HomeMy WebLinkAboutSUB201200152 Bond Reduction 2021-05-24V
401 McIntire Road, North Wing
County of Albemarle Charlottesville, VA 22902-4579
COMMUNITY DEVELOPMENT DEPARTMENT Telephone:434-296-5832
WWW.ALBEMARLE.ORG
Road bond inspection
Bond Title: Belvedere Phase II A-2 — Road Plan Amendment #1 (Amendment to SUB-2012-00152
File Number: SUB201200152
Date of inspection: pending, scheduled 5/25/21
Original Bond Amount: $1,012,900
Reviewer: John Anderson Current Bond Amount: $1,012,900
Phone: (434) 296-5832 -x3069 Updated Bond Amount: $405,160
Bond Inspection Checklist date: May 24, 2021
Your bond inspection request has been processed. This list contains an update on the items received and approved.
Received
Y N
Approved
Y N N/A VDOT
■ ❑
Completed inspection request and fee
■ ❑ ❑ ❑
■ ❑
As -built plan, updated, sealed to current date, per As -built policy
❑ ❑ ❑ ❑
Provide /label public RW width, or private access width/s on road plan sheets.
Provide deed bk.-pg. ref. to recorded subdivision platted RW or pvt. access on road plan sheets.
Provide deed bk.-pg. ref. to public /pvt. drainage easements on storm sewer plan
sheets.
Provide design pavement sections /As -built pavement sections on As -built drawing.
❑ ■
Copies of recorded plats for right-of-way, easements
❑ ❑ ❑ ❑
❑ ❑
VDOT approval AM-4.3, or partial completion via punchlist
❑ ❑ ❑ ❑
■ ❑
Letter from P.E. certifying improvements to date are built to plan
❑ ❑ ❑ ❑
■ ❑
Current certification form completed by owner/developer (for release)
❑ ❑ ❑ ❑
❑ ■
CBR test reports for each road
❑ ❑ ❑ ❑
❑ ■
Stone depth and material inspection reports (or core tests)
❑ ❑ ❑ ❑
❑ ■
Pavement depth and material inspection reports (or core tests)
❑ ❑ ❑ ❑
❑ ■
Compaction test reports for fill areas under road
❑ ❑ ❑ ❑
❑ ❑
Pipe trench inspection reports (if available)
❑ ❑ ❑ ❑
■ ❑
Pipe interior inspections reports and video
❑ ❑ ❑ ■
❑ ■
Concrete test reports for structural concrete, curbing, aprons, etc.
❑ ❑ ❑ ❑
❑ ❑
Structural inspection reports for any bridges or box culverts
❑ ❑ ❑ ❑
❑ ❑
County road name signs and posts, or a sign agreement for alt. posts
❑ ❑ ❑
Visual -physical inspection pending, scheduled 5/25/21.
Please refer to on-line content at Engineering Applications (
hMs://www.albemarle.org/govemment/community-development/appiv-for/engineering-applications ) for road
inspection checklist and public /private road acceptance procedures.
bond inspection checklist 042219_WPO201200152_belvedere phase II-A_052421ja.docx
Engineering Review Comments
Page 2 of 2