HomeMy WebLinkAboutSDP201900049 Review Comments Final Site Plan and Comps. 2019-11-18 Albemarle County Service Authérity - Serving•Conserving November 18, 2019 Timmons Group Attn: Mr. Mitchell Bowser, P.E. 1001 Boulders Parkway, Suite 300 Richmond, Virginia 23225 Re: Berkmar Drive Apartments Dear Mr. Bowser: We have reviewed the plans entitled "Berkmar Drive Apartments," dated October 4, 2019. The following comments need to be addressed. General 1. A sewer upgrade agreement will be required prior to final approval. Refer to email from September 26, 2019 for a reference document. 2. Remove the following sheets from ACSA submission: C1.0-1.1, C4.1-4.6, C6.0- 6.2, C6..7-6.10, 00.1, L3.0-L6.0. Sheet C5.0 1. Move FHA's closer to roadway. 2. Maintain minimum 10 feet of separation between FHA and FDC. The fire code calls out the maximum distance between a FHA and FDC to be 100 feet. 3. Remove stub out behind building 5. 4, Callout Manhole.1 and sewer segment 1_2 as privately owned. 5. Call out water Meter sizes. 6. Relocate valves, as shown on plan set. - 7. Install stub out by Building 9, as shown on plans. Consider extending water main. beyond curb and gutter for possible future connections. 8. Water and .sewer mains will not be permitted under the retaining wall or in the foot of the retention pond. Looking at the County GIS, there is no stream buffer shown in this area. You will want to confirm this is true.. Another option is to check with the County if there is a waiver to disturb the wetlands for public utilities. 9. The lateral from the Clubhouse will need to enter Manhole 5 at equal or greater than 90 degrees from the invert out. 10.Move sewer out of proposed parking spots. Sheet C5.1 1. Call out 2"threaded plug for service lines, rather than 4x2 reducer. 168 Spotnap Road • Charlottesville,VA 22911 • Tel (434) 977-4511 • Fax(434) 979-0698 www.serviceauthority.org Sheet C5.2 1. Water main on adjacent parcel has been installed. Show water main connection on Inset 1-2. Reflect this change on utility plan sheets. Sheet C5.5 and 5.6 1. Call out drop connections as external drops. Include external drop connection detail if not already there. Sheet 5.7 and 5.8 1. Have water mains crossing on top of storm pipe. If you have any questions concerning this review, feel free to call me at (434) 977-4511, Ext. 113. Sincerely, Richard Nelson Civil Engineer RN/dbh 050601 BerkmarDriveApartn entsComments2111819