WPO201900042-53431-Full Inspection Report
V NOTICE TO COMPLY Hand delivered Project: WP0201900042 Spring Hill Village - VSMP Operator/Contractor: Goodman Excavation SPRING HILL LAND DEVELOPMENT LLC Issued Date: 4/23/2021 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 Under section § 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Land Disturbance Permit (or Agreement in Lieu of a Plan) for the referenced project and to immediately take corrective measures to address erosion and sediment control deficiencies on this property. This Notice to Comply is being issued because of the following deficiencies: Deficiency: Inspections for townhouse construction is not complete, or unclear. Corrective Action: Townhouse must be inspected same as overall site. Deficiency: Repairs and corrections not being completed Corrective Action: Non -conforming items identified must be corrected in a timely manner Deficiency: Stabilize any that are on site. Corrective Action: Stockpiles must be stabilized within 7 days Deficiency: Stabilize as required Corrective Action: Deficiency: Clean out and repair basin Corrective Action: Basin is nearing or at capacity also dewatering device is damaged, repair and maintain Deficiency: Seed as required. Corrective Action: Deficiency: Seed and mat to maintain Corrective Action: Overseed and mat to prevent erosion Deficiency: Townhouse section is tracking Corrective Action: Clean road daily Deficiency: Practices in approved swppp but may not be in use Corrective Action: Deficiency: Lower section, upper Townhouse activity no Corrective Action: Deficiency: For the most part in use Corrective Action: Deficiency: Trash containers within close proximity to drop inlets Corrective Action: Move from extremely close proximity Deficiency: Silt fence needs maintenance upper and lower sections of site Corrective Action: Repair and maintain Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by. Re -inspection of this notice to verify corrective measures will incur a $150 for land disturbing under VESCP and single-family dwelling units (§ 17-207) or a $250 fee for land disturbing under VSMP (§ 17- 208). Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection. County Inspector Name: Geoff Elsie County Inspector Phone Number: (434) 296-5832 OF Al.,& Inspection Result: Notice to Comply r L�eo��P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: Spring Hill Village - VSMP Project/WPO Number: WP0201900042 TMP: 09000000002800 DEQ Permit Number (if applicable): VARlON324 Project Operator: Goodman Excavation Operator Telephone #: (540) 872-5105 Project Contact: LLC SPRING HILL LAND DEVELOPMENT Contact Telephone #: Contact E-Mail: Qualified Personnel (QP): Gregg Odonnell Inspector: Geoff Elsie Weather (Wet/Dry/Rain): Disturbed Acreage: Inspection Date & Time: 4/23/2021 Single -Family: Stage of Construction: Grading Re -Inspection: No COVERAGE & POSTING REQUIREMENTS Compliant? Reviewed during re -inspection? Yes Comments/Description Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) Yes 1 (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the Yes main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if Yes 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re -inspection? Yes Comments/Description 4 The SWPPP is on -site or made available during the inspection? (CGP Yes Part II D.1 & 2)(9VAC25-870-54.G) The SWPPP contains a signed copy of the registration statement? Yes 5 (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage Yes letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the Yes 7 construction activity, including the function of the project? (CGP Part II A.1 A) The SWPPP includes a legible site plan identifying all appropriate Yes 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) Page 1 of 4 9 The SWPPP contains the name, phone number and qualifications of Yes "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? Yes (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that Yes ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- Yes 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of Yes 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III Yes K? (CGP Part 11 A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part Yes 11 A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection? No Comments/Description Is the SWPPP being amended whenever there is a change in the design, 16 construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- 54.G) Has the SWPPP been amended if inspections or investigations by the 17 operator's qualified personnel, or by local, state or federal officials find that existing control measures are ineffective in minimizing pollutants in discharges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are identified? (CGP Part 11 B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major 19 grading activities occur, construction activities temporarily or permanently cease on a portion of the site or stabilization measures are initiated? (CGP Part 11 B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? (CGP Part 11 B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 legal control of the operator and the dates on which the operator no longer had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and measures taken to prevent the recurrence of any prohibited discharge? (CGP Part 11 B.4(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection? Yes Comments/Description Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved No TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) 26 Inspection reports are completed and signed in accordance with CGP Yes Part 11 F (3-4)? (CGP Part 11 F (3-4)) Page 2 of 4 27 Corrective actions are taken consistent with the requirements of the No CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description 28 Have stream buffers and steep slopes been protected as shown on the N/A plan? Sequencing of the project is implemented in accordance with the yes 29 approved erosion and sediment control plan and stormwater management plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when No applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected No Stabilize any that are on site. 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II A.2(c)) (9VAC25-870-54.B) A permanent vegetative cover has been established that is uniform, N/A 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land yes 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? Yes Stabilize as required 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.6) Are sediment traps and basins installed in accordance with MS-6 and the No Clean out and repair basin 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are finished cut and fill slopes adequately stabilized to prevent or correct No Seed as required. 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate yes 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? yes 38 (9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Do all operational storm sewer inlets have adequate inlet protection? No 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Are stormwater conveyance channels adequately stabilized with channel Yes Seed and mat to maintain 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel N/A 41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where N/A 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 43 Is necessary restabilization of in -stream construction complete? (9VAC N/A 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Are utility trench operations conducted and stabilized in accordance with yes 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are soil and mud kept off paved or public roads to minimize the transport No Townhouse section is tracking 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 46 Have all temporary control structures that are no longer needed been N/A removed and disturbed soil resulting from their removal permanently Page 3 of 4 stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are properties and waterways downstream from development adequately Silt fence needs maintenance upper and lower 47 protected from erosion, sediment and damage in accordance with the No sections of site standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? N/A (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description Practices are in place to prevent and respond to leaks, spills, and other Practices in approved swppp but may not be in use releases including (i) procedures for expeditiously stopping, containing, Yes 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels Yes 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the N/A clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle No Lower section, upper Townhouse activity no 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof Yes For the most part in use settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from Yes 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part II A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other Trash containers within close proximity to drop inlets 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? No (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential Yes 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Page 4 of 4 Construction General Permit Site Inspection Report Request for Correction Action Check Regulatory Citation/Legal Occur. Observation Recommended Corrective List # Requirement* Action 25 (CGP Part II F (2)) (CGP Inspections for townhouse Townhouse must be inspected Part II A.5.b.3) construction is not complete, same as overall site. or unclear. 27 (CGP Part II G(1-2)) Repairs and corrections not Non -conforming items being completed identified must be corrected in a timely manner 31 (9VAC 25-840-40.2) Stabilize any that are on site. Stockpiles must be stabilized (CGP Part II A.2(c)) within 7 days (9VAC25-870-54.B) 34 (9VAC 25-840-40.5) Stabilize as required (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) 35 (9VAC 25-840-40.6) Clean out and repair basin Basin is nearing or at capacity (CGP Part II A.2.c (9)) also dewatering device is (CGP Part II A.2(c)) damaged, repair and maintain (CGP II E(1-2)) (9VAC25-870-54.B) 36 (9VAC 25-840-40.7) Seed as required. (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) 40 (9VAC 25-840-40.11) Seed and mat to maintain Overseed and mat to prevent (CGP Part II A.2(c)) erosion (CGP II E(1-2)) (9VAC25-870-54.B) 45 (9VAC 25-840-40.17) Townhouse section is tracking Clean road daily (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) 49 (CGP Part II A.4.e(1)) Practices in approved swppp (9VAC25-870-56) but may not be in use 52 (CGP Part II A.4.e(4)) Lower section, upper (9VAC25-870-56) Townhouse activity no 53 (CGP Part II A.4.e(5)) For the most part in use (9VAC25-870-56) 55 (CGP Part II A.4.e(7) Trash containers within close Move from extremely close (9VAC25-870-56) proximity to drop inlets proximity 47 (9VAC 25-840-40.19(a- Silt fence needs maintenance Repair and maintain n)) upper and lower sections of site Recommended 4/30/2021 Corrective Action Deadline: Targeted Re- 5/3/2021 Inspection Date: Comments: Site needs stabilizing, maintenance on inlets. Townhouse construction needs to be inspected and non conforming controls need to be corrected. Paved section of site needs to have road swept daily and large deposits of sediment cleared immediately. Try and maintain minimum of 50 foot clearance of trash containers from any drop inlet, same for portable toilet facilities. Basin is at capacity will need to be cleaned and repaired, stabilizing the entire site will help reduce sediment intrusion of the basin. Dewatering device needs to be repaired. Check structure for sediment buildup out to the outfall. *Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Construction General Permit Site Inspection Photo Log Photos for Item 2 Photos for Item 4 Photo Description: Photos for Item 10 Photo Description: Photos for Item 30 20210423_083104.jpg.jpg 313.48KB M6 Photo Description: Example of open area not stabilized Photo for Item 35 20210423 mm9jgjq m*mKB , ` 2 adm«» \ ` \ \q \� � :i %> � \ © y - VA - X< «• � \2 Photo Photovsriplom Basin at or nearing wetstorage capacity structumd_a +gde m is damaged. Photos for Item 39 20210423_082456.jpg.jpg 765.96KB j W-FWA..fix';£ IN p a ME 4 � yy� li F T Q. C s 3 k* �f rdx w� Photo Description: Townhouse drop inlets example of poor or improper protection 20210423_082920.jpg.jpg 686.37KB V Y, A` y"�/ a"�, � y •3.' p� � y �.ti V ,, r t i �' 4. I .�,. 1 q 3 � r tad t { yy` z Photo Description: Curb drop without adequate controls lower portion of site Photos for Item 45 20210423_082525.jpg.jpg 530.41 KB Photo Description: Sediment on roadway Photos for Item 47 20210423_083127.jpg.jpg t 262.86KB 1 4: • a i b.• t 1 R A � t Photo Description: Example of poorly maintained silt fence. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 W4'jPFj 1 Inspection Date: 4/23/2021 County Inspector