Loading...
HomeMy WebLinkAboutWPO201900014 Correspondence 2021-05-17May 12, 2021 Emily Cox Senior Planner Community Development County of Albemarle 401 McIntire Rd. Charlottesville, VA 22902 RE: WP0201900014-Amendment 1 Foothill Farm Emily: The following is a response to your review comments dated May 6, 2021: A. Stormwater Pollution Prevention Plan (SWPPP) 1. SWPPP book will need to be updated with this amendment once approved. Noted. 2. Please provide an updated registration statement showing the total disturbed area. Ensure you use the new form (attached to this comment letter). The Registration Statement is included with this submittal. 3. Please note that no work can be completed based on this amendment until this plan is approved. A note is added to the Title Sheet. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. PPP in the SWPPP book will need to be updated with this amendment once approved. U i rj C. Stormwater Management Plan (SWMP) B. Clark Gath right, LLC lo0 loth St NE Suite 200 Charlottesville, VA 22902 434-971-8848 1. Please provide a design for the level spreaders (proposed length based on flow rate). The level spreader areas and flows are added and two of the spreaders size increased because of the larger flows. 2. Nutrient credits must be purchased before plan can be approved. The nutrient credit purchase is underway. Final documents will be sent to Ana Kilmer. D. Erosion and Sediment Control Plan (ESOP) 1. Please provide blankets and matting on both sides of the proposed driveway. Blankets and matting are now shown on the graded areas on both sides of the driveway. Best regards, Clark Gathright, P.E. B. Clark Gathright, LLC 100 10th St NE Suite 200 Charlottesville, VA 22902 434-971-8848