HomeMy WebLinkAboutSDP201600055 Letter of Revision 3 Correspondence 2021-04-29® ROUDAEUSH, GALE & ASSOCIATES, INC. Date: Thursday, April 29, 2021 To: Mariah Gleason Principal Planner Albemarle County Community Development Department 401 McIntire Road Charlottesville, Virginia 22902 From: Dustin Greene, PE RE: Monscane Center - SDP201600055 - Letter of Revision Request Letter Dear Mariah, Please consider this letter and revised Site Plan Sheets 1, 4, 5, and 6 as our request for a letter of revision to the referenced site plan. The updated building footprint matches the architectural plans by Bob Anderson. The changes include the following: 1) A generator has been added to the plans for building 2. The placement of the generator displaces some landscaping so we have updated the landscape plan. Note that total numbers have not changed but trees have been moved from generator pad area. 2) Mechanical equipment has been added to landscaping islands in the upper parking lot of building 2. The placement of the mechanical equipment displaces some landscaping so we have updated the landscape plan. Note that total numbers have not changed but trees have been moved from the mechanical equipment. 3) The ADA space behind building 2 has shifted to the northwest corner of the upper parking lot behind building 2. 4) A fire line and domestic line have been moved from the northeast of building 2 to the front of building 2. 5) Stairs have been added to the front of building 1 leading down to the sidewalk along Olympia Drive. The lower sidewalk has been updated to connect with the stairs and the retaining wall has been extended further along the sidewalk. 6) The sidewalk on the east and west side of building 2 have been moved away from the building to follow the edge of the road. 7) The sidewalk on the west side of building 3 has been moved away from the building to follow the edge of the road. MEMO - Leave 2of2 8) HVAC equipment has been added to the west side of building 2. The placement of the equipment displaces some landscaping so we have updated the landscape plan. Not that total numbers have not changed but trees have been moved from this area. 9) HVAC equipment has been added to the east side of building 2 and to the west side of building 3. We thank you for taking the time to review this request. please let me know if you have any questions or require additional information. Sincerely, D tin Gre , PE