NOTICE TO COMPLY
Hand delivered
Project: WP0201900042
Spring Hill Village - VSMP
Operator/Contractor: Goodman Excavation
SPRING HILL LAND DEVELOPMENT LLC
Issued Date: 5/25/2021
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Under section § 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with
the requirements of the Land Disturbance Permit (or Agreement in Lieu of a Plan) for the
referenced project and to immediately take corrective measures to address erosion and sediment
control deficiencies on this property. This Notice to Comply is being issued because of the
following deficiencies:
Deficiency: Seed all denuded areas as required by program
Corrective Action: Seed and mulch as required by program
Deficiency: Silt fence and seed all piles
Corrective Action: As required, install proper controls
Deficiency: No vegetative ground cover over majority of site
Corrective Action: Seed and much denuded areas.
Deficiency: Townhouse sites not contained as required. Install controls and mark on plan
Corrective Action: Install standard alone controls to contain runoff from construction of
Townhomes and prevent issues within development area
Deficiency: Trap and existing basin near capacity. Maintain as required and direct all runoff into
approved controls
Corrective Action: Maintain and repair as needed, continue use as project advances. Size as per
plan and current active phases, direct all runoff towards control
Deficiency: Stabilize as required by program.
Corrective Action: Seed and mulch
Deficiency: Structures failing
Corrective Action: Maintain all perimeter controls, install additional as needed to contain
building envelopes and active work zones
Deficiency: All inlets within and downstream of active Townhouse construction must be
protected
Corrective Action: Install and maintain as required by program
Deficiency: Maintain proper stabilized channels to direct runoff
Corrective Action:
Deficiency: Maintain roadways within single family building envelope
Corrective Action: Keep roadway free of sediment and trash
Deficiency: With current site conditions, downstream waterways and properties are at risk.
Corrective Action:
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by.
Re -inspection of this notice to verify corrective measures will incur a $150 for land disturbing under
VESCP and single-family dwelling units (§ 17-207) or a $250 fee for land disturbing under VSMP (§ 17-
208). Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection.
County Inspector Name: Geoff Elsie
County Inspector Phone Number: (434) 296-5832
OF Al.,& Inspection Result: Notice to Comply
r
L�eo��P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Spring Hill Village - VSMP
Project/WPO Number:
WP0201900042
TMP:
09000000002800
DEQ Permit Number (if
applicable):
VARlON324
Project Operator:
Goodman Excavation
Operator Telephone #:
(540) 872-5105
Project Contact:
LLC SPRING HILL LAND DEVELOPMENT
Contact Telephone #:
Contact E-Mail:
UnderwoodDD@stanleymartin.com
Qualified Personnel (QP):
Gregg O'Donnell
Inspector:
Geoff Elsie
Weather (Wet/Dry/Rain):
Disturbed Acreage:
Inspection Date & Time:
5/25/2021
Single -Family:
Stage of Construction: Grading
Re -Inspection: Yes
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? No
Comments/Description
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant?
Reviewed during re -inspection? No
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part II
A.1 A)
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
Page 1 of 4
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part 11 A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? No
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part 11 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part 11 B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-f)) (9VAC25-870-54.G)
24
mendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? No
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part 11 F (3-4)? (CGP Part 11 F (3-4))
Page 2 of 4
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
NIA
plan?
Sequencing of the project is implemented in accordance with the
No
Direct all stormwater to approved controls
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
Seed all denuded areas as required by program
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
No
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
NIA
Silt fence and seed all piles
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
No
No vegetative ground cover over majority of site
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
No
Townhouse sites not contained as required. Install
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
controls and mark on plan
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
N/A
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
No
Trap and existing basin near capacity. Maintain as
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
required and direct all runoff into approved controls
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
No
Stabilize as required by program.
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
No
Structures failing
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
N/A
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
No
All inlets within and downstream of active Townhouse
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
construction must be protected
54.13)
Are stormwater conveyance channels adequately stabilized with channel
No
Maintain proper stabilized channels to direct runoff
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
N/A
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
No
Maintain roadways within single family building
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
envelope
(9VAC25-870-54. B )
46
Have all temporary control structures that are no longer needed been
N/A
removed and disturbed soil resulting from their removal permanently
Page 3 of 4
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
With current site conditions, downstream waterways
47
protected from erosion, sediment and damage in accordance with the
No
and properties are at risk.
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
N/A
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 4
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory Citation/Legal
Occur.
Observation
Recommended Corrective
List #
Requirement*
Action
30
(9VAC 25-840-40.1)
Seed all denuded areas as
Seed and mulch as required
(9VAC25-870-54.B)
required by program
by program
(9VAC25-880-60) (CGP
Part I F.1(a)) (CGP Part
11 A.5.b(1)) (CGP Part 11
A.2.c (8)) (CGP 11 E(1-2))
31
(9VAC 25-840-40.2)
Silt fence and seed all piles
As required, install proper
(CGP Part 11 A.2(c))
controls
(9VAC25-870-54. B )
32
(9VAC 25-840-40.3)
No vegetative ground cover
Seed and much denuded
(CGP Part 11 A.2(c))
over majority of site
areas.
(CGP 11 E(1-2))
(9VAC25-870-54. B )
33
(9VAC 25-840-40.4)
Townhouse sites not
Install standard alone controls
(CGP Part 11 A.2(c))
contained as required. Install
to contain runoff from
(CGP 11 E(1-2))
controls and mark on plan
construction of Townhomes
(9VAC25-870-54.B)
and prevent issues within
development area
35
(9VAC 25-840-40.6)
Trap and existing basin near
Maintain and repair as
(CGP Part 11 A.2.c (9))
capacity. Maintain as required
needed, continue use as
(CGP Part 11 A.2(c))
and direct all runoff into
project advances. Size as per
(CGP 11 E(1-2))
approved controls
plan and current active
(9VAC25-870-54.B)
phases, direct all runoff
towards control
36
(9VAC 25-840-40.7)
Stabilize as required by
Seed and mulch
(CGP Part 11 A.2(c))
program.
(CGP 11 E(1-2))
(9VAC25-870-54. B )
37
(9VAC 25-840-40.8)
Structures failing
Maintain all perimeter
(CGP Part 11 A.2(c))
controls, install additional as
(CGP 11 E(1-2))
needed to contain building
(9VAC25-870-54.B)
envelopes and active work
zones
39
(9VAC 25-840-40.10)
All inlets within and
Install and maintain as
(CGP Part 11 A.2(c))
downstream of active
required by program
(CGP 11 E(1-2))
Townhouse construction must
(9VAC25-870-54.B)
be protected
40
(9VAC 25-840-40.11)
Maintain proper stabilized
(CGP Part 11 A.2(c))
channels to direct runoff
(CGP 11 E(1-2))
(9VAC25-870-54. B )
45
(9VAC 25-840-40.17)
Maintain roadways within
Keep roadway free of
(CGP Part II A.2(c))
single family building
sediment and trash
(CGP II E(1-2))
envelope
(9VAC25-870-54.B)
47
(9VAC 25-840-40.19(a-
With current site conditions,
n))
downstream waterways and
properties are at risk.
Recommended 6/3/2021
Corrective Action
Deadline:
Targeted Re- 6/3/2021
Inspection Date:
Comments: Maintain perimeter controls, keep runoff heading to traps and basins, use cutoffs to
direct water towards controls, contain building sites with independent controls, log
new controls into SWPPP and on approved esc plans, stabilize entire site to prevent
sediment loss, hydroseed/mulch can be used. Stockpiles to have siltfence and
seed/mulch. Contain and stablize as much of the upstream site as possible prior to
installation of underground detention.
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control
Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from
Construction Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 2
Photos for Item 4
Photo Description:
Photos for Item 10
Photo Description:
Photos for Item 30
Time Photo_20210525_122030.jpg.jpg 417.57KB
Photo Description: Example of denuded and needing seed
Photos for Item 31
TimePhoto_20210525_122025.jpg.jpg 670.39KB
Photo Description: Stock pile unprotected and inlet without protection
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Inspection Date: 5/25/2021
County Inspector