Loading...
HomeMy WebLinkAboutSUB202000021 Review Comments Road Plan and Comps. 2021-05-06 (3)V 401 McIntire Road, North Wing County of Albemarle Charlottesville, VA 22902-4579 Telephone:434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG Road and Drainage Plan Review Project title: Foothill Crossing Phase V — Amendment 1 Project file number: SUB-2020-00021 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Stanley Martin [OdonnellGP@stanleymartin.com] Plan received date: 25 March 2021 Date of comments: 6 May 2021 Reviewer: Matt Wentland Scott, We have reviewed the plans and have the following comments: Engineering 1. Fix the labelling on sheet 7. 2. Provide more detail/spot grades for the overland relief for inlet 12. 3. Show the riprap on the outlet to the pond. Planning — Mariah Gleason 1. Planning comments are attached to this email VDOT 1. VDOT comments are attached to this email Fire Rescue and GIS had no objection. Planning and VDOT comments are attached to this email. Comments have not been received from ACSA. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: Engineering Review Comments Page 2 of 2 After approval, plans will need be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, ajoint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; httos://www.a lbemarle.org/government/com m un ity-develoi2ment/a pply-for/engineering-aool ications If you have any questions or concerns, please contact me either by email (mwentlandC@albemarle.org or by phone at 434-296-5832 ext. 3458. Sincerely, Matt Wentland, P.E. Civil Engineer II File: SUB202000021 Foothill Crossing V Road Plans review comments 05-06-21.docx