HomeMy WebLinkAboutWPO201900063 Preconstruction Form 2021-04-29Request for Pre -construction Meeting and Grading $�
Permit from Albemarle County -VSMP r
��AGIN�P
Approved Plan Number: WPO-201900063
Approved Plan Name: Cale Elementary School — Safe Routes to School (SRTS)
(Plans must be approved prior to a pre -construction meeting.)
(Bonds must be approved and posted prior to a pre -construction meeting or permit.)
Responsible Land Disturber:
Print Name: Aaron Bruce
State Certification Number. RLD14530 (Commonwealth of Virginia, State Water Control Board, exp.02/13/23
Address Virginia Infrastructure, Inc., 60 Cloverleaf Lane
City Lexington State VA Zip 24450
Daytime Phone (540) 460-4491 E-mail aaron.infrastructure(a),vahoo.com
Primary Contractor:
Print Name Andrew Hoofnagle, Virginia Infrastructure, Inc.
Address 60 Cloverleaf Lane
City Lexington State VA Zip 24450
Daytime Phone (540) 570-0865 E-mail vaconcrete(i�hotmail.com
Permit Issuance and First Year Maintenance Fees (Request must include payment): N A. (county project)
Total acres proposed to be disturbed is contained on the approved plan and
application: VSMP:
Acres to be disturbed Fee Due at Grading Permit
Less than 1 G$63.80 N.A. (County -Owned project)
1 and less than c Sy94-0000
5 .,�..1� 3T0:00
10 And 'Ass than cncn $990.00
cn....a'Ass than rnn1nn Gig-�4�00
Annual Maintenance Fees [Section 17-208 of the Albemarle County Code] — Annual maintenance fees will be assessed
in March of every year this permit is active. Fees cannot be prorated after the first year of permit issuance.
7/1/14, Revised: 8/29/14, 8/28/19 Page 1 of
Person(s) to attend the Pre -construction Meeting:
Names (type or print) Firm Contact Number or email
Montie Breeden Owner's Rep (The School Board of Albemarle County, Virginia) mbreeden2(c�r�albemale.org
Eugene Coleman, P.E. A/E (A. Morton Thomas and Associates, Inc.) ecoleman&amtengineering com
Andrew Hoofnagle GC (Virginia Infrastructure, Inc.) vaconcrete@hotmail.com
Aaron Bruce RLD (Virginia Infrastructure, Inc.) aaron.infrastructure&Aoo.com
FOR OFFICE USE ONLY
WPO#
Fee Amomt $ Date Paid By who? Receipt # C # By:
7/1/14, Revised: 8/29/14, 8/28/19 Page 2 of
Information for Permit applicants;
9-Month Permanent Stabilization Deadline:
Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after
commencing land disturbing activity
A. When permanent vegetation required. The owner shall install on all denuded areas on the site within nine (9)
months after the date the land disturbing activity commenced, except for areas that the administrator
determines are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non -erosive surface, including, but not limited to, the following surfaces: (i)
roadways and sidewalks covered by gravel, asphalt pavement, or concrete; (ii) trails or paths covered by
gravel, stone dust, or mulch; (iii) buildings and other permanent structures; and such other surfaces that the
administrator determines would adequately provide a permanent barrier to erosion.
(see code 17-808 for information about possible extensions)
Notice to Comply and Permit Revoked for Overdue Fees
Late fees will incur interest, and enforcement actions per code section 17-210.
(1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply (NTC). The notice
gives 7 days to make payments.
(2) At the end of the NTC time period, the permit will be revoked, and a Stop Work Order will be issued
for working without a current permit.
Disturbed Area Reductions
Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on
approved plans. If fees are to be reduced, an application for plan amendment must be made, and areas reduced by
changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee
due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and
all erosion control measures (including traps and basins) removed.
Refunds
The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will
not be pro -rated at payment, other than the first year VSMP fee as indicated in code section 17-209B.
Re -inspection Fees
Re -Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are $250
per inspection, or as given in code sections 17-207 and 17-208.
7/1/14, Revised: 8/29/14, 8/28/19 Page 3 of