Loading...
HomeMy WebLinkAboutWPO202100006 Correspondence 2021-05-06 (3)Mike Myers From: Mike Myers Sent: Thursday, May 6, 2021 4:57 PM To: 'John Anderson' Subject: RE: Planning Application Review for WP0202100006 FOOTHILL FARM MAINTENANCE BUILDING - VESCP - DIGITAL. [ Engineering review comments ] Attachments: FOOTHILL FARM - SWCGP_RegistrationStatemen.pdf, FULL - Foothill Farm -AGREEMENT (4-15-21).PDF John, Attached please find the Eyt revised WPO 2021-00006 and the In SWPPP to address your comments dated March 17, 2021. 1 have also included the DEQ Registration Statement and the Nutrient Credit Completed Agreement/Sale. FYI I have also uploaded all of these to the County online portal and for ease of reference, I have responded to your comments in email form below: Michael Myers, PE, CFM 30 Scale, LLC C: 34-242-2866 1 Web: 30Scale.com From: John Anderson <janderson2@albemarle.org> Sent: Wednesday, March 17, 2021 5:03 PM To: Mike Myers <mike@30scale.com> Subject: Planning Application Review for WP0202100006 FOOTHILL FARM MAINTENANCE BUILDING - VESCP - DIGITAL. [ Engineering review comments ] The Review for the following application has been completed: Application Number = WP0202100006 Reviewer = John Anderson Review Status = Requested Changes Completed Date = 03/17/2021 This email was sent from County View Production. Mike, CV review comments: 1. Revise plan title to include reference to WP0202100006 and VSMP; this is not just a VESCP plan. RESPONSE: The plan title has been revised accordingly to include the WPO# and `VSMP." 2. Sheet 2: a. Revise steep slopes label/s to critical slopes; steep /critical slopes requirements differ. RESPONSE: The steep slopes labels have been revised to read "critical' slopes. b. Identify /provide parcel data for TMP 62-77 on opposite side of Rocky Hollow Road. RESPONSE: TMP 62-77 has been identified. 3. Sheet 3: Provide bottom of trap, bottom of weir, weir crest, Sed.Trap embankment top elevations. RESPONSE: A detail has been added on Sheet 3 with the requested elevations superimposed on the detail, and the plan view has been updated as well. 4. Sheet 4: Provide Stormwater notes that address SWM quality and quantity requirements at 9VAC25-870-65 and -66, and at county code 17-403. Project is not eligible for Agreement in lieu of a plan (since not a single-family dwelling) and is not exempt from the VSMP. Please see 17-302, 17-303. RESPONSE: Stormwater notes that address both SWM quality and quantity requirements have been added to Sheet 4. a. Attached, please find example New Development VRRM.xls which indicates 0.42 lb. TP load reduction required (Soil Group B). Albemarle anticipates nutrient credit purchase, FOS easement, on -site BMP/s, or a mix of these to meet water quality /phosphorus reduction requirements. RESPONSE: The owner has purchased 0.42 lb of phosphorus offset credit to fulfill the water quality requirements. Please refer to attached executed agreement and attachments. Note the bill of sale has also been added to Sheet 4. b. Albemarle will accept design based on attached example 0.42 lb./ `B' soils) and recommends submit VRRM.xls and NRCS Websoil survey report in support of revised application. [Images of VRRM.xls and wbsoil survey on plan sheet is fine.] RESPONSE: Images of the VRRM spreadsheet have been added to Sheet 1 and the Web Soil Survey map has been added to Plan Sheet 2. c. Complete SWPPP. Use county 12-section template. Link to template: b-ttps://www.albemarle.org/home/shonublisheddocument?id=166. RESPONSE: A SWPPP has been completed and included with the submission. Please note the owner -signed copies will be provided with the signature submission. d. Complete /return updated DEQ VAR10 CGP Registration Statement, Elf l/l/21 (Attached). RESPONSE: The DEQ VAR10 CGP Registration Statement has been included with the submission documents. Please note the owner -signed copies will be provided with the signature submission. 5. Sheet 5: Label 15" DIA HDPE pipe length and slope. RESPONSE: The 15" diameter HDPE pipe length and slope have been labeled on Sheet 5. 6. Sheet 6: a. Provide post -developed total to outfall #3, similar as provided for post -developed total to outfall 1. RESPONSE: Post -developed total Q to outfall #3 has been added to Sheet 6. b. Provide plan -profile specific detail for level spreaders, outfall 1 and 3: i. 13 linear ft/cfs; size for 10-vr event. RESPONSE: The level spreaders have been revised to be designed for the 10-year event. Refer to revised drainage area computations on Sheet 6 and sizing on Sheet 5. ii. Provide VA DEQ Stormwater Design Specific No. 2 typical ELS plan /profile details; modified, as needed. (Rip -rap stilling basin detail 2' level lip is not specific.) RESPONSE: Plan and profile of the engineered level spreaders for outfall 1 and 2 sized for the 10-year event have been added to Sheet 5 of the plans. Note the plan details are based on DEQ Specification No. 2, Figure 2.4. 7. Sheet 7: culvert report lists type as circular concrete; sheet 5 lists HDPE. Revise culvert report consistent with plan view label. Revise design, if necessary. RESPONSE: The culvert report has been updated to remove the reference to concrete and to update the roughness coefficient to n=0.012, suitable for HDPE. No significant changes to the plan have occurred as a result. 8. VSMP Fee for small construction activity or land clearing that is less than 1 Ac. is $290 with half due with initial plan submittal. $150 was submitted. $140 is the balance. $59 will be due (to Albemarle) at pre -construction. RESPONSE: A $59 check will be provided at the pre -construction meeting. 9. Note: Since project will not be registered with DEQ, $81 state -portion of VSMP CGP fee is likely forfeit, not required to be paid. No promises, but appears likely.' RESPONSE: Fingers crossed. Thanks for your patience. best, J. Anderson John E. Anderson, PE I Civil Engineer II Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3069