HomeMy WebLinkAboutSUB202100057 Review Comments Easement Plat 2021-05-14V
401 McIntire Road, North Wing
County of Albemarle Charlottesville, VA 22902-4579
COMMUNITY DEVELOPMENT DEPARTMENT Telephone:434-296-5832
WWW.ALBEMARLE.ORG
Easement Plat review
Project title: Rivanna Village, Phase 2, Easement Plat
Project file number: SUB202100057
Plat preparer: Bethany Velasquez —Roudabush, Gale & Associates, Inc.
172 S. Pantops Drive, Charlottesville, VA 22911
[ bethanygroudabush.com ]
Owner or rep.: Rivanna Investment Holdings LLC, 150 West Main St. Suite 1100
Norfolk, VA 23510 [ tculpgpoer(cr�,robinsondevelopment.com ]
Date Received: 26 Mar 2021
Date of comments: 14 May 2021
Project Coordinator: Andy Reitelbach
Engineering has reviewed the easement plat and offers the following:
1. VI
2. V2
a. Note: Once all plat reviewers comments are addressed and final revision date is set, Engineering
will format deeds for SWM facility and public drainage easement dedication for Applicant review
and notarized signature. Applicant to record deeds with easement plat, either prior to or with the
final subdivision plat.
a. Recommend dimension lines for L5 (IF -to -IF) to clarify L5 is not to Leaning PF.
b. Increase size of endpoint between C3 and LI, similar to other endpoints.
c. Provide deed bk.-pg. ref. to US Rt. 250 public RW.
d. Provide deed bk.-pg. ref. to Village Park, Steamer Drive, and Sedgewick Lane public RW.
e. Furnish linework to indicate access easement connects Lazy Branch and Cattail Court.
f Reposition Ib�earing �labels, so readable, see below:
ti
g. Provide inset exhibit or additional plat sheet that includes complete TMP parcel information for 7
highlight lots fronting Village Park Avenue: TMP, owner, deed bk.-pg. Image, below:
3. V3
4. V4
BLO
OK \a pH4 p
5f03 pG 251
1AY
Engineering Review Comments
Page 2 of 11
PARR'
CV
O to
h. Provide inset exhibit or additional plat sheet that includes complete TW parcel information for 5
lots (Lots 11-15) fronting Pinewood Drive: owner name, deed bk.-pg. Image, below:
yF
I
_
TV 791f6 �o
\\ \, I
DRIVE
LOT 16 �� n
�\
/
`�--
�
TYP 79D-if /` � R.C. MAGRUDER r
' SUBDMSION
,\ LOT 7f j DB 368 PC 175
TYP 79D-15\ II
IMP 790-12 jTYI0-131 TYP 791 1
LOT 15 \J
G3f IP 17�1' /3 I LOT 14
��
55g5806'E 933.90'
P 79D-10 IF
LOT f0 ` LEANING PF:
:ANING PF F
'—""— OPEN SPACE I-E'35'0.i'E
TYP
UTVRZLOTS
OF ALBE A
9&15' COUNTY LENUJF
APC
10 395
DB 5f 03 PC 395 —
a. Label Cattail Court
b. Provide AE, SE easement tables.
a. Provide/label temporary construction easement or letter of permission, consistent with Road Plan
sheet30.
Ll
p I TMR eo-sen I
r. I WRYBE55
u'I I JOHNSON
y, RESIDENTIAL
0O 566.V 60
2
I
F� �
i \\
b. Revise plat as needed to accommodate additional property owner signatures, if needed.
5. V6: Provide EC line -curve data (EC4, for example).
6. VT Provide 10' Private Wall Maintenance Access Easement leader line to easement, similar to leader line
on V6.
7. V9
a.
b.
Engineering Review Comments
Page 3 of 11
Beginning with this sheet, check matchline references, which appear to be carryovers from earlier
sheets in plat.
Provide /label SWM facility access easement from Lazy Branch Lane to BMP G3, consistent with
Road Plan sheet 32. Image, below:
c. DE5 (tie) label obscures SW 14 label, please uncover SW 14 label.
d. Label Cattail Court.
e. Provide endpoint: DE2-DE3.
f. Provide public drainage easement for storm pipe at end of Terrapin Trace. Image, RP sheet 28:
r r
� I
g. Provide tie to IF on boundary between Pinewood Drive Lots 14, 15, and DE or DE2, similar to
tie provided for RW26 to an IF at 119.25' boundary endpoint, shown on V9. Otherwise, it is quite
difficult to trace DEs along Cattail Drive. See DE 17 (tie), V l l .
h. Please provide tie between DEl and DEB, and between DE8 and DE10.
i. Unless change in direction of easement calls is clearly apparent, provide visible endpoints between
all RW calls and easement line segments for comparison with approved WPO and ROAD plans,
and future lot /parcel owner benefit.
j. Provide visible endpoints between all RC-RW transitions since precise location is not apparent.
This is particularly important to county and lot owners.
8. V10
a. Provide leader lines to each public drainage easement, or revise label to read `variable width
public drainage easements' at intersection of Butterfield Lane and Terrapin Trace.
Engineering Review Comments
Page 4 of 11
b. Please provide DE39 or DE40 tie to exterior boundary, for reason listed elsewhere.
c. Please clarify slight offset at blue circle boundary location. Image, below:
S
d. Provide sufficient public drainage easement width, Lots I-22/I-23, please ref. ACDSM Easement
width diagram. 24" DIA pipe at depth 11.4' requires Min. easement width =27'. Also, please see
review item V 12.a., below. Image, ROAD Plan sheet 65:
38
37
36
10+40 10+80 11+20 11+60 12+00 12+40
'2Q' PROFILE
Note: No part of a structure/no improvements may occupy a public drainage easement. With final
subdivision plat, please resolve spatial conflict that appears to exist between public drainage
easement and dwellings on Lots I-22 and I-23. Image, RP sheet 28.
LOT F
5,939 SF
I
I
I I
W BPIlUGE
E .-.T,-P.
(MBM)
LOT F23
5.939 SF
W
e. Provide off -site grading easement needed to construct Terrapin Trace cul-de-sac. RP sheet 29.
f.
Engineering Review Comments
Page 5 of 11
vGv
_ 2(1 21 0 wll00ncw.o w — 1 I
�w w
TERRA IN TRAC
� w i
BLOCK
• �_ TMP60-
I
_ I RIVANNA ME
RESIDEN
OB. 3641 P.
OB. 3536, F
9,1 WSF
Provide /label SWM facility access easement from Mossy Rock Road to BMP I2, consistent with
g. Provide off -site grading easement for TMP 80-58A, consistent with proposed grading shown on
RP, sheet 29,
20+00 29+00
9. Vll
a.
b.
C.
10. V 12
a.
Engineering Review Comments
Page 6 of 11
Coordinate all BMP/SWM facility access easements with linework shown on Road Plan
(SUB2019000156). For example, see below:
v �
m
Recommend label private drainage easement across Lots G-25 thru G41.
Provide /show SWM/BMP forest/open space (FOS) easement (across plat sheets) where depicted
on Road plan or approved VSMP/WPO201800007, consistent with these plans. If recorded,
please provide deed bk.-pg. ref. to recorded FOS easement. Image from RP sheet 31.
- r �Lq Ji
u ex u �., +uo
m %
.E r�
m � W, 1. F /
xam r 1 e m FFEM.
_ r
`
_
swaew J
rwcsrx
E �
�1'_ EVEEOIl�
�M�
IM.EI
Revise public drainage easement width, Lot J-38, per ACDSM easement diagram, image Aink
below, and Road Plan design storm profile (SUB201900156, sheet 67), 20' width is insufficient.
Dwelling shown on Lot J-38 of approved WPO201800007 encroaches on this public drainage
easement. No portion of a structure, tooter, or constructed improvements may occupy drainage or
SWM facility easements. 24" DIA pipe at depth 14' requires Min. easement width =32'.
Engineering Review Comments
Page 7 of 11
BR1yCH LIyB
KI ",
VMiIAE
am WBIIC
M FA W
rA91flIT
SUB201900156, sheet 67, ref. Str. SD 2S3
STORM DRAIN'2S' PROFILE: STA. 10+00 -16+60
WP0201800007, sheet SWM-10
�oAM R�BB �
� ,MN�P,�BIrvONEB,'�
1 �
LOW FLOW SRLL`N<Yro
WEiL4N0 BENCR IELEV.-3N 011L D nip AM MNXPTH Mni2FEEn
'' TOP DRESS WrtHeINCHFS OFeINLH OWAETFA NNINOFDRIVER
1
II
CgrvBWVCIEO WETLMD BENCXI
1
LGW ft W S LLw y M
WERANOBEN HIELF 2
fEEn,CP LNE%WTIBN
RIPER COBBLEI
341'
i�
Al
CC
an
Engineering Review Comments
Page 8 of 11
Link to ACDSM:httys://www. bemarle.org/Home/ShowDocument?id=270
Albemarle County Design Standards Manual — Engineering
b. Provide /label SWM facility access easement from cul-de-sac, Mossy Rock Road, to BMP J142,
consistent with Road Plan sheet 35. Image, below:
I
Er
>
Engineering Review Comments
Page 9 of 11
c. Similarly to item V 12.a., above, check and revise public drainage easement width as needed, Lots
J-35, J-36. 30" DIA pipe at depth 11.75' requires Min. easement width =28'.
11. V13
a.
10+00 10+40 10+80 11+20 1
STORM DRAIN '2M' PROFILE: STA. 10+00 - 16+60
SCALE: 1'- 0V H;1' 10' V
Provide /label BMP J3 access, consistent with Road plan, SUB201900156, sheet 36
LOT S
LOT SF
FfE%IS
b. Revise 20' public drainage easement across Lots J-6 thru J-I Ito indicate private drainage
easement.
12. V 14
C.
Engineering Review Comments
Page 10 of 11
Provide /show SWM/BMP forest/open space (FOS) easement across plat sheets where depicted on
Road plan or on approved VSMP/WPO201800007, consistent with these plans. If recorded,
iom RP sheet 36.
a. Provide off -site construction easement required to construct Lazy Branch Lane cul-de-sac. 7'
offset distance, edge of walk to PL is insufficient to construct improvements. Image, RP sheet 37:
� e
w wowAl
91fOMON i NEIGANTIAL 0
/- FESIOANTIAL
OB 1192192G.]i1
; P. 124
b. Provide /label BMP J5
Engineering Review Comments
Page 11 of 11
ss, consistent with Road plan, SUB201900156, sheet 37.
enm
�c NoOM'1fi5\ LOT J-25
WaLIC10�.iw. 4,5205F
LOT Fz) \ ersei¢iA�a
�. 5.1905F
FFE '` A eIIE 111iw i
` C a
Am
0MRJ5
!n/ / (00-FILTER)wT svu
1 IE 1Ex B'
hJ oe w
W'
r�1ANE
13. V 15: Please check -revise duplicate DE40 table values.
Thank you
J. Anderson 434.296-5832 -x3069
SUB202100057 Rivanna Village Phase 2 Easement plat 051421