Loading...
HomeMy WebLinkAboutARB201900079 Checklist - Project Closeout (Administrative) 2019-07-22 ARCHITECTURAL REVIEW BOARD FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA for QC and status label. CDA will forward to the Imaging Center for digital closeout. Imaging Center will return the file to the Planning Division once documents are in the Laserfiche Repository. ARB# 2019-79 PROJECT TITLE Atlantic Union Sign LEAD REVIEWER FULL NAME Brent Nelson FINAL ACTION DATE: 07-23-2019 CountyView: the following items must be available in CountyView X Staff report,actions,final approval letter,updated status on Application 1 page Hardcopy—File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file.Please indicate those items on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or,if the document is already in digital format,note that it can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. X Application ❑ Scan ❑ Saved location N/A Notification letter ❑ Scan ❑ Saved location X Applicant Correspondence(to/from—including emails;do not include duplicate emails) ❑ Scan ❑ Saved location X Review comments ❑ Scan ❑ Saved location X Approved plan(site,architectural and/or sign plan that is marked"Approved") ❑ Scan X Saved location Laserfiche X Action Letter(s),including final approval letter(Certificate of Appropriateness letter) • ❑ Scan X Saved location_Laserfiche N/A ARB presentation display documents(in separate,labeled envelope) ❑ Scan ❑ Saved location X Review history form ❑ Scan ❑ Saved location X Other Items(Please explain) Completed sign review checklists ❑ Scan ❑ Saved location X Other Items(Please explain)Original sign drawing submitted ❑ Scan ❑ Saved location ❑ Other Items(Please explain) ❑ Scan 0 Saved location M1 APPLICATION REVIEW HISTORY ARB#/Name 2019-79, Atlantic Union Sign—Forest Lakes ACTION DATE NOTES County received application 06-28-19 Corresponding submittal 07-08-19 deadline deadline/ARB meeting date 08-19-19 meeting Transfer from intake to ARB Staff 07-02-19 First ARB staff review 07-03-19 Completeness check Comments to applicant 07-11-19 Email Resubmittal received by staff 07-15-19 While Brent was on vacation(07-12-19 till 07-22-19) Resubmittal reviewed by staff 07-22-19 Were all comments addressed? Yes Comments to applicant Resubmittal received by staff Resubmittal reviewed by staff Were all comments addressed? Comments to applicant Resubmittal received Resubmittal reviewed Approval letter sent 07-23-19 Email/mail ARB meeting date ARB action