HomeMy WebLinkAboutSDP202100038 Architectural Drawings 2021-04-29GENERAL NOTES: 1. SITE INFORMATION HAS BEEN TAKEN FROM HAZEN AND SAWYER RECORD DRAWINGS FROM PROJECT #31037-039 TITLED "MOORES CREEK WASTEWATER TREATMENT PLANT NUTRIENT REMOVAL IMPROVEMENTS", DATED SEPTEMBER, 2014. 2. HORIZONTAL CONTROL IS REFERENCED TO NAD 83, VIRGINIA SOUTH ZONE, AND VERTICAL CONTROL IS REFERENCED TO NAVD 88. 3. FLOOD PLAIN ELEVATIONS FROM FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) FLOOD INSURANCE RATE MAP FIRM PANEL 0289D MAP NUMBER 51003CO289D DATED FEBRUARY 04, 2005 THE PROJECT IS LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD. 4. CONTRACTOR SHALL VERIFY FIELD CONDITIONS BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS AND DIMENSIONS WHERE NEW WORK WILL MATCH EXISTING. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO THE COMMENCEMENT OF WORK. 5. CONTRACTOR SHALL OBTAIN ALL THE NECESSARY PERMITS FROM THE APPROPRIATE AUTHORITIES, DEPARTMENTS, AND/OR AGENCIES HAVING JURISDICTION PRIOR TO COMMENCING WORK. 6. CONTRACTOR SHALL TAKE CARE TO AVOID DAMAGE TO EXISTING PAVEMENT, TREES, VEGETATION, STRUCTURES, AND UTILITIES THAT ARE NOT INDICATED TO BE DEMOLISHED OR REMOVED. ANY DAMAGE TO EXISTING PAVEMENT, TREES, VEGETATION, STRUCTURES, AND UTILITIES NOT INDICATED TO BE DEMOLISHED OR REMOVED SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 7. UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORD INFORMATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THEIR EXACT LOCATION AND TO AVOID DAMAGE TO THEM. THE CONTRACTOR SHALL CONTACT VIRGINIA 811 AT PHONE NUMBER 811 OR 1-800-552-7001 TO REQUEST UNDERGROUND UTILITY LOCATION MARK -OUT AT LEAST THREE (3) WORKING DAYS BUT NO MORE THAN TEN (10) WORKING DAYS PRIOR TO BEGINNING EXCAVATION, INCLUDING SOIL DRILLING. THE CONTRACTOR SHALL ALSO CONTACT AND REQUEST UTILITY LOCATION MARK -OUT FROM BURIED UTILITY OWNERS WITH UTILITIES ON THE PROJECT SITE THAT ARE NOT PARTICIPANTS OF VIRGINIA 811. 8. WHERE PROPOSED WORK IS IN THE VICINITY OF UTILITY POLES, SUCH THAT SUPPORT OF THE POLE(S) WILL BE REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE UTILITY OF THE WORK. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE UTILITY FOR SUPPORT OF THE POLE. 9. WHERE OVERHEAD POWER LINES ARE PRESENT, CONTRACTOR MUST CONTACT THE UTILITY PRIOR TO CONSTRUCTION ACTIVITIES TO DETERMINE THE MINIMUM REQUIRED EQUIPMENT CLEARANCE (MEC) DISTANCE BASED UPON LINE STRENGTH. 10. DURING EXCAVATION AND PLACEMENT OF UTILITIES THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY REGULATIONS AND SHALL SUBMIT TO THE ENGINEER FOR REVIEW SHEET PILING, SHORING AND/OR BRACING DESIGNS AS MAY BE NECESSARY TO COMPLY WITH THESE REGULATIONS. 11. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL EXCAVATION SUPPORT AT LOCATIONS AS MAY BE SUGGESTED ON CONTRACT DRAWINGS OR FOR THEIR OWN CONVENIENCE. CONTRACTOR SHALL SUBMIT ALL NECESSARY CALCULATIONS, DRAWINGS, ETC. PREPARED BY A PROFESSIONAL ENGINEER REGISTERED IN THE COMMONWEALTH OF VIRGINIA AS MAY BE NECESSARY FOR REVIEW BY THE ENGINEER PRIOR TO INSTALLATION. REQUIREMENTS FOR EXCAVATION SUPPORT DESIGN MAY BE FOUND IN SPECIFICATION SECTION 02200 EARTHWORK, SECTION 3.03. 12. GROUNDWATER FROM ALL DEWATERING OPERATIONS SHALL BE DISCHARGED TO AN ENVIRONMENTALLY ACCEPTABLE LOCATION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, OR AS DIRECTED BY THE ENGINEER. 13. ALL TEMPORARY FACILITIES ARE SUBJECT TO THE SAME HEALTH AND SAFETY REQUIREMENTS AS PERMANENT FACILITIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS AND HEALTH SAFETY PLAN (HASP). 14. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS GENERATED DURING THE PROJECT OFF SITE AT A PROPERLY PERMITTED DISPOSAL FACILITY. NEW STRUCTURES/SURFACES DEMO EXISTING � C �TT7TT a 77 , eG G - REV I ISSUED FOR I DATE I BY BUILDING/STRUCTURE CONCRETE CURB AND GUTTER CONCRETE PAD/SIDEWALK LEGEND SITE INFORMATION PROJECT DESCRIPTION: THE RIVANNA WATER AND SEWER AUTHORITY IS PROPOSING DEMOLITION OF THE TWO IN -PLANT CLAIFIERS AND LIME SILO AND OTHER RELATED STRUCTURES. ALL YARD PIPING ASSOCIATED WITH THE CLARIFIERS WILL BE DEMOLISHED AND CAPPED WHEN NECESSARY. THERE WILL BE REROUTING OF EXISTING YARD PIPING WHERE APPROPRIATE. WHERE SHOWN, EXISTING SIDEWALK WILL BE REPLACED, AND ASPHALT WILL BE MILLED AND OVERLAID WITH SURFACE COARSE. AN EXCAVATION SUPPORT SYSTEM OF 10' WILL BE DESIGNED BY THE CONTRACTOR FOR MAJOR DEMOLITION ACTIVITIES. THIS PROJECT WILL RESULT IN APPROXIMATELY 57500 SF OF LAND DISTURBANCE. EXISTING SITE CONDITIONS: THE PROJECT IS AT THE MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY (MCAWRRF) LOCATED AT 695 MOORES CREEK LANE, CHARLOTTESVILLE VA 22902. THE PROPERTY IS LOCATED IN UNINCORPORATED ALBEMARLE COUNTY. THE PROPOSED DISTURBANCE WILL BE LOCATED ADJACENT TO THE PRIMARY DIGESTERS AND THE SOLIDS HANDLING BUILDING. TOPOGRAPHY IN THESE THREE AREAS ARE GENTLY SLOPED ALONG THE EXISTING INFRASTRUCTURE, RANGING IN ELEVATIONS FROM 325 FT TO 355 FT. THE NEAREST BODY OF WATER IS MOORES CREEK, WHICH IS APPROXIMATELY 500 FT DOWNSTREAM FROM THE NEAREST GROUND DISTURBING ACTIVITY. NO LAND DISTURBANCE WILL TAKE PLACE IN THE FEMA FLOODPLAIN OR 100' MOORES CREEK STREAM BUFFER. MOORES CREEK ULTIMATELY DISCHARGES TO THE RIVANNA RIVER. ACCORDING TO THE 2016 TMDL REPORT, MOORES CREEK STREAM SEGMENT IS SEVERELY IMPACTED FOR ITS AQUATIC LIFE USE. SEDIMENT WAS SELECTED AS THE MOST PROBABLE STRESSOR. THE PROJECT IS LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD. THE COMBINED MCAWRRF PARCELS ARE BOUND TO THE SOUTH BY THE 1-64 CORRIDOR. TO THE WEST AND NORTH ARE MULTIPLE OPEN PARCELS, ZONED RURAL AND LIGHT INDUSTRIAL. OFF -SITE AREAS: CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SELECT BACKFILL FROM AN OFFSITE LOCATION. ANY VPDES PERMIT REQUIRED IN SUPPORT OF OFFSITE ACTIVITIES SHALL BE OBTAINED BY THE CONTRACTOR SOILS: SOIL TYPES FOUND AT THE MCAWRRF SITE WERE IDENTIFIED BASED ON INFORMATION OBTAINED FROM THE UNITED STATES DEPARTMENT OF AGRICULTURE (USDA), NATURAL RESOURCE CONSERVATION SERVICE (NRCS). THE PROJECTS LIMITS OF DISTURBANCE IS COMPOSED SOLELY OF RABUN CLAY LOAM, 15 TO 25 PERCENT SLOPES. RABUN CLAY LOAM IS IN HYDROLOGIC SOIL GROUP (HSG) A. ADJACENT SOIL TYPES ARE SHOWN ON THE LEGEND BELOW AND ON C12 FOR BOUNDARY CLARIFICATION ONLY. SOIL UNIT LEGEND MAP UNIT SYMBOL MAP UNIT NAME 71D RABUN CLAY LOAM, 15 TO 25% SLOPES 71C RABUM CLAY LOAM, 7 TO 15% SLOPES 83 COLVARD FINE SANDY LOAM, 0 TO 2% SLOPES, OCCASIONALLY FLOODED 23C YADKIN CLAY LOAM, 7 TO 15% SLOPES NEW/OTHER 300 CONTOUR 300- uYARD INLET EXCAVATION SUPPORT SOIL TYPE BOUNDARY O YARD PIPING t t t t MILL AND OVERLAY PROJECT ENGINEER: DESIGNED BY: 191e7-TATA011:1'i CHECKED BY: IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE A. MARCH A. MARCH B. EDWARDS 0 1/2" 1" HSG SITE AREA B 100% B 0% A 0% B 0% EXISTING CONTOUR FENCE PROPERTY LINE EASEMENT -- STORM DRAIN LINE MANHOLE YARD INLET POWER POLE STORMWATER RUNOFF CONSIDERATIONS: QUALITY THE VIRGINIA RUNOFF REDUCTION METHOD (VRRM) SPREADSHEET FOR RE -DEVELOPMENT WAS USED TO DETERMINE THE NUTRIENT REDUCTION REQUIREMENTS. BECAUSE OF THE REMOVAL OF IMPERVIOUS SURFACES, THE PROPOSED PROJECT IS EXCEEDING THE PHOSPHORUS LOAD REDUCTION BY 0.04 LBS/YR. THE PRE -DEVELOPMENT PEAK FLOWS FOR THE 2-YR AND 10-YR 24-HR STORMS FOR EACH DRAINAGE AREA (DA) ARE AS FOLLOWS: 2-YR, 24-HR 10-YR, 24-HR DA1 0.1 CFS 0.4 CFS DA2 1.0 CFS 2.1 CFS DA3 0.9 CFS 1.9 CFS DA4 0.2 CFS 0.5 CFS THE POST -DEVELOPMENT PEAK FLOWS FOR THE 2-YR AND 10-YR 24-H5 STORMS FOR EACH DRAINAGE AREA ARE AS FOLLOWS: 2-YR, 24-HR 10-YR, 24-HR DA1 0.1 CFS 0.4 CFS DA2 0.6 CFS 1.5 CFS DA3 0.7 CFS 1.6 CFS DA4 0.2 CFS 0.5 CFS UNDER PRE -DEVELOPMENT CONDITIONS, RUNOFF FROM THE PROJECT AREA SHEET FLOWS DOWNHILL AWAY FROM THE CLARIFIERS, DOWN A STEEP HILL AND INTO THE NEAREST STORMWATER INLET. NO CHANGE IN OVERALL DRAINAGE PATTERNS IS PROPOSED POST -DEVELOPMENT. EACH DRAINAGE AREA EITHER EXPERIENCES NO CHANGE OR A DECREASE IN PEAK FLOW. AT THE POINT OF OUTFALL THE DRAINAGE AREA OF MOORES CREEK IS APPROCIAMTELY 35.1 SQUARE MILES. THERE WILL BE NO CHANGE IN PRE AND POST RUNOFF CONDITIONS AS A RESULT OF THIS PROJECT AS ALL EXISTING DRAINAGE PATTERNS WILL REMAIN. DUE TO PROJECT DEMOTION, THERE WILL BE A DECREASE IN PEAK FLOW FOR THE PROJECT'S AFFECTED DRAINAGE AREAS AND AS SUCH NO IMPACT ON MOORES CREEK AS IT RELATES TO EROSION OR FLOODING. EROSION AND SEDIMENT CONTROL IP SF SF LOD- LOD- B/M TS PS DC INLET PROTECTION GRAVEL CONSTRUCTION ENTRANCE SILT FENCE LIMITS OF DISTURBANCE SOIL STABILIZATION BLANKETS TEMPORARY SEEDING PERMANENT SEEDING DUST CONTROL Digitally signed by Brian Y. Porter Date: 2021.04.29 15:04:30-04' 00' PRELIMINARY DESIGN Haze DO NOT USED FOR CONSTRUCTION HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 SITE SEEDING SCHEDULE AND NOTES APPLICATION RATES IN POUNDS/ACRE SEED PLANTING STRAW MIXTURE SEASON SEED LIME* FERTILIZER** MULCH*** COMMENTS PREFERED SEASONS: P FEB 15 - APR 30 200 4000 1000 4000 SEPT 1 - SEPT 30 SEPT 1 OCT 31 FEB 15 - MARCH 30 OVERSEED WITH TYPE P TW SEPT 1 - FEB 15 100 * 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON OVERSEED WITH TYPE P TSP FEB 16 - APR 30 100 * 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON OVERSEED WITH TYPE P TSU MAY 1 - AUG 31 50 * 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON ABBREVIATIONS P - 190 LB/AC KENTUCKY 31 TALL FESCUI 5 LB/AC PERENNIAL RYEGRASS 5 LB/AC KENTUCKY BLUEGRASS TW - 50 LB/AC ANNUAL RYEGRASS 50 LB/AC CEREAL (WINTER) RYE TSP - 100 LB/AC ANNUAL RYEGRASS TSU - 50 LB/AC GERMAN MILLET SEED MIXTURES TO BE USED ON THE PROJECT FOR PERMANENT (P), TEMPORARY WINTER (TW), TEMPORARY SPRING (TSP) AND TEMPORARY SUMMER (TSU) SHALL BE AS FOLLOWS (ACCEPTABLE SUBSTITUTES PER SECTION 6.24 OF THE NC EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL MUST BE APPROVED BY ENGINEER) SEEDBED PREPARATION NOTES: 1. SCARIFY 2" DEPTH OF SUBGRADE PRIOR TO PLACING TOPSOIL. 2. TOPSOIL SHALL BE SPREAD AT 4" INCH CONSOLIDATED DEPTH 3. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, OF HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. IN FINE SOILS, SEEDS SHOULD BE DRILLED 1/4 - 1/2 INCH. IN COARSE, SANDY SOILS, SEEDS SHALL BE PLANTED NO DEEPER THAN 3/4 INCH. COVER BROADCAST SEED BY LIGHTLY RAKING OR CHAIN DRAGGING; THEN FIRM SURFACE WITH A ROLLER OR CULTIPACKER TO PROVIDE GOOD SEED CONTACT. 4. ON CUT AND FILL SLOPES 2:1 OR STEEPER ADD 20 LBS/AC OF WEEPING LOVEGRASS TO THE P SEED MIXTURE IN THE SPRING AND ADD 20 LBS/AC ANNUAL RYEGRASS IN FALL AND WINTER. * LIME SHALL BE APPLIED AT A MINIMUM OF 2 TONS PER ACRE WITH 3 TONS PER ACRE IN CLAY SOILS. APPLICATION RATES AND/OR CHEMICAL ANALYSIS SHALL BE CONFIRMED OR ESTABLISHED BY SOIL TEST. TACK MULCH BY APPLYING AT 0.10 GAL/YD2. RATE REQUIREMENTS FOR TEMPORARY SEEDING SHALL BE BASED UPON A pH TEST AS SUCH: <4.2 3 TONS/ACRE 4.2-5.2 2 TONS/ACRE 5.2-6.0 1 TON/ACRE ** FERTILIZER SHALL BE 10-20-10 MIX OR EQUIVALENT NUTRIENTS. *** ALTERNATIVE METHODS OF MULCHING MAY BE UTILIZED. ALTERNATIVE METHODS SHALL CONFORM TO REQUIREMENTS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. TEMPORARY SEEDING: 1. LIMING: AN EVALUATION SHOULD BE CONDUCTED TO DETERMINE IF LIME IS NECESSARY FOR TEMPORARY SEEDING. SEE ABOVE NOTES TO DETERMINE THE NEED AND APPLICATION OF LIME FOR TEMPORARY SEEDING. 2. FERTILIZER: SHALL BE APPLIED AT 600 LBS/AC OF 10-20-10 OR EQUIVALENT NUTRIENTS. LIME AND FERTILIZER SHALL BE INCORPORATED INTO THE TOP 2 TO 4 INCHES OF THE SOIL. 3. SEEDING: SEEDING SHALL BE APPLIED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER OR HYDROSEEDER. SMALL GRAINS SHALL BE PLANTED NO MORE THAN ONE INCH DEEP. GRASSES AND LEGUMES SHALL BE PLANTED WITH NO LESS THAN 1/4" SOIL COVER. FOR SEED SELECTION AND RATES SEE TABLE 3.31-13 (THIS SHEET). 4. MULCHING: SEEDING MADE IN FALL FOR WINTER COVER AND DURING HOT AND DRY SUMMER MONTHS SHALL BE MULCHED ACCORDING TO MULCHING STD. & SPEC 3.35 (TABLE 3.35-A PROVIDED THIS SHEET), EXCEPT THAT HYDROMULCHES (FIBER MULCH) WILL NOT BE CONSIDERED ADEQUATE. STRAW MULCH SHOULD BE USED DURING THESE PERIODS. TEMPORARY SEEDING MADE UNDER FAVORABLE SOIL AND SITE CONDITIONS DURING OPTIMUM SPRING AND FALL SEEDING DATES MAY NOT REQUIRE MULCH. PERMANENT SEEDING: 1. LIMING & FERTILIZER: LIME AND FERTILIZER SHALL BE APPLIED PER SOIL TESTS. SOIL TEST MAY BE PREFORMED BY THE COOPERATIVE EXTENSION SERVICE SOIL TESTING LABORATORY AT VPI&SU, OR BY A REPUTABLE COMMERCIAL LABORATORY. INFORMATION CONCERNING THE STATE SOIL TESTING LABORATORY IS AVAILABLE FROM COUNTY EXTENSION AGENTS. IF SOIL TESTS ARE NOT POSSIBLE, DUE TO UNUSUAL CONDITIONS, SEE THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION 3.32 FOR LIMING AND FERTILIZER NEEDS. 2. SEEDING: SEEDING SHALL BE APPLIED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. SEED DEPTH SHOULD BE 1/4 TO 1/2 INCH. FOR SEED SELECTION AND RATES SEE TABLE 3.32-D (THIS SHEET). 3. MULCHING: ALL PERMANENT SEEDING SHALL BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION. REFER TO MULCHING, STD. & SPEC. 3.35 (TABLE 3.35-A PROVIDED THIS SHEET). EOP EDGE OF PAVEMENT G GAS LOD LIMITS OF DISTURBANCE SS SANITARY SEWER OHE OVERHEAD ELECTRIC W WATER FOC FIBER OPTIC CABLE R PROPERTY LINE LP LIGHT POLE CENTER LINE UGE UNDERGROUND ELECTRIC PP POWER POLE RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION SIGNATURE PANEL NOTES CIVIL GENERAL NOTES AND LEGEND DATE: APRIL 2021 HAZEN NO.: 31430-0106 CONTRACT NO.: 1 DRAWING NUMBER: C01 REV 9VAC25-840-40. MINIMUM STANDARDS. A VESCP MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 300 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH PROJECT ENGINEER: DESIGNED BY: I9I:L TA011:l'fi CHECKED BY: IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING ISSUED FOR DATE gy IS NOT TO FULL SCALE THIS CHAPTER. f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS. (b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION. d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. h. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. A. MARCH A. MARCH B.EDWARDS 0 1/2" 1" PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. I. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS. n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION. STATUTORY AUTHORITY § 62.1-44.15:52 OF THE CODE OF VIRGINIA. HISTORICAL NOTES FORMER 4VAC50-30-40, DERIVED FROM VR625-02-00 § 4; EFF SEPTEMBER 13, 1990; AMENDED, VIRGINIA REGISTER VOLUME 11, ISSUE 11, EFF. MARCH 22, 1995; VOLUME 29, ISSUE 4, EFF. NOVEMBER 21, 2012; AMENDED AND RENUMBERED, VIRGINIA REGISTER VOLUME 30, ISSUE 2, EFF. OCTOBER 23, 2013. Digitally signed by Brian Y. Porter Date: 2021.04.29 15:04:46-04'00' 1 Haze RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY RALEIGH, NORTH CAROLINA27607 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION LICENSE NO.: C-0381 OVERALL EROSION & SEDIMENTATION CONTROL NOTES 1. THE CONTRACTOR IS ENCOURAGED TO PHASE CONSTRUCTION TO MINIMIZE EXPOSED SOIL AREAS THROUGHOUT THE PROJECT. 2. ALL ONSITE ACTIVITIES SHALL BE MANAGED TO INSURE NO ADVERSE IMPACTS TO WATER QUALITY OCCUR DURING AND AFTER CONSTRUCTION. THE ACTIVITIES, AS DESCRIBED IN SPECIFICATION SECTION 31 25 00, AND OTHERS, REQUIRE OVERSIGHT THROUGHOUT THE CONSTRUCTION AND DEVELOPMENT PROCESS TO ASSURE THAT ALL WATER QUALITY STANDARDS ARE PROTECTED. SEE SPECIFICATION SECTION 3125 00 FOR FURTHER REQUIREMENTS. 3. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EROSION CONTROL MEASURES WHETHER OR NOT SHOWN ON THE PLANS TO PROTECT ADJACENT CREEKS, RIVERS, ROADWAYS, ETC. FROM SILTATION AND EROSION. 4. EACH EROSION AND SEDIMENTATION CONTROL MEASURE SHALL BE INSPECTED AT LEAST ONCE EVERY FOUR BUSINESS DAYS OR AT LEAST ONCE EVERY FIVE BUSINESS DAYS AND NO LATER THAN 48 HOURS FOLLOWING A MEASURABLE STORM EVENT. IN THE EVENT THAT A MEASURABLE STORM EVENT OCCURS WHEN THERE ARE MORE THAN 48 HOURS BETWEEN BUSINESS DAYS, THE INSPECTION SHALL BE CONDUCTED ON THE NEXT BUSINESS DAY. 5. ALL PIPE WORK SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD CONSTRUCTION TECHNIQUES. ONLY THE LENGTH OF TRENCH IN WHICH PIPE CAN BE INSTALLED IN ONE DAYS TIME SHALL BE OPEN AT ANY TIME, WITH SPOIL MATERIAL PLACED ON THE UPHILL SIDE OF THE TRENCH. PIPING SHALL BE CAPPED AT THE END OF EACH WORK DAY TO PREVENT SEDIMENT FROM ENTERING PIPE. TRENCH SHALL BE BACKFILLED AT END OF EACH WORKDAY AND DISTURBED AREA SEEDED WITH TEMPORARY SEEDING MEASURES, AS APPROPRIATE. 6. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE, PERMANENT VEGETATION IS ESTABLISHED ON ALL DISTURBED AREAS, AND APPROVAL BY THE ENGINEER IS GIVEN. AREAS WHERE EROSION AND SEDIMENTATION CONTROL MEASURES ARE REMOVED SHALL BE REGRADED AND SEEDED TO MATCH ORIGINAL SITE CONDITIONS. EROSION & SEDIMENTATION CONTROL CONSTRUCTION SEQUENCING 1. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL INSTALL SILT FENCE AS SHOWN ON THE DRAWING FOR TEMPORARY PERIMETER EROSION CONTROL. 2. ONCE THE SITE HAS BEEN CLEARED AND GRUBBED, AND ALL SILT FENCE HAS BEEN INSTALLED, ALL APPROPRIATE UTILITY REROUTING SHALL COMMENCE. ONCE ALL PERMANENT UTILITIES HAVE BEEN ROUTED, THE EXCAVATION SUPPORT SYSTEM MAY BE FURBISHED. ALL MAJOR EXCAVATION AND DEMOLITION ACTIVITIES MAY OCCUR AFTER SUPPORT SYSTEM HAS BEEN VERIFIED BY THE ENGINEER. 3. TEMPORARY SEEDING MEASURES SHALL BE EMPLOYED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES ON ANY AREA WHICH WILL REMAIN UNDISTURBED FOR MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS, WHICHEVER IS SHORTER. ALL SLOPES STEEPER THAN 3H:1 V SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS. ALL OTHER SLOPES OF 3HA V OR FLATTER, EXCEPT THOSE GREATER THAN 50 FT IN LENGTH, SHALL BE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR OTHER STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 14 CALENDAR DAYS. 4. PERMANENT SEEDING SHALL BE INSTALLED, IN THE PROPER PLANTING SEASON, FOR ALL AREAS REACHING FINAL GRADE WHICH WILL NOT BE DISTURBED AGAIN. IF PLANTING SEASON IS NOT APPROPRIATE FOR PERMANENT SEEDING CONTRACTOR SHALL RE -SEED AREA WITH PERMANENT SEEDING WHEN SEASON ALLOWS. 5. UPON COMPLETION OF FINAL GRADING, PERMANENT STRUCTURAL OR VEGETATIVE STABILIZATION SHALL BE ESTABLISHED. 6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES AND THE SITE HAS BEEN PERMANENTLY STABILIZED WITH STRUCTURAL AND/OR PERMANENT VEGETATIVE MEASURES. 7. CONTRACTOR SHALL PERFORM SITE INSPECTION AND MAINTENANCE ONCE EVERY5 BUSINESS DAYS AND WITHIN 48 HOURS AFTER MEASURABLE STORM EVENT. 8. ONCE PERMANENT STABILIZATION HAS OCCURRED, TEMPORARY SEDIMENT CONTROL MEASURES MAY BE REMOVED UPON APPROVAL FROM THE ENGINEER AND ALBEMARLE COUNTY. ANY AREAS DISTURBED BY THE REMOVAL OF EROSION CONTROL MEASURES SHALL BE RETURNED TO THE ORIGINAL, OR BETTER, CONDITION BEFORE SEEDED, MULCHED, AND FERTILIZED. EROSION AND SEDIMENT CONTROL MEASURES: TEMPORARY MEASURES: • CONSTRUCTION ENTRANCE PER STD 3.02 • SILT FENCE PER STD 3.05 • GRAVEL DROP INLET SEDIMENT FILTER PER STD 3.07-2 • CURB INLET SEDIMENT FILTER PER STD 3.07-6 • TEMPORARY SEEDING PER STD 3.31 PERMANENT MEASURES: • SOIL STABILIZATION BLANKETS PER STD 3.36 • PERMANENT STABILIZATION: AREAS OF THE SITE THAT WILL NOT BE PAVED WILL BE SEEDED AND MULCHED ACCORDING TO THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK REQUIREMENTS PER STD 3.32 EROSION AND SEDIMENT CONTROL MAINTENANCE NOTES: IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AFTER EACH RAINFALL OR WEEKLY, WHICHEVER IS MORE FREQUENT, AND SHOULD BE CLEANED AND REPAIRED ACCORDING TO THE FOLLOWING SCHEDULE: 1. EROSION AND SEDIMENT CONTROLS WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION AND BUILDUP OR CLOGGING WITH SEDIMENT. CORRECTIVE ACTION SHALL BE TAKEN IMMEDIATELY. 2. FREQUENT INSPECTIONS AND CLEANING OF MUD AND DEBRIS FOUND OUTSIDE OF THE LIMITS OF DISTURBANCE IS REQUIRED, ALONG WITH ANY OTHER REMEDIES REQUIRED BY THE COUNTY. 3. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND OF GRASS IS MAINTAINED. AREAS SHALL BE RESEEDED AS NEEDED. TEMPORARY STABILIZATION WILL BE USED AS REQUIRED BY THE COUNTY. DATE: 19MA00110[�] CIVIL CONTRACT NO.: EROSION AND SEDIMENT CONTROL NOTES DRAWING NUMBER: APRIL 2021 31430-006 1 CO2 MAIN PLANT ENTRANCE PROPERTY LINE, TYP. Igo / F- d� 0 O \\ / / 10� `Y�q' N CITY OF CHARLOTTESVILLE LIMITSNee �yQ-../ .......... O /�\ 100 YEAR FLOODPLAIN, TYP. R` R . % 1 QDYA 5 �/.".".".". aoaY.. .... MOORES CREEK PUMP STATION ...................... _ �__ oy yf /,'•'•','• / EXPANSION, SDP2010-82 ............ p.."..'/..".'.".".'.".".".".".'.".".'. ............/.......... 6 " FLOODWAY, TYP. y ... �/ ' ^Y.............. . �_ O CA /................♦.................................................. /W I ♦ DIGESTER IMPROVEMENTS, �................... \}�_ \ \ SDP2012-40 .................. ............................... _ >...."/ .............. a o. /..'.'.'.'.'.'.'.'..'.'.'.'.'.' .... ............. ...... ... .. . 100'STREAM BUFFER, TYP. .. .....................I .... .. ... . g oa` 1�A , . ".".".".".."."•...... ................ ♦ V _ �•�� r. O .. . 0 ♦ ' LOD �../.......:.:.:.:. - .' ' .'.' ...:.." " :. moo`..".".". o�P....../....................... ♦ o .....� . _ .. _ ♦��.. RIVANNA PUMP STATION . /..................... ` 6 r- OD r� " "[/ CONSTRUCTION, SDP2013-33 /.:.:.jam ..................... ♦ + _ :,.5:?_..,:.- L 1.-''/\�X�%�%�`��� .t�♦ ` �4Q........ ".. ".. A".. It I ................... I+ g I PROPOSED USE: INDUSTRIAL (UTILITY) OWNER: RIVANNA WATER & SEWER AUTHORITY PROPERTY: MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY TOTAL PROPERTY SIZE: 89.46 ACRES TAX MAP/PARCEL: 077-40A ZONING: LI (LIGHT INDUSTRIAL); ENTRANCE CORRIDOR (EC) MAGISTERIAL: SCOTTSVILLE COUNTY: ALBEMARLE STATE: VIRGINIA ENGINEER: HAZEN AND SAWYER 4011 WESTCHASE BLVD SUITE 500 RALEIGH NC 27607 NO SURVEY CONDUCTED FOR THIS PROJECT; SITE TOPOGRAPHY IS FROM BASE FILES FROM PREVIOUS PLANT IMPROVEMENT SURVEYS. DATUM: HORZ: NAD83 VIRGINIA SOUTH ZONE VERT:NAVD88 THIS SITE IS NOT LOCATED WITHIN THE WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. 100 YEAR FLOODPLAIN ELEVATION: 324.00' REFERENCE: FEMA MAP # 51003CO289D, EFFECTIVE 2/4/2005 AND LOMR 16-03-1107P, EFFECTIVE 2/6/2017. WAIVERS FOR DETENTION, TRAVELWAY WIDTH AND LANDSCAPE PLAN REQUIREMENTS HAVE BEEN GRANTED UNDER THE MAJOR AMENDMENT REVIEW OF SDP200800100. SETBACKS (MET OR N/A) FRONT MINIMUM: 10' FROM THE R-O-W OR EXTERIOR EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE OF R-O-W FRONT MAXIMUM: NONE SIDE AND REAR MINIMUM: 50' BETWEEN PUBLIC R-O-W, RURAL AREAS, OR THE MONTICELLO HISTORIC DISTRICT AND STRUCTURE; 30' BETWEEN OFF-STREET PARKING AND THE DISTRICT BOUNDARY. SIDE AND REAR MAXIMUM: NONE GRIT REMOVAL FACILITY IMPROVEMENTS,SDP2015-145 CLARIFIER COVER CONSTRUCTION, SDP2015-145 �� INTERSTATE 64 CORRIDOR i ADJACENT PARCELS NO. OWNER TAX MAP PARCEL NO I DB-PG ZONING USE 1 RIVANNA WATER AND SEWER AUTHORITY 77 38B 5111 - 166 LIGHT INDUSTRY INDUSTRIAL 2 RIVANNA WATER AND SEWER AUTHORITY 78 22A 5125-573 LIGHT INDUSTRY INDUSTRIAL 3 ELEMENTAL ECOTECH LLC 77 40B 495-325 LIGHT INDUSTRY OPEN 4 TREM COMMERICAL RENTALS LLC 77 40N 2893-653 LIGHT INDUSTRY WAREHOUSE 5 LACY MECHANICAL INC 77 40P 3655-442 LIGHT INDUSTRY GARAGE 6 BROADWAY CENTER LLC 77 40P1 4436-471 LIGHT INDUSTRY WAREHOUSE 7 WOOLEN MILLS 78 21B 639-193 C1 COMMERCIAL COMMERCIAL IVA- MEOW, -ASS CIATED SITE PLANS: SDP20800100 (APPROVED JAN 2009) SITE PLAN SUBMITTAL FOR THE EXPANSION OF MOORES CREEK WWTP WITH REGARDS TO THE NUTRIENT REMOVAL IMPROVEMENT PROJECT. ASSOCIATED SITE PLAN REVISIONS: SDP2010-82 (APPROVED JAN 2011) SITE PLAN SUBMITTAL FOR IMPROVEMENTS TO THE EXISTING MOORES CREEK PUMP STATION AND ITS ASSOCIATED PROPOSED FORCE MAIN. SDP2012-40 (APPROVED OCT 2012) Nim SITE PLAN SUBMITTAL FOR DIGESTER IMPROVEMENTS AT THE EXISTING MOORES CREEK WWTP SDP2013-33 (APPROVED SEPT 2013) SITE PLAN FOR CONSTRUCTION OF NEW RIVANNA PUMP STATION AND INTERCEPTOR TUNNEL. SDP 2015-145 (APPROVED SEPT 2015) MINOR SITE PLAN AMENDMENT FOR ODOR CONTROL IMPROVEMENTS. SDP 2020-015 (APPROVED OCT 2020) MINOR SITE PLAN AMENDMENT FOR ENGINEERING TRAILER ADDITION AND PARKING LOT EXPANSION PROJECT ENGINEER: B. PORTER Digitally signed by Brian Y. Porter Date:2021 0029 PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION _ HAZENANDSAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA NOTES CIVIL LOCATION INFORMATION DATE: APRIL 2021 DESIGNED BY: A. MARCH HAZENNO.: 31430-006 DRAWN BY: A MARCH CONTRACT NO.: 1 MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION CHECKED BY: B.EDWARDS NDRAWING UMBER: CO3 IF E1"THAR DOESNOT o 1 " MEASURE MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE REV ISSUED FOR DATE BY 100A ♦d0 ♦ MAIN PLANT ENTRANCE PROPERTY LINE, TYP. ♦e n /♦ 1dpVR �1p0VR ♦♦ g I/w W I ! 7ax 0 000 I C m • o. C G�C15 1 � q. --ice • pill 0• PLAN SCALE: 1" = 150' m / *1004, \ \ I .p 2 / 11192Z �� 9�iL I 100YR 1 /� IN -PLANT CLARIFIERS TO BE DEMOLISHED / LIME SILO AND ELECTRICAL SHED i / / TO BE DEMOLISHED w LIMITS OF DISTURBANCE, TYP. .. . A I * / wool, 2" MILL AND OVERLAY, TYP.J/ /�` �♦ I — - I I _ UMITS OF DISTURBANCE:57500 SIF X� 64 cORRIOOR �� INTERSTPTE -- PROJECT ENGINEER: B. PORTER Digitally signed by Brian Y. Porter Date: 2021.04.29 15:07:40-04'00' PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION _ HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA SITE CIVIL OVERALL SITE PLAN DATE: DESIGNED BY: A. MARCH HAZEN NO.: 3'1430-006 DRAWN BY: A. MARCH CONTRACT NO.: MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION CHECKED BY: B. EDWARDS NDRAWING UMBER: C10 IF E1"THAR DOESNOT o 1 MEASURE MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE REV ISSUED FOR DATE BY HL 11/ // / 6" SUPERNATANT DIGESTOR BUILDING 1y� I / wl'' RETURN TO MH N _� EIECTJBOX cn � STORAGE --od�--, _ �I �a_ •ti I — --------—---- 3 — ---�s—�----------------PB- 1 = . \\\\ O \ ----2 4N f /— ° — — — ----2�4PW ----- / /��/\�III�II A_{t„/E�A__ \% p� 4\O" \\c11—\\ 11 �\�III ,\\�J_ �\rIlIIiI\ III IX�,iIIIIIIIII —I�NII 2' Tz EW\ \ Itrno , I �II --IIIIII I I I I -- ' .—:—.. �_4— —Pw'— `' oi TIIIIIIIiIIl� � IIIIIII �—IIIIIII i .N</. . ❑�IIIII,IIIII �.,�2- '�——..--, :.:c �l.,i— .`:�/,+.;':>._'t/ ..:—:;:IIIIl � .wti/ IlIIlI :'i•.k ..r --ys —n — --/—%/\/G/ \ II :II . ;'•II 4�IIIIlIiiII 1II---------L-- — ----cam---- uu _ ASPH_-----�_�'IIIIII IIIIIIi I / w�IIIII — --- \� — \ ------�--II— —— ALT PAVEMENT -----rI ---ASPHALT — PA—Vd—ENT -----------------i_ofr(-7 ------- ---- N/4,p ---B—D l2—ss =1 =1r =--___ - `b CONCRETE WALKWAY 6p�4„DG — LW 4 EW — — — — — — 16" CURB _ BOILER FACILITY EW2"E NERATOR 4 PE ABANDON \ — — — — — —— m(n'..... --- ____ I m a D JUNCTION BOXABANDONE--------- 2„PW m -PLANT -PLANT 3" EW TERTIARY —IAR—Y CLARIFIER CLARIFIER L— —— — -----------FILTERSCONDITIONING xil TANKSTRUCTURE (ABANDONED) 16" FM Pw— — — — "8------- __II /%ms �7`�� 6»____ LB 24 ML� —— — — — — — -------- — —�I —— ❑\�\ \ �Pg\.\\133 +\— \ \—\ \ \—\\\\ \\\ \\\\\\�\\ \ \\\� �\I \\p\I�\\\\\\\I\r\\y\ \\�z\\'\ �\� \\ �. \\ ° \�\ \, • \\\\ \ \\\\— \\—\ —\— ' \ \ \\--\ --FZL`O� OrbDWFm�A—,I — �C—I=II—'• —_—g i�i--�—i/ _IiII II \IIII\ .IlII .�f...i 1 I �—\+. / ,�..:,/._—/:/:J` \ 2•'_—i \v_—\ �d—IIIii `\-- III I— — _"— -- --_° --_—=O-- —. BWW 8' PS I---------_---_--_Z--C==O--NTC—B—. BS—W—YA—P—LAES--S —�—i�--r1d— -----A-- �—C----------_e IIIIIIIII II I --II II —II— -- -------- --GRAVEL ROAD OAD — --TT— III IIIlIII1 l ul�I --\ -- 7G j-7— --/_ --r—`--vw--tN ¢l CONC. RETAINING WALL 100 YEAR FLOODPLAIN NI EL (o3EW � o----------------_____________===—s—�=— =_____�-------------- —____—___-- _----- ____--- 7 - 18 PE , — s---------------- ______Ew 3„EW 2" PW� npB.,S;— I _----_-----_—\100'STREAM BUFFER -�MA@A— — — — — — 1$" BYPASS ABANDON --—— — — — — — 00 c18" BYPASS ABANDON ----z=—------Z=--- ------ t-- - +. �";CW h y-8,DS — I 100YR 00 .4 SWALE INLET 1°pyR LIMO SILO W/ PAD A00IR YARDINLET \\o aCOG WALKWAY INLET o I24BWWBACKWASH WASTE Y CONCRETE a SOLIDS HANDLING RECLAIM BASIN PLATFORM ELECTRICAL SHED BUILDING (n�_-` I 100);P ABOVE GROUND \ ° IN c\ " a ASPHALT PAMENT A OUTFALL PIPE a n \ \ \\\ \ O \\_—\\\ _— _ _—_—_—_— WI II----�—_— 150_112--- --�\ \ _—_— _—/_— _----------------------_--_—_------------------------------ 11 ------------ ------�----——--24' ----- ---------__WW =-- ---------� — -------- ------------------ __________ I II wX III II I ---- a„� — — — — \ �� '�'�� w / i ° k \-Volo \ \ \\\�8 / ASPHALT PAVEMENT I to \\ cp' \ \/ �Q pg-14 III ° PB-15 w 04 COG ❑. \ + \\ 0 1 Y 18" D4" DO —.------.--------------===--T = 1 + X�I--L1�--- �// kw5�-�, 1 III I I I----- ���-�- \ III X -- /// \ III og-,8 OUT = 3,,.01' — �GG9� _I i— _ X x x i x PLAN 20 10 0 20' SCALE: 1" = 20' SCALE: 1" = 20' PROJECT ENGINEER: B. PORTER RIVANNA WATER & SEWER AUTHORITY Digitally signed by Brian Y. Porter DATE: DESIGNED BY: A. MARCH Date: 2021.04.2915:07:53-04'00CHARLOTTESVILLE, VIRGINA HAZENNO., 31430-006 DRAWN BY: A. MARCH PRELIMINARY DESIGN SITE CONTRACT NO.: 1 DO NOT USED FOR _ CIVIL DRAWING CHECKED BY: B. EDWARDS CONSTRUCTION HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE EXISING SITE AND YARD PIPING PLAN NUMBER IF THIS BAR DOES NOT 0 111 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY MEASURE 1" THEN DRAWING RALEIGH, NORTH CAROLINA 27607 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE LICENSE NO.: C-0381 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION C11 t 1'c- p'?,01 Ll 11% L SLUDGE STORAGE LOD L _j SOIL TYPE BOUNDARY, SEE SOIL CHART, CO CURB INLET PROTECTION CONDITIONING TANK STRUCTURE (ABANDONED) SILT FENCE, TYP. IP DIGESTOR BUILDING EXCAVATION SUPPORT SYSTEM BY CONTRACTOR IN -PLANT CLARIFIER ASPHALT PAVEMENT I Cow!0" I BOILER FACILITY LOD — LOD — LOD STOCKPILEICONTRACTOR LAYDOWN AREA G . ENERATORS j �A LIMITS OF DISTURBANCE w 0 TERTIARY FILTERS SOIL STABILIZATION BLANKETS r_ GRAVEL CONSTRUCTION 0 ENTRANCE, TYP. TS 1� C-31-5ZOJ� C PS L 74 L 0, Lor) LOD :qi I I I DC Ir 0 0 SF 100 YEAR FLOODPLA SF SF - SF - SF SF SF SF DROP INLET PROTECTION, TYP. (]O_1 (]O_1 GOl (101-00-1 0 'qj� \ C-31-0418 RE)PS- 100'STREAM BUFFER - or - ---------- I SF--;; FSF SF (10-1 — (10-1 no-1 no-1 no-1 no-1 no-i no-i nm nn IU% IF Tr 400)m 11 U-0 I wi_ uj Nj 100YR A4 A looiR IVUTM looR 4' 1oovR A4 A 4 700 A 4. A A BACKWASH WASTE FLOODWAY CONCRETE 4 SOLIDS HANDLING RECLAIM BASIN .4 . . - I PLATFORM A BUILDING A L Al' 4. 44 A 4 A' A 4. A 4 A. A A A 0 0 IOOYR 83 ASPHALT PAVEMENT E 61 + x X _X_X_ X X 12 ftftftw + Xr%,C\ \ ftftft x 'A pe-il p9_15 83 Moro X_ _7 X PLAN 20 10 0 20' SCALE: 1" = 20' SCALE: 1" = 20' PROJECT Digitally signed by Brian Y. DATE: APRIL 2021 ENGINEER: B. PORTER Porter RIVANNA WATER & SEWER AUTHORITY DESIGNED BY: A. MARCH Date: 2021.04.29 CHARLOTTESVILLE, VIRGINA PRELIMINARY DESIGN HAZEN NO.: 31430-006 15:08:07-04'00' SITE DRAWN BY: A. MARCH DO NOT USED FOR Hazen CIVIL CONTRACT NO.: 1 CHECKED BY: B. EDWARDS CONSTRUCTION MOORES CREEK ADVANCED WATER RESOURCE DRAWING HAZEN AND SAWYER EROSION AND SEDIMENT CONTROL PLAN NUMBER: IF THIS BAR DOES NOT 0 1/2" ill 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY MEASURE 1" THEN DRAWING RALEIGH, NORTH CAROLINA 27607 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE LICENSE NO.: C-0381 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION C12 RET. WALL SLUDGE STORAGE C3\� L D LOD LOD REROUTE EW,PW SEE NOTE 3 p 01 I I I DEMOLISH ABANDONED I F I I I I CONDITIONING TANK r -ti I I DEMOLISH AND CAP 16" FM DEMOLISH AND CAP 24" RAS I •:�•: 1 I i DEMOLISH AND CAP MS SIEA 1 I I 1 \ i i REROUTE 8" TS, SEE NOTE 3 REROUTE 8" DS, SEE NOTE 341 J I I I DEMOLISH AND CAP 8" HWS00 I I I T �\ \ I I •' DEMOLISH AND CAP 8" H I I I +, DEMOLISH AND CAP 6" A \ \ x l I ❑ DEMOLISH AND CAP (2) 8" PS �\ \ \ \100I \\ O ---'DEMOLISH SIDEWALK ------- 00 4. \ \ \ \\ ''o i ,C` ON \4 0 0'7? \ 1I 1Ij I I 11Ih0 ,\ . �N, I IIII 4 x 4- REV ISSUED FOR — I � DIGESTOR BUILDING ti \ I i / NOTES: \ I 1. EXCAVATION SUPPORT SYSTEM IS SHOWN �• ' � I % PICTORIALLY ONLY FOR CONTRACTOR REFERENCE AND SHALL NOT BE CONSIDERED TO INCLUDED II •3 ---- ,� Tt— \\\ I O ALL REQUIRED EXCAVATION SUPPORT TO PERFORM \\\ \ THE REQUIRED WORK. CONTRACTOR SHALL BE DEMOLISH 12" SD I i I \\\� I I \\ O EXCLUSIVELY RESPONSIBLE FOR EXCAVATION �ioSEE NOTE 2 REROUTE 4" / 1 4' EW, SEE NOTE 3 \�\__-- I-_- SUPPORT SYSTEM DESIGN AND INSTALLATION O I—_—------- —_ —_—_--�---I__ --� - _= INCLUDING VIBRATION MONITORING AND PLUG SS MANHOLE ASPHALT PAVEMENT ---- — AVID DEMOLISH 1 4' EW -- —_------_-__ — !__====—t== _-- \�----- ---- PROVIDING A VIBRATION MONITORING PLAN. ---------------- ____-_,-----\\ CONTRACTOR SHALL SUBMIT DRAWINGS AND DEMOLISH SIDEWALK, TYP. I I r �r==11 ,I I I \\ N DESIGN CALCULATIONS FOR PROPOSED / -= DEMOLISH 12" SS EXCAVATION LOD L LO EXCAVATION SUPPORT SYSTEM SEALED BY A SEE NOTE 4 I/-- o - - ____ -- I \� -- ---- CURRENTLY REGISTERED PROFESSIONAL I p I \\ ENGINEER IN THE COMMONWEALTH OF VIRGINIA. CONTRACTOR SHALL REFERENCE CONTRACT BOILER FACILITY I SPECIFICATION SECTION 3100 01 - EARTHWORK. :`'•'' `•::` - "' EXCAVATION SUPPORT SYSTEM SHALL BE DEMOLISH (2) 24" PE I REMOVED IN IT'S ENTIRETY AT COMPLETION OF SEE NOTE 4 { I CONSTRUCTION ACTIVITIES. GENERATORS I� = PLUGJAULT I 2. CONTRACTOR SHALL BE RESPONSIBLE FOR I I TEMPORARILY REROUTING STORMWATER FROM 12" -- - - - - - - - - - - - - - - ___ SD DURING EXCAVATION ACTIVITIES. SEE C15 - - - - - - - - - f - - - - - - - - - - I FOR RECONNECTION DETAILS OF 15" SD AFTER DEMOLISH IN -PLANT CLARIFIERS ________ -- i i I DEMOLITION ACTIVITIES ARE COMPLETE. ILI I I I I 3. EXISTING 2PW, 1 4' EW, 8" TS, AND 8" DS IIOD LOD LOD LOD J SHALL BE REROUTED BEFORE EXCAVATION I 0 / ACTIVITIES, AS SHOWN ON C14. CONTRACTOR I I L---_-____p --__ / SHALL EXERCISE EXTREME CAUTION AROUND THE L__________________ ______�� I REROUTED PIPES DURING EXCAVATION. I I EXCAVATION SUPPORT SYSTEM i i i CONTRACTOR SHALL COORDINATE WITH OWNER SEE NOTE 1 I I I FOR ANY REROUTING THAT WILL CAUSE A PROCESS DISTURBANCE TO THE PLANT. I I I I 4. (2) 24" PE AND 12" SS LINES SHALL BE COIJIIRC I I I I I DEMOLISHED PRIOR TO MAJOR EXCAVATION �0 I I I I ACTIVITIES TO AVOID CONFLICT WITH DEMOLISH 8" D I i i i i EXCAVATION SUPPORT. O }'; I LIMITS OF DISTURBANCE, TYP. p I I I 5. DEMOLITION OF LIME SILO AND ASSOCIATED DEMOLISH (3) 24" MIL 8" SD I I I STRUCTURES SHALL EXCLUDE CONCRETE PAD. I I I I I CONTRACTOR SHALL RESTORE AND FILL ANY OO I I I I I I DAMAGES OR HOLES LEFT BY DEMOLITION DEMOLISH 18" BYPASSII� ACTIVITIES. SEE DRAWINGS S20-S23 FOR DEMOLISH SIDEWALK AND STAIRS I I I I o LOD i LFJD LOD LOD LOD STRUCTURAL DETAILS OF LIME SILO. DEMOLISH SD MH l DEMOLISH AND CAP 12" FM i i i i i i �\ i I - DEMOLISH AND CAP 2" EW I I I I I I I \ DEMOLISH AND CAP 6" DISCHARGE PLUG SS MANHOLE I 0II 1003 003 003 003—CIO-1__— —_ -------------- ---------------- _____-_________ --------------- —---------------- ------ p r-------- — I I I o� =__'--------------___-�---_________------------------------- o 1 /------ 0-1 aoiWei -------- — — — I I '.r t'.: •.i. iM: .:i w._ a, a.. :y:' -4`- ---a.'i:—`.. ,---- �—�'— +.—� - y 1 ° ° 1 OOS A�C III 1 II I iiI 44 e I _ DEMOLISH LIME SILO,' IIII I I I I �•" 4 4 SEE NOTE 5 ' ° , °. 4 ',� 4 - , 4. ° -1 DEMOLISH ELECTRICAL SHED IIII occ I I I ---I I -- I LL BACKWASH WASTE ,;: I I CONCRETE a SOLIDS HANDLING IIII I III I I RECLAIM BASIN I II .4 PLATFORM 4 a I BUILDING Al. Q I IIII IIII I III 41 % / 4 DEMOLISH OUTFALL PIPE III i I I i i I I I T ° :4 a ° - III ASPHALT PAVEMENT ° I III I I I �rt 4 ° IK ° --------------------------HII \ \\\ a \\ I \ ______ ___ _______________------------- III IIII I I ------------- -------------- ----- ------------------------ __=------------_— _— —& X _____ __—_ _ ---------pl==____________________ II ________ ------------------------------- — — ---------------- f---- -------------------------_-- =---=________�— = __— ______________________= =— — -- ZZ------------ / ASPHALT PAVEMENT 11 _—��\�/ � � III °❑ � I �— ------------------------------------------------------ -- — —------------ I II I of OUT PLAN SCALE: 1" = 20' PROJECT ENGINEER: B. PORTER Digitally signed by Brian Y. Porter Date: 2021.04.29 15:08:24-04'00' PRELIMINARY DESIGNDO NOT USED FOR CONSTRUCTION HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE500 RALEIGH, NORTH CAROLINA27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA DESIGNED BY: A. MARCH DRAWN BY: A. MARCH MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE DATE BY I I II i I I III � x x, x 20 10 0 20' SCALE: 1" = 20' DATE: APRIL 2021 HAZEN NO.: 31430-006 SITE CIVIL CONTRACT NO.:DRAWING 1 DEMOLITION PLAN NUMBER: C13 x hcs AREA pg-13 16 Mc .� REV ISSUED FOR SLUDGE STORAGE LOD wu LOD uN 356 DROP INLET, SEE C15 354 100YEARFLOODPLAIN 344 NTREA \ 401011UFFER 338 A0 \ \ FLOODWAY ��X tx t00YR _x- "01 0 PROJECT ENGINEER: B. PORTER PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION DESIGNED BY: A. MARCH DRAWN BY: A. MARCH CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE DATE EBBY DIGESTOR BUILDING 352 i EIECTJ BOX El r 11wIF_10rwAakyAlaan LOD LOD r O - r BOILER FACILITY w GENERATORS I� EPLACE 4' SIDEWALK, TYP.32-0520 / IJ / 52 L LOD LOD LOD r — / o / r O / ppNTRO� 348 / 0 / 346 0 \vl 344 REPLACE 4' CONC. STAIR O LOD C-32-0521 342 340 OOl 00" E CURB AS NEC LOD 40-1 w NOTES: 1. CONTRACTOR SHALL MATCH THE EXISTING GRADE AND DRAINAGE PATTERNS OF THE ASPHALT PAVEMENT. SEE C10 FOR FULL EXTENT OF 2" MILL AND OVERLAY. i u TERTIARY FILTERS Aw LOD ILOD —�L + ] + + + + + + + + +� + + + + + QO1001 Al. aG a. a 4 1 100YR . 4 C \ 700 / 4 Q' a / a �a a CONCRETE ,''' Q. , BACKWASH PLATFORM 326 SOLIDS HANDLING I RECRECLAIMM BASINN WASTE .d n a BUILDING c as a 2" MILL AND OVERLAY, TYP. a Al. a a y °. SEE NOTE 1 T / a / 4 Q A a A C Q d Q. A I A e + 324 + + + + + + + + + + + + + + + + + O+ + + + + + + + + + + + + + + + i X + + +.. . + + +� ' + + . +, + + + + + + + + + + + + + + + + + + + + + + + + +- +� � + + + + + + + + + + + + + + + + + + + + +j + + ' + + + +. + + +�J. / + + + + + + + + + + + + + + + + + I + + + Q❑15 + + + + + + 3 x�x 22 x x x x —x x x x k ++++++++ + + x ++++++++t++++++ + + + +,�-1 + + + , + + + + + + p+g.16 . 0,11 . 311.0 + + + + + + + + + + + + PLAN i _ x x x SCALE: 1" = 20' Digitally signed by Brian Y. Porter Date: 2021.04.29 15:08:36-04'00' Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION 20 10 0 20' SCALE: 1" = 20' �I DATE: APRIL 2021 HAZEN NO.: 31430-006 SITE CIVIL CONTRACT NO.: 1 FINAL SITE PLAN NUMBDRAWING C14 I I I I I g511 I I❑pg-13 I I� I I I I I I I I1� . � I REV ISSUED FOR O O m vu' n =m �m D Z m RET. WALL 2 4' PW 3" EW 8" DS 8" TS SLUDGE STORAGE PLUG MANHOLE CAP 8" HWR CAP 8" HWS CAP 16" FM CAP 6"A CAP (2) 8" PS CAP 24" RAS xx CAP (?)"MS CAP 8" HWS — — CAP 8" HWR \\\-12 vs-12 \ \ \ x J I jDIGESTOR BUILDING EIECiPoC BOX —fit ----- ` '---------------- ,: I'D�1 \\ / -- EX. DROP INLET -- TOP: 355.00' I I I \\\ I \ / INV OUT: 352.15' I I \\\� I \ / :.21\ - 30 LF, 12" DIP SD @ 6.83% I �--�------------- --- -- __ ----------_ —_. _ .mil=====— — -----� --------------------- — — - -- ASPHALT PAVEMENT ------------- -- — t-----~'\�-------------- -------�--- __-------- ^--- — rr• �F�T,TuT--rr—�— DROP INLET TOP: 353.80' INV IN: 350.10' INV OUT: 349.07' C-22-0302 141 LF, 15" DIP SD @ 13.4% CAP 6" A CAP 6" DISCHARGE CAP 2" EW EX. DROP INLET II TOP:333.55' El-� INV IN: 330.15, ET. WALL INV OUT: 329.65' PROJECT ENGINEER: B. PORTER PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION DESIGNED BY: A. MARCH DRAWN BY: A. MARCH CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE DATE BY r I BOILER FACILITY PLUG VAULT I L------- PLUG MANHOLE CAP 18" FM ------ ----- ---------- — — L L------ I \�I \ GENERATORS }1 I II J -------------� I II I II I II I II I I Ij I \ L________________ �} L---------------- ---------� i ______=____________________ 1 II 1x II II ------- — ---------------------�-1114- I 100YR100 as a °a : .. c —'°°oorR —100 I a a 4 Q . ° �. n . ; a .4 _AAa ° , a. ,... a. CONCRETE SOLIDS HANDLING IIII -Q PLATFORM .Q n° BUILDING Al' r. I III I 4 A a III A --------------------------4 ----------- a --------------------- III III I _ -_ _ -_-_ -- - - - - - - - - - - - - - - - - - - - - - - - - All _ —------—_—_—_—_—_—_—_—_—_— _ ----��/----------------------- �— ----------_ __---= -- —fir — — — — — — — — — — — — — — — — — — — — — — — — — — ft ASPHALT PAVEMENT pg.N III O Digitally signed by Brian Y. Porter Date: 2021.04.29 15:08:52-04'00' ———————————————————————————————————— I out 311.0 HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 50 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 PLAN SCALE: 1" = 20' RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE o RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION X TERTIARY FILTERS Aw I I\'00 II BACKWASH WASTE RECLAIM BASIN II II II x____ ______-- - -- -------- I I II i I I I I x x� SCALE: 1" = 20' SITE CIVIL FINAL YARD PIPING PLAN -x 20 10 0 20' DATE: APRIL 2021 HAZENNO.: 31430.006 CONTRACT NO.: 1 DRAWING NUMBER: C15 PRE -DEVELOPMENT: DA-1 PRE -DEVELOPMENT: DA-2 a v REV COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.01 1.0 LAWN A 39 0.00 0.0 B 61 0.23 14.0 TOTALS 0.2 15 COMPOSITE CN 63 TIME OF CONCENTRATION, tc (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) 2 10 3.66 5.54 0.72 1.82 0.1 0.4 POST -DEVELOPMENT: DA-1 0.04 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.01 0.5 LAWN A 39 0.00 0.0 B 61 0.24 14.6 TOTALS 0.2 15 COMPOSITE CN 62 TIME OF CONCENTRATION, t, (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) 2 10 3.66 5.54 0.68 1.76 0.1 0.4 PRE -DEVELOPMENT: DA-3 0.04 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.41 40.2 LAWN A 39 0.00 0.0 B 61 0.70 42.7 TOTALS 1.1 83 COMPOSITE CN 75 TIME OF CONCENTRATION, t. (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF. Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.39 2.86 0.9 1.9 POST -DEVELOPMENT: DA-3 M• COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.30 29.4 LAWN A 39 0.00 0.0 B 61 0.81 49.4 TOTALS 1.1 79 COMPOSITE CN 71 TIME OF CONCENTRATION, tc (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.17 2.53 0.7 1.6 PROJECT ENGINEER: DESIGNED BY: CHECKED BY: IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING ISSUED FOR DATE gY IS NOT TO FULL SCALE COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.32 31.4 LAWN A 39 0.00 0.0 B 61 0.39 23.8 TOTALS 0.7 55 COMPOSITE CN 78 TIME OF CONCENTRATION, tc (HOURS) STORM FREQUENCY (YR) 2 10 RAINFALL (IN) 3.66 5.54 RUNOFF, Q 1.60 3.14 PEAK FLOW (CFS) 1.0 2.1 POST -DEVELOPMENT: DA-2 0.04 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.17 16.7 LAWN A 39 0.00 0.0 B 61 0.54 32.9 TOTALS 0.7 50 COMPOSITE CN 70 TIME OF CONCENTRATION, t. (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.10 2.43 0.6 1.5 PRE -DEVELOPMENT: DA-4 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.05 4.9 LAWN A 39 0.00 0.0 B 61 0.41 25.0 TOTALS 0.5 30 COMPOSITE CN 65 TIME OF CONCENTRATION, tc (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) 2 10 3.66 5.54 0.84 2.02 0.2 0.5 POST -DEVELOPMENT: DA-4 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.05 4.9 LAWN A 39 0.00 0.0 B 61 0.41 25.0 TOTALS 0.5 30 COMPOSITE CN 65 TIME OF CONCENTRATION, tc (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) B. PORTER A. MARCH A. MARCH B.EDWARDS 0 1/2" 1" 2 10 3.66 5.54 0.84 2.02 0.2 0.5 PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION i 1• Digitally signed by Brian Y Porter Date: 2021.04.29 15:09:25-04'00' 1»_11 SCALE: 1" = 50' RIVANNA WATER & SEWER AUTHORITY Haze CHARLOTTESVILLE, VIRGINA HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY RALEIGH, NORTH CAROLINA27607 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION LICENSE NO.: C-0381 SITE CIVIL STORMWATER CALCULATIONS LEGEND IMPERVIOUS AREA (EXISTING) IMPERVIOUS AREA (REMOVED) OPEN SPACE DIRECTION OF SURFACE FLOW DATE: APRIL 2021 HAZEN NO.: 31430.006 CONTRACT NO.: 1 DRAWING NUMBER: C17 m a N U) w w Z J IS I I . REI 1�LAT"� STEEL POST TOP STRAND STAY WIRES GALV WIRE FABRIC AND SILT FENCE MATERIAL. BURY TOE OF MATERIAL FABRIC A MIN OF 8" BOTTOM STRAND GRADE LINE LYj _Z co o W n F J u= 8" MIN ELEVATION SECTION SILT FENCE SILT FENCE NOTE: 1. EXTRA STRENGTH SILT FENCE MATERIAL (AS APPROVED BY ENGINEER) WITH 6'-0" POST SPACING DOES NOT REQUIRE MESH SUPPORT FENCE. 2. SILT FENCE MATERIAL SHALL BE WIRED DIRECTLY TO POST. C-31-0400 ROADWAY GRATE INLET FILTER BAG BETWEEN FRAME AND GRATE CATCH BASIN INLET NOTES: 1. IN PAVED AREAS, USE FILTER BAG FOR INLET PROTECTION (NO MESH, BOX STONE REQUIRED). 2. FILTER BAG SHALL BE MANUFACTURED FROM A WOVEN POLYPROPYLENE GEOTEXTILE AND SEWN BY A DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH NYLON THREAD. 3. BAG SHALL BE SILTSACK® BY ACF ENVIRONMENTAL, OR EQUAL, AS APPROVED BY THE ENGINEER. MAINTENANCE REQUIREMENTS: 1. INSPECT GRATE AND BAG ON A WEEKLY BASIS AND AFTER EACH RAINFALL EVENT PRODUCING } INCH OR MORE OF RAIN. ANY DEBRIS OR SEDIMENT VISIBLE SHALL BE REMOVED IMMEDIATELY. 2. DAMAGE TO THE BAG SHALL BE REPAIRED IMMEDIATELY. 3. WHEN THE RESTRAINT CORD IS NO LONGER VISIBLE, THE BAG IS FULL AND SHOULD BE EMPTIED. 4. USE 1" DIAMETER REBAR TO SLIDE THROUGH THE LIFTING LOOPS/POCKETS ON EACH SIDE OF THE BAG TO FACILITATE LIFTING. 5. REMOVE SEDIMENT FROM BAG AND DISPOSE OF OFF -SITE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. BELOW GRADE INLET PROTECTION C-31-0418 50'-0"MIN 0 0"0 00-0000v -0 0 0�0 "o c 0 0 0 C7 } o0 Z o 2" - 3" COARSE Z ¢ o o AGGREGATE >� O o0 0 Z w (If000 0 0 00000 00 � �i o00o bOO o000� 0 0 00o 00000 0000 c N � o0 00 0 000 0000 0oSoo 00 00 (V lf"`SILT FENCE* PLAN EXISTING ROADWAY iorzm NOTES: NOTES: 1. *SILT FENCE SHOULD BE INSTALLED TO ENSURE 0 v CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD OR THE LENGTH OF THE CONSTRUCTION ENTRANCE EXTENDED. 3. MAINTENANCE: ADD ADDITIONAL STONE AND "FLUFF" TOP DRESSING WITH 2" STONE. TYPICAL TREATMENT — 2 NEW CONSTRUCTION - CROSS SECTION SEE N.C. DENR EROSION AND SEDIMENT CONTROL PLANNING and DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATION & DESIGN CRITERIA. GRAVEL ENTRANCE/EXIT C-31-0490 CURB OPENING WITHOUT GRATE MANHOLE OVERFLOW GAP AGGREGATE •• POUCH r r. _ ... _ `► :���= CURB FILTER GUTTERGATOR ®BY ACF ENVIRONMENTAL OR APPROVED EQUAL 1. INSTALL CURB FILTERS AT ALL INLETS WITHOUT GRATES TO KEEP SILT, SEDIMENT AND CONSTRUCTION DEBRIS OUT OF THE STORM SYSTEM 2. THE CURB FILTER SHALL BE DANDY CURB AS MANUFACTURED BY DANDY PRODUCTS INC., OR EQUAL. SUBMIT SHOP A SHOP DRAWING FOR THE CURB FILTERS. 3. THE CURB FILTER SHALL FORM OF A CYLINDRICAL TUBE PLACED IN FRONT OF AND EXTENDING BEYOND THE INLET OPENING ON BOTH SIDES. 4. THE CURB FILTER SHALL HAVE A POUCH ON THE STREET SIDE OF THE UNIT FOR STONE AGGREGATE TO HOLD THE FILTER IN PLACE. 5. THE CURB FILTER SHALL BE CONSTRUCTED OF A HIGH VISIBILITY ORANGE MONOFILAMENT FABRIC. 6. FILL POUCH WITH #57 STONE AGGREGATE TO A LEVEL (AT LEAST HALF -FULL) THAT WILL KEEP UNIT IN PLACE DURING A RAIN EVENT AND CREATE A SEAL BETWEEN THE CURB FILTER AND THE SURFACE OF THE STREET. 7. CENTER THE UNIT AGAINST CURB OR MEDIAN INLET OPENING SO THAT THE CURB SIDE OF THE UNIT CREATES A SEAL WITH THE CURB OR MEDIAN BARRIER AND INLET STRUCTURE. THERE WILL BE APPROXIMATELY TWELVE (12) INCHES OF THE INLET PROTECTION UNIT OVERHANGING ON EACH SIDE OF THE OPENING. 8. THE CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM SURFACE AND VICINITY OF UNIT AFTER EACH RAIN EVENT. CURB INLET PROTECTION C-31-0414 _0film- Vol�//1Li1reff1iT/IIF/w1 ylkyra SLOPE INSTALLATION FILL SLOPE SECTION SOIL STABILIZATION MATS SHOULD BE INSTALLED VERTICALLY DOWNSLOPE FOR BEST RESULTS. IhM TOE MAINTAIN SLOPE ANGLE SLOPE LINING (WET SLOPE 11:77_\IbI��IQ'� POLYPROPELYENE NON -WOVEN (NEEDLE PUNCHED) GEOTEXTILE FILTER CLOTH (BEHIND TREATMENT - 2) \ SOIL 4TEP i BOTTOM OF CUT SLOPE SLOPE SURFACE SHALL BE SMOOTH AND FREE OF ROCKS, LUMPS OF DIRT, GRASS AND STICKS. MAT SHALL BE PLACED FLAT ON SURFACE FOR PROPER SOIL CONTACT. DIRT SHALL BE TAMPERED PRIOR TO LAYING TOP LAP OVER BERM TRENCH INTO BERM AND PROGRESS DOWNSLOPE SLOPE LINING TOP OF CUT SLOPE (DRY SLOPE 5`P � F�ERi BOTTOM OF FILL TREATMENT - 2 BOTTOM OF CUT SLOPE - OR SHOULDER BREAK POINT 21 SOURCE: VDOT ROAD AND BRIDGE STANDARDS PLATE: 3.36-5 DETAIL F 1 SCALE: N.T.S. I CDl PROJECT ENGINEER: B. PORTER Digitally signed by Brian Y. Porter Date: 2021.04.29 15:09:39-04'00'Hazen PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION _ HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA DETAILS CIVIL EROSION AND SEDIMENT CONTROL DETAILS DATE: DESIGNED BY: A. MARCH HAZEN NO.: 31430-006 DRAWN BY: A. MARCH CONTRACT NO.: MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION CHECKED BY: B. EDWARDS DRAWING NUMBER: CD1 IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE LREV ISSUED FOR DATE BY 48' MAX SPACING BETWEEN 1/2" EXPANSION JOINTS 4" THICK CONCRETE WALK 1/2" EXPANSION JOINT MATL REQUIRED WHEN WALK ABUTS RIGID STRUCTURES TYPICAL CONTRACTION JOINT 4' T. WHEN WIDTH OF SIDEWALK, PAD, ETC EXCEEDS 6', LONGITUDINAL CONTRACTION JOINTS SHALL BE PLACED AS REQUIRED TYPICAL CONCRETE WALKWAY C-32-0520 VARIES, SEE PLAN FOR WIDTH 11" #4 NOSING BAR, TYP LVTREAD 9" WIDE SIDEWALLS SIDEWALK 2-#4 IN SIDEWALLS 244 OWELS @ 8" ODC IN SIDEWALLS #4 BARS TO EXTEND ? INTO SIDEWALLS, ti SIDEWALK SPACED AT 12" OC #4 BARS @ 12" 12" NOTE: YARD STEPS HAVING MORE THAN THREE RISERS SHALL HAVE HANDRAILS IN THE SIDEWALLS. THE WIDTH OF THE YARD STEPS TREAD SHALL BE THE SAME AS THE ADJACENT SIDEWALK. WHERE VERTICAL DIFFERENCE BETWEEN SIDEWALK ELEVATIONS IS GREATER THAN 12'-0", AN INTERMEDIATE LANDING IS REQUIRED, SEE DETAIL CONCRETE YARD STEPS C-32-0521 FRAME AND GRATE, EAST JORDAN FINISHED GRADE SLOPE VARIES IRON WORKS V5660, NEENAH BACK OF CURB R-1878-B7G, OR EQUAL 12" 2'-6" /�\/\ / 7 7 MIN GRADEFINISHED 6„ CONCRETE CURB #4 BARS CONTINUOUS WITH � AND GUTTER ASPHALT 18" LAP AT CORNERS �, PAVEMENT - �� 3" R 1 1/2" SLOPE CLASS A CONCRETE co �O 8"CONCRETE BLOCK %0 7 OR BRICK WALL #4 DOWELS w �O �0 00 00 0 Q @16"OC PIPE SIZE VARIES FILL WITH NON -SHRINK CONCRETE GROUT 1'-6" MIN\\/ NOTES: PIPE JOINT 24" 1. CONTRACTION JOINTS SHALL BE PLACED AT 10 FOOT INTERVALS, OR 15 MAX FOOT INTERVALS WHEN A MACHINE IS USED TO PLACE THE CURB. 2. EXPANSION JOINTS SHALL BE PLACED AT 90 FOOT INTERVALS AND 6„ ADJACENT TO ALL RIGID OBJECTS. TYP CURB AND GUTTER BEND AS NECESSARY C-32-0530 TO CLEAR PIPE CLASS A CONCRETE FLOOR SLAB GROUT CATCH BASIN INVERT TO ELEV OF EFFLUENT PIPE INVERT PROJECT ENGINEER: DESIGNED BY: CHECKED BY: IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING REV ISSUED FOR DATE gY IS NOT TO FULL SCALE 'v YARD INLET C-22-0302 A. MARCH A. MARCH B.EDWARDS 0 1/2" 1" EW NOTE: YARD INLET MAY BE PRECAST CONCRETE - SEE SPECIFICATIONS PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION Digitally signed by Brian Y. Porter Date: 2021.04.29 15:09:59-04' 00' Ha.zen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION DETAILS CIVIL STANDARD DETAILS DATE: APRIL 2021 HAZEN NO.: 31430-006 CONTRACT NO.: 1 DRAWING NUMBER: CD2