Loading...
HomeMy WebLinkAboutWPO202000051 Bond Estimates 2021-05-13Project Name: Boys and Girls Club - Driver's Ed Site, VSMP/WPO Submission - WP0202000051 WPO file number: WP02020-00051 TM P(s): 06000-00-00-025AO Date Estimate Completed: 5/13/2021 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed r slablization (PS, TS) acres $5,000.00 $25,750.00 z silt fence (SF) :Jft ft$5.00 $5,590.00 3 safety fence (SAF) ft$5.00 $9,235.00 4 tree protection (TIP)ft$5.00 $0.00 5 diversion (DD, FD, RWD) $13.00 $16,653.00 6 temporary slope drain (TSD) pipe length -R pipe diameter -in $0.00 $0.00 7 Sediment Trap #1 / Excavated drop inlet sediment trap #1 8 earthwork for trap/basin 9 height of dam al toeoft R cut al high sideoft R 9 9 io height of fill at faceR cut at faceft i i length of damR length of cutR 12 top width width of cut 13 (area above transition 0 sf (area below transiN 0 sf rq (total width of dam) 0 ft (total width of cut) 0 ft 15 (height below transitio 0 R (depth below transit 0 ft 16 (area below transition: 0 sf (area above transitii 0 sf 17 (total fill volume) 0.0 cy (total cut volume) 0.0 cy 18 length of spillway ft (TOAL CY estimate 0 cy 162.5 cY $13.00 $2,112.50 19 width of spillway Wft (spillway stone tons 0 tons $50.00 $0.00 zo zl riser height Lin ft zz riser diameterin (riser unit price) $0.00 $0.00 23 barrel lengthft base plate or fdn $200.00 $0 24 barrel diameter (barrel unit price) $0.00 $0.00 25 barrel collars $0.00 $0 26 baffle length R $5$50.00 $0 27 Sediment Trap #2 28 earthwork for trap/basin 29 height of dam al toeoft R cut al high sideoft R 9 9 30 height of fill at faceR cut at faceR 31 length of damR length of cutft 32 top width width of cut 33 (area above transition 3 sf (area below transiti( 181.5 sf 34 (total width of dam) 8 ft (total width of cut) 57 ft 5/13/2021 Project Name: Boys and Girls Club - Driver's Ed Site, VSMP/WPO Submission - WP0202000051 WPO file number: WP02020-00051 TM P(s): 06000-00-00-025AO Date Estimate Completed: 5/13/2021 Erosion and Sediment Control Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) 35 (height below transitio 3.5 ft (depth below transit 6.5 ft 36 (area below transition; 1.75 at (area above transitir 143 sf 37 (total fill volume) 9.9 cy (total cut volume) 1406.2 cy 38 length of spillway ft (TOAL CY estimate 1409 cy $13.00 $18,317.00 39 width of spillway =ft (spillway stone tons 0 tons $50.00 $0.00 40 41 riser height ft 42 riser diameterMin in (riser unit price) $0.00 $0.00 43 barrel lengthft base plate or Win $200.00 $0 44 barrel diameter (barrel unit price) $0.00 $0.00 45 barrel collars $200.00 $0 46 baffle length ft $50.00 $0 47 Sediment Trap #3 48 earthwork for trap/basin 49 height of dam at lee offft cut at high side offft 50 height of fill at faceft cut att faceft 51 length of damft length of cutft 52 lop width width of cut 53 (area above transition 2.5 sf (area below transitir 166.5 sf 54 (total width of dam) 6 ft (total width of cut) 51 ft 55 (height below transitio 2.5 ft (depth below transit 2.5 ft 56 (area below transition; 1.25 at (area above transitir 57.5 sf 57 (total fill volume) 10.8 cy (total cut volume) 829.6 cy 58 length of spillway It (TOAL CY estimate 833 cy $13.00 $10,829.00 59 width of spillway Mft (spillway stone tons 0 tons $50.00 $0.00 6o 61 riser height It 62 riser diameterMin in (riser unit price) $0.00 $0.00 63 barrel lengthft base plate or Win $200.00 $0 64 barrel diameter (barrel unit price) $0.00 $0.00 65 barrel collars $200.00 $0 66 baffle length Mft $50.00 $0 67 68 silt fence inlet protection (IP) 8100.00 $2,200.00 5/13/2021 Project Name: Boys and Girls Club - Driver's Ed Site, VSMP/WPO Submission - WP0202000051 WPO file number: WP02020-00051 TM P(s): 06000-00-00-025AO Date Estimate Completed: 5/13/2021 Erosion and Sediment Control Bond Estimate Item Item Number 69 stone inlet protection (IP) 70 outlet protection (OP) length 71 channel (SCC, matted) length 72 check dam depth in channel 73 construction entrance (CE) 74 wash rack 75 paved construction entrance 76 rip -rap, placed depth 77 width 78 79 survey and layout (price per 0.1 mi.) acres 80 mobilization 81 Temporary Access road - CRS access road 82 Temporary Culvert 1 Ade,.., 5/13/21 WPO202000051_Boys and Gids_ESC Bond_051321ja.xlsx No. Unit Unit Cost Cost (installed) R width 11.25 ft 1 R width 0 ft 0 R channel width 0 ft 0 1 -R length -fl (tons) - traps and basins JJJJhllllllllll $200.00 $1,200.00 $607.50 $607.50 $0.00 $0.00 $0.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $0.00 $4,075.00 $2,500.00 $0.00 $0.00 cost sum $103,569.00 contingency $10,356.90 Total $113,930 5/13/2021