HomeMy WebLinkAboutSDP201900070 Letter of Revision 2021-05-25�r County of Albemarle
m COMMUNITY DEVELOPMENT DEPARTMENT
APPROVAL
To: Nat Perkins, UVA Foundation
From: Megan Nedostup
Date: May 25, 2021
Megan Nedostup, AICP
Development Process Manager
mnedostup@albemarle.org
Telephone: (434) 296-5832 ext. 3004
Re: SDP2019-70 UVA Tennis- Letter of Revision #3, Tax Map/Parcel #07500-00-00-06300
Mr. Perkins,
This letter approves your submitted Letter of Revision for the above referenced site plan. The letter of revision proposes the
changes as indicated and shown on the attached plans with a revised date of 5-7-21 and letter dated 5-10-21.
Please note that ACSA has the following comment for Phase 1113: The existing water meter will need to be upgraded to a
1.5 meter prior to ACSA approving the building permit application for the building in Phase 1113. This was previously
discussed with Alex Morrison during the initial tennis facility site plan.
There are no other changes to the approved plan proposed.
This is the third (3rd) Letter of Revision for this site. Any additional required changes must submitted in the form of a site plan
amendment.
Sincerely,
Megan Nedostup, AICP
Attachments: Site Plan Change, Letter, and application
Application for
Letter of Revision
W Letter of Revision = $108
This application may require additional review by the Fire Marshal. Fees in addition to those shown on this
application may be required as required by the Fite Prevention Code Fee Schedule. A copy of the schedule is
available from the Fite Marshal.
Final Site Plan Name and Number: SDP201900070
Contact (who should we contact about this project) Nat Perkins
Street Address 1 Boar's Head Pointe
City Charlottesville State VA Zip Code 22903
Phone Number 434.982.5304 Email nperkins@uvafoundation.com
Owner Of Record University of Virginia Foundation
Street Address 1 Boar's Head Pointe
city Charlottesville state VA Zip Code 22903
Phone Number 434.982.5304 Email nperkins@uvafoundation.com
Applicant Dewberry c/o Maria Minnick
Street Address 4805 Lake Brook Drive, Suite 200
City Glen Allen State VA Zip Code 23060
Phone Number 804.823.6984 Email mminnick@dewberry.com
® The appropriate fee,
[441 The site plan number that the change applies to,
91 A request letter describing the proposed changes from the owner or authorized agent,
® 4 copies of the plan that shows the proposed changes,
Changes must be shown on the sheet or sheets from the approved final Site plan, or on an I I"XIY' copy of that portion of the approved
final site plan.
Owner/Applicant Must Read and Sign
I hereby certify that the information provided on this application and accompanying information is accurate, true and correct to the best
of my((k7ledge and belief.
�-eX4^- - 5AG �ZI
Signature of Own Age6geW Date
76-P��j y3 y • 153(''75>�7
FOR OFFICE USE ONLY LOR #
Fee Amount $ Date Paid By who?
Receipt #
By:
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
REVISED 4/23/2018 Page I of I
i Dewberry
May 10, 2021
Dewberry Engineers Inc. 804.290 7957
4605 Lake Brook Drive, S"te 200 804.290.7928 fax
Glen Allen, VA 23060-9278 www.dewberry.com
Albemarle County
Attn: Megan Nedostup, Development Process/Project Manager
401 McIntire Road
Charlottesville, Virginia 22902
RE: University of Virginia Foundation Tennis Facility and Parking Lot Expansion — SDP201900070 —
Letter of Revision #3
Dear Ms. Nedostup,
This letter is to notify Albemarle County of proposed revisions to a previously approved site development
plan. The University of Virginia Foundation Tennis Facility and Parking Lot Expansion, SDP201900070,
received final approval on 6/5/2020.
The proposed changes as part of this Letter of Revision application are as follows:
While the exhibition court was previously included and approved as part of Phase II of the UVA
Foundation Tennis Facility and Parking Lot Expansion Final Site Plan, Revision 5 in August 2019, the
following sheets have been revised to show the final design and construction of the exhibition court
as Phase IIA, and the remaining scope as Phase 11B. The site and utility plan, landscaping, and
lighting sheets have been revised accordingly.
Find the following plan sheets attached showing proposed changes relating to the items above.
• C3.06 — Overall Site and Utility Plan Phase IIA and IIB
• L3 — Planting Plan Phase IIA and IIB
• L4 — Planting Schedule Phase IIA and IIB
• LTA-101 - Tennis Center Lighting Layout Phase 2A and 2B
• LTA-300 — Tennis Center Exterior Lighting Calculations Phase 2A and 2B
Please do not hesitate to contact me if you have any questions or concerns, or if you need additional
information.
Sincerely,
Maria Minnick, PE
Project Manager
Page 1 of I
j
0 Dewberry
Dewberry Engineers Inc.
4805 Lake Brook Drive, Suite 200
Glen Allen, VA 23060
Phone: 804.290.7957
Fax: 804.290.7928
www.dewberry.com
Z
O1--
O
I—
0
V
Zz
Z
LU
O
oC
o
QZ
aa-
Z
Z
zoo
Q¢
Paz
z
U
Z
LU
J
n
gw
>
o
LL
J
W
LU
F--
J
Cc
T-
o(-)
cn
C)
LL
o
U)U)
wz
z
�z
-
LU
z�
D
SEAL 141;i
Ojr-
ieNLyTF//0� `f
2
VMARIA N. MII CK
Lic No. 0402061632
O. AD
KEY PLAN
SCALE
0' 50' 100'
HORIZONTAL SCALE
1"=50'
REVISIONS
3
5/07/21
ACO
LETTER OF REVISION 3
2
9/09/20
ACO
LETTER OF REVISION 2
8/17/20
ACO
LETTER OF REVISION
4/22/20
ACO
REVISION 2
2/07/20
ACO
REVISION 1
1 1 /04/19
ACO
MINOR AMENDMENT
No.
DATE
BY
Description
DRAWN BY ACO
APPROVED BY
CHECKED BY
TITLE
OVERALL SITE AND
UTILITY PLAN PHASE
IIA AND IIB
DEI PROJECT NO: 50100451
SHEET NO.
C3m06
BOAR'S HEAD
SPORTS CLUB
PLEASE SEE PLANTING SCHEDULE AND
OTHER PLANTING INFORMATION ON SHEET
L4.
DO NOT INSTALL ANY TREES WITHIN 10'-0"
OF SANITARY STORM SEWER (SSWR) LINE.
FINISH GRADE IS TO BE 1" BELOW TOP OF
PAVEMENT AT PLANTING BEDS; TAPER
MULCH TO MEET FLUSH AT EDGE OF
PAVING.
GROUND COVER AREAS NOT DESIGNATED
AS MEADOW SHALL BE LAWN.
PROVIDE APPROX. 3' MOW STRIP OF LAWN
ADJACENT TO PATHS AND OTHER PAVED
AREAS.
APPROVED
i — \ by the Albemarle County
/ Community Development Department
Date May 25 2021
File# SDP2020 070
Application Type Letter of Revision #3
` Lead Reviewer: Megan Nedostup
i
+
PROJECT
UVA Tennis
CLIENT
University of Virginia
Foundation
PO Box 400218
Charlottesville, VA
434.982.4848 tel 434.982.5852 fax
www.uvafoundation.com
CONSULTANT
AECOM Technical Services
3101 Wilson Boulevard, Suite 900
Arlington, VA 22201
703.682.4900 tel
www.aecom.com
Preparer: Rachel Lloyd, RLA
REGISTRATION
DATE
May 3, 2021
LETTER OF
REVISION
PROJECT NUMBER
60580805
TITLE
PLANTING PLAN
PHASE IIA and IIB
SHEET NUMBER
SCALE OF FEET
PHASE IIA LAWN
2080 SF SOD
PHASE IIB TREES
SYMBOL
QTY
BOTANICAL NAME
PHASE IIB ORNAMENTAL GRASSES AND SHRUBS
COMMON NAME
ROOT
SIZE
SPACING NOTES
AM
200
ARONIA MELANOCARPA WORTON'
BLACK CHOKEBERRY
#3 CONT.
2-3' HT.
48" O.C.
FULL TO GROUND
DC
1730
DESCHAMPSIA CESPITOSA
TUFTED HAIR GRASS
#3 CONT.
12-18" HT.
18" O.C.
FG
76
FOTHERGILLA WOUNT AIRY'
DWARF FOTHERGILLA
#3 CONT.
18-24" HT.
AS SHOWN
FULL TO GROUND
IN
114
ILEX VERTICILLATA'NANA'
RED SPRITE WINTERBERRY
#3 CONT.
12-18" HT.
AS SHOWN
APPROVED
by the Albemarle County
unity Development Department
County of Albemarle
Conservation Plan Checklist —To be placed on Landscape Plans
(Handbook, pp III-284-111-297 for complete specifications)
The following items shall be shown on the plan:
❑ Trees to be saved;
❑ Limits of clearing (outside dripline of trees to be saved);
❑ Location and type of protective fencing;
❑ - Grade changes requiring tree wells or walls;
❑ Proposed trenching or tunneling beyond the limits of clearing.
Markints:
❑ All trees to be saved shall be marked with print or ribbon at a height clearly visible to equipment operators.
❑- No grading shall begin until the tree marking has been inspected and approved by a County Inspector.
Pre-Coostruction Conference:
❑ Tree preservation and protection measures shall be reviewed with the contractor on site.
Eauinment Operation and Storage:
❑ licavy equipment, vehicular traffic and storage of construction materials including soil shall not be permitted within the driplines of trees
to be saved.
Soil Erosion and Stormwater Detention Devices:
❑ Such devices shall not adversely affect trees to be saved.
Fires:
❑ Fires are not permitted within 100 feet of the dripline of trees to be saved.
Toxic Materials;
❑ Toxic materials shall not be stored within 100 feet of the dripline of trees to be saved.
Protective Fencing:
❑ Trees to be retained within 40 feet of a proposed building or grading activity shall be protected by fencing.
❑ Fencing shall be in place and shall be inspected and approved by a County Inspector prior to grading or construction.
Tree Wells:
❑ When the ground level must be raised within the dripline of a tree to be saved, a tree well shall be provided and a construction detail
submitted for approval.
10. Tree Walls:
❑ When the ground level must be lowered within the dripline a tree to be saved, a tree wall shall be provided; and a construction detail
submitted for approval.
11. Trenching and Tunneling:
❑ When trenching is required within the limits of clearing, it shall be done as faraway from the trunks of trees as possible. Tunneling
under a large tree shall be considered as an alternative when it is anticipated that necessary trenching will destroy feeder roots.
12. Cleanup:
❑ Protective fencing shall be the last items removed during the final cleanup.
13. Damseed Trees:
❑ Damaged trees shall be treated immediately by pruning, fertilization or other methods recommended by a tree specialist.
NOTE: IT IS THE DEVELOPER'S RESPONSIBILITY TO CONFER WITH THE CONTRACTOR ON TREE CONSERVATION
REQUIREMENTS.
n Lviv{t?!,iry OF ti�QGr..+i4 >CeteA1V4"'&Z
CONTRACT PURCHASER SIGNATURE (DATE)
PLEASE SEE PLANTING PLAN ON SHEET L3
TOTAL LANDSCAPE AREA -
AREA REQUIRED FOR TREE CANOPY (10%)
NEW TREE CANOPY AREA
AREA OF PROTECTED EXISTING CANOPY TREES
(SAME AS PHASE 1)
TOTAL CANOPY
406A14 SF
40,641 SF
7,208 SF
41,249 SF
PROJECT
UVA Tennis
CLIENT
University of Virginia
Foundation
PO Box 400218
Charlottesville, VA
434.982.4848 tel 434.982.5852 fax
www.uvafoundation.com
CONSULTANT
AECOM Technical Services
3101 Wilson Boulevard, Suite 900
Arlington, VA 22201
703.682.4900 tel
www.aecom.com
Preparer: Rachel Lloyd, RLA
REGISTRATION
48A57 SF . DATE
THE VEGETATION SHOWN ON SHEET L3 SATISFIES THE MINIMUM
LANDSCAPING AND SCREENING REQUIREMENTS OF THE ALBEMARLE
COUNTY CODE.
ALL SITE PLANTINGS OF TREES AND SHRUBS SHALL BE ALLOWED TO
REACH, AND BE MAINTAINED AT, MATURE HEIGHT. THE TOPPING OF
TREES IS PROHIBITED.
ALL VEGETATION SHALL BE MAINTAINED IN A HEALTHY CONDITION BY
THE CURRANT OWNER AND REPLACED WHEN NECESSARY.
REPLACEMENT MATERIAL SHALL COMPLY WITH THE APPROVED PLAN.
May 3, 2021
LETTER OF
REVISION
PROJECT NUMBER
60580805
Irma
PLANTING
SCHEDULE
PHASE IIA AND IIB
SHEET NUMBER
L4
10 Dewberry
E
FBI
C
0
:. irYY
S5A
EXI003
r.
o.
TENSIONED CONCRETE
SLAB BY OTHERS a:
SSA
PROPOSED •�"
CONCRETE SIDEWALK "•:"�-�...,,.. .
TENNIS
SUPPORT
FACILITY
.°•'•. '.i.-.
(PHASE 1)
TYPE HR1
LOCATED IN BOTH RAILS,
TOTAL 15 AT THIS STAIR,
DETAILS TO FOLLOW IN
COORDINATION WITH
}
HANDRAIL SPECIFICATIONS.
a
PROPOSED BLEACHERS
BY OTHERS
�` •,! -: SSA ••
i
PROPOSED TENNIS FACILITY • ,; •`, ;
BUILDING BY OTHERS
W1
PROPOSED MARKING
W1'
° •
.� _
FOR FDC ACCESS
W1
W1 J
'. !■ .
_A. TYPE W1 (TYP)
. A MOUNTED AT 71FT ON BUILDING ELEVATION
`':.•. .�:•
.�,: • AT DOORS -REFER TO BUILDING
ELEVATIONS (TO BE DEVELOPED) FOR
'° :■!
i EXACT PLACEMENT AND COORDINATE WITH.
INTERIOR UGHTING CONTROL SYSTEM.
y
W1
tP:
,W1
PHASE 2B
PROPOSED ST S.•• "•. d..
■.:'.
BY OTHERS
.■.■. � tip, ..■■■. ■...■. ■.■■■.■■■■■.
■..
_•.fqr.•�. r■�. �.
■i..
,Iii
r.
'a l,M T. LA41 M.
7.• L
e
BY
vm F. • _
IIIIIIIIIII
I I
I I II
�
. 1
IIIIPIIIII®
IIIIIIIIIIIY9
II:!g1116
L�IIIIIIIIIIII
I_,�I�
1J
is by. `•.•.:LIRA
TYPE HR1
LOCATED IN BOTH RAILS. TOTAL 12
SPECIFICATIONS. CONTROL VIA DMX
TYPE HR1
LOCATED IN BOTH RAILS, TOTAL 10
AT THIS STAIR, DETAILS TO FOLLOW
IN COORDINATION WITH HANDRAIL
SPECIFICATIONS.
3
TYPE S5A MOUNTED ATtt4FT ON 141FT POLE.
CONNECT TO PATHWAY
LIGHTING CIRCUIT SERVING
THE LIGHTING SHOWN IN
PHASE 1.
• `•••.., TYPE HR1
. .. ... /•�?) •. LOCATED IN BOTH RAILS,
TOTAL 18 Al THIS STAIR,
DETAILS TO FOLLOW IN
COORDINATION WITH HANDRAIL
SPECIFICATIONS. CONTROL VIA
t DM% BY SPORTSUCHTINC
CONTROL SYSTEM.
PROPOSED BLEACHERS
BY OTHERS
TYPE HRi
LOCATED IN OUTER RAIL TOTAL 108 AT RAMPS, DEALS TO FOLLOW IN COORDINATION
WITH HANDRAIL SPECIFICATIONS. CONTROL VIA DMX BY SPORTSUGHTING CONTROL SYSTEM.
DRIVE AISLE LIGHTING
PERFORMED UNDER PHASE
13 NOT CHANGING DURING
PHASE 2, AND NOT SHOWN
FOR CLARITY. REFER TO
PHASE 1 DRAWINGS.
�d
TYPE HR1
I ! LOCATED IN BOTH RAILS,
DMX1003 TOTAL 15 AT THIS STAIR,
DETAILS TO FOLLOW IN
: COORDINATION WITH HANDRAIL
SPECIFICATIONS. CONTROL VIA
.. DMX BY SPORTSUGHTING
CONTROL SYSTEM.
APPROVED
by the Albemarle County
Community Development Department
Date May 25, 2021
File# SDP2020-070
Application Type Letter of Revision #3
Lead Reviewer: Megan NedOStUP
PARKING LOT AND PATHWAY
LIGHTING PERFORMED
UNDER PHASE 1, NOT
CHANGING DURING PHASE 2,
AND NOT SHOWN FOR
CLARITY. REFER TO PHASE 1
DRAWINGS.
Dewberry Engineers Inc.
4805 Lake Brook Drive, Suite 200
Glen Allen, VA 23060
Phone: 804.290.7957
Fax: 8G4.290.7928
www.dewberry.com
z
p
I—
�O
0
CD
zz
F-
O
oYC
w
`L0-z
o
Q�p
z
Z
z
LI
>
-zC/)
�a<
W
(1)
UJ
~
LL
J I IXI�/'��
— W
CC
a
Q
U
c_z
G
Cn
C)
z
LIJ
z
z
I—
Z)
CONSULTANT
2RW CONSULTANTS,
INC
2750
PROSPERITY AVENUE
SUITE 200
FAIRFAX VA 22031
ph:
703.718.4355
fx:
571.212.7155
KEY PLAN
SCALE
0'
30'
60'
HORIZONTAL SCALE
1" = 30'
REVISIONS
5/03/21
ACO
LETTER OF REVISION 3
2
9/09/20
ACO
LETTER OF REVISION 2
1
8/17/20
ACO
LETTER OF REVISION
4/22/20
ACO
REVISION 2
2/07/20
ACO
REVISION 1
11/04/19
ACO
MINOR AMENDMENT
No.
DATE
BY
Description
1■1:L1TANI '1
APPROVED BY BMW
CHECKED BY BMW
TITLE
TENNIS CENTER
LIGHTING LAYOUT
PHASE 2A AND 213
DEI PROJECT NO: 50100451
SHEET NO
LTA-1 01
C
I
C
0
a/
TENNIS PAVILION:PIan Rotated 0 Tilted 0
ILLUMINATION LEVELS AT GROUND (FQ
Scale: 1 inch= 20 Ft.
C EN TER STAR N O RTR Plan Rotated 0 TAled 0
Scale:inch= 4 Ft.
GENERAL NOTES,.
1. WATTAGE AND L LNENS FROM MANIFACIl1REI'S ES RLES.
2. ALL SITE LIGFITNG S -O L BE DK*A1BA.E YHLH AREA CLW ROLS BY ilk£ OF DAY AND S91 SOBS FOR DETECTION OF PRESENCE DETAILS TO FOLLOW.
3. BL gDM A40LJNTM FVnJRES ARE LOCATED Phi CUPPENT PAVIJON SO-Q TLC DESIGN EIEVAlra4S. FFTFER DUALS WILL FOLLOW.
4. PACI- T AND EMGNEE R TO REVEW Al r•FOFIMTION TO OETSM•E OO.ELNNCE WITH DESIGN F4 .
5. TYPE HR1 HANDRAIL L r+aNG AT STARS IS DMAABLE AND WILL BE RFT1fR OOCK)NATED WITH H AL SPECACATpPLS.
- -. ...... .............. { • ! Fy.. Z`
t.. } , i
.. �.�.A.-.A 1.
• -t:. •,t � to � ■1
Fi■ F{ .
. ....3 I
i
�t f j � •4f )f •• •,
:._ ..::
{
■
■ 1
H q
APPROVED
by the Albemarle County
Community Development Department
Date Na 2021
File # S P2020-070
Application Type Letter of Revision #3
Lead Reviewer: Megan Nedostup
Calculation summary
Label
CalcT a
Units
Avg
max
Min
AV /Mi
MAX/Hi
CENTER COURT WORTH STAIR Top Total
Illuml vnee
F.
2.39
5.4
0.0
N.A.
H.A.
CENTER COURT SOUTH STAIR Ta Total
Ilium.tnanee
Fe
2.09
5.4
0.0
N.A.
N.A.
EAST RAMP
Illuminance
Fc
3.96
4.1
3.9
1.C2
1.05
front steps 1 1 Top
Illuminance
Fc
0.90
43.9
0.9
1.00
1.00
front steps 1 2 Top
Illuminance
Fc
0.70
0.7
0.7
1.00
1.00
£cant et. . 1 3 Top
Pc
0. so
0.5
0.5
1.00
1.00
front Steps 1 Top
Illuminance
To
1.20
1.2
1.2
1.00
1.00
front walkwav unver Planar
I Illuminance
Fe
4. Be
6.1
3.7
1.32
1.65
NORTHEAST ETA:R Top Total
I Illumi non ce
Fc
3.13
I 5.0
1 2.2
1 1.45
1 2.27
PAV:LTC% PAt':NG
I Iliumi nonce
1 1.71
1 7.2
1 C.0
I N.A.
I N.A.
So.th 9_enchezn
Illumi'Arse
2.27
1 b_'.2
I C.0
I N.A.
I N.A.
SOUTHEAST STA:R To Total
Illuminance
Fe
3.02
5.2
C.8
1 3.78
6.50
SOL'TaWE9T COURT ENTRY FRCM SOUASa
Illuminance
Fc
1.69
Z9
0.9
4.23
7.25
SOUTHWEST STAIR To TotalI
Illuminance
F.
3.03
5.0
0.8
1 3.7E
1 6.25
i WEST RAMP I illuminance I Fc 1 3.76 14.0 1 3.6 11.04 1 1.11 1
Luminaire
Schedule
LLF
Description
Watts
Lumens
Filename
DOG Rating
Wl
1.000
MODERN FORMS: SWS-W1917-52 mounted at 7ft on buildin facade
10.E
836
US-W7517-AL.IES
Bl-Ul-GO
TrLabel
95
1.000
BEACON SLIDE tSLD-24L-55-3K7-5R-UNV mounted an 20ft cle
55
4980
SLO-241-SS-3-SR-UW.iea
B3-UO-G3
95
1.00G
BEACON SLIDE 99LD-24L-55-3R7-9-UNV mounted on 20ft pole
55
4831
9LD-24L-55-3K7-9-0NV. iaa
Bl-U0-G2
CMl
1.000
Aurorali ht Wide Flood SHSL16-NS-7-WF-30 mounted at Oft on support column
5.5599
435
HSL16-NS-7-WT-30.iea
51-Ul-GO
HRl
1 1. 0001
Alphabet Lighting ZETA 750 t750-3-1-2-2 mounted at aft above surface in handrail
1.5
127
750-3-1-2-2.ies
I BO-UO-GO
95a1
1. 0001
BEACON SLIDE 93LO-24L-55-3K7-5R-oNv mounted on 14fc pole
55
4980
SLD-241-55-3K7-5R-UNV.4ea
B3-V0-G3
9 Dewberry'
Dewberry Engineers Inc.
4805 Lake Brook Drive, Suite 200
Glen Allen, VA 23060
Phone: 804.290.7957
Fax: 804.290.7928
www.dewberry.com
z
O t-
F.- 0
0 CD
zz
O
Lu
LL <
:�E
g
Ql2z
o
z
zLD
w
-zC/
QQz
a>
LU
LU
LU
-
O
LLJX
_W
cr_
OF
Q
O
�UQ
L L
FnU)
°C z
W z
- W
z�
CONSULTANT
2RW CONSULTANTS, INC
2750 PROSPERITY
AVENUE
SUITE 200
FAIRFAX VA 22031
ph: 703.718.4355
fA: 571.212.7155
KEY PLAN
SCALE
REVISIONS
3
5/03/21
ACO
LETTER OF REVISION 3
2
9/09/20
ACO
LETTER OF REVISION 2
1
8/17/20
ACO
LETTER OF REVISION
4/22/20
ACO
REVISION 2
2/07/20
ACO
REVISION 1
11/04/19
ACO
MINOR AMENDMENT
No.
DATE
BY
Description
DRAWN BY
BMW
APPROVED BY
BMW
CHECKED BY
BMW
TITLE
TENNIS CENTER
EXTERIOR
LIGHTING
CALCULATIONS
PHASE 2A AND 2B
DEI PROJECT NO: 50100451
SHEET NO.
LTA-300