONTACT ENGINEER FOR CLARIFICATION AND/OR DIRECTION. INTERPRETATION DETERMINED BY CONTRACTOR SHALL BE DONE AT HIS/HER OWN RISK. 10. THE INSTALLATION OF HANDICAPPED PARKING SPACES, ACCESSIBLE ROUTES AND HANDICAPPED RAMPS SHALL COMPLY WITH THE "2010 ADA STANDARDS FOR ACCESSIBLE DESIGN" ISSUED BY THE DEPARTMENT OF JUSTICE ON SEPT. 15, 2010, OR THE LATEST EDITION. HANDICAPPED PARKING AND ACCESSIBLE ROUTES SHALL NOT EXCEED 2% CROSS SLOPE. HANDICAPPED RAMPS SHALL BE INSTALLED AS SHOWN ON THESE PLANS AND AS REQUIRED TO MEET THE LATEST ADA STANDARDS AT NO ADDITIONAL COST TO THE OWNER. COORDINATION NOTES 1. THE CONTRACTOR SHALL OBTAIN THE FOLLOWING PERMITS REQUIRED FOR CONSTRUCTION OF THESE PLANS: ALBEMARLE COUNTY LAND DISTURBANCE PERMITS, VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) GENERAL PERMIT, AND ALBEMARLE COUNTY BUSINESS LICENSE. CONTRACTOR SHALL PROVIDE ALL NECESSARY FORMS AND FEES FOR OBTAINING THE PERMITS, INCLUDING APPLICATION FEES AND REQUIRED BONDING COSTS. 2. ANY TIME WORK IS PERFORMED OFF -SITE OR WITHIN AN EXISTING EASEMENT, THE CONTRACTOR IS TO NOTIFY THE HOLDER OF SAID EASEMENT AS TO THE NATURE OF PROPOSED WORK, AND TO FOLLOW ANY GUIDELINES OR STANDARDS WHICH ARE ASSOCIATED WITH OR REFERENCED IN THE RECORDED EASEMENT. 3. THE CONTRACTOR IS TO CHECK THAT ALL EASEMENTS, LETTERS OF PERMISSION, ETC. ARE RECORDED/OBTAINED PRIOR TO THE START OF ANY CONSTRUCTION. 4. THE CONTRACTOR IS TO VERIFY THAT THE RELOCATION OF ALL EXISTING UTILITIES IN CONFLICT WITH PROPOSED WORK HAS BEEN COMPLETED, INCLUDING UTILITY POLES. 5. CONTRACTOR SHALL COMPLY WITH FENCING AND TREE PRESERVATION SIGNAGE REQUIRED BY ALBEMARLE COUNTY CODE. 6. VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) GENERAL PERMIT: PREPARE STORMWATER POLLUTION PREVENTION PLAN, SECURE VSMP PHASE I LAND CLEARING GENERAL PERMIT AND PAY PERMIT APPLICATION FEE TO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ). CONTACT DEQ - RICHMOND FOR ADDITIONAL INFORMATION. TELEPHONE NUMBER: (804) 698-4000. 7. ACCESSIBLE PARKING SPACES AND ACCESS ISLES SHALL NOT HAVE A SURFACE SLOPE GREATER THAN 1:48. ACCESS ISLES SHALL BE AT THE SAME LEVEL AS THE PARKING SPACE THEY SERVE. 8. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE MUST HAVE A VISUAL INSPECTION PERFORMED BY THE BUILDING DEPARTMENT. 9. ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS. 10. A KNOX BOX WILL BE REQUIRED FOR THE PROPOSED BUILDING. LOCATION SHALL BE COORDINATED WITH THE FIRE MARSHAL'S OFFICE. GENERAL NOTES 1. ALL FINISHED GRADING, SEEDING AND SODDING SHALL BE DONE IN SUCH A MANNER TO PRECLUDE THE PONDING OF THE WATER ON THE SITE, PARTICULARLY ADJACENT TO THE BUILDINGS OR STORM INLETS. 2. ALL STREETS OUTSIDE PUBLIC RIGHTS -OF -WAY ARE TO BE PRIVATELY OWNED AND MAINTAINED. 3. CONTRACTOR IS TO VERIFY THAT ALL UTILITIES I.E., WATER, SEWER GAS, ELECTRIC, TELEPHONE, CABLE, ETC, ARE IN PLACE PRIOR TO CONSTRUCTION OF SUBBASE AND/OR PAVING. 4. PROPOSED UNDERGROUND UTILITIES SUCH AS ELECTRIC, TELEPHONE, CABLE AND GAS WHICH SERVE THIS FACILITY SHALL BE LOCATED WITH A MINIMUM 5 FOOT SEPARATION FROM PUBLIC WATER MAINS AND SANITARY SEWER. 5. CUT AND PATCH WORK IN EXISTING PUBLIC STREETS MUST BE PERFORMED IN ACCORDANCE WITH VDOT AND ALBEMARLE COUNTY STANDARDS AND SPECIFICATIONS. 6. ALL PIPES SHOWN AS RCP ON PLANS SHALL BE REINFORCED CONCRETE PIPE CONFORMING TO ASTM C-76, UNLESS INDICATED OTHERWISE ON PLANS. 7. ALL CONSTRUCTION SHALL COMPLY WITH OSHA SAFETY STANDARD FOR EXCAVATION 1926 PART P AND OTHER APPLICABLE OSHA REQUIREMENTS. 8. THESE PLANS AND PROFILES AND ALL THE NEW CONSTRUCTION WITH THIS PLAN SHALL BE IN ACCORDANCE WITH THE CURRENT APPROVED ALBEMARLE COUNTY SERVICE AUTHORITY'S GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS, ANY AMENDMENTS THEREOF AND THE STANDARDS AND SPECIFICATIONS OF VDOT. 9. SAFETY SLABS ARE REQUIRED IN ALL STRUCTURES GREATER THAN 12' IN HEIGHT. 10. SURFACE DRAINAGE: COMPLETELY DRAIN CONSTRUCTION SITE DURING PERIODS OF CONSTRUCTION TO KEEP SOIL MATERIALS SUFFICIENTLY DRY. PROVIDE TEMPORARY DITCHES, SWALES, AND OTHER DRAINAGE FEATURES AND EQUIPMENT AS REQUIRED TO MAINTAIN DRY SOILS. WHEN UNSUITABLE WORKING PLATFORMS FOR EQUIPMENT OPERATION AND UNSUITABLE SOIL SUPPORT FOR SUBSEQUENT CONSTRUCTION FEATURES DEVELOP, REMOVE UNSUITABLE MATERIAL AND PROVIDE NEW SOIL MATERIAL AS SPECIFIED IN THIS SECTION AT NO ADDITIONAL COST TO THE OWNER. 11. SUBSURFACE DRAINAGE: CONSIDER SITE SURFACE AND SUBSURFACE CONDITIONS, AVAILABLE SOIL, AND HYDROLOGICAL DATA. REMOVE WATER BY BENCHING, SUMP PUMPING, DEEP WELL PUMPING, OR OTHER METHODS TO PREVENT SOFTENING OF SURFACES EXPOSED BY EXCAVATION. USE FILTERS ON DEWATERING DEVICES TO PREVENT REMOVAL OF FINES FROM SOIL. PROVIDE EROSION CONTROL AT OUTLET OR PIPING TO PREVENT EROSION. OPERATE DEWATERING SYSTEM CONTINUOUSLY UNTIL CONSTRUCTION WORK BELOW EXISTING WATER LEVELS IS COMPLETE. 12. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 13. ALL PAVING, DRAINAGE RELATED MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 14. ALL PIPES SHOWN AS HDPE ON PLANS SHALL CONFORM TO AASHTO M294 (TYPE S) SMOOTH WALL INTERIOR PIPE, MATERIAL AND INSTALLATION SHALL BE IN ACCORDANCE WITH VDOT ROAD AND BRIDGE STANDARDS AND ROAD AND BRIDGE SPECIFICATIONS. 15. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 16. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTALNERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 17. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE CURRENT EDITION OF THE "MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES" AND THE VIRGINIA SUPPLEMENT. 18. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 19. PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AFFECTING HIS WORK INCLUDING EXISTING TOPOGRAPHY. IF THERE ARE ANY DISCREPANCIES WITH WHAT IS SHOWN ON THE CONSTRUCTION DRAWINGS OR TOPOGRAPHIC SURVEY PLAN, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN ORDER TO DETERMINE THE COURSE OF ACTION NECESSARY TO CORRECT FOR SUCH DISCREPANCY. FAILING TO NOTIFY THE OWNER AND SECURING SUCH INSTRUCTION, THE CONTRACTOR WILL BE CONSIDERED TO HAVE PROCEEDED AT THEIR OWN RISK AND EXPENSE. 20. THE PROPOSED BUILDING WILL BE SPRINKLED. CALCULATED SPRINKLER FLOW RATE = 570GPM. GENERAL WATER & SEWER CONDITIONS 1. WORK SHALL BE SUBJECT TO INSPECTION BY ALBEMARLE COUNTY SERVICE AUTHORITY (ACSA) INSPECTORS. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE PROPER ACSA OFFICIALS AT THE START OF THE WORK. 2. THE ALBEMARLE COUNTY SERVICE AUTHORITY SHALL HAVE ACCESS TO USE THE AIRSPACE ABOVE THE LOCATIONS OF CONSTRUCTION FOR THE FLIGHT OF UNMANNED AERIAL VEHICLES FOR THE PURPOSE OF IMAGERY COLLECTION. 3. THE LOCATION OF EXISTING UTILITIES ACROSS THE LINE OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONLY APPROXIMATELY CORRECT. THE CONTRACTOR SHALL, ON HIS OWN INITIATIVE, LOCATE ALL UNDERGROUND LINES AND STRUCTURES, AS NECESSARY. 4. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE CURRENT EDITION OF THE GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS, AS ADOPTED BY THE ACSA. 5. DATUM FOR ALL ELEVATIONS SHOWN IN NATIONAL GEODETIC SURVEY. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING MISS UTILITY (1-800-552-7001). 7. ALL WATER AND SEWER PIPES SHALL HAVE A MINIMUM OF THREE AND A HALF (3.5) FEET OF COVER MEASURED FROM THE TOP OF PIPE, OVER THE CENTERLINE OF PIPE. THIS INCLUDES ALL FIRE HYDRANT LINES, SERVICE LATERALS AND WATER WATER LINES, ETC. 8. ALL WATER AND SEWER APPURTENANCES ARE TO BE LOCATED OUTSIDE OF ROADSIDE DITCHES. 9. VALVES ON DEADEND LINES SHALL BE RODDED TO PROVIDE ADEQUATE RESTRAINT FOR THE VALVE DURING A FUTURE EXTENSION OF THE LINE. 10. TREES ARE NOT PERMITTED IN THE ACSA EASEMENT. 11. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH THE NO -LEAD REGULATION REGARDING BRASS FITTINGS EFFECTIVE JANUARY 4, 2014 (SENATE BILL 3874 WHICH AMENDS THE SAFE DRINKING WATER ACT). 12. THE SEWER LATERAL BEYOND THE CONNECTION AT THE SEWER MAIN SHALL BE PRIVATE. THE SEWER LATERAL STUB -OUT SHALL UNDERGO THE ACSA LOW-PRESSURE AIR TEST TO SATISFY COUNTY TESTING REQUIREMENTS. VISUAL INSPECTION OF THE SEWER LATERAL STUB -OUT SHALL BE WITNESSED BY THE COUNTY BUILDING INSPECTIONS DEPARTMENT. THIS INSPECTION SHALL OCCUR UNDER AN "OTHER PLUMBING' PERMIT WHICH MUST BE OBTAINED BY THE CONTRACTOR. 13. THE SEWER LATERAL BEYOND THE CONNECTION AT A MANHOLE SHALL BE PRIVATE. VISUAL INSPECTION AND PRESSURE TESTING OF THE SEWER LATERAL SHALL BE WITNESSED BY THE COUNTY BUILDING INSPECTIONS DEPARTMENT. THIS INSPECTION SHALL OCCUR UNDER AN "OTHER PLUMBING' PERMIT WHICH MUST BE OBTAINED BY THE CONTRACTOR. 14. THE FIRE SPRINKLER MAIN DOWNSTREAM OF THE GATE VALVE IS PRIVATE. VISUAL INSPECTION AND TESTING OF THE FIRE SPRINKLER MAIN DOWNSTREAM OF THE GATE VALVE SHALL BE WITNESSED BY THE COUNTY BUILDING INSPECTIONS DEPARTMENT. THIS INSPECTION SHALL OCCUR UNDER AN "OTHER PLUMBING' PERMIT WHICH MUST BE OBTAINED BY THE CONTRACTOR. 15. ALL FLUSHING OF FIRE SPRINKLER MAINS SHALL NOT OCCUR UNTIL APPROVAL IS GIVEN BY THE ACSA. 16. THE PROPOSED APARTMENT BUILDING SHALL BE PROVIDED WITH A BACKFLOW PREVENTION DEVICE IN ACCORDANCE WITH SECTION 8 OF THE ACSA RULES AND REGULATIONS. STORMWATER NARRATIVE STORMWATER DETENTION FOR THE IMPROVEMENTS PROPOSED WITH THIS SITE PLAN ARE PROVIDED BY THE PERMANENT NORTH SWM FACILITY LOCATED IN THE ADJACENT COSTCO PARKING LOT. DETAILS FOR THE FACILITY ARE PROVIDED ON THE ALBEMARLE PLACE STORMWATER MANAGEMENT PLAN AMENDMENT NO.4, WPO# 2010-00023 AND WPO# 2013-69. AN ASSUMED POST DEVELOPED IMPERVIOUS COVER OF 90% WAS UTILIZED IN THE DESIGN OF THE UNDERGROUND DETENTION SYSTEM FOR ALL ON -SITE COMMERCIAL AREAS. THE PROPOSED IMPERVIOUS COVER FOR BLOCK D1 IS 83.4%. THEREFORE THE EXISTING NORTH UGD IS ADEQUATE TO PROVIDE STORMWATER DETENTION FOR THE PROPOSED IMPROVEMENTS AND THE POST -DEVELOPED RELEASE RATE HAS DECREASED FROM THE ORIGINAL ANALYSIS. STORMWATER QUALITY FOR THE IMPROVEMENTS PROPOSED WITH THIS SITE PLAN ARE PROVIDED BY THE STORMFILTER AND VORTECHS UNITS CONSTRUCTED AS PART OF THE ALBEMARLE PLACE STORMWATER MANAGEMENT PLAN AMENDMENT NO.4, WPO# 2010-00023 AND THE BIOFILTER INSTALLED AS PART OF THE STONEFIELD BOULEVARD ROAD PLAN, WPO# 2011-00036. THE ORIGINAL BMP ANALYSIS FOR BLOCK D1 WAS DEFINED AS PART OF THE STONEFIELD BUILDING C1-IV FINAL SITE PLAN, WPO# 2011-00055. THE SITE IS GRANDFATHERED PER 9VAC25-870-48 AND MEETS THE WATER QUALITY REQUIREMENTS OF PART II C SET FORTH IN 9VAC25-870-96. PER PART II C THE STORMFILTER AND VORTECHS UNITS PROVIDE A POLLUTANT REMOVAL RATE OF 60% AND THE FILTERRAS PROVIDE A POLLUTANT REMOVAL RATE OF 74%. THE REQUIRED OVERALL POLLUTANT REMOVAL RATE IS 74% FOR THE RE -DEVELOPMENT OF BLOCK D. PLEASE REFER TO BMP COMPUTATIONS USING THE SIMPLE METHOD WORKSHEET PROVIDED ON THIS DRAWING. STONEFIELD BUILD OUT SUMMARY USE IN BLOCK (GLA OR UNITS) RETAIL THIS SUBMISSION NON RETAIL RESIDENTIAL PREVIOUS SUBMISSIONS RETAIL NON RETAIL RESIDENTIAL SUBMISSIONS TO DATE RETAIL NON RETAIL RESIDENTIAL A 0 0 0 0 0 0 50,224 14,000 0 50,224 14,000 0 B 33,836 6,500 0 33,836 6,500 0 C 0 0 0 57,701 111,595 0 57,701 111,595 0 D 2,073 0 227 0 110,000 209 2,073 110,000 436 BLOCK GROUP 1 TOTAL 2,073 0 227 141,761 242,095 209 143,834 242,095 436 E (BLOCK GROUP 2) 0 0 0 0 0 250 0 0 250 F G 0 0 0 0 0 0 149,964 14,700 0 22,880 0 0 149,964 14,700 0 22,880 0 0 BLOCK GROUP 3 TOTAL 0 0 0 164,664 22,880 0 164,664 22,880 0 STONEFIELD TOTAL 2,073 0 227 306,425 264,975 459 308,493 264,975 686 1 REVISED SWM NARRATIVE JDB 05/21/20 Otto OF Ui ic. No. 0 o a? ��0 4W: .4 io-a�-ao 1 ■ SS IONnL E� N�1�N ENGINEERS SURVEYORS PLANNERS ^ ASSOCIATES PO Box 4119 96801ympia Dr, Buitel L,mchbu&VA24502 Charloti-nile,VAzz911 Phone _ 434 316 6080 Phone 4349842700 wwwwwassnclalesnel DESIGNED BY: JDB PROJECT: STONEFIELD BLOCK D-1 FINAL SITE PLAN ALBEMARLE COUNTY, VIRGINIA SET REV. NO. 4 DRAWN BY: KTM DRAWING NUMBER: C-3 TITLE: GENERAL NOTES DIHR BY: HFIN SHEET NUMBER: 3 of 12 WWA NUMBER: 219040.03 FILE NAME: 904003C-ND-2-LOR.dwg DISCIPLINE: CIVIL SCALE. H: NIA V. NIA DATE: 02128120 NO. SHEET REVISION BY DATE NO. SHEET REVISION BY DATE