Loading...
HomeMy WebLinkAboutSDP201600055 Letter of Revision 3 Correspondence 2021-04-30ROUDABUSII, GALE & ASSOC. , Inc. A PROFESSIO\ A L CORPORA:rlOty Seil.,ing Virginia Since 1956 April 30, 2021 Mariah Gleason Community Development Department 401 McIntire Road RE: LOR3, Monscane Center SDP 201600055 Dear Mariah, We have reviewed your comments provided on September 23rd, 2020, and have provided the following responses: PLANNING 1. [Comment] Amendment. The sixth substantive change listed in the letter of request and on the Cover Sheet for the site plan amendment states that the "sidewalk on the west side of Building 2 has been moved...", however the plan maps show that sidewalks on both the east and west sides of Building 2 have been relocated. Please review and revise the letter of request and Cover Sheet to incorporate changes made to the sidewalk east of Building 2. RESPONSE: The letter of request has been reviewed and revised to incorporate changes made to the sidewalk east of Building 2. 2. [32.7.9] Landscape plan. a. Provide an additional street tree to meet the requirements of Sec. 32.7.9.5 and align with the Street Tree calculations provided in the plan notes. RESPONSE: An additional street tree has been provided to meet Sec. 32.7.9.5. The transformers are to be removed and are no longer in conflict. b. Revise the Interior Landscaping calculations to reflect the relocation of trees that were previously located within the parking area. RESPONSE: The interior landscaping calculations have revised to reflect the relocation of trees previously located within the parking area. 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com 434.977.0205 Project 4/29/2021 It appears the Landscape Plan map and the Planting Schedule do not align. The Planting Schedule identifies 36 Willow Oaks are being provided, however the plan map only shows 33. i. Review and revise to align the Plan map and Planting Schedule. (Please note that the same inconsistency was present in the final approved site plan as well.) RESPONSE: The plan map and the planting schedule have been reviewed and revised to avoid future inconsistencies. ii. If the number of Willow Oaks being provided in the plan changes, all subsequent canopy calculations will also need to be revised. RESPONSE: The canopy calculations have been reviewed and revised to include plan changes. d. There are areas on the landscaping plan where a line symbology typically used to represent tree lines is present. Please review and revise as necessary. This linework can be seen crossing Building 2, in the rear parking lot of Building 2, and by the Radicans' Cryptomeria in the southeastern corner of the site. RESPONSE: The original, existing tree line has been removed from this submittal. BUILDING INSPECTIONS 1. Movement of the accessible parking spaces must meet the following: Accessible parking spaces, access isles, and accessible route shall be installed in accordance with ICC ANSI A117.1-09. RESPONSE: The moved accessible parking space has been shown to be in accordance with ICC ANSI A117.1-09. Per 2. Movement of equipment may require the installation of vehicle impact protection, left up to inspector determination. RESPONSE: Comment noted. We thank you for taking the time to review these plans and trust the above adequately addresses your comments. However, please let me know if you have any questions or require additional information. Best Regards, Dustin Greene, P 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 2 of 2