HomeMy WebLinkAboutSDP201900015 Correspondence Final Site Plan and Comps. 2021-04-22M COLLINS ENGINEERING
April 19, 2021
Cameron Langille
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Brookhill Block 8B Final Site Plan (SDP 201900015)
200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
(�434.293.3719 PH 434.293.2813 FX
www.coll i ns-engineering.com
Thank you for your comments dated April 14, 2021 on the above referenced project.
Planning Comments:
1. Comment previously addressed.
2. Comment previously addressed.
3. Comment previously addressed.
4. Comment previously addressed.
5. Comment previously addressed.
6. Comment previously addressed.
7. Comment previously addressed.
8. Comment previously addressed.
9. The TMP number listed under owner information on sheet 1 has been updated.
10. Comment previously addressed.
11. Comment previously addressed.
12. Comment previously addressed.
13. Comment previously addressed.
14. Comment previously addressed.
15. Comment previously addressed.
16. Comment previously addressed.
17. Comment previously addressed.
18. Comment previously addressed.
19. Comment previously addressed.
20. Comment previously addressed.
21. Comment previously addressed.
22. Comment previously addressed.
23. Comment previously addressed.
24. Comment previously addressed.
25. Comment previously addressed.
26. Comment previously addressed.
27. Comment previously addressed.
28. Comment previously addressed.
29. Comment previously addressed.
30. Comment previously addressed.
31. Comment previously addressed.
32. Comment previously addressed.
33. Comment previously addressed.
34. Comment previously addressed.
35. Comment previously addressed.
36. Comment previously addressed.
37. Comment previously addressed.
38. Comment previously addressed.
39. Comment previously addressed.
40. Comment previously addressed.
41. Comment previously addressed.
42. Comment previously addressed.
43. Comment previously addressed.
44. Comment previously addressed.
45. Comment previously addressed.
46. Comment previously addressed.
47. Comment previously addressed.
48. Comment previously addressed.
49. Comment previously addressed.
50. Comment previously addressed.
51. Comment previously addressed.
52. Block 8B open space parcel and Lot 'A' have been shown and labeled on the existing conditions sheet per the
approved plat. Hatching has been revised on the existing conditions sheet to delineate these areas.
53. Easements have been shown and labeled on the plans per the approved plat.
54. Comment previously addressed.
55. Comment previously addressed.
56. Comment previously addressed.
57. Comment previously addressed.
58. Comment previously addressed.
59. A note has been added to sheet 1 stating all three recorded instrument numbers for the HOA covenants.
60. Comment previously addressed.
61. Comment previously addressed.
62. Comment acknowledged.
Engineering Comments:
1. Comm viously addressed.
2. Comment previously addressed.
3. Comment acknowledged. The approved and stamped retaining wall drawings have been included with this
submittal.
4. Comment previously addressed.
5. Comment previously addressed.
6. Comment previously addressed.
7. Comment previously addressed.
8. Comment previously addressed.
9. Comment previously addressed.
10. Comment previously addressed.
11. Comment previously addressed.
12. Comment previously addressed.
13. Comment previously addressed.
14. Comment previously addressed.
15. Comment previously addressed.
16. Comment previously addressed.
17. Comment previously addressed.
18. Comment previously addressed.
ARB Comments:
1. Revised architectural elevations for buildings land 3 were submitted by the builder directly to Margaret for
review and approval. The plans have also been included in this resubmittal as well.
VDOT Comments:
1. A turn lane warrant for the connection of the private Wesley Circle travel way and the public Archer Avenue is
provided with this submittal.
2. A note & detail have been added to the grading and drainage plan on Sheet 9, specifying the retaining wall
foundations shall be constructed behind the public road right of way.
3. The marked crosswalks have been removed from the plan.
4. Sight line locations of eye have been revised to provide a minimum of 14.5' from the edge of travel lane.
5. CG-12's have been updated on the site plan to show the truncated domes detectable warning surface per
Road & Bridge Standards.
6. Sidewalk connections note has been shown on the layout plan, Sheets 5 and 6.
Should you have any questions, please feel free to contact me at Scott@collins-enaineerine.com.
Sincerely,
Scott Collins