Loading...
HomeMy WebLinkAboutWPO202100014 Correspondence 2021-05-24® COLLINS ENGINEERING May 20, 2021 Frank Pohl, PE Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Berkmar Overlook —Townhouses VSMP Plan(WP0202100014) 20o GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com The following responses and attached plans are intended to address County Engineering's comments dated April 9, 2021 on the above referenced project. Should you have any questions during your review and approval of this project, please contact Scott Collins at scott0collins-eneineerine.com or at (434) 293-3719, or Graham Murray at ¢rahamPcollins-eneineerine.com or at (434) 566-3011. A. Stormwater Pollution Prevention Plan (SWPPP) 1. All comments have been addressed. B. Pollution Prevention Plan (PPP) 2. All comments have been addressed. C. Stormwater Management Plan (SWMP) 1. All comments have been addressed. D. Erosion and Sediment Control Plan (ESCP) 6. A. Sheet 3A has been added to this plan showing the envisioned lot phasing. A table is also shown on this sheet showing a breakdown of the phases' limits of disturbances, inclusive of the total acreage. B. Please allow this letter, and the labels shown on sheet 3, to be confirmation that the proposed plan is only for the construction of lots 27-30 and not lots 24-26, with the staging, storage and material delivery being temporarily placed on lot 24. As construction of the homes continue, it is possible that this plan may be redlined in the field for future home construction since this plan's limits of disturbance incorporates the future lots. C. Please allow this letter, and the labels shown on sheet 3, to be confirmation that the proposed plan covers 4.33 acres of land disturbance. D.A revised registration statement has been provided for this plan showing 4.33 acres of total disturbance (Section II, Q. E. A revised registration statement has been provided for this plan stating the project is part of a common plan of development (Section II, H). 7. The applicant kindly requests this comment be considered addressed. Labels are provided in two locations mandating the contractor tie the roof drains directly into the yard drains shown. Adding individual downspouts for residential townhomes on construction plans is challenging since asbuilt conditions may necessitate subtle changes. The applicant believes the 'main' yard drains located in close proximity to the homes, and the notes shown on the plans, provide both the contractor with the ability to make the roof drain connections and the County with the ability to enforce their installations prior to the release of the bonds or CO's. In a May 18th phone conversation, the notes were deemed an acceptable method for addressing this comment without the need for depicting individual downspouts. 8. The plat has not been approved yet and the TMP numbers are not available to be assigned at this time. It's the applicant's understanding that this comment can therefore be considered withdrawn based on a May SBth MS Teams meeting between Mr. Frank Pohl of County Engineering and Mr. Murray of Collins Engineering. 9. The easements are shown on sheet 3. The easements are lightly shaded since this is an ESC plan and the easements are more applicable to the final site plan and the road plan. In efforts to address this comment, the applicant has added 'typical' labels for the easements located on lots 27-30. In the aforementioned MS Teams meeting this was deemed an acceptable method for resolving this comment since the subdivision plat has not been recorded to date. 11. A copy of the Virginia DEQ VAR10 2019 registration statement for this 4.33 acre disturbance has been provided. 14. A concrete washout area, with a label, is now shown on sheet 3A for the construction of lots 27-30. Sincerely, Scott Collins