Loading...
HomeMy WebLinkAboutSP202000016 Correspondence 2021-05-17® COLLINS ENGINEERING May 16, 2021 Andy Reitelbach Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Claudius Crozet Park(SP2020-00016) 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Below are our responses to the comments from staff and Planning commission from the review of the Special Use Permit application. Planning Commission Comments: 1. See responses below: a. The attached site plan application (color exhibit sheets 2 and 3) and the attached presentation exhibit illustrate that increase in impervious area on the Crozet park with the expansion is approximately 5%. This overall increase in impervious area is not as significant as the Planning Commission seemed to think, and the overall exhibits illustrate this point. The proposed stormwater management features and landscaping mitigate this minimal increase in impervious area on the property. b. The entrance to parkside village has been relocated to preserve the existing trees adjacent to the nearby residences. In addition, the location of the new pool and recreational facility has been shifted away from the property line, allowing for additional room for landscaping and buffering. The site modifications and the additional landscaping and screening proposed on the property mitigate the negative impacts of the proposed development on the adjacent neighborhoods and nearby residences. 2. See responses below: a. The attached presentation exhibits illustrate the massing and scale of the proposed building in relationship to the surrounding neighborhood structures, and other buildings in the Crozet area. Based on these massing exhibits, it can be seen that the proposed facility is consistent with the surrounding structures. b. The proposed fitness facility has been shifted 25 feet south on the property, increasing the distance of the building from the residential property line. In addition, the location of the pool within the building is shown on the application plan and exhibits. The building is now 55 feet from the property line and the location of the pool within the building is 80 feet from the property line. This appears to meet the ordinance requirements, if the measurements of the pool within the structure is used for the 75 feet requirement. 3. With the proposed 5% increase in impervious area on the property, the proposed bio-filter facilities will treat the additional run-off associated with the pavement and buildings. The facilities will also treat portions of the existing impervious surfaces that were not previously being treated. These green infrastructure solutions will provide water quality on -site, before releasing the run-off into the existing pond or leaving the site. 4. See responses below: a. Below is an updated summary of the traffic counts (existing and proposed) for the Community Park. This updated analysis includes the existing uses on the property that were not included in the overall traffic numbers for the Park. These numbers help determine the increases in the traffic to the community park during key periods in the day. Crozet Park ITE Trip Generation ITE Code 492 (Health Fitness Club) P.H. adjacent street I P.H. Generator Saturday I P.H.G. AM Peak IPM Peak JAM Peak IPM Peak ITE Average Rate 1.31 3.45 1.4 3.92 3.1 Existing S.F.(1000's) 17.516 17.516 17.516 17.5161 17.51 Proposed S.F (30OO's) 53.39 53.39 53.39 53.39 53.3 Existing Tips 23 60 25 69 S6 Proposed Trips 70 194 75 209 170 Trip Increase 47 124 50 141 1 114 note s: S4uaref000age was ca'culated using the pool deck as indoor S.F. when the bubbkdupindiefa6,winterandspring. The bubblewwld nolonger be used wide the new plan and the indoor pool is used for S.F. Note 2: 6ppo S. F. of sheltered Paviiolls are currently used for exerose d asses due to lack of indoor spce and/ or COND precautions. The proposedfadlty wo ukl provde indoorspaceforthedasses. The 6,ppp SF. is not used in the cakWation of the existing SF. b. The location of the 2"d entrance to the property has been relocated to a more suitable location, moving it away from the adjacent neighbor and to a location that has better site lines along the existing roadways for the entrance. c. The emergency access road for the community park from Park Road will be used for most of the construction traffic during the 15-month construction of the facility. There will occasionally be some periods where construction traffic may need to enter the site from the new 2"d entrance, based on the programming of the park activities that day. The proposed development plan enhances the sidewalk and pedestrian connections to the neighboring properties and developments, and provides additional pathways through the park, linking up these connections to the existing trail networks. The Community park and the existing and proposed trailway network links up many of the neighborhoods to each other, allowing for interconnectivity between the neighborhoods for pedestrian and bicycle connections. Comments from the December 2020 review: Planning Comments: 1. All the review fees have been paid for the project. 2. Comment previously addressed. 3. Comment previously addressed. 4. Comment previously addressed. 5. Comment previously addressed. 6. Attached is the cooperative parking agreement. In addition, the overall parking requirements have been approved by the Zoning department. The gravel parking area has been removed from the plan. The proposed pool facility does not generate any additional parking requirements for the community park since the existing pool on the property also served as an indoor pool facility with the bubble over it. The bubble option is being replaced with the indoor pool. Any modifications or adjustments to the overall parking requirements will be part of the final site plan process. 7. Comment previously addressed. 8. The location of the concession areas are now shown on sheet 3. 9. Comment previously addressed. 10. The setback line labels have been changed from rear to side. 11. Comment previously addressed. 12. A copy of the agreement is attached. The conditions of the agreement will remain. 13. Comment previously addressed. 14. Comment previously addressed. 15. Comment previously addressed. 16. Comment previously addressed. 17. Comment previously addressed. 18. Comment previously addressed. 19. Comment previously addressed. 20. The concept plan illustrates the improvements that are being constructed within the R-6 portion of the park. The improvements include a relocated drive aisle access, landscaping, and trailway connections. Transportation Comments: No objections Building Inspections Comments: 1. The building separation note has been updated on the cover sheet. 2. The general note about roof drains has been added to the cover sheet. VDOT Comments: 1. The proposed entrance to Parkside Village has been relocated, and the new location meets VDOT sight distance requirements. 2. The client acknowledges that turn lane warrants will be part of the final site plan process. Parks and Trail Comments: 1. The adjacent development (Glenbrook at Foothills) is creating the connection from the park to the Crozet connector greenway trail system. 2. Any additional bike/pedestrian connections within the Park property will be worked out and determined with the final site plan. Engineering Comments: No objections ACSA and Fire/Rescue Comments: No objections Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com. Sincerely, Scott Collins, PE