Loading...
HomeMy WebLinkAboutWPO202100001 Correspondence 2021-04-29 (2)SHIMP ENGINEERING, P.C. Design Focused Engineering April 29, 2021 David James County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: Variance Request for 9VAC25-870-66-B(3) for 999 Rio Road Dear David, The 999 Rio Road site plan is subject to water quantity regulations that are set forth in 9VAC25-870-66- B(3) which states: "[W]hen stormwater from a development is discharged to a natural stormwater conveyance system, the maximum peak flow rate from the one-year 24-hour storm following the land - disturbing activity shall be calculated either: a. In accordance with the following methodology: QDeveloped -" I.F. *(QPre-developed* RVPre-Developed )/RVDeveloped Under no condition shall QDeveloped be greater than QPre-Developed nor shall QDeveloped be required to be less than that calculated in the equation (QF.,est * RVF..A)/RVDeveloped; where I.F. is the improvement factor and =0.8 for sites > 1 acres or 0.9 for sites < 1 acres." In order to evaluate the requirements set forth in 9VAC25-870-66-B(3), The site was divided into two drainage areas, each drainage area flows into an underground detention system. The first drainage area is 1.779 acres which flows into the Stormtech MC-3500 underground detention chamber system. The second drainage area is 0.169 acres flows into the Stormtech SC-310 underground chamber system. The site runoff from the development is directed to a Point of Analysis (POA) at the western comer of the development. The SWM Quantity requirements for 999 Rio Road can be satisfied if the 1-yr orifice for the Stormtech MC-3500 chamber system is 1.7-inches and the 1-yr orifice for the SC-310 chamber system is 1.8-inches. Due to the small size of these orifices, they are susceptible to clogging and therefore would not flow the required flow rate. This would cause the Post Development Peak Runoff (Qp�t-d,) to increase as the system would hold the water and not function as designed for the 1-yr and 10-yr stones. If the design of the detention systems were modified to 3-inch orifices, the Post Development Peak Runoff (Q�.&v) will increase more than the Maximum allowable Peak Runoff (Q�) but remains below the Pre-Dev Peak Runoff (Qp,e.dev). Below is table 1 to compare the runoff calculations based on the orifice sizes: Table 1: Peak Runoff Calculations per Orifice size Orifice Size inches Storm Year Pre-dev Peak Runoff Max. Allowed Peak Runoff Post-dev Peak Runoff 1.7 & 1.8 1-Yr 0.64 cfs 0.14 cfs 0.13 cfs 1.7 & 1.8 10-Yr 3.32 cfs 3.32 cfs 2.95 cfs 3.0 & 3.0 1-Yr 0.64 cfs 0.14 cfs 0.28 cfs 3.0 & 3.0 10-Yr 3.32 cfs 3.32 cfs 2.44 cfs SHIMP ENGINEERING, P.C. Design Focused Engineering As shown above, the 1-year Post-dev (Qwst_d,) exceeds the allowable flow (Q.�) of 0.14cfs, however it remains approximately 50% of the pre -development level and well below the 1 cfs threshold that has been considered a point at which these variances should be considered. By increasing the minimum orifice size to 3" the intent of the regulations is better served as the system is far less likely to clog and in -turn fail to even meet the pre -development runoff levels for the project. Energy balance calculations showing the results of the various orifice dimensions are attached for your review and consideration. If you have any questions about this calculation packet please do not hesitate to contact me at: steohanie@shimp-en ing eerieg com or justin nAshimp-en ing eerieg com or by phone at 434-299-9843. Regards, Stephanie Paul Shimp Engineering, PC 999 Rio Road Energy Balance Equation Summary: POA 24 Hr 1 year Storm Comparison: Q,,,,m<I.F.*(Qercd loped*RVr' D-n k MYRV&-[. d Q&e :5 (Qr :gym*RV,.re: )/RVde.el I.F. 10.81 0.64 0.051 Max Q&1d,M = 0.14 cfs 0.192 SITE AREA: Qpred Iopm aC = RVp ,. pm = RVoe�,a = Not Achieved Post-Dev Max Runoff 01= 0.28 cfs. Site complies with 9VAC25-870-66- 3 A Maximum Qloyr = 3.32 cfs (predev) Achieved Qloyr = 2.44 cfs LF: 1 0.8 FOR LDA > 1 AC LF: 1 0.9 FOR LDA < 1 AC LDA= AC Predev Flowrates Storm I Cf$ Postdev Plowrates Storm Cfs I-Yr 0.28 10-yr 2.44 Flow Reduction Check Energy Balance Equation Compliance: Not Achieved 999 Rio Road Energy Balance Equation Summary: POA 24 Hr 1 year Storm Comparison: Qderempm<I.F.*(Qpre eloped*lzv' DevkVMYRVdevdoped Qdere :5 (Qr :gym*RV,.re: )/RV&e LF. = 0.8 0.6 n0MaQnva = 14 cfs5100.RVpD, 0.192 SITE AREA: Qpred I.ped ac = = RVDeempm Achieved Post-Dev Max Runoff Qlyr = 0.14 cfs. Site complies with 9VAC25-870-66- 3 A Maximum Qtoyr = 3.32 cfs (redev) Achieved Qtoyr = 2.95 cfs LF: 1 0.8 FOR LDA > 1 AC LF: 1 0.9 IFOR LDA < 1 AC LDA= AC Predev Flowrates Storm cfs 1-yr 0. 0-y 3.3 Posidev Flowrates Storm cfs l-yr ]0-yr Flow Reduction Check Energy Balance Equation Compliance: Achieved Predev Reduced