HomeMy WebLinkAboutSDP202000035 Checklist - Project Closeout (Administrative) 2021-01-06 SUBDIVISION/SITE PLAN
FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS
CHECKLIST
Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC
and status label. CDA will forward to the Imaging Center for digital closeout.SDP/SUB # E212O20 -3 5 PROJECT TITLE g(no lni\\ 16\0011_ IA
FULL NAME OF LEAD REVIEWER (mean I.on1 I\Z FINAL ACTION DATE: j' 6,2oa1
____ - - - -------------------___
_____----------------------------------______- -
o my iew—
----------------------
Application,Page 2 Data Entered
II111 taff Report,Ground Water Assessment,or other documents placed in"Does&Pies"
------- ____________-_-------------------__ -- --- --
Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse
chronological order(latest on top).
Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file,please indicate that item on the"Other"lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital
location(path/name)of the document in the space provided.
111111 ngineering Folder Information/documentation
El Scan ❑ Saved location
El Applicati n(signature copy) l
Scan ❑ Saved location P 1� w52 S j(l�
n '�G tie
d 'ublic Notification records/Abutting Owner correspondence
El Scan ❑ Saved location
Ltd Applicant Correspondence(to/from, memos/emails)
❑ Scan El Saved location ) /Tt +�� j Ci �T i( .
Qf Complete set ofprinted p Review Comments Aralkl
El Scan El Saved location j n ` iU6.t
❑ Approved an/plat(signed, or stamped"Approved"with Planner/Engineer name)
Scan El Saved location P ctse- SC q r) 1-14-o LuSe-c'c!„e.ApN,ta
II Action Letter(Administrative Approval) Om i5 G�lctc d (o �o l�la�, G
0 Scan ❑ Saved location
111 White Envelope-PC/BOS Meeting Package- Staff Report(include plan/plat presented,PC/BOS Action Letter)
❑ Scan 0 Saved location
Ground Water Assessments
❑ Scan El Saved location
111I Other(Please explain-i.e. Studies)
❑ Scan El Saved location
Other(Please explain-i.e. Studies)
i, El Scan El Saved location
I1c At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the
staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be
clearly marked as unapproved and contain a note clarifying why it was included.
❑ Scan ❑ Saved location
----------
------------------------------------------
dditional Information on this project:
• Planning Commission Minutes-may be obtained online or by contacting PC Recording Secretary
• Board of Supervisor Minutes-may be obtained online or by contacting the Clerk of BOS
♦ Construction Documents-will be added to this folder after completion of project. Prior to completion,
___________________________________________documents may be obtained by contacting the County Engineer.
NOTES: SDP/SUB project folders will be accepted by the Imaging_Center when the following items are complete:
1) Checklist is completed and included in folder;
2) Folder has a typed status label(same font&label color as project label)placed under the project label to
reflect current project status and date;
3) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top);
4) Documents are sufficiently identified as to which need-to be scanned or saved to LaserFiche.
if the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Chief of
Planning for corrective action.
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012