Loading...
HomeMy WebLinkAboutSUB202000226 Review Comments Road Plan and Comps. 2021-05-13�r County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT MEMORANDUM To: Emily Cox From: Megan Nedostup Date: May 13, 2021 Re: SUB2020-226 Pleasant Green Phase 2- Road Plans Megan Nedostup, AICP Development Process Manager mnedostup@albemarle.org Telephone: (434) 296-5832 ext.3004 The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. [32.5.6] Dam break inundation zone. Pursuant to Virginia Code § 10.1-606 3, DCR has determined that Phase twill change the spillway design flood standards of the impounding structure. The County cannot approve this application until the requirements of Virginia Code§ 15.2-22431 are met as outlined in the letter dated February 10, 2021. a. Engineering study. If the Virginia Department of Conservation and Recreation determines that a plan of development proposed by a subdivider would change the spillway design flood standards of an impounding structure pursuant to Virginia Code § 10.1-606.3, the subdivider shall submit an engineering study in conformance with the Virginia Soil and Water Conservation Board's standards under the Virginia Dam Safety Act in Virginia Code § 10.1-604etseq. and the Virginia Impounding Structure regulations in4 VAC 50-20. The engineering study shall be reviewed and acted upon by the Virginia Department of Conservation and Recreation as provided in Virginia Code § 15.2-2243.1. b. Mapping information. The subdivider shall provide the dam owner, the county, and any other affected localities with information necessary for the dam ownerto update thedam break inundation zone mapto reflect any new development within the dam break inundation zone following completion of the development 2. [SP1990-103 Condition #2] Condition #2 of the special use permit that was approved in 1990 requires the crossing to be made prior to development. Zoning staff is reviewing this condition in relation to this submittal to determine if the crossing will need to be built. I will pass on any information from zoning once an interpretation of the condition is made. 3. Sidewalks and street trees should be bonded with the road plans. 4. Sugar maples are known to have shallow roots. It is recommended that another species be selected for the street trees so that the roots do not lift the sidewalks in the future 5. [32.7.9.5] The required number of street trees are not being provided. Provide the required number of trees within lots in a landscape easement where conflict with utilities exists in planting strip, see below. LOT V l _ 202 / LOT / / 100 LOT S 99, v 2 � LOT 0LOT 62 10 63 63 / LOT ' / LOT _ / B 64 7 _LOTj LOT 5 \ e > / 4 LOT / 3 4i 7��..40 / LOT / 2 ]o �1 Z� 1_ PROPOSEDECLRING ( YP.) r TREE CLEARING (TYP.) LIMITSOFSTREAM ..- BUFFER T/RI { / •//� LOT / 67 14