HomeMy WebLinkAboutWPO202100029 Plan - VSMP 2021-05-10WESTERN ALBEMARLE HIGH SCHOOL
MODULAR CLASSROOM ADDITION AND RENOVATION
SITE DATA:
TAX MAP PARCEL: 05600-00-00-017CO
LIMITS OF DISTURBANCE: 0.55 AC.
ZONING: RA
SETBACK: 25' FRONT
25' SIDE
35' REAR
MAGISTERIAL DISTRICT: WHITE HALL
SOURCE TOPOGRAPHY: TIMMONS GROUP, APRIL 2021
DATUM: HORIZONTAL: NAD83 (NA2011) VIRGINIA STATE GRID SOUTH
ZONE
VERTICAL: NAVD88 ESTABLISHED THROUGH LEICA
SMARTNET
BUILDING HEIGHT: 18.33' (ADDITION)
BUILDING AREA: 7,750 SF
PROPOSED USES: MODULAR CLASSROOM ADDITION AND ASSOCIATED SITE WORK
WETLAND IMPACTS: NONE
WATER SUPPLY: ACSA
SANITARY SEWER: EXISTING SEWER SYSTEM
DRAINAGE DISTRICT: STOCKTON CREEK
THERE ARE NO CRITICAL SLOPES LOCATED WITHIN THE PROJECT LIMITS.
THERE ARE NO CONSTRUCTION ACTIVITIES PROPOSED WITHIN THE 100-YR FLOODPLAIN.
THE SITE IS LOCATED IN A WATER SUPPLY PROTECTION DISTRICT.
VSMP PLAN
COUNTY OF ALBEMARLE, VIRGINIA
ALBEMARLE COUNTY PUBLIC SCHOOLS DISTRICT
05/10/2021
King Family Vineyards
Old Trail Golf Club
Brownsville uooahsh Gav
!q5
v, rr
SITE LOCATION
1
VICINITY MAP
SCALE 1" : 2000'
OWNER:
ALBEMARLE COUNTY SCHOOL BOARD
401 MCINTIRE RD
CHARLOTTESVILLE, VA 22902
CONTACT: JOE LETTERI
TELEPHONE: (434) 975-9340
FAX: (434) 975-9341
ENGINEER OF RECORD:
TIMMONS GROUP
608 PRESTON AVE. SUITE 200,
CHARLOTTESVILLE, VA 22903
CONTACT: JONATHAN SHOWALTER, P.E.
TELEPHONE: 434-327-1681
JONATHAN.SHOWALTER@TIMMONS.COM
Sheet List Table
Sheet Number
Sheet Title
CO.0
COVER
C1.0
NOTES & DETAILS
C1.1
NOTES & DETAILS
C2.0
EXISTING CONDITIONS & DEMO PLAN
C3.0
EROSION & SEDIMENT CONTROL NOTES & DETAILS
C3.1
EROSION & SEDIMENT CONTROL NOTES & DETAILS
C3.2
EROSION & SEDIMENT CONTROL PLAN - PHASE I
C3.3
EROSION & SEDIMENT CONTROL PLAN - PHASE II
C4.0
LAYOUT AND UTILITY PLAN
C5.0
GRADING AND DRAINAGE PLAN
C6.0
STORMWATER MANAGEMENT PLAN
C6.1
STORMWATER CALCULATIONS
TOTAL NUMBER OF SHEETS = 12
SIGNATURE PANEL:
APPROVAL DATE
DEPARTMENT OF COMMUNITY DEVELOPMENT
PLANNING & ZONING
ENGINEERING
INSPECTIONS
ARCHITECTURAL REVIEW BOARD
DEPARTMENT OF FIRE AND RESCUE
ALBEMARLE COUNTY SERVICE AUTHORITY
VIRGINIA DEPARTMENT OF TRANSPORTATION
HEALTH DEPARTMENT
LTy " OF
Cam+ " CY
V\.NTK-%N M. SHOW.�LTER
Lic. No. 040057151
"q+O 05/10/2021
t'
�+tis/r) A
CL
O
oc
H
7-
0
a
U
Uj
w
0
z
O
Uri
IY
Ii
DATE
05/10/2021
DRAWN BY
n
DESIGNED BY
AM
CHECKED BY
JS
SCALE
AS SHOWN
LL
J
Z)
0
0
2
W
J
Q
W
m
J
Q
z
DC
W
V 1
w
Q�
w
0
U
IOB NO.
44695.005
SHEET NO.
Co. 0
GENERALNOTES
1. ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH CURRENT VIRGINIA DEPARTMENT OF
TRANSPORTATION'S SPECIFICATIONS AND STANDARDS.
2. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONSULT THE ENGINEER AND VERIFY THE APPROVAL OF THE PLANS
BY ALL FEDERAL, STATE AND LOCAL AGENCIES.
3. LAND USE PERMITS (LUP-A) MUST BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO BEGINNING
ANY CONSTRUCTION WITHIN THE EXISTING STATE MAINTAINED RIGHT OF WAY (INCLUDING ACCESS).
4. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS,
SANITARY LINES, WATERLINES, ETC, PRIOR TO CONSTRUCTION.
5. UPON DISCOVERY OF SOILS THAT ARE UNSUITABLE FOR FOUNDATIONS, SUBGRADES, OR OTHER ROADWAY CONSTRUCTION
PURPOSES, THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE OWNER. THESE AREAS SHALL BE EXCAVATED BELOW PLAN
GRADE AS DIRECTED BY THE OWNER, BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED IN ACCORDANCE WITH THE
CURRENT VERSION OF THE VDOT ROAD AND BRIDGE STANDARDS AND SPECIFICATIONS.
6. ALL STORM SEWER DESIGN AND CONSTRUCTION TO BE IN ACCORDANCE WITH VDOT I AND I LD-94 (D) 121.13.
7. ALL STORM SEWER PIPE SHALL BE REINFORCED TONGUE AND GROVE CONCRETE PIPE IN ACCORDANCE WITH ASTM-C-76. PIPE
WITHIN THE RIGHT OF WAY SHALL BE MINIMUM CLASS III OR GREATER IN ACCORDANCE WITH CURRENT VDOT STANDARDS AND
SPECIFICATIONS.
8. IF PRE -CAST UNITS ARE TO BE USED, VDOT SHALL BE NOTIFIED AND THE MANUFACTURER SHALL SUBMIT DRAWING DETAILS FOR
REVIEW. CERTIFICATION AND VDOT STAMP WILL BE REQUIRED ON ALL UNITS.
9. ALL CONCRETE SHALL BE A3-AE (AIR ENTRAINED 3,000 PSI), UNLESS OTHERWISE NOTED.
10. DESIGN CHANGES, SPECIFIED MATERIALS CHANGES AND/OR FIELD CHANGES FROM THE APPROVED PLANS NEED TO BE
RESUBMITTED TO THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. A LETTER OF EXPLANATION SHALL ACCOMPANY THE
REVISED PLANS AND/OR THE DRAINAGE CALCULATIONS, WHICH MUST BE SUBMITTED AND APPROVED BY THE ENGINEER.
11. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF
CONSTRUCTION PRIOR TO STARTING WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM
THAT SHOWN ON PLAN. IF THERE APPEARS TO BE A CONFLICT, AND/OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THIS
PLAN, CALL MISS UTILITY OF CENTRAL VIRGINIA AT 1-800-552-7001. THE OWNER SHALL BE RESPONSIBLE FOR THE RELOCATION
OF ANY UTILITY WITHIN EXISTING AND/OR PROPOSED RIGHT-OF-WAY REQUIRED BY THE DEVELOPMENT.
12. THE INSTALLATION OF SEWER, WATER, AND GAS MAINS (INCLUDING SERVICE LATERALS AND SLEEVES) SHALL BE COMPLETED
PRIOR TO THE PLACEMENT OF AGGREGATE BASE COURSE.
13. ALBEMARLE COUNTY APPROVAL OF CONSTRUCTION PLANS DOES NOT PRECLUDE THE RIGHT TO REQUIRE ADDITIONAL
FACILITIES AS DEEMED NECESSARY.
14. A PRIME COAT SEAL BETWEEN THE AGGREGATE BASE AND BITUMINOUS CONCRETE WILL BE REQUIRED AT THE RATE OF 0.30
GALLONS PER SQUARE YARD (REC-250 PRIME COAT) PER VDOT STANDARDS AND SPECIFICATIONS.
15. THE SCHEDULING OF AGGREGATE BASE INSTALLATION AND SUBSEQUENT PAVING ACTIVITIES SHALL ACCOMMODATE FORECAST
WEATHER CONDITIONS PER SECTION 315 OF THE ROAD AND BRIDGE SPECIFICATIONS.
16. THE OWNERS REPRESENTATIVE SHALL HAVE APPROVED THE AGGREGATE BASE COURSE(S) FOR DEPTH, TEMPLATE AND
PERFORMED THE REQUIRED FIELD INSPECTION (PROOF ROLL) PRIOR TO PLACEMENT OF ANY SURFACE COURSE(S). CONTACT
THE OWNER FOR INSPECTION FOR THE AGGREGATE BASE COURSE(S) 48 HOURS PRIOR TO APPLICATION OF THE SURFACE
COURSE(S).
17. A GEOTECHNICAL ENGINEER IS TO ASCERTAIN CAUSE AND CERTIFY RECOMMENDED METHOD OF REPAIR FOR ALL PAVEMENT
STRUCTURAL FAILURES PRIOR TO STATE ACCEPTANCE.
18. ALL VEGETATION AND ORGANIC MATERIAL MATERIAL IS TO BE REMOVED FROM THE PROPOSED PAVEMENT LIMITS PRIOR TO
CONDITIONING OF THE SUBGRADE.
19. CERTIFICATION AND SOURCE OF MATERIALS ARE TO BE SUBMITTED TO THE OWNER FOR ALL MATERIALS AND BE IN
ACCORDANCE WITH THE ROAD AND BRIDGE SPECIFICATIONS, AND ROAD AND BRIDGE STANDARDS.
20. ALL APPROACH GUTTERS TO SAG INLETS SHALL MAINTAIN A MINIMUM SLOPE OF 0.004 ft./ft.
21. ALL NEW HANDICAP ACCESSIBLE REQUIREMENTS ON -SITE AND WITHIN ALL NEW STRUCTURES SHALL COMPLY WITH THE 2009
UNIFORM STATEWIDE BUILDING CODE, 2009 VIRGINIA CONSTRUCTION CODE, 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
AND ICC/ANSI A117.1-03.
22. REFER TO SHEET L1.0 FOR ALL LANDSCAPING GENERAL NOTES.
23. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED.
24. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE MUST HAVE A VISUAL INSPECTION
PERFORMED BY THE BUILDING DEPARTMENT.
25. ALL ROOFDRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS.
26. BUILDING OR STRUCTURES BUILT BEFORE JANUARY 1, 1985 MUST HAVE AN ASBESTOS SURVEY PERFORMED IN ORDER TO APPLY
FOR A PERMIT. ASBESTOS REMOVAL PERMITS ARE REQUIRED IF POSITIVE FOR SUCH. CONTACT VDOLI FOR ADDITIONAL
REQUIREMENTS AND PERMITS FOR DEMOLITION PROJECTS.
27. BUILDING INSPECTIONS MUST VERIFY PROPER ABANDONMENT OF SITE UTILITIES BEFORE CONCEALMENT.
GENERAL CONSTRUCTION NOTES FOR EROSION AND
SEDIMENT CONTROL
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE
WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM
STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT
NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION
CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO
PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING
EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL
BE MADE IMMEDIATELY.
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA.
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE
OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28.
13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE.
14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF
7:OOAM TO 9:OOPM.
15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER
TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND STRUCTURES/IMPROVEMENTS, AND
DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE.
16. THE OWNER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER
MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF
THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE
MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN
MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS
TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE
LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE
APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT
180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY
BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY
EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT. ANY DAMAGE OR CLOGGING
TO STRUCTURAL MEASURES SHALL BE REPAIRED IMMEDIATELY. SILT TRAPS SHALL BE CLEANED WHEN 50% OF THE WET
STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS SHALL BE RESEEDED WHEN NECESSARY TO ACHIEVE A
GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH COLLECT SEDIMENT TO HALF THEIR HEIGHT MUST BE
CLEANED AND REPAIRED IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF FINAL SITE
STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL
INSPECTOR.
21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER
PROTECTION ORDINANCE SECTION 17-204G.)
22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND
DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B)
ALBEMARLE COUNTY ENGINEERING GENERAL CONSTRUCTION NOTES
1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT OF WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD,
A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT
ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE
PERMIT SHALL GOVERN.
2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT.
3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL
PLAN AND MUST BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION.
4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED.
5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTALMERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR
BETTER ARE TO BE ACHIEVED.
6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR
DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL.
7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES.
8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III.
9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION
INDUSTRY (29 CFR PART 1926).
ALBEMARLE COUNTY STORMWATER MANAGEMENT NOTES
1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT.
ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING
CONSTRUCTION OF DAMS.
2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES.
3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT
FACILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM
THE COUNTY EROSION CONTROL INSPECTOR.
BLASTING NOTES
1. BLASTING SHALL NOT BE PERMITTED ON THIS PROJECT.
SITE PLAN LEGEND
101- WATER
STORM PIPE
STORM MANHOLE
DROP INLET 8 STRUCTURE NO
CURB
CURB 8 GUTTER
LIMITS OF DISTURBANCE
X FENCE
XXX MAJOR CONTOUR
XXX MINOR CONTOUR
TC 725.94 PROPOSED SPOT ELEVATION
0 PARKING COUNT
GRADING
TC = TOP OF CURB
TW = TOP OF WALL
BW = BOTTOM OF WALL
TS = TOP OF STAIRS
BS = BOTTOM OF STAIRS
FC = FACE OF CURB
EP = EDGE OF PAVEMENT
EX. = EXISTING
PROP.=PROPOSED
APPROX. = APPROXIMATELY
j.:\LTy Off'
O � Z
�'' ; U\.NTK-%N J1. SHOW.�LTER y
Lic. No.0403057ISI
� 05/10/2021
�SSJONAI EC
am
O
oc
f
z
0
a
v
w
w
0
z
0
w
w
Q
0
DATE
0511012021
DRAWN BY
YT
r
ESIGNED BY
AM
CHECKED BY
is
SCALE
AS SHOWN
LL
J
O
7
W
�J/
LL
MW
W
J
LL
W
V /
w
IOB NO.
Moll
J
H�
Lu
0
•♦
SHEET NO.
C1.0
2" R
COMPACTED
SUBGRADE
r
4 MIN.
Z
CONC CURB AND GUTTER CLASS 3A,
(fc=3,000 PSI) CONCRETE
VDOT STANDARD CG-6 CURB & GUTTER
No Scale
TOP OF CURB
No Scale
/ 4„
R=2„
7
S
CONTINUE 21B STONE
BASE FROM ADJACENT
PAVEMENT SECTION
UNDER CURB
VDOT A-3 CONCRETE
CONTINUE 21B STONE BASE
FROM ADJACENT PAVEMENT
SECTION UNDER CURB
EXIST GRADE METAL INSPEC7I01V FRAME W/ SOLID LID
(NEENAH R-1975 OR EQUIVALENT)
3' CONCRETE COLLAR
MR F11i CRUSHED STONE BEDDING
DI CLEANOUT
PLUG AT END
OF LINE
CLEANOUT DETAIL
2.0" BITUMINOUS CONCRETE SURFACE COURSE - SM-9.5A
(PLACED IN SINGLE LIFT)
4" TYPE 21B AGGREGATE BASE COURSE
COMPACTED SUBGRADE
QED) DENOTES LIGHT DUTY ASPHALT PAVEMENT ON PLANS
LIGHT DUTY ASPHALT PAVEMENT SECTION
No Scale
R= %4"
..
COMPACTED SUBGRADE
CONTROL JOINT SPACED
AT WIDTH OF WALK (MAXIMUM)
CONCRETE SIDEWALK JOINT DETAIL
No Scale
NON -SLIP BROOM FINISH
n.
°.. . .'
EXPANSION JOINT AT MAX OF 30', WITH
PREMOLDED EXPANSION FILLER
VARIABLE WIDTH' _
MAX. CROSS SLOPE 2%
CONC. WALK
474
4" 21-B STONE
r `4" 3,000 PSI AIR -ENTRAINED
/ CONCRETE
COMPACTED SUBGRADE 4" TYPE 21 B STONE
NOTE: SIDEWALKS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH VDOT STANDARDS.
CONCRETE SIDEWALK PAVEMENT SECTION
No Scale
° I
1 �OR AS SHOWN ON PLAN
WHEN NOT ALONG SIDEWALK
CURB WIPE DOWN DETAIL
No Scale
Asphalt Pavement Restoration Detail for Open Cut Utility Installations
Mill & resurface Mill & resurface
per Saw -cut existing pavement
to the full depth of asphalt 7.5" total asphalt
ITmlm. ITmin.concrete pavement
Asphalt Concrete Surface Material P
depth or equal to
the depth of existing
T6" min. Asphalt Concrete Base, Type SM-25.OA asphalt concrete,
whichever is greater
1.5" min.
Sub -base course depth
Aggregate Base Material, Type I
10' min.YP shall be 10" or equal to
Size No. 21 A or 21B depth of existing sub -base,
whichever is greater
,. Bench ' Horizontal and vertical surfaces
6" Bench shall be tacked with RC-250 liquid
Min. Min. asphalt at a rate of 0.1 gallon per
NOTES: SY, or as determined by the
district administrator's designee
Asphalt Concrete Surface Material:
SM-9.5A for ADT < 10,000 Select Material Type I with minimum CBR = 30
SM-9.5D for ADT > 10,000
The district administrator's designee shall determine the Class I l material in accordance
with Secctionoon 302 of the Road and Bridge
restoration requirements for other pavement types. Specifications
"" Trench width and pipe bedding shall be in No. 26 or 27 aggregate pipe bedding in
accordance with VDOT Std. PB-1 accordance with Sections 205 & 302 of
the Road and Bridge Specifications
' 12 inches minimum beyond the edge of the trench ..
on longitudinal open cuts, or 25 feet minimum beyond
the trench cent dine on perpendicular open cuts, or as
determined by the district administrators designee.
Date: August 27, 2014
j.:\LTy Off'
O � Z
, V \.1TK-%N J1. SHQW.�LTER y
he. No. 0401-057151
'O05/10/2021
m E
O
N U
N C
¢ o
> E
w °1 E
W i
Q LL O 3
01
<Wl U07
W J —N
N
WN N
v
z °1 v
3x
g_�<
in
c n4
U �
S N
N �
v m
d �
W J
O W
am
O
ce
Z
O
Z
H
Z
O
a
L)
V
U)
w
0
Z
O
w
w
Q
DATE
0511012021
DRAWN BY
YT
DESIGNED BY
AM
CHECKED BY
JS
SCALE
AS SHOWN
Q
J
z
0
O
}>}
Z
0
O
U
w
V/
Lu
U)
=
n
J
Q
J
H�
W
U
�
w
J
V
0
0Z��
G`'
J
V/
O
U
w
W
U
O
(n
U
Z
z
W
U)
W
IOB NO.
695.(
SHEET NO.
Cl.1
LEGEND:
I
I
ILI
I
I
I
I
I
CONC. STEPS
2 TREADS.
3 RISERS W/RAIL
\ ` \ \ \ \ \ \ 6g�`- _ \ Y• \ u'� \ I CONC. LANDING
ASPHALT
ROADWAY
2 LEVEL BLOCK
To STEEL STAIR (2019 SCIENCE'ADDITION)
22 23 RISERS
20' WATERLINE I W/RAIL
EASEMENTFORACSA \
-(PENDING RECORDA T/ON) \�\
\ _ I FFE=69345'L1
FFE=706.82' L2
` �6, I8"MAPLE \ \ \ SAWCUT CURB CONC.
8 a \ \ \ O 2"DEC
\ ( ) CONC. LEVEL 1 1
` . S� \ \ \ I H� AT NEAREST JOINT TYP. srEP ��,
STEEL LANDING 2"DEC },eq 2"D C`
\ \� \ \ ♦\ �\`-/ LEVEL 2-----92�
\ ` \ 28" PINE `__
\ ♦ \ \ \ ON
2"DEC Pa'\ �0�1
\ \ ^ \ \ l2"
` ` ` \ ` _ - - - UGFIBER \ \ i\ \ O 2" DEC/I C
� \ 36" P/NE 36" OAK � \ \ WITNESIS
PEDESTAL ` - \ \ QO OggTF,p\ \ I L
�i,YO Fp\ I
\ss9F �-691- / 1,
\ _ 4f4
BENCHMARK � \
NA(L SET
32"OAK \`\ ��\ \ ELE\V=691.4I
/ Gy
REMOVF\AND
\ RELOC\ATE \ I 1
18"OAK \ EXISTING TREES ; 1 1 1 a _690�
\ \ `\ IF POSSIBLEOk I 1 1 6"DEC j
REPLACF\IN KIND' I e
\ \ �� \\ �� �� \♦ \\ \` \` I I ICG-6 //// 6"DEC O �5
\ \ \ ` \ 1 F4NCTKCNING / /
2%"QAK ` REMOVE PORTION OFI 1 / 0
\ 6+> \ \ e \ \ I AS FLUME // Q r�P
EXISTING\-k2" HDOE
NE\ ESSARY PER THEI I 1 %// o \
G"IING ANQ\DRAIN�AGE PLAN I 1 — — — — — — t/'
\ \ \ \ \ \ -689- 2"DFC
680
\ \ \ \ \ \\ \\ \\ \\ \
EMOV4 CONCRETE
FLUME AIS REQUIi2Eq
P R GFAD11NG/AND
` \ 0\ ID"INP)bE /PL fN —�e`tiQ/ /
B
\ \ \ ) \ \ 1 1 I I 1 I D EMOVE
NAL -%.0)\ i
2.DEr,
M/ FDU7LET i
/NOkHEID) INV--686.34' - -687- - e
I JEMOY5 \\ / /
It/ / l I / 1 1 1 I I If 6
_PIPE OUTLET(ENO WALL)_ -
ARMOR INV W 82' 12" HDPE
EMOVE \\\ 0`?o��
Z L .-REMOVE
STI - Q iQ i
/ A IRONY (2.66'Qll&YLOPOAp
m ,i) ,' / ! 1 / / 685./ / , .� SOe=66V.57'
w A j,861.9' / / / / / I I / 1 I I 1 / / / 2� INV PUT\=A.5' 12" HD�C 1
REMOVE `
COQRDIr ATE ANY I I I I I SWMPOND \ \ i 2"OE
RIEQUIRHD RErROUTAG I I 1 I I FLOOR NOT \ 1 a
WITH U�ILITYICOMPANY iI I \ \\ LOCATED )
o
MULTI -LEVEL
BRICK SCHOOL FACILITY
WESTERN ALBEMARLE H.S.
39' (5941 ROCKFISH GAP TPKE.)
-FFE=691.85'
2 LEVEL
> BRICK SCHOOL
MHD FACILITY
TOP=691.64'
INV. IN=686.74' 12" DIP
INV. IN-690.63' 3" PVC
INV. OUT=686.62' 10" HOPE
SO INLET (20 DIA. NYLOPLAST)
TOP=690.40'
INV. IN=6686.87' 6" PVC
INV. OUT=686.52' 12"HDPE
CUT AND REMOVE
EXISTING 12" HDPE PIPE
AS NECESSARY DOWN
FROM THE NEW
DOGHOUSE INLET
CONNECTION
® REMOVE ASPHALT
® REMOVE CONCRETE
A���� a
SAW CUT CURB SIDEWALK
OR ASPHALT (SIDEWALKS
AND CURB TO BE CUT AT
NEAREST JOINT)
THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE
DIRECT AND RESPONSIBLE CHARGE OF JOSEPH C. MEDLEY
FROM AN ACTUAL GROUND SURVEY MADE UNDER MY
SUPERVISION; THAT THE ORIGINAL DATA WAS OBTAINED
ON THE FOLLOWING DATES: APRIL 13, 2021. THIS
BASE -MAP AND DIGITAL GEOSPATIAL DATA INCLUDING
METADATA MEETS MINIMUM ACCURACY STANDARDS
UNLESS OTHERWISE NOTED.
SURVEY NOTES
1. HORIZONTAL DATUM IS BASED ON NAD83 (NA2011),
VIRGINIA STATE GRID, SOUTH ZONE VERTICAL DATUM IS
BASED ON NAVD88. DATUM ESTABLISHED THROUGH
NETWORKRTKGPS (LEICA SmartNET) OBSERVATIONS.
2. TOPOGRAPHIC DATA DEPICTED BASED ONA CURRENT
FIELD SURVEY BY THIS FIRM, COMPLETED APRIL 13, 2021.
3. THIS IS NOT A BOUNDARY SURVEY,' WESTERN
BOUNDARY LINE DEPICTED HEREON IS COMPILED FROM
DEEDS AND PLATS OF RECORD AND RECOVERED
MONUMEN TA TION.
4. MISS UTILITY TICKET INITIATED, TICKET NO.
B109502497-00B. NO UNDERGROUND UTILITYINVESTIGATION
BEYOND INFORMATION PROVIDED VIA MISS UTILITY HAS
BEEN CONDUCTED BY THIS FIRM.
5. NO TITLE REPORT FURNISHED, EASEMENTS MAYEXIST
WHICHARE NOT SHOWN HEREON.
6. CONTOUR INTERVAL = V
"r4t.ALTy OF
U\.NTH.•\N J1. SHOW.�LTER
Lic. No. 040 057151
05/10/2021 �4w
�S'L O ON A I k'2 G
z
O
a
L)
v
w
w
0
z
O
w
cr
ul
0
0
LEGEND
o
®
WATER VALVE
FIRE HYDRANT
H
STORM DRAINAGE (SD) MANHOLE
Q
w
® ®
STORM INLET W/ GRATE
9
ROOF DRAIN/ DOWN -SPOUT
DIP
DUCTILE IRON PIPE
Q
PVC
POLY -VINYL CHLORIDE PIPE
HOPE
HIGH -DENSITY POL Y-ETHYLENE PIPE
0
O
DATE
El TEL COM PEDESTAL
if)
04
L/GHTPOLE
>
®
UTILITY VAULT, AS NOTED
0511012021
0
DRAWN BY
- UFO— - UNDERGROUND FIBER/TEL COMM
Y
- W - WATER LINE
YT
- UGP
-
UNDERGROUND POWER/ELEC UTILITY
•
DESIGNED BY
OHP
OVERHEAD POWER / UTILITY
•
AM
—X—
FENCE LINE
•
CHECKED BY
Nv
EDGE OF PAVEMENT (EP)
is
TREE LINE/ EDGE OF WOODS
•
•
SCACA LE
CONIFEROUS TREE
•
1 "=20'
titd
DECIDUOUS TREE (DEC)
•
SWK
SIDEWALK
v
SIGN
•
0
PROPER TY CORNER FOUND
(AS NOTED)
�F EMOVF
O EXISTING\
GRAN EL \ \ 1 \ \ ✓ /
i
-688' �` t� !�\ AD24 \ /
%0 h QJ
O V Q� O \ /
ro
�0
*O
VE AND
RELOC EXISTING
�5 TREES IF POSSIBLE
Qe� OR REPLACE IN IZTN
� ASPHALT
PARKING
1 I 1 h 1 I I I \\ HC RAMP
'
Fp�\ 12"PIiJ _ _ _ e // \\\\ %%aS'b /GRATE
3'.BEC� 7.5'
SO IN T (2.0 DIA. NYL OPLAST) (TOP '
l 1 1 \ \ \ \ \ \ \ \ Fp TOP--683. 16' ° INV .94' 12" HOPE
FIBER ASIMARFRIN - 79.08'12"HOPE(POND) INV OUT=678.85'15"HDP
I I \ o ,KED OM _ IIN=579.01' 8" PVC (S)
I ` PRIOR SUR17EYS
N01`A�4RKED �V.O 78.95'12"HOP
( �.
Z�NTEMRORARIL Y) `
\ \ \ I \ CUT ANDREMOVE€XISTING \ 1
\ \ \ \\ I I 4. HDPE PIPI'AS NECESSARY�� GREENHOUSE
UPI FROM THE NEW UOGHbpSE � \ \\ \\ I �J
INLET CONNECTAON \ \ \
/ I 1
I
PO RASM
rOM PRIOR
(NOT MARKS
e
COORDINATE FINAL SEWER AND
WATER LINE ROUTING, SIZE,
MINIMUM COVER, AND CONNECTION
TO EXISTING FACILITIES WITH MEP
ENGINEER AND PLUMBER BEFORE
BEGINNING DEMOLITION OR
CONSTRUCTION
Y)
REMOVE ASPHALT
SO ��CURB INLET W/MHD
TORV(/ TOP=683.7T
_ INV IN=67844' f5"HOPE
15° INV. IN=678.32' 15"HDPE
TO OUTFALL
r / SECTION \— SAWCUT CURB
OF CG-6 AT NEAREST JOINT (TYP.)
I STORY UTILITYBOX ON
WOOD FRAME CONC PAD
BLDG. ® EXISTING
SEWER PUMP
A
SCALE 1"=20'
0 20' 40'
am
O
oc
LG`'L Q
J z
0z
O z Q
G �
WO
Q Lu
m C)
2 Q C6
W Lf)
.j
Q
O
w u O
u U
J J
mz
}
z
z U)
z
O X
U w
WW
J
Q
/ /) W
v J m
J
Lu Q
]0B NO.
695.0
SHEET NO.
C2.0
0
N
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DESCRIPTION
THIS PROJECT INCLUDES AN ADDITION OF A MODULAR CLASSROOM TO WESTERN ALBEMARLE HIGH SCHOOL, SITE
IMPROVEMENTS, AND ASSOCIATED UTILITIES & LANDSCAPING. THE LIMITS OF DISTURBANCE IS 0.55 AC..
ADJACENT PROPERTY
THESE IMPROVEMENTS ARE BEING MADE WITHIN THE PROPERTY BOUNDARY. THE PROPERTY IS BOUNDED BY ROCKFISH
GAP TURNPIKE TO THE NORTH, HIGHWAY ROUTE 64 BORDER THE SOUTH, MILLER SCHOOL ROAD TO THE EAST. THE WEST
SIDE IS BORDERED BY COMMERCIAL PROPERTIES.
EXISTING SITE CONDITIONS
THE SITE IS CURRENTLY THE LOCATION OF WESTERN ALBEMARLE HIGH SCHOOL.
OFF -SITE AREAS
NO OFF -SITE AREAS WILL BE DISTURBED AS A PART OF THIS PROJECT.
CRITICAL EROSION AREAS
NO CRITICAL EROSION AREA EXIST.
EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES
SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE
CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF
THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES
HAVING JURISDICTION.
EROSION AND SEDIMENT CONTROL MAINTENANCE
ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND THE
CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS.
STRUCTURAL PRACTICES:
1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT
THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE MAINTAINED THROUGHOUT
CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY
MOTOR VEHICLES OR RUNOFF.
2. SILT FENCE BARRIER - 3.05 SILT FENCE SEDIEMENT BARRIERS SHALL BE INSTALLED DOWNSLOPE OF AREAS WITH
MINIMAL GRADES TO FILTER SETTLEMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. ITS PRPOSE IS TO
PREVENT SEDIMENT FROM LEAVING THE SITE.
3. STORM DRAIN INLET PROTECTION - 3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL DRAINAGE
STRUCTURES AS INDICATED ON PLANS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM ENTERING THE STORM
DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION.
4. OUTLET PROTECTION - 3.18 STRUCTURALLY LINED APRONS PLACED AT THE OUTLETS OF PIPES OR CHANNEL SECTION
TO PREVENT SCOUR AND PROTECT THE OUTLETS STRUCTURE.
5. DUST CONTROL - 3.39 DUST CONTROL IS TO BE USED THROUGH THE SITE IN AREAS SUBJECT TO SURFACE AND AIR
MOVEMENT
6. TREE PROTECTION - 3.38 PROTECTION OF DESIRABLE TRESS FROM MECHANICAL AND OTHER INIUSRY DURING LAND
DISTURBING AND CONSTRUCTION ACTIVITY.
VEGETATIVE PRACTICES:
7. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL
BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE
AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT IS APPLIED.
8. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY
PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED AREAS, AND ENHANCE NATURAL BEAUTY.
MANAGEMENT STRATEGIES
1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH IMMEDIATELY
FOLLOWING INSTALLATION.
2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING.
3. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE
PERIMETER CONTROLS.
4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED
TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW.
PERMANENT STABILIZATION
ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY
FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC. 3.32, PERMANENT SEEDING.
SEED TYPE SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS" AND "GENERAL SLOPES" IN THE HANDBOOK FOR
SLOPES LESS THAN 3:1. FOR SLOPES GREATER THAN 3:1, SEED TYPE SHALL BE AS SPECIFIED FOR "LOW MAINTENANCE
SLOPES" IN TABLE 3.32-D OF THE HANDBOOK. FOR MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED
SURFACES. IN ALL SEEDING OPERATIONS SEED, FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO MULCHING.
SEQUENCE OF INSTALLATION
PHASE I
1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E&S INSPECTOR, CONTRACTOR, OWNER,
AND ENGINEER. THIS MEETING SHALL TAKE PLACE AT THE COMMUNITY DEVELOPMENT OFFICE. CLEARING LIMITS
MUST BE FLAGGED PRIOR T THE MEETING WITH ONE 1 WEEK F NOTICE.
US GG 0 0 G 0 0
2. INSTALL CONSTRUCTION ENTRANCE, SUPER SILT FENCE, TREE PROTECTION AND INLET PROTECTION. E&S MEASURES
FOR MOBILE CLASSROOMS REMOVAL AREAS DENOTED ON PLANS. NO WORK SHALL BEGIN IN THOSE AREAS UNTIL
ALL ESC MEASURES IN THOSE AREAS ARE INSTALLED.
3. AFTER ALL EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE, SITE WORK CAN BEGIN.
4. ROUGH GRADE PROJECT AREA.
5. SEED ALL DENUDED AREAS PER VESCH STANDARDS.
PHASE II
1. FINE GRADE PROJECT AREA. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER
FINAL GRADE IS ACHIEVED.
2. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE 1S ACHIEVED.
SILT FENCE MUST BE MAINTAINED THROUGH GRADING AND CONSTRUCTION.
3. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION CONTROL MEASURES
CAN BE REMOVED UPON APPROVAL FROM THE E&S INSPECTOR.
MINIMUM STANDARDS:
AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH
THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS:
MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS
AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE
TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS
AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE
PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A
GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS-4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO
TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE
MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND
DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL
DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF
DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER
THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE
CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL
SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR
STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND
TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS
UTILIZED.
MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION
SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN
ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHALL BE PROVIDED.
MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR
OTHERWISE TREATED TO REMOVE SEDIMENT.
MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL,
ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE
ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT
POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF
CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY
NONERODIBLE COVER MATERIALS.
MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY
SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL
SHALL BE PROVIDED.
MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN
ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY
AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL
BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE.
WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE
CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY
SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING
SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY
TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.
MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER
FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS
OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL
AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED
TO PREVENT FURTHER EROSION AND SEDIMENTATION.
MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM
SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW
RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE
WITH THE STANDARDS AND CRITERIA LISTED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK, CHAPTER 8 PAGES 20-24.
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND
SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST
EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00
EROSION AND SEDIMENT CONTROL REGULATIONS.
1.:\LTy OT
U\.NTK-%N M. SHQW.�LTER
Lic. No. 0403057151
ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND A4O 05/10/2021
EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. I 'gyp
ll l L NA I
ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING,
OR LAND DISTURBANCE.
ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. o E
N U
ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS ¢ c
(INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY EROSION > E
CONTROL PLAN TO THE ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY w °1 E
FOR REVIEW AND ACCEPTANCE. r .W�. >� 3..
w "3
ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS o o 0 2 �.
DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MODIFIED NOTE) W M
u
W M - l!j
ES-7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING a > o 0°'
LAND -DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. Z w
I3
ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. in a 3
ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. MAKE Ln a
ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES
IMMEDIATELY.
24
SOILS INFORMATION: M
v
W J
7B - BRADDOCK LOAM, 2 TO 7 PERCENT SLOPES, MORE THAN BO INCHES TO RESTRICTIVE FEATURES, WELL OWNED,
HYDROLOGIC SOIL GROUP: B
ui
37C3 - HAYESVILLE CLAY LOAM, 7 TO 15 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC SOIL GROUP: B 0
x
0
37D3 - HAYESVILLE CLAY LOAM, 15 TO 25 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL p
DRAINED, HYDROLOGIC SOIL GROUP: B
H
0
GENERAL CONSTRUCTION NOTES FOR EROSION AND W
x
SEDIMENT CONTROL a
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE zz
WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM >
STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. Oy
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT
NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION •
CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO •
PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. •
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. •
8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING • •
EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL
BE MADE IMMEDIATELY. •
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. •
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE
OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. •
13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE.
14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF
7:OOAM TO 9:OOPM.
15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER
TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND STRUCTURES/IMPROVEMENTS, AND
DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE.
16. THE OWNER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER
MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF
THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE
MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN
MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS
TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE
LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE
APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT
180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY 0
BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY
EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT. ANY DAMAGE OR CLOGGING
TO STRUCTURAL MEASURES SHALL BE REPAIRED IMMEDIATELY. SILT TRAPS SHALL BE CLEANED WHEN 50% OF THE WET
STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS SHALL BE RESEEDED WHEN NECESSARY TO ACHIEVE A
GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH COLLECT SEDIMENT TO HALF THEIR HEIGHT MUST BE
CLEANED AND REPAIRED IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF FINAL SITE
STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL
INSPECTOR.
21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER
PROTECTION ORDINANCE SECTION 17-204G.)
22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND
DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B)
z
O
E
f
z
O
a
U
v
w
w
0
z
O
rn
w
W
a
0
DATE
0511012021
DRAWN BY
YT
DESIGNED BY
AM
CHECKED BY
JS
SCALE
AS SHOWN
0L
Q Q J
Jz ,�
Q
Q > w
0zas
O Ln
U
W w
Q
O
(nLuz w
m
= J J
0
W U
�.j
LL o O
z
w U w
M (f)
W U F i
J m
Q 0- w
a
U7
zz
O;6
py°z
w W O
J F1
Q V )
O
W
v) �
coJ
w Q w
IOB NO.
ar%jl
SHEET NO.
C3.0
1. SET THE STAKES.
FLC
2. EXCAVATE A 4"X 4" TRENCH UPSLOPE
ALONG THE LINE OF STAKES.
pN
3. STAPLE FILTER MATERIAL TO STAKES AND 4. BACKFILL AND COMPACT THE
EXTEND IT INTO THE TRENCH. EXCAVATED SOIL.
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
♦ GRAVEL FILTER 1 Z„
RUNOFF WATER WIRE MESH
FILTERED WATER
T
SEDIMENT I ! : •. ;•?°�
CONCRETE "
GUTTER CURB INLET
12"
GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE.
/���I�®�� ��glllllglllll�`M SPECIFIC APPLICATION: THIS METHOD OF INLET PROTECTION IS APPLICABLE AT
CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO
POINTS A SHOULD BE HIGHER THAN POINT B. CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND
OSF DRAINAGEWAY INSTALLATION 3.05-2 IP UNPROTECTED AREAS. 3.07-6
(FRONT ELEVATION) O
SILT FENCE (W/O WIRE SUPPORT) STORMWATER INLET PROTECTION
No Scale No Scale
1. SET POSTS AND EXCAVATE A 4"X4"
TRENCH UPSLOPE ALONG THE LINE OF
POSTS. 6'
J /
3. ATTACH THE FILTER FABRIC TO
THE WIRE FENCE AND EXTEND IT
INTO THE TRENCH.
SILT FENCE
No Scale
2 X 4" WOOD
FRi —
1.5'
MAX
C
2. STAPLE WIRE FENCING
TO THE POSTS.
4. BACKFILL AND COMPACT THE
EXCAVATED SOIL.
FLOW
I -11
��1��69[•]►N]�yG1:1:1[•1G1�1•�U41:7�I�IC•i1a�1:1��[•I::
TH WIRE SUPPO
SILT FENCE DROP INLET PROTECTION
PERSPECTIVE VIEWS
TYPICAL ORIENTATION OF VESCH TREATMENT 1 SOIL (STABILIZATION
BLANKET)
BM 3.36-1
DROP INLET SOIL STABILIZATION BLANKET (TREATMENT-1
WITH GRATE
col No Scale
DETAIL A
GATHER
EXCESS
AT
CORNERS
ELEVATION OF STAKE AND FABRIC ORIENTATION
SPECIFIC APPLICATION
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE
INLET DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATER THAN
5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT
EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NOT APPLY
TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET
OR HIGHWAY MEDIANS.
No Scale
POLYETHYLENE
FABRIC (ATTACH
TO POSTS WITH
METAL TIE WIRES
PERSPECTIVE VIEW
METAL (T) OR
(U) POSTS
10,
FABRIC
SAF PERSPECTIVE VIEW PERSPECTIVE VIEW
PLASTIC FENCE METAL FENCE
SAFETY FENCE
No Scale
PIPE OUTLET CONDITIONS
TABLE 3.31-B
ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS
"QUICK REFERENCE FOR ALL REGIONS"
PLANTING DATES SPECIES RATE (LBS./ACRE)
SEPT. 1 - FEB. 15 50/50 MIX OF
ANNUALRYEGRASS
(LOLIUM MULTI-FLORUM)
& 50-100
CEREAL (WINTER) RYE
(SECALE CEREALE)
FEB. 16 -APR. 30 ANNUAL RYEGRASS 60-100
(LOLIUM MULTI-FLORUM)
TS MAY 1 - AUG. 31 GERMAN MILLET 50
(SETARIA ITALICA)
TEMPORARY SEEDING PLANT MATERIALS
No Scale
TABLE 3.32-D
SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA
TOTAL LBS. PER ACRE
3.1-1 MINIMUM CARE LAWN
COMMERCIAL OR RESIDENTIAL 175-200 LBS.
KENTUCKY 31 OR TURF -TYPE TALL FESCUE 90-100%
IMPROVED PERENNIAL RYEGRASS 0-5%
KENTUCKY BLUEGRASS 0-5%
GENERAL SLOPE (3:1 OR LESS)
KENTUCKY 31 FESCUE 128 LBS.
RED TOP GRASS 2 LBS.
SEASONAL NURSE CROP ` 20 LBS.
150 LBS.
LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1)
KENTUCKY 31 FESCUE 108 LBS.
RED TOP GRASS 2 LBS.
SEASONAL NURSE CROP ` 20 LBS.
CROWNVETCH " 20 LBS.
150 LBS.
` USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES
AS STATED BELOW:
FEBRUARY 16TH THROUGH APRIL.................................. ANNUAL RYE
MAY 1ST THROUGH AUGUST 15TH ............................ FOXTAIL MILLET
AUGUST 16TH THROUGH OCTOBER ............................... ANNUAL RYE
NOVEMBER THROUGH FEBRUARY 15TH........................ WINTER RYE
" SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF
FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL
OTHER PERIODS, USE UNHULLED SERICEA). IF FLATPEA IS USED IN LIEU
OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED
MUST BE PROPERLY INOCULATED. WEEPING LOVEGRASS MAY BE
PS ADDED TO ANY SLOPE OR LOW -MAINTENANCE MIX DURING WARMER
SEEDING PERIODS; ADD 10-20 LBS./ACRE IN MIXES.
PERMANENT SEEDING MIX FOR PIEDMONT AREA
No Scale
uuu uuu
STANDARD ORANGE VINYL OR PLASTIC CONSTRUCTION
FENCE ATTACHED TO POSTS (PRE -WEATHERED WOOD,
GALVANIZED STEEL, IRON OR THICK PVC PLASTIC), AT LEAST
40" ABOVE FINISH GRADE WITH SPAN BETWEEN POSTS NO
GREATER THAN 6' ON CENTER. EVERY NINTH POST SHALL
CONTAIN A WARNING SIGN THAT CLEARLY IDENTIFIES THE
TP FENCE AS A TREE PROTECTION FENCE.
3.38
NO SCALE
TREE PROTECTION
No Scale
O��•,1.:\LTy Off'
O � Z
U\.NTH•%N J1. SHOW:�LTER y
I.1c. No. 0401-057151
05/10/2021 �Q
F \
'•r.
•a.C
s
1 1•
\ l A
m B
0
01 u
N N
N C
> E
w °1 E
W > i
Q w O 3
w 0 L n
Qaw U0�
J — uj
N
N N
L9
v
z °1 v
0=x
�i
ce
in =
Ln X c ON
a
a ON
S N
M
v
W J
N
0
0
x
C7
0
a'
x
H
w
w
w
x
a
z
O
Ln
0
0
z
O
a
v
w
w
0
z
O
Ln
w
w
Q
0
DATE
0511012021
DRAWN BY
YT
DESIGNED BY
AM
CHECKED BY
JS
SCALE
AS SHOWN
Q . J
J z
Q I W
O z06
O /A
U V �
w w
of
O
(n�z w
2 In
Q 0
W U
.J
oCoo
�0z
w U W
U)
inC
U GF- H
J m �
0- W
a
z
zz 0-6
p�°z
w w O
J F,^
w 1
< V /
LL O
' ^
V / m
J
w a W
N
16
0
2
M
10B NO.
695.0
SHEET N0.
C3.1
l
I
I
I 1LEVEL
BRICK SCHOOL
FACILITY
I
I
I
I
CONC. STEPS
SOIL TYPE: ` ♦`\`� \` ` I \ \�� \ 3RISERS,
\ \ \ \ \ / \ \ ` 3 RISERS W/ RAIL
37C3 \ \ � ' \ \ � ` \ �� � I
\ \ ♦ ♦ \ \ p _ ♦ 4 � \ I CONC LANDING
ASPHALT
\ \ \ \ \ ♦ - _ _ \ ♦ O m, i1a m� \ ROALYWAY
\ 2 LEVEL BLOCK
♦ \ \ ♦ \ R` \ '' I STEEL STAIR
To ` I I I \ \ 22 TREADS, (2019 SCIENCE' ADDITION)
\1 23 RISERS
20'W4TERLINE I W/RAIL
EASEMENT FOR A CSA \
\ \ \ \ \ \ \ \ \ -(RENDING RECORDATION) \� \
SL \ ♦ \ �'P I -, I
\ \ I FFE=69345'L1
\ ♦ ♦ \ \ \ � \\ Fa � �6'92' � � FFE=706.82' L2
\ \ 18"MAPLE \ \ CONC.
\ \ 68 \ ♦ O
\ \ (\ H OF STE\ CONC. LEVEL 1 2"DEC 2"DEC \I
\ \ ■ STEEL LANDING 2"O O`
\ \ \ \ \ \� \ \ \ \ \ \ _ - ■ Fa \ LEVEL 2 - - -zJ
2"DEC Pa-t
\ l2"
36" PIN \ \ ` \ \ 36,./OAK \ \ \ _ _ - W TNI ES CiE \ \ONA= /� p,� D�C/1
PEDESTA \ �s� C o p �R/N\ k \ I
\ \ \ \ \ \ e0 \ R9
SSF ♦\ \y ___ \ \iyc _' lozo�
\sue AR
\ \ ♦ \ \ \ \ \ �+�\32" OAK \ \ \ 1. \ \ \ 4 rOFYS
\ ` \\ \ ♦\ \ \\� �\ ` \\ I I 1 a _ / FO
` ♦ \ \ ♦ \ \ ` \ \ \ ` \ \ \ \ `8" OAK\^'-.,` \ � $$F \ � 1 i\ I I \ / C 69Q
\ ` ` ` \ IG6 6°DEC
SOIL TYPE: \ \
37D3 \ \ \ \ \ \S' `\ \ \ \ \ \ \ \ \ 2% QAK \ \ \ ♦ \ I 1FtfNCT16NZG
As FLUME
\ \ \ \BMI� QF 61STURBANCE=b,55AC\ACR'ES ` ♦ \ \I �` I I I 1 _ _ _ _ _ ,/ \ \
\ \ ♦ \ ♦ ` \ \ \ I I I \ / - -689- / / 2"DEC
\ ♦ \ ♦ ♦ 30" OAK
\\ \\ \ `\ \\ ♦♦ ♦ \\ 68p\ \ 1 / I I I \ TS DC
SSF
/
MULTI -LEVEL
BRICK SCHOOL FACILITY
WESTERN ALBEMARLE H.S.
39' (5941 ROCKFISH GAP TPKE.)
-FFE=691.65'
v�
P &/
2 LEVEL
\ 6 ��g/
R '
BRICK SCHOOL
�" �/
MHD FACILITY
TOP=691.64'
INV. IN=686.74' 12"DIP
U G /
INV. IN-690.63'3"PVC
mo
INV OUT=686.62' 10" HOPE
SO INLET (2.0 D/A. NYLOPLAST)
TOP=690.40'
INV. IN=6686.87' 6" PVC
/l
INV. OUT=686.52' 12"HDPE
\
A
P
1 / �NDALj (W 0)
\ / / / I 1 I I I F UM OUTLET \ \ J� - - - - pJ
/NO7'CHEID) INV=686.34' - /� 687-/0`C
I
� / -PIPE OUTLET (ENOWALL) \� -686- V
ARMOR \ INV W 82 12" HDPE G \ dye
84�
/ �RISF\R ST ` Q\fie /
L/< / / / / I I I I r/' - (266'Q/A�YLOPLAp
IRON,rYJ i /' /' /' /' J 1 / I Bgs� / / SOe=s8Q.5T\
(Z A j-861.9' / `662` INV PUT=679.5' 12" HDA� 1 /G
SSF I I I I I / / / \ \ \ 1 I �` ♦/ - - 685-
04// // I l I 1 I I I / Ili /I SWMPOND \\ / 2"DEC
I I I DC I FLOOR NOT \ I a
I I 1 I( I TS I l l\ LOCATED II
' W / / // � / II I 1 1\c � I I 1 I \\\\ ` - _682_ - ♦\</ I�/ � � � >.
_688�
o
1\ 1 I 1 1 I\ I
I I 1 I `s84-
I I I I t1
I P /`\\ y
`♦� �0,9bR
\` �684- -
1 1 \ ' \
I
�
HCRAMP i
1 1
I \ ♦
♦`
N-
\
/ /// 1 I 1 11 11 `�
\it• �12"PAfEJ
_ }er•p /
`` �% 11VLET IP E
/ I I \ \ \
SO INLET (2.0 DIA. NYLOPLAST
\ ` SSF OF
7.5', 2,5'
(TOP-683.50'
�N =678.94'12"HOPE
I \
O
o /BER ASIMARKED FRO
TOP
= 79 08' 12" HDPE ( ND)
I p INV. UT=67 5' 15"HDPE
I
PRIOR SURosE s
=679.01' 8" _(S)
-2 P )
\ \ l I \ \
\ \ l I \ \
\ (NO7-kARKED \ \
\ NTEMRORARIL' \
♦
\ I \
\
1
GREENHOUSE
\ \
1 1 I 1
\
I 1 1
i
ASPHALT
PARKING
POWER AS M
FROM PRIOR
(NOT MARKET
1 STORY
WOOD FRAME
BLDG.
72„
EROSION CONTROL LEGEND
LIMITS OF CLEARING AND GRADING
SOIL AREA DIVIDE
SAF SAF— SAFETY FENCE 3.01
CONSTRUCTION ENTRANCE
INLET PROTECTION
TEMPORARY SEEDING
PERMANENT SEEDING
MULCHING
TP
Tp
TREE PROTECTION FENCE
DC
DUST CONTROL
BM
AREAS STEEPER THAN 3:1 TO BE
STABILIZED WITH STABILIZATION
BLANKET
3.02
3.07
3.31
3.32
3.35
3.38
3.39
3.36
* "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" SPECIFICATION NUMBER
J
\ Fps B3ti pGRgcsq
/
AD24 \ \
oy \
/ /OVv�
OQw
ry
YJ
SD CURB INLET W/MHD
IP TOP=683.77'
INV IN=678.44' 15'HDPE
INV IN=678.32' 15"HOPE
TO OUTFALL
UTILITYBOXON
CONC. PAD
® EXISTING
SEWER PUMP
0
SCALE 1"=20'
0 20' 40'
j.:\LTy OT
O � Z
; Q\.NTKAN J1. SHOWALTER y
Lic. No. 0403057151
05/10/2021
2Slrl\ A I l:\`6%
ll�L
m E
O
N U
N C
> E
w °1 E
W 3.1
Q LL O 3
0
L
W �
¢<1J U0�
J - ui
N
W N N
v
A x
9
in
Uc
� 04
S N
M
W J
z
O
a
it
v
w
z
O
w
w
Q
DATE
0511012021
DRAWN BY
YT
DESIGNED BY
AM
CHECKED BY
JS
SCALE
1 "=20'
]OB NO.
695.0
SHEET NO.
C3.2
-2
d
c
ga
0
a0
�z
20
oF-
m2
c -6
E O
a w
M h
m
D
O
�o
� 3
Z
z„
o�
� a
F
H d
o r
2 3
.N Y
X C
0.0
d N
N C
!A U
C 0
C
O
a o,
w 'c
1O a
0
m o
m
a
c
m
= o
V
m
s. E
� E
1 I i
I O
I 2
0
I I
I
I 2 I I LEVEL
p BRICK SCHOOL
FACILITY
I I I
I o
I
I \ I
4
CONC STEPS
2TREADS,
\ 3 RISERS W/RAIL
ASPHALT I CONC. LANDING
ROADWAY 2 LEVEL BLOCK
STEEL �o I I I \\ 22 TREADS,R (2019 SCIENCE'ADDITION)
23 RISERS
ENTFO ACSARLINE I \ W/RAIL
EASEMENT FOR ACSA �
` ♦ \ \ \ \ \ \ `(PENOING RECORDATION) \� \
FFE=693.45' L 1 \ Pv
\ \ \ \ \ — \ \ \ ♦ \ \ \ \ \\ F,o `692� _ I r I FFE=706.82' L2 \�C
\ \ 18"MAPLE{( \ \ \ I CONC S\
�TEP DEC
\ Q
\ Ltt\ \ \ \ \ CONC. LEVEL 1 2"�^-vV�ly%,
2 I \S Q
\ \ \ \ \ GiO \ STEEL LANDING "DEC },qq 2"D C`
\ \ I \ \ 28"PINE \ \ \ \\ \ Fa \ LEVEL 7
\� I` d
\�\` 2"DEC a
\ A \ _ _ _ iY 2" DEL /
\ \ \ 6"PINE \ \36"OAK -UG-RE CE \ \ONA O \ / `J�\' \ C N 71 m //
\ \ ^^\ _ W/TNES
III
PEDESTA q"RGiy\ h' \ I c9 C.
\\ \\ \\\ \ \ SSF
EROSION CONTROL LEGEND
r_
LIMITS OF CLEARING AND GRADING
or
SOIL AREA DIVIDE
SAF
—SAF—
SAFETY FENCE
3.01
CE
CONSTRUCTION ENTRANCE
3.02
IP
®
INLET PROTECTION
3.07
TS
TEMPORARY SEEDING
3.31
PS
PERMANENT SEEDING
3.32
M U
MULCHING
3.35
TP
TP
TREE PROTECTION FENCE
3.38
DC
DUST CONTROL
3.39
BM
AREAS STEEPER THAN 3:1 TO BE
3.36
STABILIZED WITH STABILIZATION
BLANKET
* "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" SPECIFICATION NUMBER
MULTI -LEVEL
BR/CKSCHOOL FACILITY
WESTERN ALBEMARLE H. S.
39, (5941 ROCKFISH GAP TPKE)
—FFE=691.85'
2 LEVEL
BRICK SCHOOL
MHO FACILITY
TOP=691.64'
INV. IN=666.74' 12" DIF
/
INV 1N=690.63'3"PVC
INV, OUT=686.62' 10" HDPE
SO INLET (2.0 DIA. NYLOPLAST)
/
TOP=690.40'
INV. IN=6686.87' 6'PVC
INV. OUT=686.52' 12'HDPE
OAK
18"OAK
\ \ \ \ \ \ NMITSa� DISTURBANCE\ 0.5 AC.
24' QAK
\ \ \ \ \ \ \ \ \ \ 1 I I \ / \ ` — —669�
`�\ \� \\ \ \\\ \\ ♦\ \\30"OAK �\ \ , 1 \ // BM
0
co
—49 o //
\ \ \ I > \ 1 I I 1 I I PS
G,
Yo
\ °j ASPHALT
16 ^ \ \ PARKING
KA /RON,(�J/ / ��/ /� /// / / BM I I 1 Z�B�`-`�\68g\ \ J� \
. oa'o j /
qN
SSF
l I Il I to
Ps
Mu 1\ l A HC RAMP
PS `
I 1 \
MU¢.
12 RX _ _ _ `a D `Er. IP E
� 3"33EC i �'� @5' �:i25';ii
SD INLET (2.0 DIA. NYLOPLAST) l
SSF UFO TOP=6Asmm IP SIN 94'12"HDPE
= 79 08' 12"HDPE ( ND) INV. UT=67 5' 15"HDPE
I I \ o FIBERAS-MARKED FRO
PRIOR SURREYS 2 DP I STORY
\ \ l I \ \ \ (NOrkARKED � � WOOD FRAME
\ \ \ l I I I \ \ \ \ \ NTEMRORARILY) \ 1 BLDG.
GREENHOUSE
25' SETBAC)K
/
1 1 1
i
I
POWER AS M
FROM PRIOR
(NOT MARKET
Y)
I
\ AG "Pit \ /
C /
AD24
°y \
Po
ccb
ca`b O
/ do
SO CURB INLET W/MHD
T
.INVJN=678.44' 15'HOPEI�
INV /N=678.32' 15"HOPE
TO OUTFALL
UTILITYBOXON
CONC PAD
® EXISTING
SEWER PUMP
SCALE 1 "=20'
0 20' 40'
: V\.NTK-%N J1. SHOW.�LTER y
Lic. No. 040 057151
05/10/2021 �4,
, �
m E
O
N U
N 'A
> E
'_
W i
Q LL O 3
oLL
¢�J U0�
N
1La7 W N N
v
4 B rl,
3 x
� <
/7 Q
c
U � M
cON
ON
S N
M
7
W J
H
CL
O
oc
w
Q
DATE
0511012021
DRAWN BY
YT
DESIGNED BY
AM
CHECKED BY
is
SCALE
1 "=20'
Q H1
J z
Q Q
0z
0 I
U z
LJ
- Q
V) � a
2 m J
< o
� LL
W U
.J
~ O
V)
oU
<oz
= LU
W
V)
U I --I
J coLu
Q a (n
0,6
zz
LL o 0
Lu (n
L
W
vJ m w
J
WQ
30B NO.
695.0
SHEET NO.
C3.3
6
N
0
0
a
0
ga
0
a0
�N
20
6
mw
E 0
a
� h
m
a
O
O 3 Z
o m
O �
� a
"6 d
o r
$ 0
o .3
.N Y
0 w
X C
0.0
0 3
N 0
A 0
C 0
C
a m
w 'c
1O a
0
m o
M-6
a
M
m
m 0
M 0
m
s. E
� E
I
I p
I
0
I I
I
I i I I LEVEL
p BRICK SCHOOL
iFACILITY
I I
I o
I
I
Q
CONC. STEPS
2 TREADS,
�3RISERS W/R.4/L
\ \ \ \ \ CONC LANDING
A. � \ ASPHALT I
ROADWAY 2 LEVEL BLOCK
° I I I \ \ 22STEEL STAIR (2019 'SCIENCE' ADDITION)
23 RISERS
20'WATERLINE I \ W/RAIL
EASEMENTFORACSA
-TRENDINGRECORDAT/ON) \� I
FFE=693.45' L 1 \ v
FFE=706.82' L2
18"MAPLES\ \ \ \ ` I CONC. I
ONO. I �TEP \ Q
CONC LEVEL 1 2"DEC � 1 Q' C
STEEL LANDING 2" DEC 'SR 2 D,FG� Q4' \�
28"P\NE \ \\\\ \ \ J / _Dy \\t OB �(
R'ECO�'f'UCT oRe \ 2"DEC
` • ` \ \ \ • \ ` ` - - - ' ' - - • \ Y� �ONCFjETE FLUMF�TO
` \ ` \ \ n \ 36" OAK \ - _ - - - UGFIBER ` \OH.o O \ ,(7 jV C N 2"DEC
\ 6"P/NE . \ \ �(vy _ _ - WITNESIS $ \\ RAIN T A DITCH I
PEDESTAL \ \ _ \ C e POS�INLE A R,�'VF Gy k \ 1 I C / C.
ilk
BENCHIVARK RAIS' D WAEK WITH
MULTI -LEVEL
BR/CKSCHOOL FACILITY
WESTERN ALBEMARLE H.S.
FFE=693.39' (5941 ROCKFISH GAP TPKE)
2 LEVEL
BRICK SCHOOL
MHD FACILITY
TOP=69t64'
INV. IN=666.74' 12"DIP
INV. IN=690.63' 3" PVC
INV. OUT=686.62' 10"HDPE
SD INLET (20 DIA_ NYLOPLAST)
TOP=690.40'
INV. IN=6686.8T 6" PVC
V. INOUT=686.52' 12"HDPE
Amh SET HANDRAINS TO HERE
32
" OAK _ \ ELE\V-691.41'
\ \ \ \ �QESIGNED B-YOTHERS)
\ ` \ \ ♦ \ \ \ ` \ \ ` 18" OAK\^v%,\ \ \ \ \ I 1 909
T
2PRAK
64' \
30"OAK
h^ A024 PRESERVE OR RECONSTR /
1 \ \ \ \ I I O bo h' J 3 PICK TABLE AREAS AT
\ I I \ / I� cc 0 DIRECTION O� 01�INER. /
\ I // \ Q /I ' \
\ `\ `\ `\ `\ \ \ \ \♦ ` \� /I I / / !\0 Vv OQ O \ /
MODULAR py \ 1 J• � \r ^p � \
cb
`� �\ `\ \\ `\ `\ \ \\ `\ \ 1 I // 1 ♦� RLF-690.20 \` / �bcoh0
^`v
REPLANT 5 TREES SIMILAR IN SIZE
5 AND TYPE TO THE 5 TREES
REMOVED IN AREA BETWEEN PATH
ASPHALT AND PARKING LOT. COORDINATE
\ \ PARKING LOCATION AND SPECIES WITH THE
/ /`"'" / TIE PROPOSED CG-2
L POWERAS MA OWNER
A IRON,(Y) / / / / / / / / / / / l l 1 1 1 i i ` J��j'� XISTING AT FROM PRIOR EYS
w A �61.9' / / L / / / / / / / I I t I / / j i�i ` \ \ II Q NEAREST JOINT (TYP.) (NOTMARKE COORDINATE THE FINAL SEWER
T I I I I / / / I \ / coNrEMPO Y) AND WATER LINE ROUTING, SIZE,
a / MINIMUM COVER, AND CONNECTION
30 RAMPNVITH HANDRAILS \ 1 TO EXISTING FACILITIES WITH MEP
to 1 1 AND LANDINGS (DESIGNED I ENGINEER AND PLUMBER BEFORE
c to
I/ / 1 1I 1 1 1 I \ ` BY OTHERS) BEGINNING CONSTRUCTION.
_ _ - - - - / / \ TIE P OPOSED CG-6 N
I I I I 9' ___-_ / 9 SO CURB INLET W/MHO
/ 1 o f - _ _ TO EXISTING AT 2
I 1 I I 1 I TOP=683.77'
1 I 1 I 1 1 1\ I NEAREST JOINT
1 I �8, \.:',.;::;:!:.., IN1N=678.44' 15"HDPE
pNpTP
V.
I I I 1 \ 11 \ 1 11 \ ( ft
\\\ H r.1 15° INV. 1N=678.32' 15"HDPE
TO OUTFALL
HIANDRAII13 0-,\ �' 'N _ _ / `\� : /GRATE
LANDINGS ��ESI�NE'f�BY\ �� - 75' .z:g';
OTHERS) \ ` \ SO INLET (2.00/A. NYL OPLAST) ITOP „83'. '
UFO TOP=683. 16' INV. .94'12"HDPE
INV�Id- 79.08'12"HDPE(POND) INV. OUT=678.85'15"HOPE
I I \ \FIBERASYMARKED FROM _ _ I .IN--679.01'8"PVC(S)
PRIOR SURREYS 1 STORY UTILITY BOX ON
\ 1 "VV. OU 78.95'12"HDP
\ \ l I \ \ \ \ (N01`EMPO D `) WOOD FRAME SONG PAD
CONTEMRORAR/LY) ` ` BLDG.
SEWER PUMP
GREENHOUSE
25' SETBAO\K I / I 1 I \ ` \ \ \ \ \ \ \ \ 1 (o
/ I I
J
IL
SCALE 1 "=20'
0 20' 40'
V\.NTH.•\N J1. SHOW.�LTER
Lic. No. 040 057151
05/10/2021
��ss/f1N A 1 E�G�
m E
O
N U
N C
> E
w °1 E
AD
W �
Q LL o 3
LL
Ow O y
a W m
a J U m Z
J — ,n O
o 1u N a
.Z. „ m a
91 w
c' 3 � O
Ln N Z
U ¢ o O
S N W
M
W J
V)
0
O
x
C7
d
H
w
w
Q �
z
O
in DATE
0 0511012021
Y DRAWN BY
YT
• DESIGNED BY
• AM
• CHECKED BY
•is
SCCAA
LE
• 1 "=20'
Q
J z
Oz
0
O z
V � w
m
2Q�
W U I --I
J
O
O Q
W u D
m"O
J m >-
\L a J
}
zz
O
U
LLJ
�..0 �
Q
w
v J m
J
Lu a
IOB NO.
44695.00
SHEET NO.
C4.0
0
N
i'
I
I
ILI
I
I
I
I
I
4
CONC. STEPS
2TREADS,
3 RISERS W/ RAIL
ASPHALT I CONC LANDING
ROADWAY 2 LEVEL BLOCK
STEEL STAIR i2019'SCIENCE'ADDIT/ON)
22 TREADS,
23 RISERS
20'WATERLINE I \ W/RAIL
EASEMENTFORACSA
-'PENDING RECORDATION) \� `
\ \ I FFE-706 85' L 1
6'9 �2' - � Ir FFE=706.2' L2
\ ` \ 18"MAPLE��(tt`j \ l \ I I ` CONC.
\
ONO. \ �TEP \
CONC 2"DEC LEVEL > 2"DEC 1
STEEL LANDING �
\ `_'w 2" D C-
` H ��
\ V I gg
\\\ \\\\ \\\\\2P\ 8"NE �\ \\ \\\ \�--J// _Dh \\a Oca \ LEVEL 2 2"DEC �(�^^27�� G
\ \ \ \ 6" P/NE \ \ ` ^ \ 36" OAKA` \ UG-FBER \ \ \ \ C c 11.2tt"ddDEC/I /1
PEDESTAL �F \ I
/1'\ \ I \
/\\\Ss cg4�AA.,-691- /T
LOW AREA TO s90 09' /\ `
\ \ \ BENCHNIFkRK
\ \6 \ \ \ \ \ MA�ITAIN POSITIVE - Nl1 L SET
DRAINAiEAROUND \ \ \ 690.20'
ELE\V=691.41'
\ \ \ \ 32"OAK \ \ \ 1`JILDING \ 6862' \ \ 690.20'
18" OAK\{�\ \ \ \ \ I I
GLEANOUT\ I 1 I
6" HD)E BURIED \
24eAKA PIPEPE)2.E20OF
\�'n�2 \\ DRAIN AND
GRADING NOT�\S \ I I
DO\AIN
30"OAK \ \ \ I I TY \ /
I
IDE E\ \ I I FIFE 690.20\13'�/SETO'IHANIJL� DRAA
I
L_CJNAREATO
FROMI�OOF DRAINAGE \ \ I\\M�INTAIN POS'IFWE
PPAINAGEAROUNa-
\ BUILDING-
\
DOWN SPOUTS ON EAST
/ /\ 1 1 11 I I / �� 1 SIDt TO BE PIPED
/ / / // / / 1 1 I / 1 UNfSER T41LEV,ABOVE- - -
BCIVE GRADE -AND TIED
615.87' \j0 WE TTA-bQNN
I . 'SPOUTS (AYFL) I
QRb
a IRON,()
I LEVEL 8 \7 / T , ,se � r285.
. AT1861.9'/ / /� / /� / I �✓ I I LANDING
PIT 690.20
rl
It 1 � I 1 / / I\ I
it � I@8hfi7'S /
o
685.
`sue \ /~
/ 1 \ I \ I 1 �FkjFO� ♦ 12"PIN
SD INLET (2.0 CIA. NYL OPLAST)
1 I \ \ \ \ \ UFO TOP=683. 16'
INV - 79.08' 12" HDPE (POND)
FIBER ASYMRKED FROM_ _
\ I 1 \ \ \ \ l . IN=li79.01'' 1 PVC (S)
PRIOR \ \ \ l I \ \ \ \ N07%kARKED S %V. OU 78.95' 72" HDP
NTEMRORARILY)
I
25'SETBAOK\\ \ \ / / I I I \\\ \�\ \ \ \\\ \\ I �°0
/ I I
i
�u.
LEVEL LANDING
AT-69D.20
i
MULTI -LEVEL
BR/CKSCHOOL FACILITY
WESTERN ALBEMARLE H.S.
{5941 ROCKFISH GAPTPKE)
L
rro-w....
2 LEVEL
e..(j
BRICK SCHOOL
MHD FACILITY
TOP=691.64'
/
/
INV. IN=666.74'12"DIP
V /
INV. IN=690.63' 3" PVC
mo /�
INV. OUT=686.62' 10" HDPE
' -
C.
SD INLET (2.0 DIA. NYLOPLAST)
/
TOP=690.40'
INV. IN=6686.8T 6" PVC
l
INV. OUT=686.52' 12"HDPE
° NSF 10
690:�5 \1/Oo O \ G ?q
sao.� \
� �A,
� 0
.4
ASPHALT
p
�ry
0
*O�
\
UG�o
PVC \
Q
� ASPHALT
PARKING
POWER AS M
FROM PRIOR
(NOT MARKET
A� CONTEMPOPIlLY)
.60,
I Q,b Ij Cur
Vv
ry
:L SO CURB INLET W/MHD
r6g4- - TOP 683.77'
684.47' HC RAMP INV. IN 678.44' 15"HOPE
15 INV. IN=678.32' 15"HOPE
DoFp �� --' TO OUTFALL
_ '
3.
/GRATE
P INV. IN .
� .94' 17" HOPE
INV. OUT=678.85' 15"HOPE
1 STORY ` UTILITYBOXON
WOOD FRAME CONC PAD
BLDG. ® EXISTING
SEWER PUMP
GREENHOUSE
\
o�
e
104. DI-1 102: MH-1
STA 10+00.00 STA 10+10.91
TOP 689.92 TOP 689.93
INV IN 686.03 (EXIST 12" HDPE) INV IN 685.60 (103)
INV OUT 685.82 (103) INV OUT 684.32 (101)
6AS
100: MH-1
STA 11+41.11
TOP 684.73
INV IN 681.06 (101)
INV OUT 679.32 (EXIST 12" HDPE.)
RQ5
EXISTING G
DE
690
690
\
PROPOSEM GRADE
\
685
685
103
10.91' OF
12" HDPE
101
@ 2.00%
120.20, 0E
680
yDp
680
675
675
q
VJ
V,
50
0 50
PROFILE SCALE
0
10+00 1+STR 104012+00 12+50
STR 100
HORIZ SCALE: 1 "=50'
VERT SCALE: 1 "=5
ROOFDRAIN AND GRADING NOTES:
1. PIPES FROM ROOFDRAINS TO HAVE A MINIMUM SLOPE OF 1.0% OR AS SPECIFIED ON PLAN.
2. SOUTHERN ROOF DRAINS FROM DOWNSPOUT TO HAVE A MINIMUM COVER OF 2.0'
3. CONTRACTOR TO VERIFY IF DOWNSPOUT BOOT CAN BE SUBSTITUTED FOR CLEANOUT. IF
NOT, PROVIDE CLEANOUTS AT ALL LOCATIONS WHERE ROOFDRAINS TURN OR CONNECT TO
PIPE OUT OF BUILDING.
4. CONTRACTOR TO FIELD VERIFY ALL EXISTING AND PROPOSED STORM INVERTS OUT OF THE
BUILDING AND CONFIRM REQUIRED SLOPES, COVER, CROSSING AND CONNECTION POINTS
CAN BE ARCHIVED. CONTRA TOR SHALL COORDINATE ANY CONFLICTS WITH ENGINEER
BEFORE BEGINNING CONST CTION.
J
SCALE 1"=20'
0 20, 40'
� 1.:\LTy O�
O:
O � Z
,V\.1TH.•\N,\4. SHOW.�LTER y
Lic. No. 0401-057151
'0p 05/10/2021 4
O��ss/rlNAl ��`G,w
m E
O
N U
N
> E
w °1 E
W i
Q LL O 3
oLL
Qaw U0�
J - ui
N
W N
N
v
Z B 7
x
91,0
oa ��
Uc
�04
S N
N �
v m
a�
W J
H
am
O
oc
w
Q
0
DATE
0511012021
DRAWN BY
YT
DESIGNED BY
AM
CHECKED BY
JS
SCALE
AS SHOWN
LG`'L Q
J z
U
z
0 z
O Q
w J
i -Lu
a
Q
m Q
2 J
az
r-I
W Q
J
0
o
O Q
LU v UI
m U Z
J J
m p
Qua
a
} a/
� z (n
z
O
U
Ww
Q
/ ) W
v m
J
Lu a
IOB NO.
695.0
SHEET NO.
C5.0
0
N
0
0
a
0 1
I o I
op
r3 `4p
O �
�''
2
I
,V\.NTH.'\N Ni.
SHOW.�LTER y
I
I
Lic. No. 0401-057151
05/10/2021
i\ I�
\�I,0°
z
I I
z
Ms
N C
o\
SCALE 1 "=40'
\ \ \ \\�9_ _ \ \ \ 1 o.oe n.ao
0.18 0.80
SCALE 1 "=40'
W v E
E
\ \ \ \\ _ \ \
\ \ \ 1 \ \ I 10a EXISTINGTNLET
W
\
0 40' 80'
` \ \ _ _\ \ \f I
0 40' 80'
F X v 3
u
N
>0
� N
\ / _ /
\ \ \ a� /
VEIN
x
d
L)
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \2 /
\ \
^v>ND
O
ON
\ \\ \\\w\\\\ \\ \C
-A
\ \ 1 1
`�
gZAI 6�
_
'N \ \ \� \ \ I 1 I /llIl I \�Be.�
\\ \ ` \1 \ \ I I �°'
\ o68
\ \ \\\ I I I I I 1 1 I l l l I l // ��
-66
\\\\\\ �\
W
°1. /
w
to
LIMITS OF DISTURBANCE = 0.55 AC.
0.05 AC OF IMPERVIOUS
/ / / / / / I / v 1
1 686
o
/
PRE -DEVELOPED
i ro
8g'�sa
a
O
I / 1 h/ 8%,//
II
II
\
r 11
/l l' 1 1 I \\ Q
I
// I1
DATE
eo / / I I I I _ �. `
to/ I 1 1 I �8� __- \\
l I
1
o
OS/10/2021
DRAWN BY
w I I 1 1\ \\
w I 1 I I \ 100 q/
YT
DESIGNED BY
\ '
\ I at ; �
/ I \ \ \ ` \ \ \
0
\ \ \ \
\ \AM
•
) 1 \ I 1 \ \
CHECKED
BY
0
l / \ \ \ I
•
�'Ijl/ II \
i'Ijl/ II \ \
I/
•
JS
PRE -DEVELOPED CONDITION
STORMWATER
DRAINAGE AREAS
SCALE
1 "=40'
II
WATER QUANTITY:
° I
IN THE DEVELOPED CONDITION THE RUNOFF FROM THE DISTURBED AREA WILL FLOW OFF
I
I
AS SHEET FLOW. A LEVEL SPREADER IS PROVIDED AT POINTS OF CONCENTRATED
z
DISCHARGE TO RETURN RUNOFF TO SHEET FLOW. THIS PROJECT FULFILLS THE
-
�
REQUIREMENTS OF SECTION 9VAC25-970-66 SECTION D.
I
\
Q >
z
Z
WATER QUALITY CALCULATION (PHOSPHORUS REDUCTION REQUIRED)
°Lu
a
\ \ \ `� I �I
SCALE 1"=ao'
SUMMARY FROM RUNOFF REDUCTION SPREAD SHEET (SEE C6.1
STORMWATER CALCULATIONS):
\ \ = - ` Ir\\
'U�1, z
W
\ \\\ \ _ `
0 40' 80'
TOTAL ON SITE DISTURBED ACREAGE: 0.55 ACRESLu
_ oD
Q
/
PRE -DEVELOPMENT LAND COVER:
Lu U
V
0.00 AC FORESTED/OPEN SPACE
0.50ACTURF
Q
z
0.05 AC IMPERVIOUS
QC
\C \s8 \, \ \ �l\�66 w►\`
s�o°�
\\��\
POST -DEVELOPMENT LAND COVER:
\� p
\ \ \ \ \ \ \ \ \ >� ` \ �\ s
\
��
`�
0.00 AC FORESTED/OPEN SPACE
O
Lu
\
/
0.32ACTURF
U
W
a \ '� \ \ I 1 \I
I\\
/^
p
\ \ \
0.23 AC IMPERVIOUS
Q
\/ s8� '� - s�
\
REQUIRED REMOVAL: THE 0.34 LBS/YR REQUIRED REMOVAL WILL BE SATISFIED BY PURCHASING NUTRIENT
J oD
a
\ I
\
0
CREDITS. TO BE PURCHASED FROM A DEQ APPROVED CREDIT BANK IN ACCORDANCE WITH LIS CODE OF
VIRGINIA 62.144.15:35.
\ \\\
I
I 1�
\
\\ ` I 1 1 ,
'b 1 l ti -
LIMITS OF DISTURBANCE = 0.55 AC.
LLJ
\
0 1 -68 \
0.23 AC OF IMPERVIOUS
_
POST -DEVELOPED
Lu
Q
Lu
�s-1—
w
tp
] BN
.
44695.00
POST -DEVELOPED CONDITION
i J
SHEET NO.
C6.0
0
0
a
Of4 Virginia Runoff Reduction MethodRe-Development Compfiartce Spreadsheet -Version 3.0
-- 201.16M P 5ta nda r ds a nd 5 pet Ifkat Ion s rL• 2O 13 Draft B M P Standa rds and 5 peclflcatlons
Project Name: WAHS MudularClassrooms
Date: 5f10f2021
Linear Development Project? No
Site Information
Post -Development Project (Treatment Volume and Loads)
Enter Total Disturbed Area (acres) 4 0.55
Pre -Re Development Land Cover (acres)
A So its
B Soils
C soils
D So its
Totals
forestrbllenSpacc )ova} - u nd sturbcd
'.02
fares Vao space
libmged Tuaf lavesl --d a to rued, gradcd
forardsar.ather turf tutx
0.50
'0'50
krpervdpsa Carerfaves)
O.r
OAS
Post- Deve Iorane nt Land Cover (acres)
A Sow
BSoils
Csoils
DSpib
Totals
ForesttbpenSpaoe laocj - undstuabed.
OOD
oteticd forest/open spaue W refpaested
h4ratied Tuff {acres f -disturbed, graded
E32
for Yards at :xhe r turf tobe
032
krgnrvxns Corer {aaesl
6.23
023
AreaCheck
OK.
03L
OK.
tiY.
B:S5
Constants
Annual Rairdall{indresl 43
Target Raidill G_•ntlinchal LOD
Total Plowhorm lTPl Eh1CIns Tl a26
Rundf Coefficients (Rvl
datainputcn8s
constant values
calculation calls
Check:
BMP Design Specifications list: 2013 Draft Stds & Specs
linear project? No
land cover areas entered correctly? ✓
TotaldisturbEdareaentered? ✓
Aims
asois
csoih
Osois
forat/Open Spacc
❑02
Q43
004
OAS
Mmlaged Turf
015
a20
G.
O25
trn{rerviorb Crner
0.95
0.95
0.95
OAS
Pre -le Deveknxmart
listed
Adjusted'
Pmt ReDev.&New
Impervious
Fcrest/Opal Space Cover {aa
0.00
4A4
FamMA)pen Spaceesl
Cwerlaaeaj
0.d0
Vieighted Rvlfuestl
QOD
Weighed R.fforcul
0.00
0.00
%Forest
0%
%Forest 0% 0%
Mmaged Turf Caaerlavesl
0.50
032
Manageacngvef Caw
Jl
0.32
'Weighted W{turil
0.20
Weighted Wltufl 0.20 020
%Managed Turf
91%
86%
%Managed Turf
58%
Impervious Cover
lanes]
0.23
hnpervious Covenlaoesl O.vS OAS
W]impervioml
195
0.95
W]enperviousl
0.95
% Impen,i ous
9%
14%
%Imy_•n•::is
42%
Fad Site Arealaaesl
0.55
TotarSe Areataoesl 0.55 037
Site W
0.27
030
Final Pmt Dev Site Rv
QSl
T rea tore nt V o l u nTe and
Nutrient Loa
d
Final Pmt
Prr Re Development treatment Volume
Jame ftl
812j
v_ d
Development
Treatment 4'd one
'
Iacre ftl
Final Pmt-
Pre-ReLlevelopmentTreatment Volume
Imbicfeet)
,�s
Devekanent
TreabnentVdune
1p25
{udsicfeetl
Fin al Post -
Pre Re Development TP Load
Ilb/vrl
(3.34
0.25
Development TP
Load
0.64
llb/Prl
ftrul Pm 0.tiaapmsT
TPaosd Pa u_,c
�frc4'rrl
L17
Pre fLWw proart TP Iaad Per z: rc
{14'x n3ta'rl
0.63
...
Base lint•TP Lund Ilb,)
•,SIAl ID(7aaSitT aPPhos to PrP redr,ebPrtrcmars Cc u]'µ
�.
PCTi Ip1: L• II.t Propl:Ntor caw i mpav s vrl
'AdpusedlwdCowv.&u n q:
Pre Rehvelupaxnt End coxvmirus pervisus Jandcwer(foreN%+en sir¢ ar
managed turf) r nwr w prapasedfarnew iraperviam rover.
Adjursted tertal areageis caraistea[ ruarh Post-17clle srkpnent arm¢ (rrsvrus
areageaJnewin>¢rvaus casrrj
Cakmsn t shojis kod reluctim respnevnent for newimpervxess ewer(bosed on
mwdcsc*tkmdlirrutra4l Ab4loae/year).
pmt4baDesekapnsere
For Svopen Space
Cove laeresl
OAO
Vileigrted Rv{forestl
OAO
% Forest
0%
Managed Turf Cover
laves]
032
Weighted Rv{turf)
030
%Mmraged Turf
11113%
leDev. nvervious
Coverlaore]
01i5
Rv)erperviousl
095
%.i pervious
14%
ToW leDev. Site Area
{acres]
0.37
Rel) v Ste Rv 030
-
TreetmentVolunieand Nutrient Load
Port FeDevelopment,
Treatment Volume
OAo93
lacre-Ell
port-Ieoeveklprnere
Treatrnent Vakrrre
40S
(cubic feet)
Port-Ie Oevekapmert
LoadlTP1
O.E
uawr
PS T kbwT `bPn ra rp
I. rd Xrauc
afi9
*sfaeilFl
M4 Aeductm RNured
I Bckw Pre
10%
RCWreloprnern taadl
Lord Ewer Sunanary-Post
Posv DeveioWnent New Impervious
New -rx -. _in L_c
{avesl 0.18
Wlirrpevroml 095
Past -
Development
TreatmentVdune 0A143
lace ftl
post-Devekgp ne
TmahneidValune 621
{m6icfeet)
Port Dew lopment TP 039
Load Ilb(vrl
TP Load Red uct ion TP Load Reduction
Req uired for Required for New
Redeveloped Area 0,03 bnpervious Area 0'
32
Ilb/ yr 1 0 b/p rl
rYlr
PROJECT WAHS Modular Classroom
DESIGNER A '.'_-a-
CHECKED:
CA TE 5u712021
UNITS E43LI5H
12=Sag
Inlets
Only
1
ad
tt
-
z
-
-
-
s
104
DI-1
2000
Q180
0.80
4144
Packa
0-OXIMGEII'
0.144
4
Q576
0
EackU
0
4
0
0
3head.Rt
0576
a01CC'
2000
05 6
1465
R'eirFkn:
LD-229
STORM SEWER DESIGN COMPUTATIONS
STORM FREQUENCY 10
PROJECT: WAHS Modular Classroorrs
LOCATION: Crozet
COUNTY: Free Union
NDAA STATION:
Des ign d by: A. rwlabee
Checked by:
UNITS ENCaLI5H
PIPE
NO.
FROMPOIhT
TO POINT
DILkW-
3RE_4
' 4'
_+.cue
3
RUNOFF
COEFF.IIi�li4CCUi[
'C'
'4
TOTAL
1NLEI
TA[E
)Minutes,
RAIN
FALL
InHr
r8
RUNOFF I WERTELEVATION
!f
dPpe
Ft
12
SLOPE
Ft_Ft
1
SIZE
{Da Or
SpanRisel
In
14
SKkPE
Numberla=ttr
ofPip=s
CFS
15
Fric[ian
Stop.
FLFt
NORMA
LFLOW
FLOW
TIME
Sec
1
REM ARKS
1
\[F2`'I
5
LILTED
Latgal
CFS
TolatQ
CFz1
99)
UPPER
F2v-D
14
LOVER
FIdD
11
DepOaf
Ftar, do
Ft
Areaaf
Floor• _•1r.
SgFt
Hrr
Ft
t'r.
Ft.Sa:
1
En
Ft
REFERENCE
1
r( 3-
REFERENCE
Sr _k
101
102
100
000
0.00
0.14
123
5.82
0.00
1.51
68432
RI-06
130.20
Q02504
12
Ctrcubf
1
611
0.00170
034
0.24
Q19
650
LOD
20.02
103
104
142
GIB
0-90
0.14
OA4
iM
5.83
0.00
151
685.82
685.60
1Q91
Q02016
L
':ifcui=r
1
5.48
0.40110
037
026
02D
&01
0.93
L91
`LEVEL SPREADER TIMBER LENGTH
(L) CALCULATIONS
DRAINAGE AREAS FROM SHEET C6.0
LEVEL SPREADER - ROOF DRAINAGE
PER VIRGINIA DEQ STORMWATER
DESIGN SPECIFICATION No. 2:
L = 40 LF FOR FLOW TO WOODED
AREA x Q(1 INCH) CFS INFLOW
(1 INCH STORM EVENT USED)
L=40LFX0.27CFS= 10.8'='13'
`MINIMMUM LEVEL SPREADER
LENGTH = 13'
AS NOTED ON PLAN
PIPE OUTFALL
VDOT STD. No. 1
BROWN STONE, 2"4' IN
SIZE
FILTER FABRIC
FULL LENGTH 6"X6"
TOP TIMBERWOOD
(TYP.)
F
MIN. T BACK INTO
GRADE. BOTTOM
TIMBER TO BE FULL
LENGTH
LEVEL SPREADER DETAIL
No Scale
6" MIN.
(2) 6"X6" WOOD TIMBER -
18" LONG #4 EPDXY
COATED REBAR
LEVEL WITH
EXISTING OR
PROPOSED
GRADE
MAINTENANCE NOTE: INSPECTIONS SHALL TAKE PLACE ANNUALLY,
IDEALLY DURING THE NON -GROWING SEASON. SEDIMENTS SHOULD BE
CLEANED OUT OF THE LEVEL SPREADER FOREBAYS AND FLOW
SPUTTERS.
PIPE OUTFALL
18" LONG #4 EPDXY
COATED REBAR (TYP.)
OT STD. No. 1
OWN STONE RIP
P. 2"-4" IN SIZE
MODIFIED CN METHOD
(per DEQ2013 draft SWM handbook section 11.5.3)
RAINFALL INCHES -P= 1 INCH
from TR-55 table 4-11
Runoff Coefficients(Rv)
HydrologlcSollType
A
B
C
D
Forest/Open Space
0.02
0.03
0.04
0.05
Managed Turf
0.15
0.20
0.22
1 0.25
Impervious Cover
0.95
0.95
0.95
0.95
DRAINAGE AREA AND
IN LET LABEL
IMPERVIOUS
AREA(AC)
Soil Type
MANAGEDTURF
AREA (AC)
MANAGED
TURF RV
FOREST/OPEN
SPACE(AC)
FOREST/OPEN
RV
TOTAL
AREA (AC
RV
Tv-1"
VOLUME (CF)
Qa- RUNOFFVOL.
(WATERSHED
MODIFIED
CN
la INITIAL
ABSTRACFION
la/P
Tc
(hours)
qi - UNIT PEAK
DISCHARGE(csm/in)
gpTV-1"Treatment
Volume Peak Discharge
Western
0.18
B
0
0.2
0
0.03
0.18
0.95
621
0.950
99.57
0.009
0.009
0.10
1000
0.27
RATIONAL METHOD
lYRRAINFALL INTENSITY=
2YR RAINFALL INTENSITY=
10YR RAINFALL INTENSITY=
4.22
5.04
6.64
IN/HR
IN/HR
IN/HR
LEVEL SPREADER
1"
WEIR
1YR
COMPUTATIONS
2YR
101YR
Runoff Coefficients (C)
Hydrologic
Soil Type
A
B
C
D
Forest/Open Space
0.20
0.20
0.20
0.20
Q(CFS)
WEIR LENGTH
WEIR COEFF
FLOW DEPTH -FT
DEPTH INCHES
0.27
13
3.33
0.03
0.41
0.68
13
3.33
0.06
0.76
0.82
13
3.33
0.07
0.85
1.08
13
3.33
0.09
L02
Managed Turf
0.30
0.30
0.30
0.30
Impervious Cover
0.90
0.90
0.90
0.90
DRAINAGE AREA AND
INLET LABEL
IMPERVIOUS
AREA (AC)
Sol I Type
MANAGEDTURF
AREA (AC)
MANAGED
TURF RV
FOREST/OPEN
SPACE (AC)
FOREST/OPEN
RV
TOTAL
AREA (AC)
Average
C val ue
Q1yrFlow
(CFS)
Q2yrFlow
(CFS)
Q10yrAow
(CFS)
Western
0.18
B
0
0.3
0
0.03
0.18
0.90
0.68
0.82
1.08
Is
•
LxLTH QR
' \ 1TMN N. SHOW.A.LTER v
I.r.. No.040_057151
05/10/2021 �tcQr
Z
O
a
Of
U
(n
w
L]
Z
O
(n
>
W
cc
DATE
0511012021
DRAWN BY
YT
DESIGNED BY
AM
CHECKED BY
JS
SCALE
AS SHOWN
U)
)z
J0
1
I --I
1 Q
J J
)0B NO.
694.0
SHEET NO.
C6.1
L