Loading...
HomeMy WebLinkAboutWPO201900063 Preconstruction Form 2021-04-29Request for Pre -construction Meeting and Grading $� Permit from Albemarle County -VSMP r ��AGIN�P Approved Plan Number: WPO-201900063 Approved Plan Name: Cale Elementary School — Safe Routes to School (SRTS) (Plans must be approved prior to a pre -construction meeting.) (Bonds must be approved and posted prior to a pre -construction meeting or permit.) Responsible Land Disturber: Print Name: Aaron Bruce State Certification Number. RLD14530 (Commonwealth of Virginia, State Water Control Board, exp.02/13/23 Address Virginia Infrastructure, Inc., 60 Cloverleaf Lane City Lexington State VA Zip 24450 Daytime Phone (540) 460-4491 E-mail aaron.infrastructure(a),vahoo.com Primary Contractor: Print Name Andrew Hoofnagle, Virginia Infrastructure, Inc. Address 60 Cloverleaf Lane City Lexington State VA Zip 24450 Daytime Phone (540) 570-0865 E-mail vaconcrete(i�hotmail.com Permit Issuance and First Year Maintenance Fees (Request must include payment): N A. (county project) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 G$63.80 N.A. (County -Owned project) 1 and less than c Sy94-0000 5 .,�..1� 3T0:00 10 And 'Ass than cncn $990.00 cn....a'Ass than rnn1nn Gig-�4�00 Annual Maintenance Fees [Section 17-208 of the Albemarle County Code] — Annual maintenance fees will be assessed in March of every year this permit is active. Fees cannot be prorated after the first year of permit issuance. 7/1/14, Revised: 8/29/14, 8/28/19 Page 1 of Person(s) to attend the Pre -construction Meeting: Names (type or print) Firm Contact Number or email Montie Breeden Owner's Rep (The School Board of Albemarle County, Virginia) mbreeden2(c�r�albemale.org Eugene Coleman, P.E. A/E (A. Morton Thomas and Associates, Inc.) ecoleman&amtengineering com Andrew Hoofnagle GC (Virginia Infrastructure, Inc.) vaconcrete@hotmail.com Aaron Bruce RLD (Virginia Infrastructure, Inc.) aaron.infrastructure&Aoo.com FOR OFFICE USE ONLY WPO# Fee Amomt $ Date Paid By who? Receipt # C # By: 7/1/14, Revised: 8/29/14, 8/28/19 Page 2 of Information for Permit applicants; 9-Month Permanent Stabilization Deadline: Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after commencing land disturbing activity A. When permanent vegetation required. The owner shall install on all denuded areas on the site within nine (9) months after the date the land disturbing activity commenced, except for areas that the administrator determines are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non -erosive surface, including, but not limited to, the following surfaces: (i) roadways and sidewalks covered by gravel, asphalt pavement, or concrete; (ii) trails or paths covered by gravel, stone dust, or mulch; (iii) buildings and other permanent structures; and such other surfaces that the administrator determines would adequately provide a permanent barrier to erosion. (see code 17-808 for information about possible extensions) Notice to Comply and Permit Revoked for Overdue Fees Late fees will incur interest, and enforcement actions per code section 17-210. (1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply (NTC). The notice gives 7 days to make payments. (2) At the end of the NTC time period, the permit will be revoked, and a Stop Work Order will be issued for working without a current permit. Disturbed Area Reductions Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on approved plans. If fees are to be reduced, an application for plan amendment must be made, and areas reduced by changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and all erosion control measures (including traps and basins) removed. Refunds The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will not be pro -rated at payment, other than the first year VSMP fee as indicated in code section 17-209B. Re -inspection Fees Re -Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are $250 per inspection, or as given in code sections 17-207 and 17-208. 7/1/14, Revised: 8/29/14, 8/28/19 Page 3 of