Loading...
HomeMy WebLinkAboutWPO201900063 Review Comments WPO VSMP 2021-04-23t 401 McIntire Road, North Wing County of Albemarle Charlottesville, VA 22902-4579 COMMUNITY DEVELOPMENT DEPARTMENT Telephone:434-296-5832 W W W.ALBEMARLE.ORG VSMP Permit plan review Project title: Cale Elementary School Safe Routes to School (SRTS) Project file number: WPO201900063 Plan preparer: Eugene Colman [ecoleman@amtengineering.com] Owner or rep.: Jack Kelsey Ukelsey@albemarle.org] Plan received date: Nov. 1, 2019 Date of comments: Reviewer: Feb. 3, 2020 March 3, 2021 April 14, 2021 Dec. 16, 2019 Feb. 25, 2020 (Rev. 1) March 26, 2021 (Rev. 2) April 23, 2021 (Rev. 3) David James [djames2@albemarle.org] County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. General 1. Please add the County's `General Construction Notes', `General construction notes for Erosion and Sediment Control plans', and `General construction notes for Stormwater Management plans' to the plan. (Rev. 1) Addressed. 2. Sh.1: Show `WP0201900063' under or near title. (Rev. 1) Addressed. 3. Remove sheets 19-24 from the V SMP plans. (Rev. 1) Addressed. 4. Submit a final site plan for review, if haven't. (Rev. 1) Addressed. 5. Show location of all existing and proposed utilities and easements with deed book references. (Rev. 1) Addressed. 6. Show/label existing right-of-way with street name, route number & width labeled. (Rev. 1) Addressed. 7. Show/label property line. (Rev. 1) Addressed. 8. (Rev. 1) Cover: Please include Contact information (Site data). [17-403 A.2] 9. (Rev.2) Provide/Update date revisions. (Rev.3) Addressed. B. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Insert copy of General Permit coverage when obtained. C. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Show all proposed clearing/grading activities, E&S controls, staging, vehicle/equipment washing, concrete washout locations on the PPP. (Rev. 1) Addressed. D. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Sheet 8/10/12: Show VDOT designation (type & details) of Str. 1 & 3 inlets. (Rev. 1) Addressed. (Rev.2) Str. 3 inlet type is not identified. (Rev.3) Addressed. 2. Provide callout to detail sheet 21 for these structures/features shown on the grading plan. (Rev. 1) Addressed. 3. Provide on the plan: SWM narrative (State how plan meets Water Quality/Quantity requirements); Show the design storm WSEs on the facility's details, General description of SWM facility operation and maintenance. (Rev. 1) Addressed. 4. Bioretention, level 2 (VADEQ SW Design Spec. 9): Provide Surface Area sizing calculation required & provided (Section 6.1). (Rev. 1) Addressed. 5. Include this checklist in the plan set. http://www.albemarle.ory/upload/images/forms_center/departments/Community Development/fo rms/Engineering_and _WPO_Forms/WPO_VSMP_Construction _ Record_ Drawings Policy 23M ay2014.pdf (Rev. 1) Addressed. 6. (Rev.2) Sheet 9: The detail is missing for curb opening. Callout to sheet C8.0 doesn't exist and I'm not seeing it on Sheet 8. (Rev.3) Addressed. 7. (Rev.2) Sheet 11: The detail is missing for the cleanout. Callout to sheet C8.0 doesn't exist and I'm not seeing it on Sheet 8. (Rev.3) Addressed. E. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. The erosion control plan content requirements can be found in County Code section 17-402. 1. Please show location of the construction entrance (CE). Use the County's design detail (DSM, pg. 8). Inspector will work with the contractor on alternative if necessary. [VADEQ ESC HB, Spec. 3.02] (Rev. 1) Addressed. 2. Sh.15: Some of the silt fence locations are not clear to me. Maybe try making the symbol linetype more visible. Show within the LOD, if not. (Rev. 1) Addressed. 3. Sh.16: Extend silt fence further north adjacent to Avon Ext. near entrance. Extend LOD to include this and any grading activities. (Rev.1) Addressed. 4. Sh.17: Retention rolls ("Gutter buddies", "EC socks") are no longer being permitted due to contractor neglect. Show only state approved inlet protection measures. (Rev.1) Addressed. 5. (Rev.2) Sheet 16: Show IP for Str. 1 DI. (Rev.3) Addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; bitp://www.albemarle.ory/deptforrns.asp?department==cdengWo