Loading...
HomeMy WebLinkAboutWPO201700081 Other 2021-05-21Iaterml Ute only 0.50 OF Al� Dale Received: 5 -a� Foe Paid: Receirtd by: 1ah6e: Forward to Mamgemeot Analyst ... nn 4 BOND INSPECTION REQUEST APPROVED PLAN # WP0201700081 PROJECT NAME: Brookdale (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed, a fee is required for each inspection. Please check the inspections requested. VSMPIVESCP Erosion Controt, Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207 & 208 $250 ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14435 and 14438; $269 ❑ Water & Sewer per Subdivision Ordinance section 14435 $269 ❑ Site Development Performance bond (Incomplete Site Work & Landscape Maintenance) $301 TOTAL FEES250.00 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst - Phone 434-296-5832; Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports, and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work, a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: oschimming@pcdcva.com OR REGULAR MAIL AD" RE§S— �1821 Avon Street, Ste. 200 �� �s�n! _ vn nnnkn Signature William N Park Print Name Sm Date Revised 71152014, 7202015, I I132015 �/�iy Y / nt Oy T N M N T-A A I y w