Loading...
HomeMy WebLinkAboutWPO202000034 Plan - VSMP 2021-05-10SITE DATA OWNER - DEVELOPER PLAN PREPARER: TAX MAP PARCEL No: PARCEL AREA: ZONING: CURRENT USE: PROPOSED USE MAGISTERIAL DISTRICT WATERSHED: BELVEDERE LAND HOLDINGS LLC PO BOX 7505 CHARLOTTESVILLE, VA 22906 NEW BELVEDERE, Inc. 610 WEST RIO RD CHARLOTTESVILLE, VA 22901 ROUDABUSH, GALE, & ASSOCIATES 914 MONTICELLO ROAD CHARLOTTESVLLE, VA. 22902 (434)-977-0205 %I:Y7/ZIIIIIIIIIIIIIIILY/ZIi 15.00 ACRES R4 RESIDENTIAL (THIS PARCEL IS NOT PART OF THE BELVEDERE ZMA-2004-0007) STEEP SLOPES - MANAGED STEEP SLOPES - PRESERVED VACANT RESIDENTIAL DEVELOPMENT RIO MAGISTERIAL DISTRICT UPPER RIVANNA RIVER BOUNDARY SOURCE PLAT DIVISION OF DUNLORA" PREPARED BY WM MORRIS FOSTER, LAND SURVEYOR, DATED NOVEMBER 1, 1985, REVISED DECEMBER 20, 1985, RECORDED AT DB 815 PG 331. TOPOGRAPHY AERIAL TOPOGRAPHY FLOWN IN 2016 BY BELL LAND SURVEYS LLC. TOPOGRAPHY STILL UNCHANGED BASED ON A SIFF VISIT AND DESIGN PROFESSIONAL'S OPINION, THE SURVEY IS STILL ACCURATE TO THE EFFECT THAT THERE ARE NO EVIDENT VARIATIONS BENCHMARK: FIRE HYDRANT 455.10, RIGHT FRONT BONNET BOLT AT CORNER OF FOWLER SFREET AND FARROW DRIVE DATUNM. HORZ: NAVD 88, VERL: NAD83 FLOODPLAIN: THIS PROJECT IS LOCATED WITHIN 'ZONE X" AS SHOWN ON FLOOD INSURANCE RATE MAP. COMMUNITY PANEL NUMBER 510003C 0279 D. EFFECTIVE DA TE FEBRUARY 4. 2005. NO EVIDENCE OF A BURIAL SITE WAS FOUND ON SUBJECT PARCEL. NO STREAM BUFFER(S) ARE PRESENT ON THE SUBJECT PARCEL. THE SUBJECT PROPERTY IS NOT LOCATED WITHIN AN AGRICULTURAL -FORESTAL DISFRICL THIS SITE IS NOT LOCATED WITHIN THE WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. STORMWATER MANAGEMENT COMPLIANCE SUMMARY THE DEVELOPMENT OF BELVEDERE PHASE 5, TMP 62-16D, WILL OCCUR IN TWO SEPARATE STAGES OF CONSTRUCTION. THE COMPLETED SUBDIVISION WILL UTILIZE AN EXTENDED DETENTION FACILITY TO FACILITATE CHANNEL AND FLOOD PROTECTION. STORMWATER RUNOFF WILL BE COLLECTED AND CONVEYED THROUGH A STORMWATER PIPE NETWORK TO THE FACILITY. NUTRIENT OFFSET CREDIT PURCHASE ROUNDS OFF THE STORMWATER APPROACH. REGARDING WATER QUALITY ANALYSIS: 9VAC25-870-63. WATER QUALITY DESIGN CRITERIA REQUIREMENTS. 1. NEW DEVELOPMENT, THE TOTAL PHOSPHORUS LOAD OF NEW DEVELOPMENT PROJECTS SHALL NOT EXCEED 0.41 POUNDS PER ACRE PER YEAR, AS CALCULATED PURSUANT TO 9VAC25-870-65. CALCULATIONS SHOWN ON THIS PLAN WERE DETERMINED FROM ACCEPTABLE METHODOLOGY "DEQ VRRM FROM NEW DEVELOPMENT COMPLIANCE SPREADSHEET -VERSION 3.0." CONCLUSION: BASED ON NEW DEVELOPMENT OF BELVEDERE PHASE 5 (A AND B), TMP 62-16D, SHOWN HEREON THESE PLANS, THE WATER QUALITY PORTIONS OF THIS PLAN WILL BE SATISFIED WITH PURCHASING 9.68 IB/YR OF OFFSITE NUTRIENT CREDITS IN THE SAME OF ADJACENT HYDROLOGIC UNIT CODE (02080204). COMPLIANCE OF 9VAC25-870-65.F: OFFSITE ALTERNATIVE IAW 9VAC25-870-69 PURCHASE OF NUTRIENT OFFSET CREDITS IS PROPOSED AND AFFIRMED. REGARDING WATER QUANITY ANALYSIS FOR POINT OF DISCHARGE #1: COMPLIANCE OF 9VAC25-870. III (CHANNEL PROTECTION IN ACCORDANCE WITH CHANNEL PROTECTION SECTION B.3.A) OF 9VAC25-870-66 OF VIRGINIA LAW; THE MAXIMUM PEAK FLOW RATE FROM THE ONE-YEAR 24-HOUR STORM FOLLOWING THE LAND- DISTURBING ACTIVITY APPEARS TO BE IN ACCORDANCE WITH THE ENERGY BALANCE METHODOLOGY: QDEVELOPED < I.F.*(QPRE-DEVELOPED* RVPRE-DEVELOPED)/RVDEVELOPED Al WPO 2020 00034 TMP 62 PARCEL 16D RIO MAGISTERIAL DISTRICT, COUNTY OF ALBEMARLE, VA L C a VICINITY MAP SCALE: 1 "=1000 FEET EXISTING INTERMEDIATE CONTOUR - — --a32 EXISTING INDEX CONTOUR 3ou- LEGEND PROPOSED CONTOUR 20 POINT OF ANALYSIS 2: _ _ _ Ex EP EXISTING EDGE OF PAVEMENT — — — - 1YR QDEVELOPED < I.F.* (1YR QPRE-DEVELOPED * RVPRE- DEVELOPED) /RVDEVELOPED EP 0.772 S 0.80* (1.597 * 0.515)/ 0.680 PROPOSED EDGE OF PAVEMENT EXISTING CURB AND GUTTER C&G 0.772 < 0.97 cfs - — — — PROPOSED CURB AND GUTTER CG-6 COMPLIANCE OF 9VAC25-870-66.0 (FLOOD PROTECTIONS TRANSITION FROM CG-6 ROLL-TOP CG-6 ROLL-TOP EX. 15" RCP EXISTING STORM SEWER IN REFERENCE TO FLOOD PROTECTION SECTION C.1), THE SITE'S POINT OF DISCHARGE RELEASES CAPTURED STORMWATER INTO A CONVEYANCE SYSTEM PROPOSED STORM SEWER 15" RCP THAT, FOLLOWING LAND DISTURBING ACTIVITY, CONFINES THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE 10-YEAR 24-HOUR STORM EVENT WITHIN THE STORMWATER CONVEYANCE SYSTEM. 010POST-DEVELOPED S Q,OPRE-DEVELOPED EXISTING SANITARY SEWER —S —S —S — 'OINT OF ANALYSIS 2: J10POST-DEVELOPED S Q10PRE-DEVELOPED 5.31 cfs S 7.63 cfs IIL Al PROPOSED SANITARY SEWER PROPERTY LINE EASEMENT LINE CENTERLINE LIMITS OF CLEARING AND/OR GRADING EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION +12.0 EXISTING TREE DRIP LINE EXISTING TREE ? PROPOSED TREE OAK EXISTING WATERLINE PROPOSED WATERLINE EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING WATER VALVE PROPOSED WATER VALVE PROPOSED WATER METER EXISTING REDUCER PROPOSED REDUCER HANDICAP RAMP (CG-12) DENOTES LOCATION OF STD. VDOT CG-12 AND/OR JURISDICTIONAL STANDARD RAMP CONSTRUCTION PARKING INDICATOR INDICATES THE NUMBER OF TYPICAL PARKING SPACES BENCHMARK SOILS BOUNDARY VEHICLES PER DAY COUNT PROPOSED STREET NAME SIGN EXISTING SIGN PROPOSED SIGN SANITARY MANHOLE IDENTIFIER STORM DRAIN STRUCTURE IDENTIFIER 1,2134 VPD T 0 ASSOCIATED PLANS WITH THIS PARCEL: 1. FINAL SITE PLAN SDP-2020-00036 2. ROAD & UTILITY PLAN SUB-2019-00170 3. EASEMENT PLAT SUB-2020-00123 4. RETAINING WALL DESIGN PLANS APPROVED by the Albemarle County Community Development Department Date 05/10/2021 File WP02020-00034 Amendment #1 SHEET INDEX Al C SHEET 1 COVER SHEET 2--- ------ I DITIONS, SOILS & DEMOLITION PLAN SHEET 3--- — --- — EROSION CONTROL NARRATIVE SHEET 4--- ------ EROSION CONTROL PLAN PHASE 1 - PHASE 5A & TEMPORARY FIRE ROAD SHEET 5--- ------ EROSION CONTROL PLAN PHASE 1 - PHASE 5113 SHEET 6--- ------ EROSION CONTROL PLAN PHASE 1 - TEMPORARY FIRE ROAD SHEET 7--- ------ EROSION CONTROL PLAN PHASE 2 - PHASE 5A & TEMPORARY FIRE ROAD SHEET 8--- ------ EROSION CONTROL PLAN PHASE 2 - PHASE 5113 SHEET 9--- ------ EROSION CONTROL PLAN PHASE 2 - TEMPORARY FIRE ROAD SHEET 10--------- EROSION CONTROL PLAN PHASE 3 - PHASE 5A & TEMPORARY FIRE ROAD SHEET 11--------- EROSION CONTROL PLAN PHASE 3 - PHASE 5113 SHE 1 — - rr - - - PORARY FIRE ROAD SHEET 13 SEDIMENT BASINA DESIGN & DETAILS SHEET 14--------- EROSION CONTROL NOTES & DETAILS SHEET 15 ---- T R Q AI I ITY CU TION COMP E SHEET 16 --- WATER QUANTITY CALCULATIONS & COMPLIANCE SHEET 17 STORMWATER MANAGEMENT POND CONVERSION SHEET 18 - -- --- CULVERT DESIGN VSMP AMENDMENT #1 NARRATIVE A. THIS AMENDMENT IS TO ADJUST THE GRADING OF THE STORMWATER POND DUE TO ENCOUNTERING SIGNIFICANT BEDROCK ON THE NORTHERN BANK OF THE POND. TO LIMIT THE AMOUNT OF BLASTING ON -SITE, AND ASSOCIATED POTENTIAL DAMAGE TO NEARBY RESIDENCES, THE NORTHERN POND EMBANKMENT WILL FOLLOW THE EXCAVATED BEDROCK. THE TOP EMBANKMENT ELEVATION OF THE POND HAS BEEN RAISED BY 0.3-FEET, ENCROACHING INTO THE MAINTENANCE ACCESS ROAD SLIGHTLY. THIS ALTERATION ALLOWS FOR THE VOLUME OF THE POND TO STAY RELATIVELY CONSISTENT WITH THE APPROVED PLAN. ADDITIONALLY, THE EMERGENCY SPILLWAY WILL BE WIDENED FROM 10-FEET TO 15-FEET TO PROVIDE THE REQUIRED 1-FOOT FREEBOARD FOR THE 100-YEAR STORM ELEVATION. AS WITH THE APPROVED PLAN, A 3-INCH "ENERGY BALANCE" ORIFICE WAIVER REQUEST ACCOMPANIES THIS AMENDMENT. THE ROUTED FLOWS ARE LISTED IN THIS AMENDMENT, WAIVER REQUEST, HYDROGRAPHS, AND STAGE STORAGE REPORTS, WHICH ACCOMPANY THIS SUBMITTAL. B. DUE TO THE PRESENCE OF BEDROCK, THE STORM PIPE BETWEEN STRUCTURE 1 AND STRUCTURE 0 HAS BEEN REPLACED WITH GROUTED RIPRAP CHANNEL. THE STORM PIPE FROM STRUCTURE 2 HAS BEEN REVISED TO 0.5% SLOPE WHICH WILL DAYLIGHT TO THE NORTH OF THE POND. THE CHANNEL WILL EXTEND FROM THE NEW OUTFALL LOCATION INTO THE FOREBAY. THE 6" UNDERDRAIN PIPE BEHIND LOT 19 - 28 WILL DAYLIGHT DIRECTLY INTO THE OPEN CHANNEL. CONTRACTOR'S RECORD DRAWING CERTIFICATION STATEMENT: (SEE SHEET 3 FOR RECORD DRAWING REQUIREMENTS) THIS HAND MARKED SET OF DRAWINGS HAS BEEN 'REDLINED" TO PROVIDE AN ACCURATE DETAILED RECORD OF ANY SUBSTANTIVE CHANGES TO THE APPROVED DESIGN DRAWINGS. ANY ITEMS NOT 'REDLINED" ON THIS PLAN SET OR SUBSEQUENT PAGES SHOULD BE CONSIDERED TO BE "CONSTRUCTED IN ACCORDANCE WITH THE DESIGN AS SHOWN" NAME, TITLE FOR: /: 1 TRACTOR) APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT ENGINEERING INSPECTIONS o zU O 0 to GO o Q 'MO cl O U w m oin wo W U �a a3 a �u 3 z a C7 ° s o � o w C7 En W n O N O o � aW N� N LLl z > o n ^ U O aoW UO �x rn U z 0 a z V 0 W r 0 z O z H F F H a 0 z o z W z W z W z W Z g z P7 0 0 0 0 o z g w a o z 0 z 0 z 5 z 5 Z 0 0 0 0 w Z w a W 0000ti�, N N O N O N O N N O O H Q N \ m \ M \ O m m M zr N M V Vl l0 DESIGNED BY: UVN/JLF DRAWN BY: I UVN/JLF 'CHECKED BY: I JILT o r��c o���t,yTfl O G a immy L. Taggart Uc. No, F� 05 f 0t3/eat2021 F' " Ss1aNAL e�G-' z 0 5 W tx Q 0 LU W z T O- = LLI O W U LUCIE L1J < z CIO o�N0 94 zwCOE-; Q LU Q U H cn J Q cn LLryU� a :5 > W w F cn O P.' DATE: 06-11-2020 SCALE: 1" = 1000' FILE: WPO-2020-00034 RGA#: 8438 SHEET: 1 OF 18 c 99 SEDIMENT BASIN-1 SEDIMENT BASIN S CHEMA TI C FAFA.11 51=07WAS61 10' WIDE EMBANKMENT ® 425 CREST OF EMERGENCY / SPILLWAY ® 424 DESIGN HIGH WATER .,(25-YR. STORM ELEV.) SIIkgm 67 C.Y./ AC. DRY STORAGE_ TOP WET STORAGE: 417.7 - 67 C.Y./ AC. - WET " STORAGE SEDIMENT CLEANOUT POINT (" WET " STORAGE REDUCED TO 34 C.Y./ ACRE) RISER CREST: 422 DEWATERING DEVICE 48" RISER � POND BOTTOM: 414 DESIGN ELEVATIONS WITH EMERGENCY SPILLWAY (2) ANTI -SEEPAGE COLLARS 4.5'x4.5' 106LF-18" HP PIPE 54.71% 1.1: 414 LID: 409 I I SOURCE: VA. DSWC PLATE. 3.14-2 L ANTI- VORTEX DEVICE DESIGN PRESSURE RELIEF HOLES 1/2" DIA. A O C PLAN VIEW D TACKWELD I ALL AROU #6 X 12" SPACER E (TYPICAL) 71 RT BAR SIZE BAR MIN.) KISLKI I SECTION A -A TOP STIFFENER (IF REQUIRED) IS XX ANGLE WELDED TO TOP AND ORIENTED PER- O n PENDICULAR TO CORRUGATIONS ISOMETRIC TOP IS -GAGE CORRUGATED METAL OR 1/8" STEEL PLATE. PRESSURE RELIEF HOLES MAY BE OMMITTED, IF ENDS OF CORRUGATIONS ARE LEFT FULLY OPEN WHEN THE TOP IS ATTACHED. CYLINDER IS GAGE CORRUGATED METAL PIPE OR FABRICATED FROM 1/8" STEEL PLATE. NOTES: 1. THE CYLINDER MUST BE FIRMLY FASTENED TO THE TOP OF THE RISER. 2. SUPPORT BARS ARE WELDED TO THE TOP OF THE RISER OR ATTACHED BY STRAPS BOLTED TO TOP OF RISER. RECOMMENDED DEWATERING FOR SEDIMENT PROVIDE ADEQUATE STRAPPING TACK WELD POLYETHYLENE CAP PERFORATED POLYETHYLENE DRAINAGE TUBING, DIAMETER VARIES (SEE CALCULATIONS IN APPENDIX 3.14-A) DEPTH VARIES AS REQUIRED FOR" DRY STORAGE WET FERNCO-STYLE " COUPLING STORAGE DEWATERING ORIFICE, SCHEDULE 40 STEEL STUB 1-FOOT MI !MUM, DIAMETER VARIES (SEE CALCULATIONS IN CORRUGATED METAL RISER APPENDIX 3.14-A) NOTE: WITH CONCRETE RISER, USE PVC SCHEDULE 40 STUB FOR DEWATERING ORIFICE SOURCE: VA. DSWC DRAINAGE TUBING SHALL COMPLY WITH ASTM F667 AND AASHTO M294 PLATE. 3.14-15 1992 3.14 DETAILS OF CORRUGATED METAL ANTI -SEEP COLLAR E6TNL cawx wmI C°MUWMMIB Y9lIN:xL W WA 10 � C£ QYME GCE AS TIE FPE 'M111 WXICX R IS USEp Wxrt°aus rm ,n• x r SLOi1FD XCIES f9R ,r MIN. °/Y pwETER BGErz. + T� MD TEER-RZ .wm "'°•cc SECTION B-B aF BwD ELEVATION OF UNASSEMBLED COLLAR 3. UNASSEMBLED COLLARS SHALL BE MARKED BY NOTES FOR COLLARS: PAINTING OR TAGGING TO IDENTIFY MATCHING PAIRS. 1. ALL MATERIALS TO BE IN ACCORDANCE WITH 4. THE LAP BETWEEN THE TWO HALF SECTIONS CONSTRUCTION AND CONSTRUCTION MATERIAL AND BETWEEN THE PIPE AND CONNECTING BAND SPECIFICATIONS. SHALL BE CAULKED WITH ASPHALT MASTIC AT 2. WHEN SPECIFIED ON THE PLANS, COATING OF TIME OF INSTALLATION. COLLARS SHALL BE IN ACCORDANCE WITH 5. EACH COLLAR SHALL BE FURNISHED WITH TWO CONSTRUCTION AND CONSTRUCTION MATERIAL 1/2" DIAMETER RODS WITH STANDARD TANK SPECIFICATIONS. LUGS FOR CONNECTING COLLARS TO PIPE. DETAIL OF HELICAL PIPE ANTI -SEEP COLLAR SIZE AND SPACING OF SLOTTED �w'I Y/a'xOE /�°•s/N oR> TOtown aR BEND x so' OPENINGS SHALL BE THE SAME NOTE FOR BANDS AND COLLARS: AS SHOWN FOR CM COLLAR. I' '/B' MODIFICATIONS OF THE DETAILS USE RODS AND LUGS TO CLAMP SHOWN MAY BE USED PROVIDING BANDS SECURELY TO PIPE. I/8. EQUAL WATERTIGHTNESS IS MAINTAINED AND DETAILED ><< DRAWINGS IE - E SUBMITTED APPROVED BYTHEENGINEER N PRIOR *ZMED= TO DELIVERY. ISOMETRIC VIEW ME WI SH BE CUf TO RT S6 Np1V1 HWo..Wo n Cd NUOU° NIID. NOTE: FOR DETAILS OF FABRICATION DIMENSIONS, MINIMUM GAGES, SLOTTED HOLES, AND NOTES, SEE DETAIL ABOVE. uErxE Wwn ro BE NOTE: TWO OTHER TYPES OF ANTI -SEEP COLLARS ARE: NflCm 10 CENIFn E 'a'� nPE solo 1. CORRUGATED METAL, SIMILAR TO UPPER, EXCEPT SHOP WELDED TO A SHORT (4FT.) SECTION OF THE PIPE AND CONNECTED WITH CONNECTING BANDS TO THE PIPE. PARTIAL ELEVATION 2. CONCRETE, SIX INCHES THICK FORMED AROUND THE PIPE REF � R,.D "� WITH #3 REBAR SPACED 15" HORIZONTALLY AND VERTICALLY. SOURCE: USDA-SCS ANTI -SEEP COLLAR SATURATED ZONE CONNECTIONS BETWEEN THE ANTI -SEEP AND THE BARREL MUST BE WATERTIGHT VA. PLATE. 3.14-13 PLATE. 3. RISER PIPE BASE CONDITIONS SOURCE: VA. DSWC TYPICAL CONCRETE BASE Al SEDIMENT BASIN/DRY POND CONSTRUCTION NOTES 1. GEOTECHNICAL CONSULTANT TO SPECIFY DAM EMBANKMENT MATERIAL, SEEPAGE CONTROL DEVICES, CUT-OFF TRENCH DESIGN, CULVERT BEDDING REQUIREMENTS, AND OTHER APPROPRIATE GEOTECHNICAL DESIGN REQUIREMENTS. 2. IMPERVIOUS CORE SHALL EXTEND TO THE 10-YR WATER SURFACE ELEVATION UNLESS OTHERWISE NOTED. 3. FOUNDATION AND ABUTMENT AREA EXTENDING 10' BEYOND DAM FOOTPRINT SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATION TOPSOIL AND/OR ORGANIC SOIL AND OTHER UNSUITABLE MATERIALS. 4. AFTER CLEARING, GRUBBING, STRIPPING, AND REMOVING ANY OTHER UNSUITABLE MATERIALS, THE SUBGRADE SHALL BE PROOF -ROLLED WITH COMPACTION EQUIPMEL UNDER THE OBSERVATION OF A QUALIFIED ENGINEER. THE COMPACTION EQUIPMEN SHALL CONSIST OF THE HEAVIEST POSSIBLE EQUIPMENT THAT WILL NOT CAUSE DISTURBANCE OF SUITABLE SUBGRADE SOILS. EXCESSIVELY SOFT OR UNSUITABLE MATERIALS SHALL BE REMOVED AND REPLACED WITH COMPACTED FILL. WHERE ROCK IS EXPOSED AFTER STRIPPING OR UNDERCUTTING, ALL LOOSE ROCK MATERIAL SHALL BE REMOVED PRIOR TO PLACING COMPACTED FILL. ROCK SUBGRADES SHALL BE INSPECTED AND APPROVED BY INSPECTOR OR ENGINEER PRIOR TO PLACEMENT OF FILL. 5. COMPACTED FILL SHALL NOT BE PLACED PRIOR TO PERFORMING THE REQUIRED FOUNDATION AND ABUTMENT PREPARATION, OR ON ANY FROZEN SURFACE. COMPACTED FILL SHALL EXTEND TO THE FILL LIMIT LINES AND GRADES INDICATED ON THE APPROVED CONSTRUCTION PLAN. COMPACTED FILL MATERIAL SHALL BE OF THE TYPE CLASSIFICATION SYMBOL SPECIFIED BY THE GEOTECHNICAL CONSULTANT, OR OF A BETTER QUALITY MATERIAL AS DEFINED BY THE UNIFIED SOIL CLASSIFICATION SYSTEM (USCS). RESTRICTIONS ON LIQUID LIMIT AND PLASTICITY INDEX OF MATERIAL MAY BE INCLUDED WHERE APPLICABLE. COMPACTED FILL SHALL CONSIST OF MATERIAL FREE OF ORGANIC MATTER, RUBBISH, FROZEN SOIL, SNOW, ICE, AND PARTICLES WITH SIZES LARGER THAN 3" OR ANY OTHER DELETERIOUS MATERIAL. 6. COMPACTED FILL SHALL BE PLACED IN HORIZONTAL LAYER of 10"-12" IN LOOSE THICKNESS. ACTUAL LIFT THICKNESS SHALL BE SPECIFIED BY THE GEOTECHNICAL CONSULTANT. THE MOISTURE CONTENT SHALL BE CONTROLLED SUCH THAT COMPACTION IS ACHIEVED WITHOUT YEILDING OF THE SURFACE. EACH LAYER SHALL BE UNIFORMLY COMPACTED WITH SUITABLE COMPACTION EQUIPMENT TO AT LEAST 95% OF STANDARD PROCTOR MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D-698, AASHTO T-99, OR VDOT SPECIFICATIONS. ANY LAYER OF FINE GRAINED FILL WHICH BECOMES SMOOTH SHALL BE SACRIFICED TO A DEPTH OF 2" TO ALLOW ADEQUATE BONDING BETWEEN LAYERS. 7. COMPACTED FILL WITH A MOISTURE CONTENT WHICH WILL NOT PERMIT COMPACTION TO THE SPECIFIES DENSITY STANDARD SHALL BE SACRIFICED, DRIED, OR WETTED AS NECESSARY TO PERMIT PROPER COMPACTION. OP OUTLET PROTECTION SPECIFICATIONS if) CL I R��RAP 4" MIN. DEPTH ° FtB" PIPE �W/UNDERLYING F.F APRON LENGTH = 10' OP#1 3DO = 4.5' LA = 10' W = DO + LA = 14.5 SEDIMENT BASIN #1: SEDIMENT BASIN #1 IS DESIGNED FOR 6.76 ACRES OF DRAINAGE. THE DRAINAGE AREA TAKES INTO ACCOUNT THE REMOVAL OF SEDIMENT TRAPS THROUGH DIFFERENT PHASES OF THE EROSION AND SEDIMENT CONTROL PLAN. TOP DAM = 425.30 BOTTOM = 414.00 BOTTOM WIDTH = 36' DRAINAGE AREA TO SB #1: 6.76 ACRES DRY/WET STORAGE REQUIRED: 453 c.y. TOTAL STORAGE REQURIED: 906 C.y. PROVIDED STORAGE @ 425.3: 3,235 c.y. CLEAN OUT ELEVATION: 416.80 SLOPES: 3:1 UNLESS OBSCURED BY BEDROCK FOUND IN FIELD* PRINCIPLE SPILLWAY: 48" RCP RISER DIAMETER TRASH RACK/ANTI-VORTEX DEVICE DESIGN: 72 INCHES zt m TEMPORARY SEDIMENT BASIN V o w PROJECT Belvedere Phase 5 PROJ NO. 8438 BASIN # SEDIMENT BASIN SB-1 DATE 5I312021 ° m U U a N ' LOCATION BY RV O O ° d V) > INPUT (4 Q 2 a 1SOo Go ' DRAINAGE AREA 6.76 ac O w z N V) TOTAL STORAGE REQUIRED 905.84 cy 1y p U s w p Wo BASIN VOLUME DESIGN W U a ' WET STORAGElp .a 3 1. MINIMUM REQUIRED VOLUME FOR WET STORAGE 452.92 y! d 2 AVAILABLE BASIN VOLUME ZO 24 AVERAGE END AREA- BASIN VOLUME ESTIMATES v1 o w � N ELEVATION AREA E _ J hL VOLUME TOTAL w0 Z c m it cY Cy a N ' 414 1,41230 N z 3,804.23 140.90 Q w > o 416 2,391.92 140.90 v V) •w-' a 8,197.21 303.60 �y V d ' 418 5,805.29 444.50 0. a w 600.00 22.22 Top of wet storage 418.1 6,194.76 466.72 o ' 6,020.74 222.99 Y 1 419 7,184.67� 1 689.71 M U 26,718.07 989.56 422 10,627.38 1,679.27 ` 41,999.72 1,555.55 425.3 14,827.00 3,234.81 REQUI RED WET S TORAGE VOLUME 45292 cy PROVIDED AT APPROX. ELEVATION 418.10 z O ' 4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 223.08 cy a K 5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 416.80 0 ' S. DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL 1.00 INVERT DEWATERING ORIFICE R'QD 417.80 Min. Elevation Req' INVERTDEWATERING ORIFICE USED 418.10 at Wet stmge elevation ' APPROX. VOLUME AT INVERT USED 466.72 cy DISTANCE FROM INVERT TO C/O LEVEL 1.30 ft ¢o DISTANCE ACCEPTABLE WET STORAGE VOLUME ACCEPTABLE to ' DRYSTORAGE O z 7. MNIMUM REQUIRED VOLUME 452.92 cy v� 5 ' 8. TOTAL AVAILABLE VOLUME AT CREST OF RISER F F F CREST OF RISER 422.00 Top of dry storage z z z z z w 8)APPROX. AVAILABLE TOTAL VOLUME 1679.27 cy o 2 2 2 2 it: AD DRY STORAGE VOLUME a 2 2 2 2 0 1 9. DIAMETER OF DEWATERING ORIFICE o U U o z o / K 0 U U 0 Z 0 'U^ r r r r 2 Q (From Dewatering Sheet) 1.52 cfs o z z z z ¢� z d (From Dewatering Sheet) 6.43 in O o 0 02 USE d 8 in (Never less than 3 inches) U U U U> z 1D. DIAMETER OF FLEXIBLE TUBING 10 in (minimum 2 inches larger} a STANDARD SIZE � 0000.,� N N N N N N w o 0 0 0 0 0 N PRELIMINARY DESIGN "o 0 N 11. PRELIMINARY DESIGN ELEVATIONS: CREST OF RISER 422.00 ft oD o 0 ' TOP OF DAM 425.30 It z ti N m a n n DESIGN HIGH WATER 423.30 ft *design of high water assumes a peakflowrate UPSTREAM TOE OF DAM 414.00 It ' BASIN SHAPE DESIGNED BY: UVN/JLF 12. LENGTH OF FLOW I EFFECTIVE WIDTH: DRAWN BY: I UVN/JLF SURFACE AREA OF NORMAL POOL 6195 sf (wet storaae) CHECKED BY: JILT LENGTH OF FLOW PATH 78 It ' EFFECTIVE WIDTH 79 It LIWe 0.98 BAFFLES REQUIRED 8 PROVIDED ��P1,TH Op DI RUNOFF ' (RATIONAL METHOD CALCULATION) USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE UL_ 17 y q 13. FLOW FROM 2-YEAR STORM (from Hydro software) C: 0.60 Jimmy L. Taggart 1 / A L'°' No.Tc: 7.7 I: 3.4 in/hr 4 Q= 15.9 cfs(from Hydraflowsoftware) �o�E053O %2021oti�w� 14. FLOW FROM 25-YEAR STORM Y&ZONAL E� ' C: 0.60 1 To: 7.7 I: 6.8 iWhr J Q= 21.2cfs(from Hydraflowsoftware) ' PRINCIPAL SPILLWAY DESIGN 1 16. REQUIRED SPILLWAY CAPACITY. ¢_ EMERGENCY SPILLWAY? (YIN) Y Z REQUIRED SPILLWAY CAPACITY: 15.9 CFS 0 ' 16. AS 5UMED AVAILABLE HEAD: 04 ELEV. OF CREST OF E.S. IF USED: 424.00 AS5UMEDAVAILABLE HEAD= 2.00 ft W V] ' 17. RI SER DIMENSIONS: ""41 RISER DIAMETER 48.00 in (From Plate 3.14-8 orCalcs) LO 04 Q H ACTUAL MAX. ELEV.: 422.55 ft (From Calcs if appropriate) LL LL w W ' ACTUAL HEAD: 1.45 ft (From Plate 3.14-8 or Calcs) U) CO Q ' 18. BARREL LENGTH: J d a3 BARREL LENGTH: 106.00 ft w Z BARREL INVERT OUT: 409.00 ft O U O z HEAD H ON BARREL: 15.00 ft (From Plate 3.14-7) C) t j 19. BARREL DIAMETER W W QOZ A BARREL DIAMETER: 18 in (From Plate 3.14Aor3.14B_ ) U ' EMERGENCY SPILLWAY DESIGN N x 1 21. REQUIRED SPILLWAY CAPACITY: W w QD Qe= Q(25)-Qp= 5.2 CFS Q U Z 22. DIMENSIONS: W Q p ­e Q ' PQ BOTTOM WIDTH (bj: 15.00 ft [From Table 3.1 4-C] > SLOPE OF EXIT CHANNEL (s): 3.90 fUft [From Table 3.1 4-C] J x F5 E-1 MN. LENGTH EXIT CHANNEL (x): 33.00 ft [From Table 3.1 4-C] U) m < W ' ANTI -SEEP COLLAR DESIGN :2� 23. DIMENSIONS: W Q DEPTH WATER § CREST OF P.S. (Y): 1.00 ft TW ' SLOPE UPSTREAM FACE DAM (Z): 3.00 :1 ' SLOPE P.S. BARREL (Sb): 4,72 % Q LENGTH BARREL IN SAT. ZONE (Ls): 62.00 ft (From Plate 3.14-11) 2 Number of collars req: 2.00 (From Plate 3.14-12) O Dimensions 4.50 ft (From Plate 3.14-12) :4 FINAL DESIGN ELEVATIONS _j ' 25. ELEVATIONS: TOP OF DAM _425.30 ft DATE: 06-11-2020 DESIGN HIGH WATER 422.55 ft SCALE: 1'20' EMERGENCY SPILLWAY CREST: 424,00 ft FILE: WPO-2020-00034 PRINCIPAL SPILLWAY CREST: 427-00 ft RGA#: 8438 1 DEWATERING ORIFICE INVERT: 418.10 ft 7 � CLEANOUT ELEVATION: 415.80 ft SHEET: 1 OF 18 3 ��♦��yl�gH? • •ice.+•'i��i���i 1a•� � ��•���o Via♦ '0,���+,iO:J' �i �����i�w d�+p":+'y Q.•;,��i�;:�'i\ �•i�,i� ►� pig♦•,���1 �•::•O•w•i ♦•i�•:�+♦i��♦ice` :�i••i�\ � w•�♦�••••!•� ♦•�Gi��i�•;:•��a �'•��ii �•`. Q r COi'��q♦:niw♦ae� e��•ci♦♦01t� ♦aw•�•�♦ ��p� j �••♦�•♦♦ ���♦ � ♦•♦�� :•i��i�w ••i••�i•••w•�••••♦•iw:i::!•°:••`iwa. A ♦ 1 ♦♦♦,♦ , , �••♦jFli••s�••,•(n••♦,M•,♦•,. yp• o<...U♦•, •i,•,,�,�,���� �,••, •••i�•i"•••;.••i"••i�••iL!u"•��•• .•�►i'iii•`i ♦•♦,♦♦�j♦♦,♦d♦••��I yl�♦♦�♦��♦♦j•,'�♦•••II►♦♦,•�ul••,•���•♦,,••,Q!-♦♦:•!•�� •Q•,Q,♦♦O ♦�,., 4aa, •'i•••i••ew:e••!•'i:,,••i��'' ♦ •�♦♦♦♦♦♦•♦••♦•♦! V f N♦♦♦vl►♦♦♦,,♦ •^ i"►••♦MI••••.••♦♦I►•♦♦11♦j••1. .i#� ♦Q♦ ♦•t ii••,w'�.� .-•O`•+••••iw•Eiw•,w••i�$..• � � � ►�♦•��IL.A:•I,!♦!♦, 11♦♦!♦•�♦♦♦♦♦♦II ♦•••'I►♦••91t♦••♦'♦•••'►,•♦t .ice ♦•i` �' tOau�• ..�.:�w•, -,,••4••••Q••'i•'i••'i•••.•'" • �'j^_-ey_�.. _a�♦�a�; I►'♦,� �♦sdli•♦♦1�ai,t,♦•Q•!,�••♦•,,1)1 •,•♦♦,Q -i. tea'' i �G' �•,4••'. ..'♦••au•i ..,•••• ••p •'!•••♦�.. ♦_•♦. ! ♦ •♦ ♦ ,•�• � :♦" .. ate., . J,. ., ♦ l - ,C- � _♦,• .•,• ,t �•,- - .- ••.,p,•♦,•,404•+N♦ •qe®- ..al..a�i�S�o4+.! atc.- a♦�•�- . ,•• ►•, ,1 �" �-i►• -'i\w �'•• •♦•♦ A•••••••♦•a pp••••i••O•••♦i0 •••u♦a•+,0,,�.0 � a! p. •� �_ .-_� i._�1.• -ab.A •i► �..� � ♦.- e�eo. .♦ . ♦ ♦ C' ♦ ♦ • _•_.•_.-.•..ls _.w.A.w als_���...¢A _�_�_.♦ a♦.a�.•�a�.•.•`....___ __ -_�-_ �•.i'fir.'$�ysl.a�i_9••rnrc ._..a __.w.-..a.�l�i►..,.s•ni .a�G♦�a♦•.♦�,•. ,•♦Q.�iw•�f+♦\ �:w♦♦ s-- 1�48 III�� •I' Ilia r�',PRE-IDIEVELOPMENT �4 1 ii,♦i . ��♦�i��' I.!���♦tee!♦��;��� ♦ e \ t III r .y 6♦,, .iQ•Qi,♦♦i,♦•,� r�•q1. � ��.�. Q• �♦♦ ♦!. . � 11 ••�i •,�••p� .,.♦► �.••�; �♦j♦•♦♦� y!-�♦•!•- . �♦• ♦♦Q ♦♦Qt. 4A•i,♦i, ♦�\♦s♦ ♦♦,♦Q♦♦♦!` .1>.I �� c•F ♦!°•C Q • ..:•i♦�+••iir ♦♦• ♦ ��+A'��•__l�,♦♦•!♦• �♦♦s'•'♦��♦•'�•�♦•♦' ♦ •♦♦•'`• !!.�♦♦ ..♦♦♦♦ !♦♦♦♦Q♦��tl`7Nb_,4N" 3"'-16-n�pr.+ ♦.1 �!♦,>, �••'••.,ciwa �. j��A, i�`�♦:O.. �`�♦♦♦♦♦!,♦,�♦♦�♦}♦,♦Qj♦♦,♦ -j ♦� tk�i,1, ;a,•,• ♦i♦♦i,♦,�♦,,.•..� _a._.�.����.. �G . �,♦♦y�., ` .c,,`•.''i•'i�� �••••cS- i•i•� �� .,.� •�� �!i ♦,Ii♦, ♦,♦♦,i♦ .iiG.i ��„`-►. '.1♦♦ •.:atr•,Ca� I,♦♦,�♦♦,♦iA♦!�♦ ,. ♦. ____-^__s.� ;1►� u4♦♦4♦� ,IQ•�•iu!:•i•! im!�•,iuv; 4,i•� a"�->c���♦�� ����:��_♦a♦� ��c°.a � �...� s • ! S A� ♦: .:w�•,,•,�•�,.� ���•i•i�!•ir �' :•i•'p v.�.i:��,�i psi,♦,tA.,1i+O..,iii ♦♦ ♦ O ♦ A ♦ ♦ ♦ ♦ • ♦ ♦ ♦.! ♦ �A ► � ,..mw 4'♦ Oim.•'i•',. wC..` e•Oi •���i►.-s- .-,J�,• ,I 4.O r ..• . ♦J• ♦ •Q,♦ ♦ ♦♦ .a. ♦!$• ♦♦ ! ♦• ♦•,♦sa59 ♦ ♦♦. �i . � / .a- .• ww•••• y, .•,••••s•`• w•p! •,•wi • t!1♦ p ' ,O •.l,,♦♦ . ♦♦♦ -ems ,♦,fa f®Q♦♦� ♦ ►��e♦ ♦•,,� Imo..,:,.. _',. �. -, .♦�•.��,°,u1•••♦.q �•,••'i••i�4w i••,. •a4i' .♦'!D♦ ai .. _ ° ♦'Q,♦,M♦�♦♦♦♦♦� l�♦►` �!A♦! ♦ �♦ ♦!� ! �iY �� �I ` ��i•'•i�°i�`� `a � iv v i•• ••�•i �r ei �'•! ►ji►♦t p+p L °�(: • °e'. . ' I y'•♦�♦�c�♦♦♦♦C! , ,. ��♦♦♦♦♦� !♦� ��'J� ��Y♦i�l:� �I�� � '.. OM�`;'',a•,o .• �mia• 6••r,'' ,a•'•iw•-. ••i•'i• �♦♦i� •a• `JIIII J'' ♦ ♦ ♦ ♦ A" �• i,1, ♦AI • • '•p•••i�•:i�••ri ii�,i �i����;:•gip . ` . *�i♦♦tu� ►♦.♦♦ • L i may" y>;�` / � ��•••,••'p•� � � � �� ••,.�•ad I III �♦.�� III • . ` � III III I ;,yi♦99,a, • I I III I P�11�I _� � • �.. / - .y� �•�Q•��,•��•�,�� .�♦�Es,,l III II =� � ��� / ' r• 0. ' • . • �':diapa�`•� I .a•,p•,ppr • I 1•ji..al' .'\.i•.'i•.o i.'i.•• �I • I O ♦A,••j0 Ai jai'+a'•ii �' CLASS I RIP -RAP PLUNGE POOL OUTLET PROTECTION APRON OP LENGHTH PER OUTLET PPnTFCTTnN nFCTFN 2:1 MAX. P : 1 MAX. / 1-3 INCH COURSE AGGREGATE OR OTHER LINING AS DESIGNED FOR STABILITY PLAN VIEW TOP OF LEVEL SPREADER -SHALL BE FLAT T LENGTH OF LEVEL SPREADER LIP TO BE BASED ON DESIGN FLOW AND ALLOWABLE VELOCITY OR EXISTING OUTLET PROTECTION APRON, WHICHEVER IS GREATER IB" TREATED TM TIMBERS ALLOWABLE DESIGN: 13 LF OF ELS PER i cfs CALCULATED DESIGN: ELS LENGTH = (131 x (2.135 cfs) = 27.8' INTO EXISTING GRADE 18" CLASS I #4 REBAR TO SECURE RIP -RAP TIMBERS SECTION VIEW NOTE REGARDING POST DEVELOPMENT FLOW LEAVING STRUCTURE 42: Q1 1.578 cfs Q2 = 2.135 cfs Q10 = 3.844 cfs OUTLET PROTECTION (min) = 3.75' (3Do) x 8.5' (La) x 9.75' (W) LED t\ a•,��,,��si•• �-rwa.:.- pia a; •;; ♦,♦ ��O♦•,••%P `: •♦i,,i,A - ♦mc•.♦a:i� O,••�i�'i�•i�i, ♦` c4l��ip� �� � •• ♦ •••♦••�i� \i••`iipi�`iii\ , �♦liGAi> •!\ .•iiii�'ii'�ii .. i•'i�'i�'i��� ��••�•��,♦ .' o'i��i,•�,i��,i�: ♦��,�A �•i•"••Oai• �•�Qi♦��%�0�• •��Qi�i�i;;off is i♦♦,Q,� •,�•,. ,♦_:Qai�:•e••i\ . - � = _ " - i•••i•'rii'i° °••'i�si•Q•!; ��•�••� ♦����••O•••0��,....'ip.Oi.;V:-'-c-. p,Q•,Q�.p,,� ,.,•r.l•, yea; i ► • y Channel Report Hydrafiow 6yress E#ension fa /wtotleskw AutoCAO• CiW 30®byALLatlesk, Inc. Tuesday. Apr 132021 Riprap channel Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.26 Side Slopes (z:1) = 2.00, 2.00 Q (cfs) = 13.61 Total Depth (ft) = 1.00 Area (sg1t) = 0.66 Invert Elev (ft) = 418.00 Velocity (ftfs) = 2077. Slope (%) = 27.00 Wetted Perim (ft) = 3A 6 N-Value = 0.013 Grit Depth, Yc (ft) = 0.85 Top Width (ft) = 3.04 Calculations EGL (ft) = 6.97 Compute by: Known Q Known Q (cfs) = 13.61 Elev (ft) 420.00 419.50 419.00 418.50 418.00 417.50 Section 0 7 2 3 4 5 s. 78 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 0.00 -050 oP OUTLET PROTECTION SPECIFICATIONS INTO FOREBAY L-CL 1-RIPRAP n M�r24" MIN. DEPTH W/UNDERLYING F APRON LENGTH = 32 F OPEN CHANNEL T REGARDING WATER OUANITY ANALYSIS FOR POINT OF DISCHARGE #1: COMPLIANCE OF 9VAC25-870. B.1.B (CHANNEL PROTECTION IN ACCORDANCE WITH CHANNEL PROTECTION SECTION B.3.A) OF 9VAC25-870-66 OF VIRGINIA LAW; THE MAXIMUM PEAK FLOW RATE FROM THE ONE-YEAR 24-HOUR STORM FOLLOWING THE LAND- DISTURBING ACTIVITY APPEARS TO BE IN ACCORDANCE WITH THE ENERGY BALANCE METHODOLOGY: QDEVELOPED < I.F.*(QPRE-DEVELOPED* RVPRE- DEVELOPED) /RVDEVELOPED 1YR QDEVELOPED S I.F.* (1YR QPRE-DEVELOPED * RVPRE-DEVELOPED)/RVDEVELOPED 0.064 S 0.80* (0.611 * 0.38) /1.27 0.144 (1.5" ORIFICE) S 0.144 A� 0.512 (3" ORIFICE) COMPLIANCE OF 9VAC25-870-66.0 (FLOOD PROTECTION. IN REFERENCE TO FLOOD PROTECTION SECTION C.1), THE SITE'S POINT OF DISCHARGE RELEASES CAPTURED STORMWATER INTO A CONVEYANCE SYSTEM THAT, FOLLOWING LAND DISTURBING ACTIVITY, CONFINES THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE 10-YEAR 24-HOUR STORM EVENT WITHIN THE STOP' !`A/ATFP CONVEYANCE SYSTEM. Q10POST-DEVELOPED S QtaPRE-DEVELOPED Q10POST-DEVELOPMENT (1.5" EB ORIFICE) = 4.207 cfs S Q10PRE-DEVELOPMENT = 4.373 cfs Q10POST-DEVELOPMENT (3" EB ORIFICE) = 3.882 cfs S Q10PRE-DEVELOPMENT = 4.373 cfs NOTE REGARDING SHEET FLOW FOR THE REAR OF THE RESIDENTIAL LOTS: ALL SFD UNITS TO HAVE SPLASH BLOCKS AT FOUNDATION DRAIN & ROOF DOWNSPOUTS TO ENSURE SHEET FLOW. THE YARD AREAS WILL BE GRADED/SEEDED/LANDSCAPED AS NECESSARY TO FULLY STABILIZE THE SITE TO PREVENT CONCENTRATED FLOW LEAVING THE REAR OF ANY RESIDENTIAL LOT WITHIN THE BELVEDERE PHASE 5 DEVELOPMENT. TOWNHOUSE LOTS 1 - 14: ROOF DRAINS AND FOOTER/FOUNDATION DRAINS TO CONNECT TO HEADER PIPE AS SHOWN. TOWNHOUSE LOTS 19 - 28:ROOF DRAINS AND FOOTER/FOUNDATION DRAINS DAYLIGHT INTO GROUTED RIPRAP CHANNEL AS SHOWN ON SHEET 10. ALL SLOPES GREATER THAN 3:1 MUST BE STABILIZED WITH LOW MAINTENANCE VEGETATIVE GROUND COVER OTHER THAN GRASS AS SOON AS FEASIBLY POSSIBLE. 9VAC25-870-66.B.3: CHANNEL PROTECTION ENERGY BALANCE CALCULATIONS - 1 YEAR DA AT POINT OF ANALYSIS DA AT POINT OF ANALYSIS PRE -DEVELOPMENT CONDITIONS POST -DEVELOPMENT CONDITIONS SITE AREA = 2.59 ACRES SITE AREA = 7.35 ACRES CURVE NUMBER (CN) = 61 CURVE NUMBER (CN) = 80 TIME OF CONCENTRATION = 21.8 MIN TIME OF CONCENTRATION = 7.7 MIN SCS METHOD SCS METHOD 1 -YR Q(PEAK) = 0.611 CFS 1 -YR Q(PEAK) = 14.75 CFS TIME TO PEAK = 12.17 HRS TIME TO PEAK = 12.00 HRS VOLUME = 3,566 CU.FT VOLUME = 33,751 CU.FT 9VAC25-870-66C: FLOOD PROTECTION 10 YEAR FOR FLOOD PROTECTION DA AT POINT OF ANALYSIS DA AT POINT OF ANALYSIS PRE -DEVELOPMENT CONDITIONS POST -DEVELOPMENT CONDITIONS SCS METHOD SCS METHOD SITE AREA = 2.59 ACRES SITE AREA = 7.35 ACRES CURVE NUMBER (CN) = 61 CURVE NUMBER (CN) = 80 TIME OF CONCENTRATION = 21.8 MIN TIME OF CONCENTRATION = 7.7 MIN 10-YR Q(PEAK) = 4.373 CFS 10-YR Q(PEAK) = 38.81 CFS TIME TO PEAK = 12.13 HRS TIME TO PEAK = 11.97 HRS VOLUME = 16,187 CU.FT VOLUME = 89,409 CU.FT T A m zU o 7 N ' N U C7 w O oN Y> o ;4 U V1 F N O W w U m 7d 0 � a 7 W �� 33a Q Z U z� x W Cn H � o 05 �i O aW H� CP d > U !n .x U!nw xW O,zW W0 a �x m U Z 0 a U U 0 W a 0 0 z z r r r F- Z Z Z Z ~ O Z W W W W Z V 0 Z H O O a 0 0 0 O Z o U U U U W U >x 0 000 O U U U U � p O N O O O O O W O N N N N N QQ m m o n OM M .i \ O O O a C3 00 ,-Y rl •-I O O O --I N M V Ill lD Z 4$P1,TH pF o U� J7 ! 9 Jimmy L. Taggart Lic. No. 4 Ado,,, 05%023/2021 � ES'Q/ONAL Eta Q z C5 W W a a (},' :•. O 0 w U Z T a 2 w 0 z z Ir F o W� D_0 Z LU Z WQ 0 Q U E u) W Q > m m. to 04 H O DESIGNED BY: UVN/JLF DRAWN BY: UVN/JLF CHECKED BY: JLTQD DATE: 06-11-2020 SCALE: 1':60" FILE: WPO-2020-00034 RGA#: 8438 SHEET: 16 OF18 74 3.0" ENERGY BALANCE ORIFICE TO BE PLUGGE DURING CONSTRUCTION UNPLUG WHEN CONVERTING TO POND 12' TRASH RACK LI Stage -Storage Report Elev(Ft) Storoge(CF) Total Storoge(CF) Areo(SF) 414.000 0.000 0.000 1,412 416.000 2,133 3,776 2,391 417.000 3,491 7,266 4,590 418.000 5,198 12,464 5,805 419.000 6,495 18,958 7,184 420.000 7,754 26,712 8,323 422.000 18,950 45,662 10,627 424.000 24,178 69,840 13,551 425.000 14,047 83,887 14,543 425.300 4,405 88,292 14,827 POND #1 STORAGE HAS BEEN SIZED TO MEET WATER QUANTITY REQUIREMENTS FOR THE FULL BUILD -OUT OF THE BELVEDERE PHASE 5 (A AND B) DEVELOPMENT ORIFICE SIZING NOTE AND WAIVER REQUEST: TO SATISFY THE ENERGY BALANCE EQUATION, SEE SHEET 16, THE 1-YEAR FLOW LEAVING THE POND CAN NOT EXCEED 0.144 CFS. TO SATISFY THE REQUIREMENT, AN 1.5" ORIFICE IS REQUIRED AT ELEVATION 414.1. DUE TO THE RISK OF CLOGGING AND MAINTENANCE ASSOCIATED WITH SMALL ORIFICES; AND DISCUSSIONS WITH COUNTY ENGINEERING DEPARTMENT, THIS DESIGN FIRM RECOMMENDS THAT A MINIMUM ORIFICE OF 3" SHOULD BE USED. IF A 3" ORIFICE IS USED, THE 1-YEAR FLOW LEAVING THE SITE WILL INCREASE TO, 0.512 CFS. 12" 0000 0000 0000 0000 FRONT SECTION TRASH RACK 1" HOLES 30% OPENING AREA 0 000 0 O SIDE SECTION I CONVERT OF SB-1 TO DRY POND #1 ORIFICE TRASH RACK DETAIL ° o a 0 0 a0g"', 0 To 0 00� 00� 00p o "®0000000000 0 0 00 0o 00 o®® 000000000 ON%' 00 0m �00 ?a o®®tt ® ao Isometric Isometric I/1" HOPE: plate HIT leert balled To Et. uElo, I,. IIIl1'1: ° lur nl plx.Lic T nlr :nut praing ° I/J" VT t o0 Will, I M1ulra and A ouI- o°oOo o �1 an No nY I (I iIra ,' LaIMNrBd l,p 1'ITT- o0 UA_ Ruhtliml• luB. uI . ,UTIL A, OIT AS 0 0. 0° 000000 000000 °°°°°° ,Ium„ Will, ul,Ii... Ki pixm ron,. npL nn IIDPE .ctruolornl p1.Ati, I/C pla Lc and graliug Section W;ln I" bale. and a or soz °r opening a Iota Bt l,I'EAr I,pla.(iB el„ f sninfinna ITT'.To egaal ° o0 peg j TO + o Elevation ,r;r„' PL9STIC ORIFICE TRASH RACK SaLIITIaNS F.O. H s 1 r,IEn«ler rn 2eea T26 Ill INC. 877-877-D7'27 Rn.ylmllu-.wlulbu.ru" RISER TRASH RACK DETAIL i- - �cRITDLM i - STORN'NATEa I RSER 0 MANAGEMEV ' RISER m- 6RAINACE srRxrvRB RISE0. IG. O.D. I, B C D E 24 36 1 31 28% 7'I 27 3fi 4E 411/2 13 '9 60 68 58 59 5A r 13 21 53 6C 72 73 67/2 IJ 2N AS 72 86 87_ 80% 23 35 79 54 GO of 9D/, 25 39 92 96 114 115 IO61/I 22 38 105 SWM DR LG, OLTS N HERS AID P_ACE:s DUAL N E' DIA B OPENING PAI. I DIMENSION I APPFOX. I.O, IT AB G O E 5EGMENT TIT, ILBS.I 24 30 30 6 G To 27 15 66 3fi 64 42 6 13 IS 40 22 62 68 58 55 9 13 20 53 29 120 60 ]2 68 9 11 26 66 36 169 72 86 51 9 23 34 79 42 227 66 100 94 12 I 25 37 92 d9 GRIT 96 96 10) 12 1 22 36 105 55 36' HIGH DENSITY POLYETHYLENE METAL NOTES: I, ALL METAL IMACH RAGHS 36"IN DIAMETER AND LARGER OR WILL A TOTAL 3- ANTI VORTEX PLATE 13 TO BE USED WHEN SPECIFIED ON THE PLANS. WEIGHT OF 75 L35 OR GREATER EHN.L HAVE A HINGED. LOCKABLE ACCESS COST OF FURNISHING AND PLACING THE ANTI VORTEX PLATE 15 TO DOOR WITH A MINIINM 'e'X G. EDEAR OP,NNG. BE 19CLUDED IN THE BID PRICE FOR THE STRUCTURE. 2. ALL HIG1 DENSITY POLYE-HYLENE TIIA56 PACKS 45 IN DIAMETER AND LARGER SHAG_ HAVE A HINGED, LOCKABLE ACCESS GOOD WITH A MINIMUM 2'A 2 CLEM OPENING SPECIFICATION STORMWATER MANAGEMENT DETAILS TRASH RACK wool EFERENCE FOR SWIM DRAINAGE STRUCTURES READ AND BRIDGE STANDARDS 302 PEVISON DATE SHEET 4 EF 5 VIRGINIA DEPARTMENT OF TRANSPORTATION 67/16 16 E, DRY POND #1 DETAIL (NOT TO SCALE) NOTE: TOP OF DAM TO BE COMPACTED TP 98% COMPACTION, NO SETTLING WILL OCCUR. Pond Embankment 100YR WSE 424.29 Trash Rack for SWM Drainage Structures see sheet for details Top of Dam Elev = 425.3 Geotechnical Engineer to determine necessity of impervious Core** concrete tsase *Trash rack to be installed on orifice as shown on details sheet. **Impervious core and cutoff trench shown for informational purposes only. Final design to be provided by geotechnical engineer. -Embed 6" in Concrete 3.0" Energy Balance Orifice @ 414.1 Cutoff Trench**FAI oP OUTLET PROTECTION SPECIFICATIONS OTo�/ L T RIPRAP OP� 1 4 24 MIN. DEPTH `n -'I PIPE 410 = 3.88 cfs W/UNDE/R(LYING /F.F � APRON LENGTH = 10' 3D0 = 4.5' LA = 10' W = DO + LA = 14.5 STORMWATER POND CONSTRUCTION SEQUENCE: THE FOLLOWING IS ATYPICAL CONSTRUCTION SEQUENCE TO PROPERLY INSTALL A DRY ED POND. THE STEPS MAY BE MODIFIED TO REFLECT DIFFERENT DRY ED POND DESIGNS, SITE CONDITIONS, AND THE SIZE, COMPLEXITY AND CONFIGURATION OF THE PROPOSED FACILITY. 1. USE OF ED POND AS AN E&S CONTROL. AN ED POND MAY SERVE AS A SEDIMENT BASIN DURING PROJECT CONSTRUCTION. IF TF E IS DONE, THE VOLUME SHOULD BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMEN- VS. WATER QUALITY TREATMENT REQUIREMENT). INSTALLATION OF THE PERMANENT RISER SHOULD BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHOULD BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION ED POND IN MIND. THE BOTTOM ELEVATION OF THE ED POND SHOULD BE LOWER THAN THE BOTTOM ELEVATION OF THE TEMPORARY SEDIMENT BASIN. THE CONSTRUCTION NOTES SHOULD CLEARLY INDICATE THAT THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. APPROPRIATE PROCEDURES SHOULD BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBID WATERS WHEN THE BASIN IS BEING CONVERTED INTO AN ED POND. 2. STABILIZE THE DRAINAGE AREA. FINAL GRADING AND CONSTRUCTION OF ED POND COMPONENTS SHOULD ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS STABILIZED. 3. ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKE SURE THEY MEET DESIGN SPECIFICATIONS, AND PREPARE ANY STAGING AREAS. 4. CLEAR AND STRIP THE PROJECT AREA TO THE DESIRED SUB -GRADE. 5. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE POND THAT ARE GRADED OR DENUDED DURING CONSTRUCTION MUST BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 6. EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE. 7. INSTALL THE RISER OR OUTFLOW STRUCTURE AND ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 8. CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8 TO 12-INCH LIFTS, OR AS DIRECTED BY GEOTECHNICAL RECOMMENDATIONS, AND COMPACT AS REQUIRED WITH APPROPRIATE EQUIPMENT. 9. EXCAVATE/GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE ED POND. 10. CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 11. INSTALL OUTLET PROTECTION, INCLUDING EMERGENCY AND PRIMARY OUTLET APRON PROTECTION. 12. STABILIZE EXPOSED SOILS WITH TEMPORARY SEED MIXTURES APPROPRIATE FOR THE POND BUFFER. ALL AREAS ABOVE THE NORMAL POOL ELEVATION SHOULD BE PERMANENTLY STABILIZED BY HYDROSEEDING OR SEEDING OVER STRAW. 13. PLANT THE POND BUFFER AREA, FOLLOWING THE PONDSCAPING PLAN. DINFARION DAM CONSTRUCTION NOTES: 1. GEOTECHNICAL CONSULTANT TO SPECIFY DAM EMBANKMENT MATERIAL, SEEPAGE CONTROL DEVICES, CUT-OFF TRENCH DESIGN, CULVERT BEDDING REQUIREMENTS, AND OTHER APPROPRIATE GEOTECHNICAL DESIGN REQUIREMENTS. 2. IMPERVIOUS CORE SHALL EXTEND TO THE 10-YR WATER SURFACE ELEVATION UNLESS OTHERWISE NOTED. 3. FOUNDATION AND ABUTMENT AREA EXTENDING 10' BEYOND DAM FOOTPRINT SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATION TOPSOIL AND/OR ORGANIC SOIL AND OTHER UNSUITABLE MATERIALS. 4. AFTER CLEARING, GRUBBING, STRIPPING, AND REMOVING ANY OTHER UNSUITABLE MATERIALS, THE SUBGRADE SHALL BE PROOF -ROLLED WITH COMPACTION EQUIPMENT UNDER THE OBSERVATION OF A QUALIFIED ENGINEER. THE COMPACTION EQUIPMENT SHALL CONSIST OF THE HEAVIEST POSSIBLE EQUIPMENT THAT WILL NOT CAUSE DISTURBANCE OF SUITABLE SUBGRADE SOILS. EXCESSIVELY SOFT OR UNSUITABLE MATERIALS SHALL BE REMOVED AND REPLACED WITH COMPACTED FILL. WHERE ROCK IS EXPOSED AFTER STRIPPING OR UNDERCUTTING, ALL LOOSE ROCK MATERIAL SHALL BE REMOVED PRIOR TO PLACING COMPACTED FILL. ROCK SUBGRADES SHALL BE INSPECTED AND APPROVED BY INSPECTOR OR ENGINEER PRIOR TO PLACEMENT OF FILL. 5. COMPACTED FILL SHALL NOT BE PLACED PRIOR TO PERFORMING THE REQUIRED FOUNDATION AND ABUTMENT PREPARATION, OR ON ANY FROZEN SURFACE. COMPACTED FILL SHALL EXTEND TO THE FILL LIMIT LINES AND GRADES INDICATED ON THE APPROVED CONSTRUCTION PLAN. COMPACTED FILL MATERIAL SHALL BE OF THE TYPE CLASSIFICATION SYMBOL SPECIFIED BY THE GEOTECHNICAL CONSULTANT, OR OF A BETTER QUALITY MATERIAL AS DEFINED BY THE UNIFIED SOIL CLASSIFICATION SYSTEM (USCS). RESTRICTIONS ON LIQUID LIMIT AND PLASTICITY INDEX OF MATERIAL MAY BE INCLUDED WHERE APPLICABLE. COMPACTED FILL SHALL CONSIST OF MATERIAL FREE OF ORGANIC MATTER, RUBBISH, FROZEN SOIL, SNOW, ICE, AND PARTICLES WITH SIZES LARGER THAN 3" OR ANY OTHER DELETERIOUS MATERIAL. 6. COMPACTED FILL SHALL BE PLACED IN HORIZONTAL LAYER OF 8"-12" IN LOOSE THICKNESS. ACTUAL LIFT THICKNESS SHALL BE SPECIFIED BY THE GEOTECHNICAL CONSULTANT. THE MOISTURE CONTENT SHALL BE CONTROLLED SUCH THAT COMPACTION IS ACHIEVED WITHOUT YEILDING OF THE SURFACE. EACH LAYER SHALL BE UNIFORMLY COMPACTED WITH SUITABLE COMPACTION EQUIPMENT TO AT LEAST 95% OF STANDARD PROCTOR MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D-698, AASHTO T-99, OR VDOT SPECIFICATIONS. ANY LAYER OF FINE GRAINED FILL WHICH BECOMES SMOOTH SHALL BE SACRIFICED TO A DEPTH OF 2" TO ALLOW ADEQUATE BONDING BETWEEN LAYERS. 7. COMPACTED FILL WITH A MOISTURE CONTENT WHICH WILL NOT PERMIT COMPACTION TO THE SPECIFIES DENSITY STANDARD SHALL BE SACRIFICED, DRIED, OR WETTED AS NECESSARY TO PERMIT PROPER COMPACTION. A U o m w CRT C7 CY N O 0� Y> III d 3 w x 0i � U w m Old 0in 24o zmr) W Ua a z� C7 ° s o � � o V1 O o aW H� V [z] z > o Oa z w Wa �x m U z 0 I-__ Uc.E w 0 w Q 0 oz BUT z z z z 0 z z z z o z z LED!w w w O z F- 0 a 0 0 0 0 z o K U U U U w U w I- I- F- H a U o z z z z a W O O O O 00 002 U U U U � p Q N N N N N N w O O O O O O F N N N N N N \ QQ \ \ \ \ � M M O NO, N \ \ a, \ \ \ BE) O a, V In 00 e-I e-I e-I O O ZDIM! M V Do Do IN ��o���PyTH Op DI Jimmy L. Taggart LIE. No. 4 A�o� 05%�03%2021 % �SSIONAL To Q z z W O a vN2 LO O (((w%%%��� (� O Z < T JJQ Q f� a = w 0 a U W 0- � W 0 N 2 Er U w Z w EF <; Q E Q 14 a E- m V W O F" E-E O Ix DESIGNED BY: UVN/JLF DRAWN BY: UVN/JLF CHECKED BY: JILT DATE: 06-11-2020 SCALE: NA FILE: wPo-2020-00034 RGA#: 8438 SHEET: 17 OF 18