Loading...
HomeMy WebLinkAboutSP202100012 Study - Turn Lane Analysis Contract 2021-05-13TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Date: Client: Contact: Phone No: E-mail: Project Name: Project Manager: Principal: Dear Dr Carr: 1001 Boulders Parkway Suite 300 Richmond, VA 23225 LETTER OF AGREEMENT March 11, 2021 Education Transformation Centre Dr. Dolores Carr 434-882-0477 DCarr@ETCNow.org 2001 Earlysville Road Turn Lane Warrant Analysis (TLWA) Thomas Ruff, 804-200-6430, Thomas.Ruff@Timmons.com W. Scott Dunn, 804-200-6955, Scott.Dunn@Timmons.com P 804.200.6500 F 804.560.1016 www.timmons.com Timmons Group is pleased to offer this proposal for completion of a turn lane warrant analysis (TLWA) in support of the Special Use Permit (SUP) to allow educational activity at the existing church complex located at 2001 Earlysville Road in Albemarle County, Virginia (the "Project"). We look forward to working with you to achieve your vision for this project. Thank you for allowing Timmons Group to provide professional services on this project. We will provide the requested services, complying with established standards, while being mindful of costs to the Client (the "Client') named above according to the terms and conditions of this Letter of Agreement (the "Agreement'). Prior to submittal to a public agency, all documents will be sent to the Client, if requested, to ensure a complete understanding by all parties. We will proceed upon receipt of this signed Agreement. Please note that fees quoted are valid for sixty (60) days from the date first written above. SCOPE AND SCHEDULE OF SERVICES: Timmons Group will provide the services as detailed on the Scope of Services attached as Exhibit A (the "Scope of Services"). We will provide services in a timely and efficient manner and will keep you informed of the job status and any necessary changes. We estimate that the project will be completed within 3 weeks of our receipt of written Notice to Proceed. Any changes required to the Scope of Services must be approved in writing before such changes take effect. As of the date first written above, any changes in the Scope of Services caused by governing codes or Client revisions may require a schedule and/or fee change. The work will be prepared based on the procedures outlined in the Manual on Uniform Traffic Code Devices (MUTCD), VDOT TOSAM, the VDOT Road Design Manual, and guidance provided by VDOT. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 1 of • • 1001 Boulders Parkway P 804.200.6500 TIMMONS GROUP Suite300 F804.560.1016 YOUR VISION ACHIEVED THROUGH OURS. Richmond, VA 23225 www.tirnmons.com LETTER OF AGREEMENT PAYMENT SCHEDULE: Client agrees to pay Timmons Group for its Services as selected and set forth below: [_XI FIXED FEE Fees for this Agreement will be billed on a monthly basis as a fixed fee per the Scope of Services in Exhibit A. Unless otherwise provided under the terms of this Agreement, all payments are due upon receipt. Interest will accrue at the rate of twelve percent (12%) per annum on all unpaid invoices older than thirty (30) days. We reserve the right to stop work on any Client account that becomes sixty (60) days past due and to notify local officials that professional seals should be removed from plans associated with the Client. EXHIBITS: The following Exhibits are attached hereto and expressly made part of this Agreement. [X] EXHIBIT A SCOPE OF SERVICES [X] EXHIBIT B TERMS AND CONDITIONS This Agreement will be controlled by the provisions listed above and the Terms and Conditions in the attached Exhibit B. If there is any conflict between the provisions of this Letter of Agreement and the Terms and Conditions, the Terms and Conditions will control. We will proceed upon receipt of this signed agreement. Should you have any questions, you can reach Thomas Ruff directly at 804-200-6430 or via email at Thomas. Ruff(cDtimmons.com. 031u/2021 Timmons Group Date ACKNOWLEDGED AND ACCEPTED: On behalf of the Client, this Agreement, including Exhibit A [Scope of Services] and Exhibit B [Terms and Conditions], is accepted and agreed to as of the date written below. By. �be92?2 Name: Dolores Carr Title: Executive Director Date: March 12, 2021 CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 2of5 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. 1001 Boulders Parkway Suite 300 Richmond, VA 23225 EXHIBIT A SCOPE OF SERVICES P 804.200.6500 F 804.560.1016 www.timmons.com Under this Agreement, Timmons Group will provide professional services relative to the project located at 2001 Earlysville Road in Albemarle County, Virginia. Scope: Task 1: Turn Lane Warrant Analysis..............................................................................................$2,500 • Per discussion with VDOT, Timmons Group will utilize the available existing 2019 count data along Earlysville Road to determine the peak hour volumes in the vicinity of the site entrance. o Collection of new traffic data will not be required. • Calculate the trip generation of the proposed land use for daily trips, as well as the AM and PM peak hours, and distribute the new site trips onto the roadway network based on existing volumes and traffic patterns. o The client has provided information that the site is expected to host approximately 30 students and operate from 8:00 AM to 3:30 PM. In addition, most traffic is planned to arrive in the NB direction of Earlysville Road based on student locations. o TG will further coordinate with the client to finalize the expected number of students, teachers, and parents during the AM and PM peak hours, as well as trip distribution. • Prepare a turn lane warrant analysis for the northbound right and souhbound left turn movements at the one (1) existing site entrance to 2001 Earlysville Road, using the appropriate nomographs from Appendix F of the VDOT Road Design Manual. • Perform a capacity and queuing analysis for the intersection to determine operational needs for auxiliary turn lanes and recommended geometric sizing of any warranted turn lanes. • Prepare a technical memorandum summarizing the study assumptions, analyses, findings, and recommendations. • Respond to any comments provided by the Client and/or reviewing agencies in a timely manner. • All coordination is assumed to be via email or phone/video conference; no in -person meetings are assumed with any party. TOTAL.......................................................................................................................................... $2, 500 Additional Services: Timmons Group will not perform the following services under this Agreement except at the request of the Client and for an additional fee. A fee for such Additional Services can be provided upon request and are as follows: 1. Project Meetings with VDOT/County Staff a. Beyond the general coordination and comment response assumed in the scope above. 2. Public Meeting Attendance CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 3 of TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. 1001 Boulders Parkway Suite 300 Richmond, VA 23225 EXHIBIT B TERMS AND CONDITIONS P 804.200.6500 F 804.560.1016 www.timmons.com 1. SCOPE OF SERVICES: The Scope of Services performed under this Agreement will be as described in Exhibit A of the Letter of Agreement. 2. STANDARD OF CARE AND CODE COMPLIANCE: Timmons Group will provide its services under this Agreement consistent with the professional skill and care ordinarily provided by members of the same profession practicing in the same or similar locality under the same or similar circumstances. Timmons Group will exercise usual and customary professional care in its efforts to comply with all applicable codes, laws, regulations and the policies of regulatory agencies in effect as of the date of the Agreement (collectively, "legal requirements"). Design changes made necessary by newly enacted legal requirements after the date of this Agreement will be an additional service subject to an executed Change Order, and Timmons Group will be entitled to appropriate additional compensation. Timmons Group will not be liable for any damages arising from conflicting interpretations of any legal requirements by different officials. In the event of a conflict between legal requirements applicable to the Project, Timmons Group will notify the Client of the nature and impact of such conflict, and the Client agrees to cooperate and work with Timmons Group in an effort to resolve the conflict. 3. INSTRUMENTS OF SERVICE: All documents, including, but not limited to, drawings, specifications, plans, reports and other forms of electronic data prepared and furnished by Timmons Group, are Instruments of Service pursuant to this Agreement and remain the property of Timmons Group. Client may retain one such copy of all such documents, for record purposes, which documents may only be used for the Project. Any adaptation by Client of said documents, whether intentional or inadvertent, without Timmons Group's verification will be at Client's sole risk and without liability or legal exposure to Timmons Group or Timmons Group's employees. Client agrees to assume all risks associated therewith and to hold Timmons Group harmless and indemnify it from and against any claims, liabilities, damages, losses and costs, including but not limited to attorney's fees, arising therefrom or in connection therewith. 4. THIRD PARTY RIGHTS: This Agreement will not create any rights or benefits to parties other than the Client and Timmons Group. 5. PROJECT SITE SAFETY: Timmons Group's Project site responsibilities are limited solely to the activities of Timmons Group and Timmons Group's employees on the Project site. The Client and Timmons Group agree that Project site safety is the sole and exclusive responsibility of the Project's owners or contractor(s). The parties likewise agree that the Project contractor(s) is solely responsible for Project means, methods, techniques, sequences of operation and procedures, and that Timmons Group will have no obligations relating to these contractor(s) duties. 6. LIMITATION OF LIABILITY: Notwithstanding any other provision of this Agreement, the maximum liability, in the aggregate, to the Client and anyone claiming by or through the Client, of Timmons Group and its officers, directors, shareholders, partners, employees, agents and subconsultants, or any of them, for any and all claims, losses, or damages, including attorney's fees, in any way related to or arising from the Project or this Agreement, will not exceed Timmons Group's total fee under this Agreement. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 4 of TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. 1001 Boulders Parkway Suite 300 Richmond, VA 23225 EXHIBIT B TERMS AND CONDITIONS P 804.200.6500 F 804.560.1016 www.timmons.com 7. DISPUTE RESOLUTION: In the event of any action or proceeding brought by either party against the other under this Agreement, other than default on payment, the prevailing party shall be entitled to recover all costs and expenses, including its court reporter fees, expert witness fees, and reasonable attorney's fees. If Timmons Group initiates legal proceedings to collect payment, it may recover, in addition to all amounts due, its reasonable attorneys' fees and other expenses related to the proceedings. Such expense shall include the cost, at the Timmons Group normal hourly billing rates, of the time devoted to such proceedings by its employees. The parties agree to litigation in a court of competent jurisdiction or in the jurisdiction where the Project is located. 8. MISCELLANEOUS: This Agreement constitutes the entire agreement of the Parties. All prior agreements, whether written or oral, are merged herein and will be of no force or effect. This Agreement cannot be changed, modified or discharged orally, but only in an agreement in writing. It any term, condition, or provision of this Agreement is found unenforceable by a court of law or equity, this Agreement will be construed as though that term, condition, or provision did not exist, and its unenforceability will have no effect whatsoever on the rest of this Agreement. This represents drafting by both parties and in the event of ambiguities, the principle of interpretation against the drafter will not apply. This Agreement may not be assigned without the prior written consent of the Client and Timmons Group, such consent not to be unreasonably withheld. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 5 of