Loading...
HomeMy WebLinkAboutSUB202100035 Review Comments Final Plat 2021-04-27of Al Megan Nedostup, AICP $ County of Albemarle Development Process Manager m mnedostup@albemarle.org COMMUNITY DEVELOPMENT DEPARTMENT Telephone: (434) 296-5832 ext. 3004 MEMORANDUM To: Bethany Velasquez of Roudabush & Jeremy Swink of Stanley Martin Companies, LLC From: Megan Nedostup Date: April 27, 2021 Re: SUB2021-35 Pleasant Green Phase 2A- Final Plat The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] [1 4-302(A)(1 6),14-307.1] Dam break inundation zone. Pursuant to Virginia Code § 10.1-606 3, DCR has determined that Phase 2 will change the spillway design flood standards of the impounding structure. The County cannot approve this application until the requirements of Virginia Code § 15.2-22431 are met as outlined in the letter dated February 10, 2021. a. Engineering study. If the VirginiaDepartmentofConservationandRecreationdeterminesthataplanof development proposed by a subdivider would change the spillway design flood standards of an impounding structure pursuant to Virginia Code § 10.1-606.3, the subdivider shall submit an engineering study in conformance with the Virginia Soil and Water Conservation Board's standards under the Virginia Dam Safety Act in Virginia Code § 10.1-604etseq. and the Virginia Impounding Structure regulations in4 VAC 50-20. The engineering study shall be reviewed and acted upon by the Virginia Department of Conservation and Recreation as provided in Virginia Code § 15.2-2243.1. b. Mapping information. The subdivider shall provide the dam owner, the county, and any other affected localities with information necessary for the dam ownerto update thedam break inundation zone mapto reflect any new development within the dam break inundation zone following completion of the development 2. [14-302(B)] Provide density information for this phase including the number of lots proposed and the density calculation. Also, indicate the types of units for the lots, it appears that Lots 65-74 are now single family detached rather than attached, which was shown on the initial site plan and preliminary plat. 3. [14-303(F)] Provide a phasing plan. This is a final plat for a larger phase and a phasing plan should be provided to track the density and types of units. 4. [14-302(B)(8)] The side setback per 4.19 is 10 feet unless the units are attached. See above comment regarding the types of units. 5. [14-302(A)(5)] Public easements. The deed book and page number for the Greenway easement will be needed prior to approval of the plat. 6. [14-302(A)(5)] The right of way shown on this plat needs to match the BLA/Easement plat (SUB2021-004) under review. Also, the BLA/Easement plat will need to be approved and the deed book and page number will need to be added to this plat prior to approval. 7. [14-317] Instrument evidencing maintenance of certain improvements. Instruments are needed for the proposed improvements prior to final approval (open space, private drainage, retaining walls etc). 8. [SP1990-103 Condition #2] Condition #2 of the special use permit that was approved in 1990 requires the crossing to be made prior to development. Zoning staff is reviewing this condition in relation to this submittal to determine if the crossing will need to be built. I will pass on any information from zoning once an interpretation of the condition is made.