VSMP Permit Plan Review
Project title: Old Trail Village — Block 7C
Project file number: WP0202100024
Plan preparer: Timmons Group [Jeremy.Fox@timmons.com]
Owner or rep.: Dave Brockman [Dave@oltrailvillage.com]
Plan received date: 26 April 2021
Date of comments: 27 May 2021
Reviewer: Emily Cox
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296 -583 2
WWW.ALBEMARLE.ORG
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is
denied/approved. The rationale is given in the comments below. The VSMP application content
requirements can be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Please provide an updated coverage map for the Old Trail DEQ CGP. If this area is not
already included, please provide an updated registration statement with the added area.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. PPP was not provided. Please provide a PPP to insert into the master Old Trail SWPPP.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is denied, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-
403.
1. Please put WP0202100024 on the cover sheet.
2. [Cover sheet] Please insert the total disturbance. It currently says #### acres.
3. Please remove sheets that do not apply to the WPO, such as 1.1-1.3.
4. Please provide previous approval or special exception for the proposed lots to be within
the 100 ft buffer.
5. Please provide mitigation plan for disturbance to the buffer for the storm outfall or show
where the disturbance has already been mitigated/accounted for in the master plan.
6. Please specify where roof drains will outlet or tie-in to storm system.
Engineering Review Comments
Page 2 of 4
7. Proposed storm easement must be public since it is collecting runoff from the public
street, Orion Lane.
8. Please show how this proposed plan complies with the master stormwater plan. For
example, show overall proposed CN or total impervious area. (CN 77.7 and 52.7%
impervious was approved for area 51 B-2). This plan shows a CN of 85.
9. The master plan shows this pipe. However, it appears this plan removes it. Please clarify:
10. Please show proposed permanent outlet protection for structure 300.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. [Sheet C3.0] The stormwater runoff note appears to be incorrect. Please ensure all notes
are updated and are project specific.
2. Is the Lindy Bain loop to remain open during construction? If so, please provide plans to
ensure pedestrian safety.
3. Does the Lindy Bain loop have an easement? If so, please show the easement as well as
the DB & PG.
4. [Sheet C3.1] Please provide the paved wash rack detail from page 8 of the county design
standards manual: httos://www.albemarle.org/Home/ShowDocument?id=270
5. Ensure there is a place for wash water from construction entrance wash rack to drain.
6. Please show the existing managed slopes as shown on county GIS.
7. Slopes steeper than 3:1 must specify plantings that can withstand steep slopes. (one
example is behind lots 43 & 44).
8. Please provide sediment trap detail and calculations from VESCH 3.13. Ensure the
drainage area to the trap is clearly shown with the drainage divide line.
Engineering Review Comments
Page 3 of 4
9. Please show the total disturbed area (acreage) on all applicable sheets.
10. Soil types were not evident. Please ensure they are shown.
11. Please show a stockpile and staging area.
12. Is the site balanced? If not, please show cut/fill quantities.
13. Please ensure the existing 48" riser and pipe are protected from sediment.
14. Sediment trap embankment does not appear to comply with VESCH Plate 3.13-1.
15. It appears baffles are necessary in the sediment trap as the length to width is not 2:1.
The VSMP permit application and all plans may be resubmitted for approval when all comments
have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete
permit package with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a
meeting to discuss this review.
Process:
After approval, erosion and sediment control and stormwater management improvements must
be bonded. The bonding process begins when the plan is approved, and the applicant submits a
bond estimate request form and fee to the Department of Community Development. A plan
reviewer will prepare estimates and check parcel and easement information based on the
approved plans. The County's Management Analyst will prepare bond agreement forms, which
will need to be completed by the owner and submitted along with cash, certificates or sureties
for the amounts specified. The agreements will need to be approved and signed by the County
Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and
forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and
recorded. The County's Management Analyst or other staff will prepare the forms and check for
ownership and signature information. The completed forms will need to be submitted to the
County, who will record the agreement.
After bonding and agreements are complete, county staff enters project information in a DEQ
database for state application processing, if a DEQ permit is required. DEQ reviews the
application information based on local VSMP authority approval. At this time, the DEQ portion
of the application fees will need to be paid directly to the state. For fastest processing, this is
done electronically with the emails provided on the application. DEQ should notify applicants
with instructions on how to pay fees. When DEQ approves the application, they will issue a
permit coverage letter, which must be posted at the construction site.
Engineering Review Comments
Page 4 of 4
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction
conference. Applicants must complete the request for a pre -construction conference form and
pay the remainder of the application fee. The form identifies the contractor and responsible land
disturber, and the fee remaining to be paid. This will be checked by county staff, and upon
approval, a pre -construction conference will be scheduled with the County inspector. At the pre -
construction conference, should everything proceed satisfactorily, ajoint VSMP and grading
permit will be issued by the County so that work may begin.