Loading...
HomeMy WebLinkAboutSDP202100027 Review Comments Initial Site Plan 2021-05-12t� OF ALB County of Albemarle COMMUNITY DEVELOPMENT DEPARTMENT Site Plan review 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone:434-296-5832 WWW.ALBEMARLE.ORG Project: Wawa Route 29 and Greenbrier, Initial Site Plan Project File: SDP202100027 Plan preparer: Ryan Perkins, Kimley-Hom Associates, 1700 Willow Lawn Drive, Suite 200 Richmond, VA 23230 [ryan.uerkins(a),,kimley-hom.com ] Applicant: Renaud Consulting, 8605 Westwood Center Drive, Suite 410 Vienna, VA 22182 [ mfontaineArenaudconsulting.net ] Owner or rep.: Charlottesville Realty Corporation, P. 0. Box 6340,m Charlottesville, VA 22906 Plan received date: 5 April 2021 Date of comments: 12 May 2021 Reviewer: John Anderson Project Coordinator: Mariah Gleason Engineering has reviewed initial site plan, and offers following plan revision comments for final site plan submittal. 1. CV-101 a. GIS indicates record of (past) leaking underground storage tanks. Please offer commentary or evidence of coordination with state agency (VDEQ), or remediation completion, if required. 2. CS-101 Engineering Review Comments Page 2 of 3 a. Recommend pedestrian crosswalk striping if pedestrians on walks along Rt. 29 and Greenbrier Drive have right of way over vehicles entering /exiting Wawa. b. Please revise shading for concrete for fuel canopy, if intended to be light duty concrete. c. Where island width =9.5', revise bullnose radius to 4.75'. d. Provide a gap between bollards (diagonally opposite CG-12A ramp of walk that climbs slight incline from Greenbrier to Wawa) wide enough to accommodate a wheelchair, similar to bollard spacing at HC parking space on west side of the Wawa building. e. Label TimbarrierTM, to clarify location. f. Label CG-6, spilling curb/gutter. 3. CS-501 a. Provide VDOT step detail, inlet shaping detail, pipe bedding detail (ST-1, IS-1, PB-I). 4. CS-502 a. Provide VDOT equivalence determination document that S. 1. Storey TimbarrierTm product meets or exceeds VDOT minimum standards for barrier protection. b. Provide surface mounted handrail detail. c. Provide pavement widening detail for Greenbrier Drive (VDOT WP-2), if required by VDOT. Coordinate work within RW with VDOT. Obtain land use permit for activities within public RW. 5. CG-101 a. Note: Nutrient credit purchase is proposed; ref. change to state administrative code concerning eligible nutrient credit banks. This site discharges to Meadow Creek, evaluated unimpaired, so this project may purchase from eligible banks within same or adjacent 8-digit HUC. b. Submit VSMP /WPO Application at earliest convenience. Link to Application: https://www.albemarle.org/home/showdocument?id=l70 Link to SWPPP template: httos://www.albemarle.org/home/showdocument?id=l66 c. Transfer stormwater-related table data and calculations to the WPO plan. Site plans do not approve VSMP/WPO plans. WPO plans do not approve site plans. d. WPO plan approval is required prior to final site plan approval. e. Conceptual stormwater narrative may remain; graphic SWM facility details, symbols, etc. may remain, just not routing or calculation details, which should appear on the WPO plan. f. Unless Str. SWMI to Str. 100 is a detention pipe, revise grade to 0.50% Min. per 31d item, p. 2, Drainage Plan checklist for plan reviewers. 6. CU-101 a. Provide and label flow arrows for storm pipes. b. Label storm pipes. c. Provide and label SWM facility easement for underground SWM facility. Ref. easement diagram, ACDSM, p. 15, below (link: hqs://www.albemarle.org/liome/ShowDocument?id=270 ) Engineering Review Comments Page 3 of 3 Albemarle County Design Standards Manual — Engineering N!E\IE\i \CIDiX � q.\MEiER � ^ � � iX!'i � IY �!•' bLY.I d. Provide and label public drainage easements for any pipe/s downstream of underground SWM facility, or any pipe that conveys storm runoff from a public right-of-way. e. Utility Note references CU-501, Utility Details; please include sheet CU-501. f. Provide utility /storm pipe profiles. Ensure no conflict between storm pipes that cross in facility entrance /exit to Greenbrier Drive. Additional comments possible. g. Provide VDOT design tables, LD-204 (Storm Inlet Computations), and LD-229 (Storm Drain Design Computations). 7. CP-101 a. Remove any canopy -species (American elm) landscaping within SWM facility easement. Please feel free to call if any questions: 434.296-5832 -x3069 Thank you J. Anderson SDP2021-00027 Wawa Rt29 Greenbrier ISP 051221